Power Distribution Network Design for Automated Test Equipment

Similar documents
VICOR WHITE PAPER. The Sine Amplitude Converter Topology Provides Superior Efficiency and Power Density in Intermediate Bus Architecture Applications

Application Note AN:005. FPA Printed Circuit Board Layout Guidelines. Introduction Contents. The Importance of Board Layout

From 48 V direct to Intel VR12.0: Saving Big Data $500,000 per data center, per year

HIGH RELIABILITY POWER SUPPLY TESTING

DC/DC power modules basics

When the Power Fails: Designing for a Smart Meter s Last Gasp

High Efficiency Battery Charger using Power Components [1]

Increasing Data Center Efficiency by Using Improved High Density Power Distribution

Power Feeding Equipment for Optical Submarine Cable Systems

Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager

MOSFET TECHNOLOGY ADVANCES DC-DC CONVERTER EFFICIENCY FOR PROCESSOR POWER

Considerations When Specifying a DC Power Supply

AC-DC Converter Application Guidelines

Developments in Point of Load Regulation

Opportunity of Energy Saving in electrical path is lesser as compared to other areas

3-Phase Synchronous PWM Controller IC Provides an Integrated Solution for Intel VRM 9.0 Design Guidelines

ELECTRONIC POWER SYSTEMS

Accurate Point-of-Load Voltage Regulation Using Simple Adaptive Loop Feedback

Qualitative Analysis of Power Distribution Configurations for Data Centers

Evaluating AC Current Sensor Options for Power Delivery Systems

The Pros and Cons of Modular Systems

Overload Protection in a Dual-Corded Data Center Environment

400V DC Microgrid Small Scale Demo System for Telecom and Datacom Applications

Motherboard- based Servers versus ATCA- based Servers

DC Electronic Loads 8500 series

Article from Micrel. A new approach to the challenge of powering cellular M2M modems By Anthony Pele Senior Field Applications Engineer, Micrel

FIBER OPTIC APPLICATION IN A PROFIBUS NETWORK

A Short Discussion on Summing Busses and Summing Amplifiers By Fred Forssell Copyright 2001, by Forssell Technologies All Rights Reserved

Considering the effects of UPS operation with leading power factor loads

Energy Smart Data Center Phase-III R&D. Andrés Márquez. Pacific Northwest National Laboratory

HyPM Fuel Cell Power Modules

Datacenter Power Delivery Architectures : Efficiency and Annual Operating Costs

SuperIOr Controller. Digital Dynamics, Inc., 2014 All Rights Reserved. Patent Pending. Rev:

Number 1 in efficiency

Physical Infrastructure Management Solutions

Selecting the Optimum PCI Express Clock Source

Magnet field- and Radiation Tolerant New Power Supply System MARATON - Technical Overview. 22-Sep-03 1

Electrical Efficiency Modeling of Data Centers

An Integrator s Guide to MicroTCA Part III System management software

The Different Types of UPS Systems

Standards in Marine Power Systems. APEC 2014 Session IS2.1 Power Electronic Standards Roger Dougal University of South Carolina Columbia, SC 29208

Figure 1 FPGA Growth and Usage Trends

How To Calculate Total Cooling Requirements For Data Center

THE INPUT/OUTPUT SYSTEM. Key Points

SSPI-APPN OTES: PARALLEL C ONNECTIONS

Understanding SMD Power Inductors. Application Note. July 2011

Application Note AN-1135

high-performance computing so you can move your enterprise forward

PCB Layout Considerations for Non-Isolated Switching Power Supplies

Current Ripple Factor of a Buck Converter

Concepts in Communication Amplifier Redundancy Systems

GENERAL POWER SYSTEM WIRING PRACTICES APPLIED TO TECNADYNE DC BRUSHLESS MOTORS

Smart Data Center Solutions

User Manual. ATX12V / EPS12V Power Supply TG-I460R (460W+460W) TG-I550R (550W+550W) Switching Power Supply User Manual

National Semiconductor Power Products - Seminar 3 (LED Lighting)

Common Mode Choke Filtering Improves CMRR in Ethernet Transformer Applications. Application Note. June 2011

High Performance ZVS Buck Regulator Removes Barriers To Increased Power Throughput In Wide Input Range Point-Of-Load Applications

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

The Different Types of UPS Systems

TEP 200WIR Series, Watt

Shrinking a power supply and the challenge to maintain high reliability.

