Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Workplace Injury & Illness Prevention Program

CONFINED SPACE ENTRY WORK STANDARD

STANDARD PRACTICE INSTRUCTION

Confined Spaces. Notes

SAFETY AND HEALTH PROGRAM

Office of Research Facilities Development and Operations Contractor Safety Policy

Life Saving Rules. Working Safely at EPCOR

Millersville University - Office Of Environmental Health & Safety Scope & Application

Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.

Contractor Safety Management

FIRE PROTECTION AT CONSTRUCTION SITE

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Safety. Vopak Fundamentals on Safety

CONFINED SPACE POLICY

Confined or Restricted Spaces

OSHA Training Guidelines (An Unofficial Summary)

INTRODUCTION Purpose Policy Exception for Short-Term Workplace Visits Relevant Legislation and Regulations...

Sample Hazard Communication Program

Examination questions: Basic Elements of Safety

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Safe Operating Procedure

3053 Electrical Safety Training Program Course Outline

CSUCI Injury and Illness Prevention Program

Basic Safety Examination instructions

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.

HEALTH AND SAFETY REDUCING ACCIDENTS IN KITCHENS

tips How smallchangescan saveyou big, &

Confined Spaces Safe Working Practices

HOT WORK PERMIT PROCEDURES

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

CONTRACTOR CONTROL CONTRACTOR SELECTION STANDARDS FOR SAFE WORKING

Factory owners must ensure the boiler is:

Occupational Health and Safety Officer

Overhead Power Line Safety for Contractors

Regulation IO-6.0: Electrical Safety Regulations

VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO USE

You ve. life. ahead. you... So, safe. the of. job!

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE

Safety and Environmental Information for External Companies

Safety and Environmental Information for External Companies Koehler Oberkirch

Confined Space Training. Developed and Presented by: Scott Cole, CSP (440)

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Guidance on Lifting Operations in Construction When Using Excavators

HSE Requirements for Contractors

OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT PROGRAM FOR AGRICULTURE

TECHNICAL INFORMATION

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

Model Safety Program

Elevating Devices Mechanic Safety Training

FLA S FIRE SAFETY INITIATIVE

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

Contractor Environment, Health and Safety Management Plan

HOT WORK PERMIT PROGRAM TRAINING. John Braun

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

Rutherford County Workplace Injuries and Safety

Contractor Safety Management Program Document

GENERAL SPECIFICATIONS REHABILITATION RESIDENTIAL CONTRACTORS HANDBOOK

FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

SITE SPECIFIC FALL PROTECTION PLAN

OSHA Compliance Checklist ASC

68 Metal Industry Guidelines for Safe Work

AN OWNER S GUIDE FOR A CONTRACTOR HEALTH AND SAFETY MANAGEMENT PROGRAM

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

WORKPLACE SAFETY. Table 1: Industries with highest fatalities rates and types of highest fatal* / non fatal^ injuries

Health and Safety: A code of practice for Approved Contractors

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

SAFETY TRAINING CLASSES & SERVICES LIST

Notes. Material 1. Personal Protective Equipment 2.

What is a Confined Space. Confined Space Awareness 2002 Surveyor s Conference. What is a Confined Space. What is a Confined Space

Excavation & Trenching Procedure

WORKING GUIDE 1996 FROM HOME. WorkCover. Watching out for you. New South Wales Government

Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE

IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS

This Guidance Notes is prepared by the Occupational Safety and Health Branch, Labour Department. This edition July 2004

OCCUPATIONAL HEALTH AND SAFETY

HealthandSafetyOntario.ca. Introduction. Responsibilities. Health and Safety Policy

Health, Safety and Environmental Requirements for Vendors.

OSHA Office of Training and Education 1

Title: Confined Space Procedure

CONSTRUCTION SAFETY POLICY

Sample Hazard Communications Program for Spray Polyurethane Foam Applications

Facilities Maintenance Standards rev

1.0 Purpose Definitions Hot Work Operations. 5

Risk management a practical approach

Safety and Environmental Information for External Companies

810. Health and Safety Policy

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

Safety at Work Total s Golden Rules

SHE Standards. Safety, Health and Environmental Protection Standards

Transcription:

Institute for Plasma Research Permit to Work System and Its Implementation 01.01.2016 1 of 20

Accident is an unplanned, unforeseen event in which injury, loss of life, loss of property and/or damage to the environment may be there. Accidents may take place during maintenance job due to presence of chemicals, pressure, temperature, defective tools, oxygen deficiency, fall of a person, fall of objects, etc. To avoid such types of accidents, permit to work system needs to be followed. 2 of 20

It is a mandatory requirement to follow the Permit to work system as per section 87 (dangerous operation) of factory act and sub rule 20 of Rule 88(schedule-II) of Atomic Energy Factories Rules, 1996. 3 of 20

