HOT WORK PERMIT PROCEDURES
|
|
|
- Edward Green
- 9 years ago
- Views:
Transcription
1 COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February
2 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4 D. LIMITATIONS 4 E. OUTSIDE CONTRACTORS 4-5 F. FIRE SAFETY REQUIREMENTS 5 G.PRE-HOT WORK CHECK 6 F. HOT WORK PERMITS 6 2
3 HOT WORK PERMIT PROCEDURES A. PURPOSE: This program establishes the minimum safe working procedures and guidelines for the operation cutting, welding, brazing, grinding and soldering or any other similar operation throughout the Columbia University Medical Center. It also covers the control of ignition sources such as spark-producing tools and devices in hazardous areas. The program meets the basic requirements of the New York City Fire Department and federal regulations. B. SCOPE: These procedures are intended to protect life, health and property from fire and the products of combustion, which might result from the use of welding and cutting equipment, open flames and ignition sources. All employees of Columbia University Medical Center and outside contractors/sellers/service companies involved in the use of flame or spark-producing equipment on CUMC premises are required to conform to these guidelines. C. POLICIES AND PROCEDURES: It is the policy at CUMC that a Hot Work Permit shall be issued by the Facilities Operations before conducting any operation involving welding or cutting, or use of flame or spark-producing equipment in the areas not specifically designated for such use. Facilities Operations shall be notified in writing by the Project Manager or Contractor Supervisor at least 48 hours in advance of intended torch operation. A copy of these Hot Work Procedures shall be provided to the contractor at time of notification. The Hot Work Permit shall be valid for the day and the operation for which it is issued. Jobs requiring more than one day shall require a separate permit for each day's work. When means other than gas or electric arc cutting or welding could provide equal or superior work quality, the least hazardous means of performing the job should be used. In order to obtain a Hot Work Permit: 1. Torch operator must have a valid Certificate of Fitness (COF) from the New York City Fire Department for Torch Use of Flammable Gases for Cutting and Welding (G-95). 2. A Fire Guard/Fire Watch* must also be present and have a valid Certificate of Fitness (COF) from the New York City Fire Department for Fire Guard for Field Construction sites/fire Guard for Torch Operations (F-93) 3. Contractors must supply their own approved fire extinguisher, minimum 2-A:20-B:C rating (one 2½ gallon pressurized extinguisher or one10 lb. ABC dry chemical extinguisher). The contractor shall also provide proper personal protective equipment including applicable safety precautions, signage, barricades, etc. * A qualified Fire Guard/Fire Watch Person - holding a valid NYFD Certificate of Fitness, shall be on a continuous duty during torch operations. This person shall inspect the exposed areas to ensure the safety of the operation. The Fire Watch Person shall have proper fire extinguishing equipment and be trained in its use. Fire extinguisher shall be readily accessible within 30 ft. of location where hot work is performed. S/he shall inspect the area initially, at one-half hour after completion of work, followed-up by another inspection at one-half hour later, for the purpose of detecting fire. This person shall complete the final report and send a copy to Facilities Operations. 3
4 Facilities Operations shall develop appropriate standard operating procedures when required. They shall designate areas where a "standing" Hot Work Permit shall be in effect. These areas should be controlled by the Facilities Operations, and may include mechanical spaces, metal shops, and heating plants. Designated areas should be free of combustible materials, including stored materials and construction material components. A standing permit shall not be in effect in any areas where gaseous fuels, hazardous vapors and fumes from liquid fuels or other flammable/combustible liquids and gases may be present or there is a potential for accumulation. When welding and cutting is to be done in a location not designated for such purpose, e.g., stairwell, inspection and authorization by the Facilities Operations Supervisor shall be required before such an operation begins. When necessary, EH&S should be consulted. In confined spaces or other such hazardous areas, use of gas and electric arc welding or cutting equipment shall not be permitted until the Facilities Operations Supervisor has inspected the area. EH&S shall be consulted, if necessary. A separate confined space entry permit may be needed, when necessary. D. LIMITATIONS: A Hot Work Permit will be issued with the understanding that the contractor shall NOT perform such activities when: CUMC Facilities Management has not authorized to perform torch work in a given area. A qualified Fire Guard/Fire Watch person (COF holder) is not assigned during operation. Sprinkler protection is impaired. Appropriate fire extinguisher equipment is not readily available. Explosive, flammable or other hazardous vapors, gases or dusts may be present in the area. There is a potential for heat transfer along or through walls, pipes, tanks or other metal surfaces that may cause ignition or decomposition of ignitable or toxic substances in contact with the metal. There is potential for production of sparks, slag or molten metal by welding or cutting within 35 feet of unprotected combustible or flammable substances that may cause fire. The area is a confined space area without proper ventilation and if the operation could result in the accumulation of smoke and hazardous gases in that space. The person issuing the permit or the employee performing the work believes that the issuing of a permit would or could result in undue hazards of any nature. Proper signs and placards are not placed to inform people in the area. Proper engineering controls are not in place to prevent exposure to fumes of adjacent area occupants. Proper barriers are not in place to prevent people inadvertently entering into the area. Whenever a question arises pertaining to the advisability of issuing a permit to any party involved, work shall NOT begin until the Facilities Operations Supervisor has completed an on-site inspection and has concluded it is safe to proceed. E. OUTSIDE CONTRACTORS: All contractors involved in the use of flame or spark producing equipment at Columbia University Medical Center must have a copy of the Hot Work Permit and the signage posted when 4