How Microsoft Designs its Cloud-Scale Servers

Nexus Technology Review -- Exhibit A

Data Center Trend: Distributed Power in the White Space

1+1 PROTECTION WITHOUT RELAYS USING IDT82V2044/48/48L & IDT82V2054/58/58L HITLESS PROTECTION SWITCHING

Simplifying System Design Using the CS4350 PLL DAC

Variable Frequency Drives - a Comparison of VSI versus LCI Systems

AC/DC Power Supply Reference Design. Advanced SMPS Applications using the dspic DSC SMPS Family

profile PC vs. PLC: key factors in comparing control options Drive & Control PC or PLC: Key Factors

AC vs DC Power Distribution for Data Centers

Avoiding Costs from Oversizing Data Center and Network Room Infrastructure

AN-3 SEVEN KEY CONSIDERATIONS BEFORE YOU START YOUR SLIC OR FXS PHONE LINE INTERFACE DESIGN

AC vs DC for Data Centers and Network Rooms

7-41 POWER FACTOR CORRECTION

650W Single Output Power Supply

DC GENERATOR THEORY. LIST the three conditions necessary to induce a voltage into a conductor.

Fiber Optic Selector Guide for Analog & Digital Data Links, Contact Closures & Multiplexers

LUXEON LEDs. Circuit Design and Layout Practices to Minimize Electrical Stress. Introduction. Scope LED PORTFOLIO

Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies

High Voltage Power Supplies for Analytical Instrumentation

TELECOM HF VHF UHF over IP

Non-Isolated Analog Voltage/Current Output module IC695ALG704 provides four configurable voltage or current output channels. Isolated +24 VDC Power

ABB Drives. User s Manual. Pulse Encoder Interface Module RTAC-01

Multi-Range Programmable DC Power Supplies 9115 Series

Temperature-Aware Design of Printed Circuit Boards

Microsoft s Open CloudServer

Health Care Solutions

Permissible ambient temperature Operation Storage, transport

Network Monitoring. Chu-Sing Yang. Department of Electrical Engineering National Cheng Kung University

Avoiding Costs from Oversizing Data Center and Network Room Infrastructure

Power supply output voltages are dropping with each

UNINTERRUPTIBLE POWER SUPPLIES >9900AUPS UNINTERRUPTIBLE POWER SUPPLIES

ABB Drives. User s Manual HTL Encoder Interface FEN-31

AC vs. DC Power Distribution for Data Centers

OPTICAL FIBER repeaters/ isolators

Temperature Sensors. Resistance Temperature Detectors (RTDs) Thermistors IC Temperature Sensors

Electrical Efficiency Modeling for Data Centers

Data Center Solutions

High-Efficiency AC Power Distribution for Data Centers

Managing Cooling Capacity & Redundancy In Data Centers Today

Transcription:

white paper Power Distribution Network Design for Automated Test Equipment Written by: Maurizio Salato Director, Systems Engineering December 2013 From Central Power to Distributed Power Architecture in ATE Automated Test Equipment (ATE) historically has been built with a centralized power architecture. Silver boxes provided a limited number of standardized voltage supplies, which were then routed to individual test cards. This arrangement was effective and convenient, as instrument card circuits did not require significant power levels: most voltages were linearly regulated from the closest available supply voltage, which was routed to each card from the centralized silver box power supply. Moreover, early DC-DC converters were expensive, bulky, noisy, and unfamiliar to power designers. As instrumentation card requirements grew in terms of count and diversification of channels and loads, distributed power architectures became a necessary choice. A simpler, central bulk power device supplied a single regulated higher DC voltage, typically 48 V, to a backplane distribution system. Test cards devoted some of their area to DC-DC converters, typically on their periphery, whose outputs closely matched the measurement circuits needs. Figure 1. Progression of ATE Power Distribution Architectures Over Time Central Power 2000 2002 2012 Distributed Power Factorized Power Silver boxes deliver few standard supply voltages to instruments cards Silver box delivers 48 V to instruments cards through a backplane distribution system Silver box delivers 400 V to instruments cards through a backplane distribution system ± 15 V ± 30 V 5V 3.3V Instrument Card 48 V Instrument Card DC-DC 48 V IBC Instrument Card 400 V IBC / FPA Instrument Card Test circuitry today requires more power to operate and voltage/current requirements span a wide range. At the same time, test instrumentations requires not just power, but also the ability to accurately and quickly modulate various voltage rails in order to completely characterize a DUT s analog partitions. The power system becomes a key portion of the ATE, driven by increasing performance and density of VLSI or SOC state-of-the art designs. The higher density, higher dynamic trend also is challenging at voltages in the 48 V range, as higher current requires larger copper cross section within densely populated boards. Some new concepts are being explored today, including Factorized Power Architecture and 400 VDC distribution. Next, we ll analyze how instrumentation cards and DUTs requirements affect the power distribution architecture within an ATE system, and the main design parameters that need to be considered to optimize the distribution network within an ATE rack, among various instrumentation cards and up to the measurement circuitry. vicorpower.com Applications Engineering: 800 927.9474 Page 1