The sole aim of the permit to work system is to carry out critical works/jobs in a safe manner. The purpose of the Permit to work system is to identify hazards associated with a non-routine job, and to take precautions required to control each hazard identified. 4 of 20

At the end of this session you will be familiar with Permit to Work System and also jobs/works requiring Permit to Work. 5 of 20

A written document. Systematic work. Maintenance job can be completed comfortably and safely. Quality of work will be better. Work culture improves. Image of organization improves. Chances of accident is less. 6 of 20

Considering the Hazards & the level of Risks associated with the activities, following works require Permit to Work : Electrical Work Confined Space Entry Lifting Activities Working at Height Hot Work Excavation Work 7 of 20

Electrical Work: It includes, Repair/Maintenance/Testing, getting megger value in 132KV switch yard equipments like breakers, CTs, PTs, Isolators, 11 KV panels, etc. Repair/Maintenance of 11KV, 415 V main electrical panels, distribution panels, new cable connection, extension and commissioning of electrical panels, downstream feeders, loads, etc. Repair/Maintenance of Equipment which needs electrical isolation, i.e. street lighting, boundary wall lighting, watch tower lighting, borewell connections, etc., whenever necessary. Any electrification work which may require tagging/loto, etc. 8 of 20

Confined Space Entry: Confined space has limited or restricted means for entry and exit and it is not designed for continuous occupancy of workers/employees. e.g., work to be carried out inside vessel, machine, storage tank, cable trench, filter, etc. 9 of 20

Lifting Activities: Lifting Activities covers loading, unloading or lifting of materials/equipments/machinaries using cranes, chain pulley, slings, ropes, etc. 10 of 20

Working At Height: Working at height means work carried on height above 2 meter, a place where a person could be injured falling from the height. 11 of 20

Hot Work: Hot Work means the use of open flame, oxyacetylene burning, cutting, grinding, etc. and the use of spark or heat producing equipment in operational areas, 12 of 20

Excavation Work: Excavation means any cut, cavity or trench by manmade/machine-made in the earth s surface formed by earth removal. 13 of 20

14 of 20

Work permit form will be filled by the person to whom work permit to be issued. It must be filled in duplicate. Work permit is always issued to concerned personnel of IPR. Work permit never issued to any contractor. If the work is conducted by the Contractor then mention contractor s name and address on the work permit. Work permit is accepted by the Permittee. The permitee shall be the person who will carry out or under his/her supervision the work will be done. Work permit is authorized by concerned Group Leader/Division Head. Safety Check verified by respective Safety Co-ordinator or Safety Officer. 15 of 20

Secure necessary permit from the concerned group/division before commencement of work. Provide for and comply with all necessary precautionary measures stipulated in the permit. Ensure that all safety equipment are in good working condition and available at site prior to commencement of the work. Ensure safe working practice throughout the work by continuous supervision. Ensure that the permit is readily available at the work site for verification, as and when required. Maintain good housekeeping practice during the work. 16 of 20

Stipulate precautionary measures such as area preparation, blinding/isolation/tagging, provision of safety and fire protection equipments, standby personnel, etc. and ensure their compliance. Ensure that the facilities and the area in and around the work site where the permit is made safe prior to commencement and during the progress of the work. Ensure that PPEs are available at site before commencement of the work and the same is used by personnel while performing the work. After completion of the work, should thoroughly check the area for good housekeeping and safe working condition and then shall close the permit. Shall stop the work at any time, if he/she presumed that the work is being done in unsafe manner which may result injury or damage to the property. 17 of 20

Group Leader/Division Head may visit the site to confirm that the conditions of the permit can be met, may brief to the permit accepter, advise any other persons who may be affected and satisfy himself/herself that the work can proceed in a safe manner. When the work is going to continue beyond the valid date and time as mentioned in the permit, then GL/DH may visit the site again and authorize for continuation of the permit. Without authorization for continuation of work by GL/DH the work will not start. Shall stop the work at any time, if he/she presumed that the work is being done in unsafe manner which may result injury or damage to the property. 18 of 20

Safety Co-ordinator or Safety Officer must visit the site to confirm that the conditions of the permit can be met, may brief to the permit accepter, permitee, advise any other persons who may be affected and satisfy himself that the work can proceed in a safe manner. Follow up periodically the progress of the work and may stop the work at any time, if conditions become unsafe till the time safe conditions are restored. 19 of 20

Generally, permit to work shall be issued from sunrise to sunset. If work is allowed after sunset, then the site shall be revisited by GL/DH to asses and confirm that the permit condition have not changed and then renew/extend the permit. 20 of 20

A register must be maintained for completed permits and shall be retained by the permitee/safety coordinator/representative as nominated by respective group leader/division head for the one year. 21 of 20