5 working. Before starting work they must ensure to the Facilities Operations that they have trained personnel and qualified Fire Guards/Fire Watch Person on premises. The contractor must adhere to all applicable New York City Fire Department, Federal regulations and CUMC policy, and obtain the required city permits, when necessary, for such work. A copy of the contractor s written Hot Work Permit Procedures shall be available for EH&S review. F. FIRE SAFETY REQUIREMENTS (As per Section 2604 of FDNY Fire Code) Separation from combustibles. Hot work areas shall not be less than 35 feet from combustible materials and combustible waste or shall be provided with appropriate shielding to prevent sparks, slag or heat from igniting exposed combustibles. Openings. Openings or cracks in walls, floors, ducts or shafts within 35 feet of the hot work area shall be tightly covered (with non-combustible materials or sealed) to prevent the passage of sparks to adjacent combustible areas, or shielded by metal fire-resistant guards, or provided with curtains to prevent passage of sparks or slag. Housekeeping. Combustible waste shall not be allowed to accumulate on floors and other surfaces within the hot work area. Contractors working in hot work permitted areas must regularly clean and lawfully dispose of combustible waste. Partitions. Partitions segregating hot work areas from other areas of the building shall be of noncombustible construction. Partitions shall prevent the passage of sparks, slag, and heat from the hot work area. Precautions in hot work. Hot work shall not be performed on a container or equipment that contains or has contained flammable liquids, gases or solids until the container or equipment has been thoroughly cleaned, inerted or purged; except that hot tapping shall be allowed at bulk plants and terminals on tanks and piping when such work is conducted by competent personnel. Hot work involving cutting, welding or heating of any flammable solid in any form shall be conducted only with the approval of the commissioner. Sprinkler protection. Sprinkler system protection shall not be shut off or impaired while hot work is performed unless approved by the CUMC Facility Management or EH&S (Fire Safety). Where hot work is performed close to sprinklers, noncombustible barriers or damp cloth guards shall shield the individual sprinkler heads and shall be removed when the work is completed. If the work extends over several days, the shields shall be removed at the end of each workday. Construction sites and torch-applied roof systems. A Fire Guard shall be provided for each torch operation at a construction site and in connection with torch applied roofing system operations. A Fire Guard shall be provided for each torch in operation. An additional Fire Guard shall be provided on the floor or level below the torch operation 5
6 Fire detection systems. Approved special precautions shall be taken to avoid accidental operation of automatic fire detection systems. (See: Notice For Shut-Down of Fire Protection Systems) G. PRE-HOT WORK CHECK A pre-hot work check shall be conducted by the responsible person prior to work to ensure that all equipment is safe and hazards are recognized and protected. A report of the check shall be kept at the work site during the work and made available for inspection. The pre-hot work check shall be conducted at least once per day and shall verify the following: 1. Fire Guard personnel are present. 2. All persons performing hot work possess certificates of fitness. 3. Portable fire extinguishers are operable and available. 4. The hot work equipment is in good working order. 5. The hot work area is clear of combustibles and flammable solids or that such materials present in the area at a distance of 35 feet. 6. Exposed construction is of noncombustible materials or, if combustible, is protected. 7. Openings are protected. 8. Hot work area floors are clear of combustible waste accumulation. 9. Approved actions have been taken to prevent accidental activation of extinguishing and detection equipment in accordance with Notice of Shutdown Procedures H. HOT WORK PERMIT: The attached Hot Work Permit form shall be completed signed by the Facilities Operations Supervisor and the contractor. A signed copy shall be posted near the work site. Hot Work Permits will be maintained by Facilities Management for 48 hours from date of permit. 6
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
HOT WORK PERMIT PROGRAM TRAINING. John Braun
HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program
1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5
HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University
Safe Operating Procedure
Safe Operating Procedure (Revised 07/09) HOT WORK PERMIT OPERATIONS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) Authority In recognition of the
Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal
Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable
Spray Booth Guideline
Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that
FIRE PREVENTION PLAN
FIRE PREVENTION PLAN 1 FIRE PREVENTION PLAN OSHA s Fire Prevention Plan regulation, found at 29 CFR 1910.38(b) and 29 CFR 1926.24, requires Northern Clearing, Inc. to have a written fire prevention plan
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.
