Allianz Global Corporate & Specialty. Panama Canal 100. Shipping safety and future risks.

Similar documents
Panama Canal Expansion Study. Phase I Report: Developments in Trade and National and Global Economies

P u b l i c P o l i c y D i v i s i o n

Panama Canal Expansion Position Paper. May 2006

The world s delivery system for consumer goods, components, and commodities is overloaded.

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

AUTORIDAD DEL CANAL DE PANAMÁ

Fourth Generation Modular Construction

THOUGHTS ON THE PANAMA CANAL EXPANSION. Bruce Lambert Executive Director Institute for Trade and Transportation Studies

The Changing Global Economy: The Implications and Opportunities for Transportation in Atlantic Canada

Pilot on the Bridge Role, Authority and Responsibility. Necessity of Bridge Team Management.

Allianz Global Corporate & Specialty Project Cargo

MAJOR CHANGES IN GLOBAL SHIPPING, MEETING THE DEMAND, IMPLICATIONS FOR PORT OPERATORS. Bernard MAZUEL, Délégué Général UNION DES PORTS DE FRANCE

Women who are Moving Ohio into a Prosperous New World. Ohio s Maritime Vision

Why infrastructure is so important

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING

PORT INFRASTRUCTURES TOC AMERICAS PANAMA CITY OCTOBER 14TH, 2015 MANUEL C. KABANA FRIOPUERTO INVESTMENT, SPAIN

Gulf Intracoastal Waterway

Curriculum Vitae SAN FRANCISCO, USA, RESIDENT SURVEYOR. British Subject and USA permanent resident

Horn of Africa: Threat Factors for Commercial Shipping and Forecast of Pirate Activity Through 2009

Global Marine Trends 2030

Passenger Terminal Amsterdam

Statistical Summary Marine Occurrences 2013

Container Shipping Industry: Facing Another Difficult Year

Decarbonising the Maritime Supply Chain

WATERWAYS in Finland

A Contribution to the Analysis of Maritime Accidents with Catastrophic Consequence

Logistics Investment and Trade Growth: The Need for Better Analytics

Skies are safer, but new risk environment and rising cost of claims challenge aviation industry, says Allianz report

PORTS OF. sh i p to no r way

Crude Oil Trading Patterns: Trends and Tonne Mile Assessments

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership

International Maritime Pilots Assoication Association Internationale des Pilotes Maritimes Asociascisn Internacional de Practicos Maritime-portuarios

A method for assessing the risk of sea transportation: Numerical examples for the Oslofjord

Fact Sheet RITA. Atlantic Coast U.S. Seaports. By Matthew Chambers. Select Atlantic Coast U.S. Seaports. Figure 1: Atlantic Coast U.S.

Index. Coumbia-Snake River System 356 dairy 64 exports 66 regional changes 64 supply and demand 66 DDGS 127, 130

London International Shipping Week. 10 September 2015

HAMBURGER HAFEN UND LOGISTIK AG ANALYSTS CONFERENCE

PORT of TAMPA. Presentation to: Tampa Bay Applications Group May 2, 2013

Allianz Global Corporate & Specialty Hull, Protection & Indemnity and Marine Liability Insurance

Copyright: Univan Ship Management Ltd.

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

MARINE INSURANCE GUIDELINES

Market Overview of Global & Regional Port Market

Safety and Shipping Review 2014

MAT and Space Insurance. November 2013

VOYAGE CHARTERPARTIES DAMAGES AN ALTERNATIVE VIEW. Bruce Buchan LMAA Arbitrator

London Array. Operations and Maintenance

APPENDIX 1 THE UK NEED FOR DEEPSEA CONTAINER HANDLING

The 40-Foot CONTAINER. Containers await transfer in the marshalling yard at Port Elizabeth, New Jersey.

United States Coast Guard COMDTPUB NVIC 11-83, CH-1 7 JULY 1995

Container shipping profitability to deteriorate in 2016

THE COMMERCIAL ASPECTS OF FREIGHT TRANSPORT OCEAN TRANSPORT: FREIGHT RATES AND TARIFFS. Hans J. Peters

Why build the Silvertown Tunnel?

