Introduction. Required Materials

Similar documents
GreenGuard Housewrap Installation Guide

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

How To Repair A Boat Landing Deck With A Boat Bed

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Article. Protecting the Building Envelope from Water Damage. MemBrain Smart Vapor Retarder & Air Barrier Film

Foundation. Foundation

Sun Windows General Information Sun New Construction Window Installation Instructions

HOW TO INSULATE CATHEDRAL CEILINGS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Tundra Series Windows January 2016

Fiberglas, Exterior Wall Thermal Insulation

2014 British Columbia Building Code Changes

What s Wrong with this Project? Report

DE Frame with C Series Sidelight

March 14, Installation of Bay, Bow and Garden Windows

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Evaluation Report CCMC R MemBrain

EcoTouch Insulation with PureFiber Technology

Window Installation Instructions

*Trademark of The Dow Chemical Company A business unit of The Dow Chemical Company and its subsidiaries Copyright 2003 The Dow Chemical Company.

INSTALLATION OF A BAY WINDOW

HOW TO INSULATE A CRAWLSPACE

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Clad Direct Glaze Window Installation Instructions

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Managing Trade Contractors for High Performance Homes. Carl Seville

DETAILED INSTALLATION GUIDE

Barewood Octagon and Elongated Windows Installation Instructions

Lightweight Partition Design for Residential and Commercial Buildings

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

solutions & tips six Wise Energy Guide Building envelope solutions and simple tips AIR SEALING

Window Sill Details for Effective Drainage of Water

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

PANELIZED HOME INSTALLATION GUIDELINE

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

The Optimum Basement Wall

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Avoiding Air Barrier Pitfalls

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Signs of insulation problems In the winter. In the summer. conditioning system

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

PART 1 GENERAL 1.1 SECTION INCLUDES

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

Residential Foundations and Basements

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

INSTALLATION INSTRUCTIONS FOR FIBER GLASS BATTS AND ROLLS

Brick Veneer Construction

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Comment Form on Proposed Gut Rehabilitation Alternatives

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Multi-layer Insulation Blanket for Roofs

Superform Products Ltd.

H-Stud Area Separation Wall System

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

WINDOW INSTALLATION GUIDE

Additions and Alterations

INSTALLATION INSTRUCTIONS FOR MINERAL FIBER BATTS

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Inspecting to a higher standard.

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

4 Installation Requirements

Electrical Wiring Technical Bulletin

AMERICAN GOTHIC PLAYHOUSE

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Renovating Your Basement

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Residential Single Family Houses Using Vinyl, Brick and Stone Claddings VERSION 10/13

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Gypsum Board Systems Manual

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

What You Need to Know About Wet-Spray Cellulose

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

2009 IECC Update. Scope. Content. International Energy Conservation Code

Selecting Energy-Efficient Windows

Asphalt Shingle Application Requirements

Basement Window Installation Guide Hopper and Sliding

Installation Instructions

DuPont Flashing Systems Installation Guidelines

Best Barns USA Assembly Book

ATTIC BYPASSES HOME ENERGY GUIDE

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

Housing Fact Sheets. Energy Saving Window Treatments

Typical Finished Basement Details

Mark Cramer Inspection Services, Inc.

How to Install UnderDeck The Original.

CertainTeed. Shaftliner For A rea Separation Firewalls

Fire Barrier Duct Wrap 15A

4 5/16 Subframe Installation

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

Transcription:

C e r t a i n Te e d Air Barrier Installation Instructions for Wood Framing

Introduction In addition to performing as an interior vapor retarder, MemBrain may be installed as a continuous, interior air barrier system over unfaced fiber glass or other insulation requiring a separate vapor/air barrier. MemBrain is recommended for interior vapor retarder and air barrier applications, located at the warm in winter (moderate to high heating climates) side of the building envelope. MemBrain sheeting is not intended for exterior applications where it would be exposed to the elements or UV light. Safety note: When installing MemBrain, make sure that you are wearing the appropriate personal protective equipment. The following items are recommended: safety goggles or glasses and gloves. Required Materials The following materials should be used to create the MemBrain Continuous Air Barrier & Smart Vapor Retarder System: MemBrain Continuous Air Barrier & Smart Vapor Retarder - Sheeting available in 8' 4", 9' 4", 10' 4" and 12' 4" widths, 100' lengths (2.44, 2.74, 3.05 and 3.66 mm widths, 30.48 m length) Approved /Caulk - Silicone-based sealants - Must conform to ASTM C920 or C834 specifications Approved Sheathing Tape - Canadian Construction Materials Centre (CCMC) evaluated or other code-approved sheathing tape. MemBrain Sheeting (Air Barrier/ Vapor Retarder) Wall Top Plate Cavity Insulation Vapor Permeable Exterior Air Barrier (Coordinate installation with the framing contractor) Rim Joist Wall Bottom Plate Figure 1: Maintain air barrier continuity at rim joists, corners, partition wall interfaces and ceilings. 2 CertainTeed Corporation, Building Science Department