Process Safety Management of Highly Hazardous & Explosive Chemicals. Safe Work Practices
Process Safety Management of Highly Hazardous & Explosive Chemicals Safe Work Practices Safe Work Practices 1910.119(f)(1) The employer shall develop and implement safe work practices to provide for the
EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM
EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29CFR1910.36-29CFR1910.38-29CFR1910.157-29CFR1910.165 NFPA-10 BASIS: The OSHA Emergency Action Planning and the
FIRE DEPARTMENT CITY OF NEW YORK STUDY MATERIAL FOR THE CONSOLIDATED EXAMINATION F-60 FOR FIRE GUARD FOR TORCH OPERATIONS
Revised 12/03/2015 FIRE DEPARTMENT CITY OF NEW YORK STUDY MATERIAL FOR THE CONSOLIDATED EXAMINATION F-60 FOR FIRE GUARD FOR TORCH OPERATIONS *Note: The F-60 Certificate of Fitness is NOT qualified to serve
PROCEDURES PREVENTION OF ACCIDENTAL IGNITION
Page No: 1 of 7 6.0 PURPOSE (192.751) All possible precautions shall be exercised to prevent the accidental escape and ignition of gas. Whenever possible, potential sources of ignition should be eliminated
Notes. Material 1. Appropriate Flammable Liquids
29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make
A. Fire Protection Plan. B. Access and Parking
Standards for Construction Site Fire Safety For Use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire Code (CFC) These standards are intended to prescribe
Compressed Gas Cylinder Storage and Handling Guide
Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely
Welding, Brazing & Cutting Guidelines
FIRENET FIRE PREVENTION DEPARTMENT November 2010 Welding, Brazing & Cutting Guidelines Hot Work is any work activity that generates a flame, heat or sparks such as soldering, brazing, welding, torch cutting
Pressure Vessels (Air Compressors) and LPG Tanks
Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result
General Fire Code Requirements Within Commercial Tenant Spaces
FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding
WEEKLY SAFETY MEETING All Euramax Subsidiaries WELDING SAFETY / HOT WORK SAFETY. Safety Meeting Contents. Meeting Notice.
Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read
ADMINISTRATIVE SERVICES MANUAL
Purpose Responsibilities Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and injuries. To minimize risk to life and properly, the requirements of
Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to:
I. Competencies Oxy-Fuel Gas Welding Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to: A. Identify the major parts of the oxy-fuel gas unit. B. Pass
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
Sample Written Program. For. Flammable Liquids
Sample Written Program For Flammable Liquids 1 Flammable Liquids. (YOUR COMPANY NAME) Purpose Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and
Fire Protection Plan
Fort Knox Installation Safety Office Fire Protection Plan Fire Protection Plan A fire prevention measure must be developed for all fire hazards found. Once employees are made aware of the fire hazards
COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.
Page 1 of 5 COMPRESSED GASES A compressed gas is defined as any mixture of gases in a container with a pressure exceeding 40 psi. at 70 o F, or 104 psi. at 130 o F; or any flammable liquid with an absolute
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Requirements for Hydrogen Storage and Use
Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These
SECTION 10 WELDING AND CUTTING
10.A GENERAL SECTION 10 WELDING AND CUTTING 10.A.01 Welders, cutters, and their supervisor shall be trained in the safe operation of their equipment, safe welding/cutting practices, and welding/cutting
FLAMMABLE AND COMBUSTIBLE LIQUIDS. n OSHA Changes
FLAMMABLE AND COMBUSTIBLE LIQUIDS OSHA Changes Introduction This module covers the two primary hazards associated with flammable and combustible liquids: explosion and fire. In order to prevent these hazards,
Notes. Material 1. Personal Protective Equipment 2.