Allianz Global Corporate & Specialty Hull and Machinery Insurance

accidents at sea REPORT Introduction SUMMARY 2013 General cargo vessels account for nearly 50% of all vessel types lost at sea

Catapult Whitepaper: Understanding Freight Rates in the Global Supply Chain

Background Information

History and Impact of the Intermodal Shipping Container

California Infrastructure Outlook Professor Nick Vyas

Offshore Alabama Prepared by the University of South Alabama MBA Consulting Group in December 2010

Vessels reporting duties on the NSR

Maritime Trade and Transportation by the Numbers

Prospects for the container shipping industry

Impact of Larger Vessel Size on Port Infrastructure Costs

Maersk Line s ECUBEX service CONNECTING CONTINENTS

THE CHINA TRADE, 1830 TO 1860

World Bank Transport Forum, April 2009

ALPHALINER Annual Review 2012

THE LIVORNO PLATFORM

Risk Consulting. At a Glance

PIANC 2002, 30 th INTERNATIONAL NAVIGATION CONGRESS S8C P121 SYDNEY-SEPTEMBER 2002 Page 1 of 12

PORT INFORMATION GUIDE PRIMORSK JUNE 2010

The Impact of a Canal through Nicaragua

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

Phone Phone

Houston, TX The Port of Houston is a 25-mile complex of public and private facilities located just a few

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

cprax Internet Marketing

Scorpio Tankers, Inc. Q Conference Call. April 29, 2013

: ALL CONCERNED DOMESTIC SHIPOWNERS/OPERATORS OF SHIPS PLYING DOMESTIC TRADE AND PORT STATE REQUIREMENTS AS PER SECTION VIII HEREIN

Swedish Law as an Example The Nairobi Convention Summary. Wreck Removal. Jhonnie Kern University of Gothenburg

Professional Truck Driver Training Course Syllabus

International Education in the Comox Valley: Current and Potential Economic Impacts

Panama Canal Ship Oil Pollution Emergency Plan (PCSOPEP) Requirements

MAT and Space Insurance - Key data

Statement of. Thomas A. Allegretti President & CEO The American Waterways Operators

World Vessel Traffic Services Guide - United Kingdom - Port of London

Departement Mobiliteit en Openbare Werken Maritieme Toegang

Safe carriage of oil in extreme environments

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, Matthew Sievert Director Business Development LNG

Risk Consulting. At a Glance

Treasure Valley Electric Plan - Community Advisory Committee

Recommendations Relating to the Application of Requirements Governing Seafarers Hours of Work and Rest

UK Key Facts Key Facts. Comprehensive risk management services worldwide. The Allianz experts for Corporate and Specialty Risks

Shipping, World Trade and the Reduction of

International Marine Insurance Conference - The Challenges Presented by a Major Marine Disaster

TRANSPORTATION COST EQUIVALENCE LINE: EAST COAST VS. WEST COAST PORTS GLOBAL RESEARCH AND CONSULTING JULY 2014

Key Development Trends in Supply Chain Management

Transcription:

Allianz Global Corporate & Specialty Panama Canal 100 Shipping safety and future risks www.agcs.allianz.com

Inside the Panama Canal: from anniversary to expansion Miraflores Locks Miraflores Lake 9 Pacific Ocean Pedro Miguel Locks Panama 7 8 Gatun Lake 6 2015 New locks expected to open for traffic allowing 12-14 larger vessels a day to use canal. 4 3 5 After expansion, increased traffic will raise cargo values by over $1bn a day. Gatun Locks 2 12,036 transits a year carrying 319m net tonnage, paying $1.8bn in tolls Safety record 38 shipping incidents since 2002. One accident every 4,000 transits. Atlantic Ocean 1 1914 Officially opened August 15, SS Ancon makes first official transit Approx 3% ($270bn) of world maritime commerce ($9trn) transits the canal each year Container ships (3,103), dry bulk (2,903) and tankers (2,468) most frequent vessels Length of canal from Atlantic to Pacific 51 miles Transit time 8 to 10 hours Vessel size 4,400 teu vessels today 12,600 teu (New Panamax) vessels in 2015. Download AGCS Panama Canal infographic here Source: Allianz Global Corporate & Specialty Diagram not to scale. Approximate representation of Panama Canal

