LIFE-Nature project The Danube-Ybbs Confluence Fishway at the Melk power plant on the Danube

Similar documents
Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Rapid Assessment of proposed Hydropower Plants on Drin River near Ashta (south of Shkodra)

Howsham fish passage Consultation document

Background Information: The Mamquam River Floodplain Restoration Project

Penticton Creek May 4, 2015 Council Meeting

Advice note. Linking River and Floodplain Management

Green Infrastructure Case Study Template

2016 Outlook and Management -Pre-season outlook / expectations and early indications - General overview of in-season management approach

Prepared By: Eric Chamberlain

Year Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Nipigon Bay. Area of Concern Status of Beneficial Use Impairments September 2010

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage

RECALLING Paragraph b of Article 13 of the Convention on the Protection of the Marine Environment of the Baltic Sea Area, 1974 (Helsinki Convention),

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

Seminário Sociedade Civil, Empresas e Biodiversidade Fundação Calouste Gulbenkian 26 de Setembro de 2007

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.

Gold Ray Dam Interagency Technical Team Meeting

How To Write A Watercourse Crossing

BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT

Decision Support Tools for the Columbia Basin from the BC Breeding Bird Atlas Final Report Project # W-F14-18

Return to the River: Baikie Island Backchannels Phase 2 Implementation Project # 05.Ca.03

May 29, Mr. Tom Howard Executive Director State Water Resources Control Board P.O. Box 100 Sacramento, CA

Establishing large-scale trans-boundaries MPA networks: the OSPAR example in North-East Atlantic

Addendum D. Nomination of Moody Wash ACEC

Monitoring the Benefits of Instream Habitat Diversity. Entiat River, Chelan County, Washington

Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties

Skaguay Reservoir. FISH SURVEY AND MANAGEMENT DATA Greg A. Policky - Aquatic Biologist (Salida) greg.policky@state.co.

COUNTRY NOTE ON NATIONAL FISHERIES MANAGEMENT SYSTEMS -- GERMANY

ANNUAL REPORT UNALIENATED CROWN LAND WEED CONTROL TASMAN-NELSON DISTRICT

RESTORATION & REVITALIZATION

Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body

Steelhead Recovery in San Juan and Trabuco Creeks Watershed

The controversy over the planned deepening of the Elbe River (Germany)

AN INITIATIVE TO IMPROVE

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE

Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park LIFE05 NAT/RO/000155

Floodplain restoration to improve green infrastructures and address multiple management objectives in an urban context: the case study of the Lobau

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

Everland Zoological Gardens. October 10, 2014

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN

Urban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.

CHAPTER 2: APPROACH AND METHODS APPROACH

American Forest Foundation (AFF) Standards of Sustainability for Forest Certification

Upper Pitt River Water Power Project Project Description Appendix I - Photographs

STUDY PERFORMANCE REPORT. Job 1. Title: Design study to evaluate performance and survival of Michigan and Skamaniastrain

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

Proposal to the Trinity Adaptive Management Working Group (TAMWG)

agricultural economy agriculture CALIFORNIA EDUCATION AND THE ENVIRONMENT INITIATIVE I Unit I Cultivating California I Word Wall Cards 426WWC

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

These pages build on Units 2B & C and introduce predator-prey relationships and food chains.

Michigan Wetlands. Department of Environmental Quality

Publish your animal exhibits in the Gallery

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

BIOMURA - Conservation of biodiversity of the Mura river in Slovenia LIFE06 NAT/SI/000066

Nechako Fisheries Compensation Program. Annual Report. Executive Summary of Activities in and Proposed Work Program for

The River Ribble is one of the longest rivers in the North West of England

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

October 11, Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA

Comment Invited on Proposal to Protect the Bristol Bay Watershed

Pöyry renewable energy. Energy through small hydropower

Using Aerial Photography to Measure Habitat Changes. Method

Laida Beach Dune System Development

Frequently Asked Questions (FAQs) on Hydropower

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant.

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

Facts on biodiversity

Sample Micro Hydro Initial Report

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Protected Area Categories and Management Objectives

Sand and Silt Removal from Salmonid Streams

Integration of Forestry & Wildlife Management

Techniques and Tools for Monitoring Wildlife on Small Woodlands

A Reconnaissance Survey Of Le Moray Lake #3

Geography. Curriculum Glance Cards

Coastal Monitoring Program for Salmon and Steelhead

Aiding the Hydro-scheme development process. Web-links to useful information sources

Hydropower Case Studies and Good Practice Examples

Austrian Energy Agency

Interpretive Elements

Engineering in the water environment: good practice guide. River crossings

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

The Effects of a Riparian Forest on Water Temperatures in the Restoration Area

Habitat rehabilitation for inland fisheries

Council CNL(12)27. Annual Report on Actions Taken Under Implementation Plans. EU Germany

EFB / Online Wetland Restoration Techniques Class Syllabus

High Conservation Value Forests 3.1. Old Growth Forests. Management & Monitoring Framework

Flood Risk Management

Flood Risk Management

AP ENVIRONMENTAL SCIENCE 2006 SCORING GUIDELINES. Question 4

Run-of-River Hydropower in BC A Citizen s Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

Importance of Wildlife

Transcription:

Publishing information: Published by: VERBUND Austrian Hydro Power AG Am Hof 6a 1010 Vienna www.verbund.at Editors: Thomas Kaufmann Helmut Wimmer Thomas Bauer Photography: Bauer/ Kaufmann (freiwasser), Haslinger, Frangez/IHG Layout and Design: freiwasser, Thomas Kaufmann This brochure is available: as a PDF in German, English and French, downloadable at www.life-donau-ybbs.at in printed form from VERBUND Austrian Hydro Power AG, Am Hof 6a, 1010 Vienna Compiled and printed with the assistance by the European Union through LIFE funding LIFE-Nature project The Danube-Ybbs Confluence 2004-2009 Fishway at the Melk power plant on the Danube www.life-donau-ybbs.at Photograph: Markus Haslinger, extremfotos.com

In brief LIFE is the European Union s funding instrument for environmental projects. The construction of a fishway at the Melk power plant on the Danube is a measure belonging to the Danube-Ybbs Confluence LIFE-Nature project. As a partner in the project, VERBUND Austrian Hydro Power AG constructed the fishway. The Lower Austrian Federal Hydro-Engineering Department, the project organiser, constructed the new mouth of the Ybbs. Besides the EU, the project organisers and the partner, the Lower Austrian Landscape Fund (NÖ Landschaftsfonds), the Ministry of Life and the Lower Austrian State Fisheries Association (NÖ Landesfischereiverband) helped finance the project. The Danube power plant No fishway was erected when the power plant went into operation in 1982. Such facilities were included in construction work only in the case of the Freudenau power plant. The Melk power plant is thus the first power plant on the Danube in Austria to have been retrofitted with a fishway. There is a difference of 12 metres between the water surface level upstream and downstream from the power plant. The second free-flowing course of the Danube in Austria, the Wachau region, is located downstream from the power plant. Obstructions interrupting the flow of the rivers are partly responsible for the decline in previously abundant fish stocks. Such obstructions include dams built as part of power plants.

Fishway? Fishways are designed to provide fish with a means of circumventing obstacles in the river. Various types exist, ranging from a technical fish pass to a nature-like bypass channel. Fish migrate along a river, for instance in order to travel from their summer habitat to their wintering grounds. Spawning migration is the term used to refer to groups of fish travelling to their spawning grounds. Today we know that every domestic fish species travels from one habitat to another over a greater or lesser distance. This is necessary for survival. Objective The purpose of the measure was to create for fish in the Danube a link between the Wachau section and the upper end or head of the reservoir. This is also where the Ybbs flows into the Danube. Like other Danube tributaries, the Ybbs is a destination for migrating fish, for instance during spawning. The fishway results in improved conditions for many fish species living in the Danube and the rivers belong to the Natura 2000 Lower Austrian Alpine Foothills Rivers region. Rare and endangered species are also benefiting from it. barbel The LIFE-Nature project has brought about significant improvements for the Danube. As such it has made a contribution to the implementation of the EU Water Framework Directive and the EU Fauna, Flora and Habitat Directive, as well as the directive on the conservation of wild birds. LIFE funding has been used for the conservation and development of habitats worthy of protection and for increasing the diversity of species within them.

Fishway at the Melk power plant on the Danube Photograph: Markus Haslinger, extremfotos.com

Construction Following extensive planning and issuing of approval by authorities, construction began on 8 August 2006. The facility went into operation on 5 March 2007 following a record construction period of only 7 months. Construction work began with rough excavation of the new channel, then bridges were erected as well as the flow-control structure. The river bed has been sealed with clay and lined with a layer of gravel. Rocks and branches provide improvements to the habitat. Construction work was completed by planting selected combinations of plants and about 5000 willow withes along the shore. Facts & Information The fishway is a newly created nature-like channel. It is 2 kilometres long and an average of 12 metres wide. It is the second fishway built at a power plant on the Danube in Austria. 60000 cubic metres of excavation material was moved during construction and the bed has been sealed with clay. The river bed has been enhanced using pebbles, rocks and wood. Construction was completed in only 7 months, and the facility went into operation on 5 March 2007. The fishway now makes the impression of already having been part of the landscape for a long time. For more information: - visit the project website - www.life-donau-ybbs.at - see the DVD (short films about the LIFE project are available on DVD) DVD available from: VERBUND Austrian Hydro Power AG, Am Hof 6a, 1010 Vienna

Monitoring Fish ecologists at the University of Natural Resources and Applied Life Sciences have been carrying out scientific research, or monitoring. Already in the first year following completion, varieties of fish, from the burbot to the sander, used the bypass river. In the meantime 40 species have been identified, among them 35 domestic ones. Their research has shown that even rare and endangered species are using the fishway. Reshaping the mouth of the Ybbs The Lower Austrian Federal Hydro-Engineering Department constructed the new mouth of the Ybbs. This phase was also part of the Danube-Ybbs Confluence LIFE project. A brochure describing the project is available from the Hydro-Engineering Department of the Lower Austrian State Government. The new mouth of the Ybbs river offers many varieties of plants and animals a suitable habitat. It enriches the Danube and Ybbs river landscapes. In the meantime it has become a habitat for many varieties of fish, including rare and endangered species such as zingel, streber and schraetzer. These have unusual names such as zingel, streber and schraetzer. zingel streber schraetzer Individuals of all sizes and at all stages of development belonging to the most important species to the Danube, the nase and barbel, have swum through the fishway. See brochure entitled Reshaping the mouth of the Ybbs : Lower Austria State Government Office, Hydro-Engineering Department Landhausplatz 1, 3109 St. Pölten