29CFR 1926.20(b)-Accident Reduction, 29CFR 1926.21- Safety Training & Education 29CFR 1926.20(a)-Unsafe Working Conditions 29 CFR 1910.132-138, the "Personal Protection Equipment" standard. & 20 CFR 1910.134
OSHA Office of Training and Education 1
Flammable and Combustible Liquids OSHA Office of Training and Education 1 Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and
An inventory of hazardous materials used in your workplace will prove useful.
Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the
Flammable and Combustible Liquids. Slide 1 (of 23)
Flammable and Combustible Liquids Slide 1 (of 23) Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and storage of flammable liquids
FLAMMABLE LIQUIDS COMPLIANCE NOTE
Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic
FLA S FIRE SAFETY INITIATIVE
Improving Workers Lives Worldwide FLA S FIRE SAFETY INITIATIVE Preventing fires and saving lives by empowering workers and factory managers SCENARIO 1 OCCURS AT FACTORY ABC, WHICH HAS NOT IMPLEMENTED NECESSARY
FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH
FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH Safety signs are the primary way to communicate important warnings and messages to your employees, on-site contractors and other
Fire Alarm and Protection Impairment Policy and Procedures
1.0 Policy Statement The University of New Haven has developed a Fire Alarm and Protection Impairment Plan in accordance with the National Fire Protection Associations (NFPA) codes. Specific codes referenced
Compressed Gas Cylinder Safety
Compressed Gas Cylinder Safety I. Background. Due to the nature of gas cylinders, special storage and handling precautions are necessary. The hazards associated with compressed gases include oxygen displacement,
CONTRACTOR SAFETY POLICY
CONTRACTOR SAFETY POLICY Revised September 2012 TABLE OF CONTENTS COMPLIANCE ACKNOWLEDGMENT COMPLIANCE GENERAL SAFETY REQUIREMENTS/HOUSEKEEPING INSURANCE COVERAGE SIGN IN AND OUT INCIDENT REPORTING CHEMICAL
FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No
General Inspection FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS 1. All Floors (inspect from top floor to basement): Yes are fire exits and directional signs properly illuminated? is the emergency
HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?
work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary
THERMIT WELDING (GB) LTD PROCESS MANUALS
THERMIT WELDING (GB) LTD PROCESS MANUALS SECTION FOUR GUIDELINES FOR SAFE OPERATION Page 1 SECTION 4 - GUIDELINES FOR SAFE OPERATION The information contained in this section is applicable to the THERMIT
Course of Construction Questionnaire
Course of Construction Questionnaire CLIENT DETAILS Broker: Contact: Insured s name: Policy number: Address undergoing works: Insured s contact phone number: 1) Name and address of Contractor: 2) Contractor
Texas Department of Insurance. Fire Safety. Provided by. Workers Health & Safety. Pub. No. HS01-028D (7-08)
Texas Department of Insurance Provided by Workers Health & Safety Pub. No. HS01-028D (7-08) A fire safety plan is an essential part of any workplace safety program. In fact, the Occupational Safety and
A Code Review for Emergency Generators and Indoor Use of Portable Generators
A Code Review for Emergency Generators and Indoor Use of Portable Generators By: the Fire and Life-Safety Group (FLS) Fire Code requires that emergency generators be stationary generators. Therefore, a
Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety
Integrated Risk Management Master Workplace Inspection Checklist for General Shop Safety Document Type: Form Control Number: UIRM- FM_012_50 File Code: UIRM-001 Last Reviewed: March 2014 Department/Unit:
During Various Aluminum Fabricating Operations
Guidelines for Handling Aluminum Fines Generated During Various Aluminum Fabricating Operations F-1 Guidelines for Handling Aluminum Fines Generated During Various Aluminum Fabricating Operations SCOPE
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
Dip Tanks. RS 1030 (9/13) 2013 Nationwide Mutual Insurance Company Page 1 of 9 All Rights Reserved
This Data Sheet discusses the fire and explosion hazards associated with dip tanks as well as several fire prevention tactics. EPA information is included as an added benefit only. The information from
Safety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS
FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS The attached self-inspection form is intended for staff use at regular, frequent intervals. It should not take the place of two other vital measures
Ethanol Vehicle and Infrastructure Codes and Standards Citations
Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and
FIRE RISK ASSESSMENT
The Regulatory Reform (Fire Safety) Order 2005 FIRE RISK ASSESSMENT Employer or other responsible person Name of Premises Address Post Code Telephone N o Name of Assessor(s) Date of Assessment Date of
FDNY C14 Certificate of Fitness Quiz
FDNY C14 Certificate of Fitness Quiz Name: Date: 1. Who issues a New York City laboratory permit? a) Department of Environmental Protection (DEP) b) Department of Environmental Conservation (DEC) c) Occupational
FIRE RISK ASSESSMENT
REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT This template has been provided to assist the Responsible Person with the preparation of a Fire Risk Assessment and is not intended for commercial
Compressed Gas Cylinder Program
Department of Environmental Health & Safety Procedures Compressed Gas Cylinder Program March 2010 Compressed Gas Cylinder Program Page 1 of 8 Table of Contents I. Introduction II. III. IV. Policy Scope
Installation Instructions for Alarm Module Kit A043F059
Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line
Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?