EXECUTIVE SUMMARY Executive Summary The Panama Canal has had a significant influence on ship development and trade routes since opening in 1914. As it marks its 100th anniversary with plans to create a new lane for larger transits, this risk bulletin focuses on the impact of this expansion on the maritime industry and the risk challenges it poses. It also examines the canal s safety record, analyzing shipping casualties (of over 100 gross tons). With approximately 3% (US$270bn) of world maritime commerce ($9trn) transiting the Panama Canal every year the safe passage of vessels is critical. There were just three shipping incidents (casualties) in the canal during 2013, in line with the 10-year average but up on a year earlier (1). There were no total losses. The Panama Canal has seen 180 shipping casualties over the past 20 years (an average of nine a year). Its safety record has improved significantly over the past decade resulting in just 27 casualties (two total losses). Bulk carriers (11), cargo ships (9) and container ships (9) dominate the canal s casualty list, collectively accounting for over 75% of all incidents since 2002. In a relatively controlled shipping environment, the most common cause of incidents in the Panama Canal is contact with walls (53) and collisions involving vessels (50), accounting for almost 60% of incidents. Machinery damage/failure is third (41), accounting for over 20%. Compared with other significant waterways such as the Suez Canal (505) and the Kiel Canal (272), Panama Canal (180) has seen fewer shipping incidents over the past 20 years, although more ships pass through the Kiel Canal each year than Panama and Suez combined. The odds of a shipping incident occurring in the Panama Canal are around 1 every 4,000 ships. For the Suez Canal it is 1 every 1,100 ships. For the Kiel Canal it is 1 in 830. Although the total number of maritime accidents in the Panama Canal has decreased significantly the potential risks are only set to increase with the creation of a new lane for larger ship transits, expected to open in 2015, posing new challenges for the maritime community. New locks will enable new-panamax ships (12,600 teu) * to enter the canal. Existing locks only allow for the passage of vessels carrying 4,400 teu. * A teu or twenty-foot equivalent unit is an inexact unit of cargo capacity, often used to describe container ship capacity. It is based on the volume of a 20-footlong (6.1 m) container 3

EXECUTIVE SUMMARY The expansion will enable between 12 and 14 larger vessels per day (approximately 4,750 additional ships a year) to transit the canal. The increased size of these vessels particularly container ships of 12,600 teu will play a critical role in doubling the annual cargo capacity of the canal to 600 million PCUMs tons **. This will have a significant impact on the insured value of goods being transported. If the Panama Canal operates at its full projected capacity following expansion this could result in an additional $1.25bn or more in insured goods passing through the canal in just one day. This potentially equates to $460bn a year, significantly, increasing risk accumulation in the region. This estimate does not include hull values or the increasing number of vessels waiting to cross the canal on either side. Larger ships automatically pose greater risks. The sheer amount of cargo carried means a serious casualty has the potential to lead to a sizeable loss and greater disruption. For example, a fully-loaded new-panamax 12,600 teu container ship as long as four football fields with a beam of up to 49 meters could have an average insured cargo value of $250m. There is concern surrounding salvage limitations for larger container ships. In the event of an accident there may be an insufficient number of qualified experienced salvage experts available to handle the new-panamax ships. Increasing traffic of larger ships also poses a heightened pollution risk due to the amount of diesel and petroleum carried. The canal s strategic and commercial importance could also mean political and security risks increase following expansion. To cater for the larger ships a raft of changes are also needed at global ports. Additional infrastructure upgrades will be needed in the form of larger gantry cranes to work these larger ships and to handle the increase in volume. Processing capability will need to be improved to avoid bottlenecks at choke points in ports. Navigability is critical: air and water drafts need to be sufficient to allow safe passage of the larger container ships. There is substantial commercial risk for ports on both the East Coast and West Coast of the US with the East Coast expanding its container capacity in the hope of gaining market share, while the West Coast spends millions in order to protect existing market share. $1.25bn Increase in value of insured goods passing through the canal every day $250m Average insured cargo value of the largest container ship able to use the new transit lane The complexity of the new canal lock system for larger ships could present a risk challenge in the event of it failing to operate. This could lead to blockages inside and outside of the canal. Contingency plans for a lock door malfunction will need to be implemented. The potential impact of any shipping incident is much wider than just impeding progress through the Panama Canal. With more larger ships on the move in the surrounding region an incident could also impede traffic at major ports in the US and elsewhere, resulting in a potential increase in business interruption losses. In addition, a number of US ports and terminals on the East and Gulf Coasts are exposed to hurricanes. Larger ships carrying higher concentrations of insured goods will spend more time in these ports, posing an increased risk. For example, a large portion of Superstorm Sandy losses in 2012 were due to storm surge that flooded ports in the Northeast region. Conversely, an expanded all-water route from Asia to the US East/Gulf Coast could reduce the risk of container damage due to a reduction in multiple transloadings. The fewer times a container is handled the lower the risk of damage. Training is key to mitigating the risks involved with the impact of the Panama Canal expansion both in the canal itself and affected ports. The Panama Canal Authority has invested heavily in training including plans to charter a post-panamax ship to practice maneuvers through the new lane. However, when the canal is opened a whole host of different vessels will be passing through. This will be a challenge. With such a focus on training human error is unlikely to be the sole cause of future shipping incidents. The risk of grounding remains, either as a result of equipment failure or a casualty on the ship. Insurers and insureds will need to re-evaluate the risk to containers under this new scenario, as risks will be exacerbated during the initial opening period. ** PCUMs tons: Panama Canal Universal Measurement System, the basis upon which vessels are charged for using the canal. A teu is equivalent to approximately 13 PCUMS tons. 4