Power Distribution Network Design Considerations As mentioned in the previous paragraph and shown in Figure 2, central power has been abandoned for quite some time and distributed power with backplane distribution approach is standard practice today. The telecom and datacom industries have been using this approach for a long time, and in many aspects face the same challenges as a modern ATE. Actually, a good portion of the silicon chips that ATEs need to verify and characterize are implemented in telecommunication systems, computing and routing systems that the telecom industry utilizes to move ever-increasing volumes of wired and wireless data around the world. The most striking similarity between the two worlds is the need for dense and granular power systems, although with different objectives: throughput and flexibility for ATEs, total-cost-of-ownership (TCO) for telecom and datacom systems. Bill of Materials Objective: To minimize bill of materials. Power distribution bill of materials are directly affected by one main parameter: backplane distribution voltage. The simple consideration of distribution losses should drive the trade-off in choosing copper cross section. The primary concern for ATEs would be avoiding thermal management issues; therefore, distribution losses should be maintained within a range easily manageable by the existing cooling system. Moreover, if instrument cards need to be hot-plugged, appropriate ORing devices should be installed on each card. Table 1 provides a guideline derived from telecom datacenter studies. While ATEs requiring more than 20 kw are restricted to ATE supporting high degrees of parallel test, it is clear that 48 V backplanes may no longer be the best choice, and 400 V backplanes with their lower currents are waiting to be exploited once 48 V will no longer suffice. Table 1. Transmissible Power vs. Distribution Voltage that Optimize Total-Cost-of- Ownership Backplane or Intermediate Distribution DC Voltage Optimal Power Range 12 V Up to 5 kw 48 V 4 kw to 20 kw 380 V Greater than 15 kw Operating Costs, Efficiency and Losses, Thermal Management Objective: To optimize the thermal management system by controlling distribution losses. Until this point we have focused on backplane distribution. While the management of thermals on the backplane is usually not very difficult, the instrument s card power system can be quite challenging to control. Moreover, power buses on instrument cards take up precious real-estate from the card itself. The most logical choice is therefore to distribute the backplane voltage on the card as close as possible to the actual load, which might be either the measurement circuitry or an on-board DC-DC converter. Obviously, if a low voltage backplane is used for example, 12 V the copper in the PCB would need to be not only properly sized, but also appropriately cooled. A less obvious aspect is the difficult to accurately compensate for DC (I2R) and AC (L di/dt) drops as current levels increase. Designers might need to oversize the converter s powertrains as well as add filtering and decoupling networks as power distribution voltages fall below 48 V. vicorpower.com Applications Engineering: 800 927.9474 Page 2