A Health and Safety Guideline for Your Workplace What is a Work Permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done,
Electrical Classification
Electrical Classification Using NFPA 70 and NFPA 499 to Classify Hazardous Locations Electrical classifications are established in accordance with the National Electrical Code, NFPA 70, also referred to
Wilkins Safety Group
H & S Guidance - Flammable Liquids See also: other pages INTRODUCTION Flammable liquids are liquids with a flashpoint of 55ºC or below and hence includes all liquids that are classified as flammable, highly
BP WIND ENERGY POLICIES AND PROCEDURES
BP WIND ENERGY POLICIES AND PROCEDURES Document Control Details 1.0 Purpose/Scope 1.1 This procedure provides the minimum requirements to be followed for the storage of flammable or combustible materials
Fire Safety PROCEDURES January 2011
Fire Safety PROCEDURES January 2011 [email protected] Campus Phones EMERGENCY Dial 911 Fire Safety Service is the focal point for the coordinated administration of the University Fire Safety program and
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection OSHA Office of Training and Education 1 Introduction Fires and explosions kill more than 200 and injure more than 5,000 workers
Mechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
Storing, Using and Handling Compressed Gases
HANFORD MSSON SUPPORT CONTRACT Storing, Using and Handling Compressed Gases MSC-RD-11198 Revision 3 Effective Date: November 12, 2014 Topic: Worker Protection Approved for Public Release; Further Dissemination
Code Compliance Guideline: Swimming Pool Chemicals
A publication of Fairfax County, Virginia CODE COMPLIANCE GUIDELINE SWIMMING POOL CHEMICALS AND FIRE SAFETY REQUIREMENTS RELATED TO POOL OPERATIONS This publication outlines the Fire Prevention Code requirements
: Sharpie King Size Permanent Markers. 3500 Lacey Road, 10th Floor Downers Grove, IL 60515 USA 800-323-0749 or 630-829-2500
PRODUCT DATA SHEET Section 1. Identification Product name : Sharpie King Size Permanent Markers Material uses : Writing instruments Manufacturer : Newell Brands 3500 Lacey Road, 10th Floor Downers Grove,
SAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
The following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
HealthandSafetyOntario.ca. Introduction. Storage Containers. Storing Flammable Liquids
Flammable Liquids Storage Introduction This guideline is designed to help you store flammable liquids safely. It is based on the requirements of the Ontario Fire Code, Part 4, and of the Regulations for
Overview of Hotel Fire Safety Requirements
Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined
PERSONAL PROTECTIVE EQUIPMENT PROGRAM
Sample Written Program For PERSONAL PROTECTIVE EQUIPMENT PROGRAM 1 TABLE OF CONTENTS Development... 3 Hazard Assessment........3 Choosing Personal Protective Equipment.......4 Training.......4 Conclusion...4
CONFINED SPACE ENTRY WORK STANDARD
CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD Copyright 2007 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized
SPILLS & SPILL KITS. Spills -General Guidelines:
Spills -General Guidelines: If handled properly, a spill may be nothing more than a nuisance. If handled improperly, a spill can seriously disrupt your activities and the work of your colleagues. At worst,
Texas Department of Insurance. Provided by. Personal Protective Equipment. Division of Workers' Compensation HS96-101C (10-06)
Texas Department of Insurance Personal Protective Equipment Provided by Division of Workers' Compensation HS96-101C (10-06) PERSONAL PROTECTIVE EQUIPMENT PROGRAM TABLE OF CONTENTS Development...3 Hazard
MONARCH FIRE PROTECTION DISTRICT
MONARCH FIRE PROTECTION DISTRICT 13725 OLIVE BLVD., CHESTERFIELD, MO 63017 314-514-0900, EXT. 309 [email protected] www.monarchfpd.org TENT / BOOTH REQUIREMENTS To help insure the safety, health