EXPANSION PLANS Photo: Panama Canal Authority A new era The Panama Canal has been shaping shipping business for the past century. And its plans for the future promise an even greater influence over world trading patterns going forward. When Spanish explorer Vasco Nuñez de Balboa made a crossing at the Isthmus of Panama in 1513, it sparked the first movement to build a water passage connecting the Atlantic and Pacific oceans. However, it was not until the 1800s that a real attempt was made to create the connection, when US president Ulysses S Grant ordered survey expeditions to Central America in 1869. A failed attempt by the French to construct a sea level crossing led to the US buying the project and the canal construction began in earnest in 1904. It took a further 10 years to complete the Panama Canal, with the first passage undertaken by the Alexandre La Valley on January 7, 1914. Overall, it cost around $375m and was the single most expensive construction project in US history at the time. Since that first transit a century ago, the Panama Canal has unequivocally proved itself as a crucial link in the global trade chain. Today, seaborne trade accounts for about 60% of world trade ($9trn out of $15trn). The Panama Canal connects 144 maritime routes calling at 1,700 ports in 160 countries ii and it is estimated that approximately 3% of world maritime commerce transits the canal every year iii. This equates to $270bn. Shaving days off sailing times A vessel laden with coal sailing from the east coast of the US to Japan via the Panama Canal saves about 4,800 kilometers (3,000 miles) over the shortest alternative all-water route. For a vessel laden with bananas sailing from Ecuador to Europe the distance saved is about 8,000 kilometers (5,000 miles) i. At 14 knots that equates to an eight-day reduction in transit time for the bulk carrier and a 13-day saving for the refrigerated cargo carrier, a significant difference when transporting perishable goods. But the shipping industry has undergone dramatic transformation over the past 100 years, no more so than with regards to ship size. Vessels that were considered large in the 1960s are dwarfed by the behemoths operating today. The Panama Canal has had to respond to this evolution in size or risk losing business as larger ships turn to transits via the Capes to avoid the canal s size constraints. Keen to maintain the sizable financial contribution that transit tolls sink into the Panamanian economy, the Panama Canal Authority (ACP) has stepped up to the mark. i www.pancanal.com/eng/maritime/routes.html ii micanaldepanama.com/centennial/connectivity/ iii www.acp.gob.pa/eng/general/reporte-anual/2013/flash.html, page 13 5