System Overview and Summary MemBrain sheeting may be installed as an interior air barrier system. Install large sheets using recommended fasteners, tapes and sealants to achieve air barrier continuity with the building envelope components, as illustrated in Figure 1. Set-up and Site Preparation The most effective time to install the MemBrain Air Barrier System is: After all building envelope penetrations are complete (i.e., plumbing lines, electrical outlets, exhaust vents, lighting fixtures, etc.) and vertical penetrations through wall plates in cavities are appropriately sealed. After all windows and doors are installed, and rough opening gaps are sealed appropriately (i.e., with code-approved low expansion foam). After wall systems are insulated with unfaced fiber glass insulation. Before exterior walls and ceilings are finished with gypsum board. Roof/Attic/Ceiling Applications 1. Staple MemBrain to the bottom of ceiling joists every 12 to 24 inches. 2. Seal the film to interior and exterior wall top plates using recommended sealants. 3. Fasten the film using staples through the sealant to the plates every 12 to 24 inches. 4. Allow the film to overlap at the corners a minimum of 6 inches. Exterior Wall Applications 1. Start at a corner of the room where an interior partition wall or door jamb meets an insulated exterior wall. Lay the MemBrain roll on the floor, with the end touching the bottom of the partition wall or jamb. 2. Unroll MemBrain along the insulated wall, until the next corner is reached. Cut the film perpendicular to the insulated wall so that the overall length is about 8 to 12 inches longer than the wall. 3. With the 3-inch offset edge parallel with the top of the insulated wall, place one corner of the cut sheet at the top left or right corner of the wall. The factory-cut edge should be covering the top edge of the top sill plate. The cut edge of the sheet should wrap around the inside corner at least 4 inches. Ensure that the folded material is facing the room (the print across top header will be facing out). Anchor this corner with staples. 4. Apply recommended sealant over ceiling-overlapped film material at the top plate, to the frame around window and door rough openings and to the bottom plate (See MemBrain Air Barrier System Details on page 4 and Figure 17 on page 10). Working towards the opposite corner, pull the sheet tight, and staple the offset edge to the top sill plate through the sealant bead. Staples should be at least 12 to 24 inches apart. 5. After stapling to the opposite corner, allow the folded sheet to unfold to the floor. (See Figure 2) 6. Pull the sheet downward and staple through the sealant bead to the bottom sill plate. Then staple at 12- to 24-inch intervals along each stud. Effort should be made to minimize wrinkles along the stud surfaces to make drywall installation easier. 7. Follow the MemBrain Air Barrier System Details on page 4 to ensure an air-tight assembly. Top Edge of Offset Folded Film to Unfold into Room Figure 2: MemBrain sheeting orientation for wall installation method. www.certainteed.com 3

MemBrain Air Barrier System Details Acoustical and Silicone-based Application at Sheet Terminations Figures 3 and 4 Use a combination of staples and recommended sealants to attach MemBrain to the top plate, bottom plate and end studs. Place a 1/4-inch to 3/8-inch bead of sealant over the stud surface. Place the film over the sealant without tension and lightly press to ensure complete contact. Secure the MemBrain sheet through the adhesive bead with 1/2-inch staples every 12 to 24 inches. Lapped Joint Treatment Figure 5 Apply a recommended sealant to the wood stud surface. Overlap the MemBrain sheet a minimum of 6 inches. Staple through the sealant to the studs every 6 to 12 inches. Seal the overlapped joint using recommended sheathing tape. All vertical and horizontal seams should be treated as described above. Bead (1/4 to 3/8 inch) Wood Stud Wood Stud 1/2-inch Staple Figure 3: application. Figure 4: Fastener application. MemBrain Wood Stud Recommended Sheathing Tape Acoustical or Silicone-based (ASTM C920 or C834) 1/2-inch Staple (6 to 12 inch Spacing) Figure 5: Overlapping seam treatment. 4 CertainTeed Corporation, Building Science Department

Penetrations Figures 6 through 11 Building envelope penetrations include windows, doors, dryer vents, bathroom exhaust fans, electrical outlets, gas lines, plumbing, etc. (See Figure 6.) Cut and fit the MemBrain sheeting tightly around the penetrations. (See Figure 7.) Seal the film around all electrical, HVAC and plumbing penetrations with recommended sealants or sheathing tapes. Exhaust Vents Chimneys Plumbing Penetrations Windows Electrical Outlets Figure 6: Building envelope penetrations. www.certainteed.com 5

Window and Door Treatment Figures 7 through 10 Cut the MemBrain sheet to fit the rough opening. Slit the film at the corners. (See Figure 7.) Apply recommended sealant between the film and the window frame. Staple through the sealant to the window head, jambs and sill. Seal the window to the rough opening with recommended sealant. (See Figure 8.) Apply recommended sealant between interior finishing material (typically gypsum board) and the attached MemBrain sheet. (See Figure 9.) Wood Stud MemBrain Sheeting Junction Box Window Rough Opening Electrical Outlet Figure 7: Cut MemBrain sheeting to tightly fit penetrations. Window Head MemBrain Sheeting Gypsum Board Window Jamb Wrap to inside of frame, slit at corners, fold and staple to rough opening Window Window Sill Apply sealant between MemBrain Sheeting, window frame and gypsum board Figure 8: Window rough-opening treatment. Figure 9: Window finish treatment. 6 CertainTeed Corporation, Building Science Department