Material Safety Data Sheet
Material Safety Data Sheet OASIS 259 GLASS FORCE 1. Product and company identification Trade name of product Product use Product dilution information : OASIS 259 GLASS FORCE : Glass Cleaner : Up to 12.5
UNIVERSITY OF TOLEDO
UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect
Enviro Safety Products Resource Center. OSHA Checklist for General Industry
Enviro Safety Products Resource Center OSHA Checklist for General Industry The Occupational Safety and Health Administration (OSHA) require many standards to be met by businesses and industries. OSHA sets
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
Summary: The significant differences between GI Part 12. Welding and Cutting and 29 C.F.R. 1910 Subpart Q Welding, Cutting, and Brazing are in:
GI Part 12. Welding and Cutting Compared With 29 C.F.R. 1910 Subpart Q Welding, Cutting, and Brazing As of February 10, 2016 Summary: The significant differences between GI Part 12. Welding and Cutting
c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.
Walmart Standards for Suppliers Section 7. Health and Safety 7. Health and Safety Suppliers must provide workers with a safe and healthy work environment. Suppliers must take proactive measures to prevent
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION
NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION Fire and Life-Safety Group (FLS) I. EMERGENCY PROCEDURES The emergency procedures for natural gas emergencies are similar to that for fire emergencies.
SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT
SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT INTRODUCTION No matter how reliable fire protection equipment may seem, periodic maintenance is needed to ensure proper operation. Fire protection
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
NFPA Hazard Class: * Physical Form: Solid. Health: 0 (Least) * Appearance: Yellow Flammability: 1 (Slight)
Safety Data Sheet Microcrystalline Wax 1. Chemical Product Identification Generic Name: Microcrystalline Wax INCI Name: Microcrystalline Wax Chemical Family: Mineral Emergency Telephone Numbers: Page 1
OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.
1. Authority Orange County Fire Rescue Department Tents & Membrane Structures Office of The Fire Marshall - 109 E. Church Street, Lower Level - Orlando, Florida 32801-3319 Phone: 407-836-0004 Fax: 407-836-8310
Important Ontario Fire Code Information for Building Owners in the City of Windsor
Important Ontario Fire Code Information for Building Owners in the City of Windsor This information is intended to be used a reference only. For a complete listing consult the Ontario Fire Code or contact
SOLVENT CLEANER MSDS Page 1 of 5 SAFETY DATA SHEET. (To comply with OSHA s Hazard Communication Standard 29CFR 1910.1200/ANSI z400.
SOLVENT CLEANER MSDS Page 1 of 5 SAFETY DATA SHEET (To comply with OSHA s Hazard Communication Standard 29CFR 1910.1200/ANSI z400.1-1993) 1. PRODUCT & COMPANY IDENTIFICATION Prepared on: Month, Year Manufactured
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
FIRE SAFETY ONLINE TRAINING
INTRODUCTION This Fire Safety Training module is designed to teach you preventive measures that will eliminate or minimize causes of fire or fire hazards in the workplace, and to teach you proper emergency
STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders
STORE HAZARDOUS SUBSTANCES SAFELY Suitable containers incompatibles gas cylinders Oxy-Acetylene welding flammable substances 35 36 STORE HAZARDOUS SUBSTANCES SAFELY STORE HAZARDOUS SUBSTANCES SAFELY Storing
Minnesota State Department of Public Safety
Minnesota State Department of Public Safety 444 Cedar Street, Suite 145, St. Paul, Minnesota 55101-5145 Phone: 651/215-0500 FAX: 651/215-0525 TTY: 651/282/6555 Internet: http://www.fire.state.mn.us Inspection