EXPANSION PLANS Expansion plans take shape Work on the $5.25bn extension program of the canal began on September 3, 2007, after six years of study and the approval by national referendum in October 2006. The project will see two new sets of locks constructed, adding a third transit lane. Beyond the new locks, the project includes the deepening and widening of the canal entrances; excavation of a new north access channel for the Pacific post-panamax locks; elevation of Gatun Lake s (a large artificial lake to the south of Colón, Panama which forms a major part of the canal) maximum operation level; and the deepening and widening of the Gatun Lake and Culebra Cut navigational channels. The scheduled opening date for commercial transits is 2015. ACP estimates that the combined effect of allowing between 12 and 14 larger vessels per day (an average of approximately 4,750 ships a year) through the new locks and the use of the existing locks for smaller vessels will double canal capacity iv. Ultimately, the expansion will allow 12,600 teu ships, with a beam of up to 49 meters and 15.2 meters draft, to use the new locks. Present capacity is for container vessels with a maximum of 4,400 teu capacity. The increased size of these vessels will play a critical role in increasing canal throughput capacity from 300 million PCUMS tons to 600 million PCUMS tons. PCUMS is an acronym for Panama Canal Universal Measurement System, the basis upon which vessels are charged for use of the canal. One PCUMS ton is approximately 100 cubic feet of cargo space. A twentyfoot long container (teu) is equivalent to approximately 13 PCUMS tons. This will obviously have a significant impact on the insured values of goods being transported through the canal, particularly on the New-Panamax ships, which are as long as four football fields. For example, a fully-loaded 12,600 teu container ship could have an average insured cargo value of $250m, based on an average value of $20,000 per teu. With the cargo-carrying capacity of ships transiting the canal having the potential to double following expansion, we can approximately assume this could result in an additional $1.25bn in insured goods passing through the canal in just one given day *. And according to Captain Rahul Khanna, Global Head of Marine Risk Consulting, Allianz Global Corporate & Specialty (AGCS) the canal s expansion will also lead to an increase in the number of vessels waiting to undertake the continental transit on both the Atlantic and Pacific sides. This means that if you are looking at natural hazard exposures or just the values concentrated in the surrounding area from an accumulation point of view, this figure could be even higher, he explains. Photo: Thinkstock Competing with train transits For the very largest new container ships, the opening of the large locks at Panama will have no effect. There are no ports in North or South America which can handle the deeper drafts, and the ships are too wide even for the wider canal. What the expansion WILL do is make all-water shipments from Asia to the Gulf Coast or East Coast time-competitive with the stack trains which now offer the quickest and most cost-effective transit times. * Based on conversion of PCUMS into teu as benchmark. Assuming full projected capacity of 46.2m teu following expansion, up from 23.1m today. Estimate assumes not all new capacity will be carried on 12,600 teu container ships. Other types of large ships will also be able to transit the expanded locks iv www.marad.dot.gov/documents/panama_canal_phase_i_report_-_20nov2013.pdf, page 16 6

EXPANSION PLANS Top 10 countries by origin and destination of cargo (long tons) 86.7m 6.1m 8.4m 15.9m 30.5m 49.8m #8 Mexico #2 China #1 US 2m 10.1m #10 Panama 9.6m 7.2m 12.1m #6 S. Korea 5.3m 6.2m #5 Colombia 6.3m #9 Ecuador 5.4m 14.5m 11.6m 17.4m 6.3m 8.7m #4 Japan #3 Chile #7 Peru Origin Destination Inside the Panama Canal: transits, tolls and tonnage The US is the number one origin and destination for cargoes shipped via the Panama Canal, with 86.675m long tons moved from the US and 49.757m long tons destined for the US moved through the canal in the 2013 fiscal year, which ended in September. China takes the second slot with 15.883m tons loaded in China and moved via the Panama, and 30.519m tons headed for China v. While the number of transits by market segment is fairly evenly split between container, dry bulk and tankers at 3,103, 2,902 and 2,468 respectively in fiscal 2013 the tolls and net tonnage figures paint a different picture. Container net tonnage in 2013 was 117.629m, down 1.9% from the previous year, while dry bulk net tonnage was 72.708m, down 12.8%. In terms of tolls, container shipping lines collectively paid $951.392m for transits in fiscal 2013, against $233.033m for tanker operators vi. All this compares with a total number of transits of 12,036 in 2013 with $1.846bn taken in tolls for 209.878m long tons of cargo or 319.545m Panama Canal/UMS net tonnage vii. Looking at the longer term picture, although number of transits have declined since 2011, they are up 2% from 2003. However, the actual amount of tons carried is up by 31.7% from 242.5m Panama Canal/UMS net tonnage viii. To put this in perspective, the Suez Canal, the world s other key waterway connecting the Mediterranean with the Indian Ocean, handled 16,596 ships in 2013, equal to 915.467m net tons ix. The principal commodity moved via the Panama Canal today is containers, with 48.383m long tons moved in both directions in fiscal 2013. Petroleum and petroleum products come second with 40.933m long tons x moved. With containers in the top slot, it comes as no surprise that the US East Coast to Asia trade route was marked as the most popular in fiscal 2013 with 77,027 long tons of cargo recorded xi. v www.pancanal.com/eng/op/transit-stats/2014-table11.pdf vi www.pancanal.com/eng/op/transit-stats/2014-table10.pdf vii www.pancanal.com/eng/op/transit-stats/2014-table01.pdf viii www.pancanal.com/eng/pr/press-releases/2003/12/09/pr126.html ix www.suezcanal.gov.eg/trstat.aspx?reportid=4 x www.pancanal.com/eng/op/transit-stats/2014-table07.pdf xi www.pancanal.com/eng/op/transit-stats/2014-table00-rev1.pdf 7

