1. brief narrative. 3. maintenance plan. 6. site development plan

Similar documents
Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

City of Shelbyville Site Inspection Checklist

Outlet stabilization structure

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Stormwater/Wetland Pond Construction Inspection Checklist

STORMWATER MANAGEMENT CHECKLIST

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Riprap-lined Swale (RS)

Table 4.9 Storm Drain Inlet Protetion Applicable for

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Emergency Spillways (Sediment basins)

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Block and Gravel Inlet Protection (BIP)

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Storm Drain Inlet Protection - IP

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

CHAPTER 5 OPEN CHANNEL HYDROLOGY

CITY UTILITIES DESIGN STANDARDS MANUAL

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

City of Beaumont, Texas Grading Permit Information

Local Road Assessment and Improvement Drainage Manual

How To Assess An Area For Erosion

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Annual Standards and Specifications. Erosion and Sediment Control

Understanding Erosion. Revised Universal Soil Loss Equation

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Prattsville Berm Removal Project. 1.0 Project Location

Storm Drain Inlet Protection for Construction Sites (1060)

Architectural Processing and Inspections for Home Mortgage Insurance

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

D R A F T. Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre. May 2014

Beseck Switching Station Inspection

Activity Yes No N/A Notes

Storm Drain Inlet Protection for Construction Sites (1060)

Erosion Control Blanket (ECB)

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Vehicle Tracking Control (VTC)

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

Basic Hydrology. Time of Concentration Methodology

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

Topic 8: Open Channel Flow

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Chapter 11 Site Rehabilitation and Stabilization

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

SE-10 STORM DRAIN INLET PROTECTION. Objectives

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION

STORM DRAINS CHAPTER 7

Construction Phasing/Sequencing (CPS)

Erosion Control and Stormwater Quality Field Guide

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

2012 Program Report. Agricultural Group Drainage Program

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES

URBAN DRAINAGE CRITERIA

Preventing Storm Water Pollution: What We Can Do

SECTION SITE PREPARATION

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

CODE OF PRACTICE - VOLUME TWO - TRAIN SYSTEM [CP2] TRANSADELAIDE INFRASTRUCTURE SERVICES. Issue: 2 Date: 26/09/08 Page: 1 of 21

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Underground Injection Control Storm Water Information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Structures Quantity Item Price $3,500 EA

SECTION EARTH MOVING

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

NJ Interception Drainage

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

SECTION 5. Sediment Control Measures

CHAPTER II - STORM DRAINAGE

SECTION STORM DRAINAGE TABLE OF CONTENTS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Definition of Tower from the Bradley County Zoning Resolution

Appendix C. Municipal Planning and Site Restoration Considerations

Permeable Pavement Construction Guide

Storm Drain Inlet Protection

Channel Stabilization with Basic Flow Calculations

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

WEST VIRGINIA EROSION AND SEDIMENT CONTROL FIELD MANUAL

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN

Vehicle Tracking Pad

CHAPTER 5. Storm Sewer

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

SECTION 5 - STORM DRAINS

Chapter 5: Drainage, Ditches, and Culverts

Transcription:

7

7 Attached is a sample erosion and sedimentation control plan based on one This sample plan was developed in detail for instructive purposes. The should select the most practical and effective practices to control erosion and formation should be included to facilitate review by erosion control personnel. Construction details should be precise and clear for use by an experience 1. brief narrative 3. maintenance plan 6. site development plan 7.1

7.2

SAMPLE EROSION AND SEDIMENTATION CONTROL PLAN ABC INDUSTRIES, INC. DEAL, N.C. SEPTEMBER 1988 TABLE OF CONTENTS Page Narrative................................. 7.4 Construction Schedule........................... 7.8 Maintenance Plan.............................. 7.9 Vicinity Map................................ 7.9 Site Topographic Map......................... Exhibit 1 Site Development Plan........................ Exhibit 2 Site Erosion and Sedimentation Control Plan............. Exhibit 3.......... 7.11 Vegetation Plan.............................. 7.30 Supporting Calculations.......................... 7.33 Financial Responsibility/Ownership Form.................. 7.51 Checklist................................. 7.53 7.3