Operating Costs, Efficiency and Losses, Thermal Management Objective: Enabling the highest degree of flexibility in test card design and configuration. Instrument cards have an ever-increasing spectrum of loads to supply. Therefore, power systems with granular components provide significant advantages to the designer. An effective approach consists of adopting an intermediate bus architecture, where the backplane voltage is effectively reduced to a lower, intermediate bus voltage, then regulated via a standard synchronous-buck, point-of-load converter. Within the flexibility paradigm, re-use of a design has become a common choice to leverage standardization within a diverse power system. Designers can source and tailor a multiplicity of regulators from a set of valid designs to electrically fit the specific loads and place them as close as possible to the load themselves to maximize dynamic performance. Clusters of regulators would be supplied by a single intermediate bus and sustained by a bus converter. While good design practice would call for matching the bus converter power throughput with the downstream regulator s needs, constraints normally arise in effectively distributing the intermediate bus on board. At an intermediate bus voltage of 12 V, distributing even just 300 W means routing 25 A, which can be challenging on high-density designs. Figure 2. Normalized Power Distribution Losses vs. Power Distribution Voltage (Constant Copper Cross-section) Normalized Power Distribution Losses, Constant Copper Section 1200 1000 800 600 400 200 0 1003 63 1 12 48 380 Power Distribution Voltage (V) Reliability and Redundancy Objective: To achieve the highest degree of system availability through design for reliability and redundancy. The power distribution network is the spinal cord of complex equipment, powering measurement systems and DUTs. As an ATE lifespan is usually measured in decades, identifying and controlling critical components mean time between failure (MTBF) is necessary. This includes: Appropriate electrical and thermal de-rating: While de-rating is usually perceived as a means to reduce thermal stresses, current density also can contribute to failure mechanisms. One example is electro-migration on PCB traces. Redundancy: Critical components whose failure jeopardizes machine availability should be made redundant and provisions made for field replacement. vicorpower.com Applications Engineering: 800 927.9474 Page 3

Serviceability and Diagnostic Telemetry Objective: To enable the highest level of modularity and provide the system with on-line diagnostic options over system lifecycle. The backplane distribution approach is inherently highly flexible, allowing Hot-Swap of non-critical loads (like, for example, fans) that can be field replaced while the equipment is operating. However, the same level of flexibility should be planned on the other end of the distribution network, enabling easy access to the bulk power system. Diagnostics also becomes a critical aspect. It is necessary to identify and isolate components or subsystem issues quickly to protect the system from propagating failures. While almost impossible in the case of central power architecture, both distributed and Factorized Power Architectures provide a means to automate the power distribution network diagnostic. Distributed power architecture traditionally utilizes a margining technique, where the remote DC-DC converter is commanded a pre-set sequence and a dedicated feedback network verifies the obtained DC or AC dynamic. Modern power components and Factorized Power Architecture provide a simpler, digital interface where supervisory controls can actually poll status information in realtime via a common serial interface bus, typically I 2 C or UART. Noise Sources and Immunity Objective: To minimize EMC and EMI within the system, de-coupling the power distribution network to minimize conducted and radiated interference. EMC and EMI are usually perceived as the black magic of power design. However, a few basic rules generally apply. First, identify the noise source; and second, contain or filter the noise as close as possible to the source (assuming the noise cannot be avoided altogether). Unfortunately, the power distribution network is a good candidate for distributing conducted noise within the system as well as radiating noise around the system rack. It is therefore extremely important to implement proper filtering if not at individual DC-DC component level, at least on each instrument card, to avoid cross-talk through the backplane. A particularly insidious issue is the low-frequency noise generated on the backplane as well as intermediate buses. This is due to the input current interactions of various converters which then create low-frequency beats. Designers can try to avoid this issue by making sure that all the switching current components are sufficiently confined within each individual converter. vicorpower.com Applications Engineering: 800 927.9474 Page 4

Conclusion Power distribution network design is a challenge of state-of-the-art test systems. Several trade-offs exist and need to be carefully evaluated within the power system architecture of choice. While distributed power architecture from 48 V backplanes is today s common choice, advanced architectures like Factorized Power from 400 V DC distribution are becoming valuable, because they improve system density by offering higher efficiency and a higher level of granularity. Figure 3 shows an example of a standard two-stage design for point-of-load supply from 400 V DC distribution: on the left, a front-end module consisting of two 400 V bus converters (under the heat sinks, with a single module shown close to the paper clip); on top, a multi-phase Voltage Regulation Module (VRM) with classic 12 V buck converter approach. Figure 3. Point-of-Load Standard Solution Example from 380 V DC Distribution High Voltage Bus Converters Card (left) Single 400 V to 12 V Bus Converter Chip (middle, closest to paper clip) Standard Multi-phase Buck Converter (top right) The Power Behind Performance Rev 1.0 12/2013 vicorpower.com Applications Engineering: 800 927.9474 Page 5