LOSSES IN FOCUS Losses in focus AGCS analyzes the Panama Canal s recent safety record, focusing on both casualties and total losses, and compares it with other key waterways such as the Suez Canal and the Kiel Canal. Panama Canal: All Casualties including Total Losses 1993 2013 Total losses Defined as actual total losses or constructive total losses recorded for vessels of 100 gross tons or over. The Panama Canal has seen 180 shipping casualties over the past 20 years with its safety record having improved significantly over the past decade in particular (27 casualties). The canal has only seen one double-digit year of incidents this century (2006) and experienced four years without an incident occurring between 2008 and 2012. However, the number of incidents was up year-on-year in 2013 (3-1). Casualties Defined as shipping incidents recorded for vessels of 100 gross tons or over. 30 25 20 15 10 17 23 21 30 14 15 9 7 8 5 6 4 3 2 3 0 0 0 0 0 1 1 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 16 Total 180 2002-2013 Total 38 Panama Canal: All Casualties Including Total Losses by type of vessel 2002-2013 Bulk carriers, cargo ships and container ships dominate the casualty list as the most frequent transiters of the canal, collectively accounting for over 75% of all casualties since 2002. The three casualties in 2013 comprised one container ship, one cargo ship and a tug. Total 38 Bulk 11 Cargo 9 Chem/prod 5 Container 9 LPG/LNP 1 Passenger 1 Roro 1 Tug 1 Source: Lloyd s List Intelligence Casualty Statistics. / Analysis: Allianz Global Corporate & Specialty 8

LOSSES IN FOCUS Panama Canal: Causes of Casualties Including Total Losses 1993 2013 Contact with walls (53) and collisions involving vessels (50) have been the main drivers of shipping casualties in the Panama Canal over the past 20 years, collectively accounting for almost 60% of incidents. Machinery damage/failure is the third most frequent cause of incidents (41), accounting for more than 20%. There has been just one foundering (sinking/submerging) in the past 20 years, the same number as piracy incidents *. In 2013 there were two collisions and one wrecked/ stranded incident. Since 2002 collisions (11), machinery damage (9) and contact (8) have been the main causes of 38 incidents. There were no reported shipping casualties in the canal through 2008 to the end of 2011. 10 9 8 7 6 5 4 3 2 1 0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 CN Collision (involving vessels) 1993-2013 Total: 50 CT Contact (eg. Harbour wall) 1993-2013 Total: 53 FD Foundered (sunk, submerged) 1993-2013 Total: 1 FX Fire/explosion 1993-2013 Total: 5 HL Hull damage (holed, cracks, structural failure) 1993-2013 Total: 4 MY Machinery damage/failure (e.g. lost rudder, fouled propellor) 1993-2013 Total: 41 PY Piracy 1993-2013 Total: 1 WS Wrecked/stranded (aground) 1993-2013 Total: 12 XX Miscellaneous 1993-2013 Total: 13 Source: Lloyd s List Intelligence Casualty Statistics. / Analysis: Allianz Global Corporate & Specialty * piracy was a case of robbery of ship s crew while onshore 9

LOSSES IN FOCUS Panama Canal - Suez Canal - Kiel Canal: All Casualties Including Total Losses 1993 2013 Atlantic Ocean Pacific Ocean Mediterranean Sea Red Sea North Sea Baltic Sea Panama Canal Suez Canal Kiel Canal 100 80 Total Panama Canal Suez Canal Kiel Canal 1993-2013 Total 957 60 Panama Total 180 40 20 Suez Total 505 0 Kiel Total 272 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AGCS analysis compares the recent safety record of the Panama Canal with two other significant waterways the Suez Canal and the Kiel Canal in Germany, which is the world s busiest artificial waterway. In total there have been 957 shipping casualties in these three canals over the past 20 years, with the Suez Canal (505) accounting for more than half of these incidents, the Kiel Canal (272) 28% and the Panama Canal (180) 19%. However, unlike the Panama Canal (27) and the Suez Canal (157), the Kiel Canal (175) has seen its number of incidents increase significantly over the past decade, even though for the last four years of available figures traffic numbers have been below those in 2003 (39,797). That said, some 34,879 ships passed through the canal in 2012, still more than through the Panama and Suez canals combined. However, the Kiel Canal was the only one of the three canals to improve its safety record in 2013, seeing a 35% decrease in shipping casualties year-on-year (27-42) while Panama saw incidents triple from just one a year earlier, albeit from a base of one. The Suez Canal saw its number of incidents almost quadruple (15-4) year-on-year. Similarly to the Panama Canal, the major cause of incidents in the Kiel Canal were collisions (57), contact (44) and machinery breakdown (42), accounting for almost 80% of 179 incidents since 2002. The Suez Canal s record differs with machinery damage (58) and wrecked/stranded (56) accounting for 65% of 176 incidents over the same period. Source: Lloyd s List Intelligence Casualty Statistics. / Analysis: Allianz Global Corporate & Specialty 10