NARRATIVE Project Description with associated paved roads and parking area. Another building will be added in the Road (see Vicinity Map). Site Description Adjacent Property Land use in the vicinity is commercial/industrial. The land immediately to the are undeveloped and heavily wooded, primarily in volunteer pine. Hocutt Creek, the perennial stream. Sediment control measures will be taken to prevent damage to Hocutt construction area. Soils The soil in the project area is mapped as Creedmore sandy loam in B and C slope classes. Creedmoor soils are considered moderately well to somewhat poorly drained in the subsoil. events. No groundwater problem is expected. The tight clay in the subsoil will make 7.4

Planned Erosion and Sedimentation Control Practices 1. NOTE: The undisturbed areas to the east and north could have been diverted, but this was not proposed because it would have required clearing to the property line to build the diversion and the required supporting calculations. 2. Temporary Gravel Construction Entrance/E 3. A temporary block and gravel drop inlet protection device will be installed at NOTE: The presence 4. NOTE: to break up this long, potentially erosive slope should the grading operation be temporarily discontinued. A temporary diversion will be constructed along supporting calculations. 5. 7.5

7. will be located on the higher cut areas, and the access road and open landscaped placed in layers not to exceed 9 inches in depth and compacted. (NOTE: Fills sedimentation control plan.) 8. road ditch and channel number 3 to protect the road ditch. Approximately 2 9. 10. Permanent sod drop inlet protection will replace the temporary block and gravel 7.6

structure when the contributing drainage area has been permanently seeded and 11. Buildings A and B to collect and convey site water to the project s sediment calculations. channel to prevent channel siltation. 12. calculations. 13. 14. 15. The 3:1 cut slopes will be lightly roughened by disking just prior to vegetating, reached. it will be controlled by sprinkling. 7.7

CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. construction. 5. Install storm drain with block and gravel inlet protection at construction entrance/exit. 7. Construct temporary diversions above proposed building sites. Install level spreader and sediment trap and vegetate disturbed areas. 10. Rough grade site, stockpile topsoil, construct channels, install culverts and 11. Finish the slopes around buildings as soon as rough grading is complete. Leave vegetate, landscape, and mulch. 15. Install riprap outlet channel and extend riprap to pipe outlet under entrance road. vegetation on the disturbed areas. 7.8

MAINTENANCE PLAN once every week. Any needed repairs will be made immediately to maintain all practices as designed. sediment pool no longer drains properly. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. maintain a barrier. vegetative cover. 7.9

7.10

7.11

7.12

7.13

7.14

7.15

7.16

7.17

7.18

7.19

7.20

7.21

7.22

7.23

7.24

7.25

7.26

7.27

7.28

7.29

VEGETATIVE PLAN Seedbed Preparation (SP) seedings) roots, large clods and other debris to remain on the slope. the slope. 3) Spread lime evenly over slopes at rates recommended by soil tests. contour. 3) Loosen the subgrade immediately prior to spreading topsoil by disking or 1) Remove rocks and debris. tiller. 7.30

Seeding Methods (SM) 2 1) Broadcast seed at the recommended rate with a cyclone seeder, drop spreader, or cultipacker seeder. 2) Rake seed into the soil and lightly pack to establish good contact. Mulch (MU) 2 grain straw, cover 2 2 (4,000 lb/acre) grain straw and tack with 0.1 gal/yd 2 2 ). Install excelsior mat in the channel, extend up the channel banks to the 2 grain straw and anchor with 0.1 gal/yd 2 2 ) asphalt. Maintenance (MA) desired. 2 2 ). Mow regularly to 2 7.31