Large Circular Penetrations Figures 10 and 11 Trace the penetration circumference on a separate piece of MemBrain sheeting. Cut a square piece of film with a minimum 6-inch clearance from the penetration outline. Intersect the circle with four diameter lines. (See Figure 10.) Cut according to these lines towards the circle s perimeter. Place the square patch over the penetration. (See Figure 11.) Seal the cut edges to the penetration with recommended sheathing tape. Seal the square patch to the continuous sheet surface without film tension using recommended sheathing tape and lightly press to ensure complete contact. MemBrain Sheeting (Continuous) 6-inch Minimum Clearance MemBrain Recommended Sheathing Tape Square Patch Figure 10: Patch preparation. Figure 11: Patch attachment. MemBrain Sheet Tears and Holes Cover all tears and holes with recommended sheathing tape. Treat large holes (greater than 1 inch) like large penetrations using a square patch. www.certainteed.com 7

Electrical Outlets Figures 12 and 13 Wrap and seal electrical boxes using recommended sheathing tapes and sealants. Airtight plastic boxes are recommended. Airtight seal (Box gasket) Wire seal Seal MemBrain sheeting to outlet box using recommended sheathing tape Caulk wiring penetration at outlet box Seal MemBrain SVR Sheeting to outlet box using recommended sheathing tape Figure 12: Sealed interior electrical outlet. Figure 13: Airtight electrical outlet box. Plumbing Penetrations Figure 14 Secure plumbing lines to a rigid mounting panel. Seal penetrations using recommended sealants. Attach MemBrain sheeting to mounting panel using recommended sealants. Mounting Board Figure 14: Mounted and sealed plumbing penetrations. 8 CertainTeed Corporation, Building Science Department

Air Barrier System Continuity Figures 15-18 Maintain air barrier system continuity at wall, ceiling, floor and foundation intersections. Use recommended sealants. Seal between framing and film overlaps. Coordinate installation details with framing and insulation trade contractors. Insulate rim and band joists with fiber glass insulation batts wrapped or pillowed with MemBrain sheeting. Interior floor intersection (See Figure 17: Detail B) Interior partition wall intersection (See Figure 16: Detail A) Foundation wall intersection (See Figure 18: Detail C) Figure 15: Building envelope intersection locations. www.certainteed.com 9

Wood Stud Structural Sheathing Cavity Insulation Interior Partition Wall Framing Wall Bottom Plate Vapor Permeable Exterior Air Barrier Band Joist Floor Decking Figure 16: Detail A MemBrain Air Barrier System interior partition intersection details. Cavity Insulation Structural Sheathing Wall Bottom Plate Band Joist Vapor Permeable Exterior Air Barrier Wall Top Plates Cavity Insulation Floor Decking Floor Joist Pillowed Fiber Glass Insulation Batt Wall Stud Figure 17: Detail B MemBrain Air Barrier System interior floor intersection details. 10 CertainTeed Corporation, Building Science Department

Cavity Insulation Wall Bottom Plate Floor Decking Floor Joist Vapor Permeable Exterior Air Barrier Insulation Sheathing Structural Sheathing Pillowed Insulation Batt Rim Joist Sill Plate Foundation Cavity Insulation Figure 18: Detail C MemBrain Air Barrier System foundation wall intersection details. Recommended References CCMC Evaluation Report 13278-R Super Good Cents Builder s Field Guide to Energy Efficient Construction Chapter 9, Air Tightening Specialists, Bonneville Power Administration, Publication #DOE/BP-2651, 1992. Best Practice Guide, Building Technology Wood-frame Envelopes, Details: Wall Assembly A Basic Stud Wall with Polyethylene Air Barrier and Vapour Retarder, Canadian Mortgage and Housing Corporation (CMHC), pg. 7-3 to 7-9, 2006. Air Barrier Association of America, http://www.airbarrier.org www.certainteed.com 11

Insulation For every insulation challenge, there s a CertainTeed solution. CertaPro Commercial Insulation Machine Works Residential Sustainable Insulation Air and Moisture Management Spray Foam Insulation HVAC / Mechanical Premium Blow-in Insulation 2015 You can Be Certain no other manufacturer offers the depth and breadth of interior and exterior building solutions, knowledge, innovation and sustainability that CertainTeed does. Our advanced, multi-product solutions optimize building efficiency, while creating beautiful, comfortable environments where people can thrive. We continue to shape the future of the building materials industry with a new generation of integrated building solutions. That s confidence worth building on. ASK ABOUT ALL OF OUR OTHER CERTAINTEED PRODUCTS AND SYSTEMS: ROOFING SIDING TRIM DECKING RAILING FENCE GYPSUM CEILINGS INSULATION www.certainteed.com/insulation http://blog.certainteed.com CertainTeed Corporation P.O. Box 860 Valley Forge, PA 19482 Professional: 800-233-8990 Consumer: 800-782-8777 05/15 CertainTeed Corporation, Printed in the U.S.A. Code No. 30-28-137