LOSSES IN FOCUS Panama Canal: Opened 1914 Approximate Length 51 miles Transit Time 8-10 hours Photo: Shutterstock Suez Canal: Opened 1869 Approximate Length 101 miles Transit Time 11-16 hours Photo: Shutterstock Kiel Canal: Opened 1895 Approximate Length 61 miles Transit Time 7-8 hours Photo: Shutterstock Panama Canal Suez Canal Kiel Canal: Total Losses 1993 2001 and 2002 to 2013 Panama Canal Suez Canal Kiel Canal: Accident rate per transit Panama Canal has recorded four total losses in the past 20 years, compared with 13 for the Suez Canal and 3 for the Kiel Canal. Only the Kiel Canal has seen total losses increase over the past decade. 7 Panama Canal* 1 in 4,000 Suez Canal** 1 in 1,100 Kiel Canal*** 1 in 830 2 2 3 6 1 in 4,000 1 in 3,000 1 in 2,000 1 in 1,000 1993-2001 2002-2013 1993-2001 2002-2013 1993-2001 2002-2013 Panama Canal Suez Canal Kiel Canal 0 *Panama Canal handled 12,036 (oceangoing commercial traffic) ships during 2013 with three shipping casualties **Suez Canal handled 16,596 ships during 2013 with 15 casualties. ***Kiel Canal handled 34,879 ships during 2012 with 42 casualties Source: Allianz Global Corporate & Specialty 11

RISK CHALLENGES The increase in size of the current Panama Canal will bring a corresponding increase in operational, environmental and commercial risks. Photo: Thinkstock Risk challenges The total number of maritime accidents in the Panama Canal has decreased significantly over the past decade. However, the potential risks are only set to increase with the opening of a third lane for larger ship transits. In its 100-year history the Panama Canal has had a significant influence on ship development and trade routes. It has curtailed ship growth for some sectors and supported wider trade links for others. Its expansion will further influence trade routes and ship sizes in the medium- to long term. However, with this greater capacity come a number of risks. From the days of the first attempt by the French to the current transformation there have always been economic, social and political risks associated with the canal, explains Captain Andrew Kinsey, Senior Marine Risk Consultant, Allianz Risk Consulting (ARC). With the increase in size you have a corresponding increase in operational, environmental and commercial risks. 12

RISK CHALLENGES Bigger ships automatically pose greater risks in that the sheer amount of cargo carried dictates that a serious casualty has the potential to lead to a sizable loss and greater disruption. Increasing traffic of bigger ships means the amount of diesel and petroleum being transported through the canal could also pose a heightened pollution risk in the event of a casualty. Meanwhile, the canal s strategic and commercial importance for the US and other countries could also mean political and security risks increase in the wake of its expansion. Conversely, the prospect of an expanded all-water route from Asia to the US East/Gulf coasts could actually lead to a risk reduction in another area. The fewer times you have to handle a container the lower the risk of damage. The longer you can keep a container on a ship and are not making multiple transloadings on to trains and various other modes, the better, explains Captain Allan Breese, Senior Risk Control Engineer, AGCS. This is a sentiment echoed by Captain William Hansen, Senior Marine Risk Engineer, ARC, who adds: I see a decrease in general risk in the US in that you no longer have to take containers off to move them by rail and reload them on the other coast. The fewer times you have to handle a container the lower the risk of damage. When the canal expansion was first announced there was concern that, when completed, it would pose a threat to the dominance of the rail systems in the US. However, railroad companies are now investing in expansion having realized that they will have a pivotal role to play in increasing and quicker movements of cargoes inland. In addition, the practice of slow steaming by ship operators reducing speed to save money and improve environmental performance keeps train options alive as a viable alternative modal option. Photo: Shutterstock 13