TABLE 1: VEGETATIVE PLAN 1 Area No. 2 Description Season 3 1 Steep slopes maintenance 2 maintenance 3 Grassed channels with side slopes 3:1 4 maintenance areas 5 Areas requiring less than 1 year Spring or Summer German millet 40 Winter Rye grain 120 Seeding Method Mulch Seeding Mixture Seedbed Permanent Temporary Preparation lb/ac lb/ac Bahiagrass 25 Rye grain 40 Maintenance Spring Rye grain 120 Summer German millet 40 Fall Winter Rye grain 120 Spring Rye grain 40 Summer German millet 10 Spring or Fall Bahiagrass 25 Rye grain 40 Summer Bermudagrass 15 German millet 10 Winter Rye grain 120 Spring Rye grain 120 Summer German millet 40 Fall & Winter Rye grain 120 1 2 Area numbers are designated on map. 3 Notes Permanent mixture also areas (4). Overseed winter plantings complete. increase rate to 250 lb/ac. Temp. seeding For temporary seeding 5 below. temporary diversions. Treat temporary maintenance, permanent (area 4) Include topsoil stockpiles here 7.32

SUPPORTING CALCULATIONS RUNOFF CALCULATIONS Method: Peak Discharge Method SCS Technical Release No. 55, Urban Hydrology NOTE: Other acceptable methods such as Rational Method may also be used. Calculate peak runoff rate for site during development--design point outlet at northwest property corner. 1) Site location: South Granville County construction area at outlet in N.W. corner land. 1. Weighted curve number (CN) (Table 8.03b) Land Use Percent CN Product Newly graded 93 58.13 good cover 37.5 70 100.0 84.38 Weighted CN = 84.38, use 85. 4. Calculate Peak Discharge Rate be made. Q 2,24 Q 10,24 7.33

(Exhibit 4). (Table 8.03d): Q 2,24 Q 10,24 and open land. 10,24 TotalQ 10,24 7.34

SEDIMENT BASIN DESIGN 10,24. 10,24 2. Determine basin volume: 3 3. 2 ) 3 ) 338 339 340 341 342 343 3200 5400 9000 11400 13300 0.5 1.5 2.5 3.5 4.5 5.5 800 5,100 12,300 32,100 44,450 3 requirement. Q min NOTE operation. Q pipe Determine riser requirement. From Figure 8.07b, riser: 21 in. diameter riser = 17 riser > Q pipe 7.35

5. Emergency Spillway Design a) Capacity Q e = Q 10,24 p Q e NOTE H p c) Antiseep collars 2 3 = 1078 lb 4 Use concrete 1 3 or approx. 1/2 yd 3 = 1140 lbs. 1 7. Dewatering the basin: 9. Embankment design: grading to 344.5 at abutments. slopes. 7.36

GRASS LINED CHANNELS Procedure given in Appendices 8.05 used in design. 1. Channel #1 in dimensions, grade, and appearance the upper reach will not be designed Area = 1.9 acre Q 10,24 For design purpose Q 10,24 c) Proposed vegetation: Tall Fescue d) Soil: Creedmore (easily erodible) e) Permissible velocity: (V p V p 2 Z = 3 A = bd + Zd 2 2 +1 An iterative solution using Figure 8.05c to relate hydraulic radius depth velocities. 7.37

2 ) n Comments V<V p 10, too 0.8 4.32 0.54 0.043 3.25 14.0 small, try deeper channel 0.9 5.13 0.59 0.042 3.53 18.1 V<V p 10 2 ) V t n Comments 1.5 11.25 0.90 3.0 0.08 2.5 reduce trial V 2.0 0.11 1.8 0.12 18.4 Q>Q 10 construction. This reduces the contributing drainage area when evaluating Area = 1.4 acre V p Q 2,24 2,24 2,24 Using Manning s equation: b 2 ) Comments 3 0.40 5.53 0.304 8.00 Q > Q 2 V >V p, needs protection 2 3 ) 2 d = 1.45 (Table 8.05g) 7.38

b 2 ) 2 ) Comments 3 2.88 0.42 10.3 0.75 T<T d Q>Q 2 where T d = allowable shear stress Channel Summary: Temporary liner: straw with net 2. Channel #3 construction because diversion may be removed when construction is complete. Q 10,24 c) Proposed vegetative cover: Tall Fescue d) Soil: Creedmore (easily erodible) By the same method as channel #1: Description 2 ) Q (cps) Comments cut (D) 3.0 1.2 7.42 0.748 2.7 21.1 Q > Q 10, V < V p uncut (B) 3.0 1.7 13.77 1.00 1.0 13.8 Q > Q 10 h) Evaluate Temporary Liner Requirements: channel will be protected by a temporary diversion, the drainage area 2,24 = 3.7 A 2 ) Comments 0.32 1.27 0.25 Q>Q 2, V>V p, needs protection liner. i. Calculate shear stress in channel at depth associated with Q 2,24. 2 net will 7.39

Channel #3 Summary: Temporary liner: straw with net 3. Channel #2 Area = 0.8 acres Q 10,24 Because diversion will protect entire channel during construction, overland 2,24 Q 10,24 c) Proposed vegetative cover = Tall Fescue d) Soil: Creedmore (easily erodible) Description d 2 ) Comments cut (D) 2.0 1.0 5.00 14.5 2.90 Q > Q 10, V < V p uncut (B) 2.0 1.4 0.80 8.19 0.94 Q > Q 10 h) Evaluate temporary liner requirements: Not necessary, negligible Q 2 Channel #2 Summary: Temporary liner: none required. establishment. However, since all other channels need temporary liner (mulch 4. Channel #4 Area = 0.75 acre Q 10,24 d) Soil: Creedmore (easily erodible) 7.40

By same method as channel #1: Description 2 ) R Q (cps) Comments cut (D) 2.0 1.00 5.00 1.95 9.75 Q>Q 10, V p uncut (B) 2.0 1.7 12.1 0.95 7.3 Q>Q 10 h) Evaluate temporary liner requirements: Q 2,24 2 ) Comments 0.35 1.07 0.25 3.10 3.32 Q>Q 2, V>V p, needs protection 2,24 conditions. 2 seeding, and will be consistent with channels #1 and #3. Temporary liner: straw with net 1 NOTE other channels even though design only requires a 2.0 bottom width. RIPRAP CHANNELS Area = 3.74 acres Q 10,24 Channels Q 10,24 2 1 4 10,24 7.41

c) Proposed liner: riprap d Channel dimensions: 2 ) n S 1.2 10.1 0.044 77.3 e) Determine riprap requirements 3 ) Since T d 50, = 12 in. From Table 8.05g T d 2 ) 2 ) Comment 8 1.2 12.48 0.93 72.3 4.5 Q>Q 10, T<T d Since the side slopes are steeper than 3:1, the d 50 must be adjusted: 0.78. 50 = 2 = 0.74. Adjustment: d 50 = d 50 1 2 max = 1.5 x d 50 below 1.5 x d max Outlet Stability Evaluation: 7.42

CULVERT DESIGNS Q 25 Slope (S o Culvert type: RCP Groove end headwall n = 0.012 n = 0.07 Channel slope (S o Tailwater (TW 25 2) Culvert #1 under road to parking lot Q 25 Slope (S o Culvert type: RCP Groove end headwall n = 0.012 Tailwater (TW 25 culvert. 7.43

3) Culvert #3 under entrance road Q 25 Slope (S o Culvert type: RCP Groove end headwall n = 0.012 Tailwater (TW 25 culvert. 1 NOTE 7.44

7.45

7.46

7.47

RIPRAP OUTLET PROTECTION Q Design Pipe diameter = 15 inches d 50 d max = 1.5 x d 50 max = 9 inches = Use 1.0 culvert #2) Q Design Pipe diameter = 30 inches d 50 d max = 1.5 x d max = 9 inches max Q Design Pipe diameter = 24 inches basin. Use Class B erosion control stone or D.O.T. class 2 riprap. (Same as riprap channel) NOTE movement. SEDIMENT TRAP 7.48

c) Trap capacity: 3 3 allows the pool to drain. 3 d) Embankment: abutments e) Stone outlet section: Side slopes: 2:1 and 21 inches thick 50 = 9 inches, d max TEMPORARY DIVERSIONS Diversion #1 Diversion #2 Drainage area: 1.8 acres Land use: woods Soil hydrology group: C Q 10,24 2 Q A Q A >Q 10,24 selected cross section is ok Drainage area: 1.2 acres Land use: woods Soil hydrologic group: C Q 10,24 7.49

Use same minimum cross section as diversion #1. 2 Q A Q A >Q 10,24 selected cross section is ok 7.50

7.51

7.52

7.53