RISK CHALLENGES New lock gates for the expanded Panama Canal. The Panama Canal Authority is investing heavily in training for its operatives who will handle larger ships during transits. Photo: Captain William Hansen, Allianz Global Corporate and Specialty Prevention programs and contingency plans On an operational front, the complexity of the new canal lock system could present a risk in the future: The Panama Canal Authority is replacing an elegant, simple system that has lasted for 100 years ago with a more complicated system, says Capt. Breese. Yes, they will be more up-to-date, but there will also be a greater potential for damage that might stop them working properly. When you look at the size of these lock doors, if there is a breakdown repairs will need to be timely, adds Capt. Hansen. If you have traffic scheduled to go through the canal and these lock doors do not work, obviously it will not be possible to use the smaller locks. This could potentially lead to blockages inside and outside of the canal. Are there contingency plans for a lock door malfunction? For its part, the Panama Canal advises it has prevention programs and contingency plans for different kind of events ranging from natural disasters to oil spills. These plans and strategies will extend to the expanded canal, including the safety of bigger vessels and new cargo. The authority has also invested heavily in training for its operatives, especially those at the front line for handling these larger ships during transits. It plans to charter a post-panamax ship in advance of the opening to allow its pilots and tugboat captains to practice maneuvers through the new lane. ACP believes that this experience offers the best way to train its pilots and tug captains in the joint effort required to transit through the two new lock complexes of the expanded canal xii. xii www.pancanal.com/eng/pr/press-releases/2014/05/30/pr512.html 14

RISK CHALLENGES Training required to mitigate risks The authority has also been putting its pilots through their paces at its Center for Simulation, Research and Maritime Development. At time of writing, 186 of the 280 canal pilots have completed the simulator training. Over 2,000 maneuvers of post-panamax ships have been undertaken on both the Atlantic and Pacific entrances of the canal, while canal pilots have also participated in theoretical and practical training programs in the Berendrecht Locks at the Port of Antwerp, Belgium, which are of a similar size and operation xiii. Capt. Kinsey describes training as key to mitigating the risks involved with these new vessels. The Panama Canal pilots are responsible for ensuring that there are no accidents. There will be a whole new method of maneuvering ships through the new locks and therefore there will be a learning curve in transporting a much larger vessel through the canal, adds Capt. Hansen. With such an important emphasis on training, Capt. Hansen believes that human error is unlikely to be the sole cause of shipping incidents in the canal. A grounding of one of the larger ships in the canal would cause severe disruption. There are no tides to help lift it off so removal will be problematic But the risk of grounding remains, either as a result of equipment failure or a casualty on the ship. Insurance companies will need to consider re-evaluating the routine risk to containers under the new scenario, according to Capt. Breese. A grounding of one of the larger ships in the canal will cause severe disruption. There are no tides to help lift it off so removal will be problematic, adds Capt Hansen. Captain Rahul Khanna, Global Head of Marine Risk Consulting, AGCS agrees the level of training provided to pilots ahead of opening will be extremely important. However, he also notes it cannot prepare mariners 100% for the live environment. This is a new operation, he says. It is extremely important that the process and systems in place are dynamic and that the industry learns from mistakes as we go along, because inevitably a few will be made. Although much training will be done, it can only be done on a few vessels. But when the canal is opened for real, a whole host of different vessels with different characteristics will be passing through. That will be a challenge. Then there is particular concern surrounding the salvage limitations for the latest generation of container ships. In the event of an accident there may be an insufficient number of qualified, experienced salvage experts available to handle the new-panamax ships. There is concern surrounding salvage limitations for the latest generation of container ships Photo: Shutterstock In response to these fears, the ACP replies: Through time the ACP has set various safety records at the Panama Canal as it pertains to maritime accidents. The total number of maritime accidents at the Panama Canal has been decreasing since the Panama Canal Authority took control of the waterway in 1999. This is all the more significant when considering the challenge of transiting an everincreasing number of oceangoing vessels. Added to the challenge of coping with the increase in the number of ships and their larger size, installation maintenance programs [must be] carried out without affecting the normal operations of the canal. xiii www.pancanal.com/eng/pr/press-releases/2014/05/30/pr512.html 15

RISK CHALLENGES Growth of container ship size and insured vessel values Fully cellular (1970-) 1,000-2,500 teu 215x20x10m $8m to $12m Panamax (1980-) 3,000 3,400 teu 250x32x12.5m $62m Post Panamax (1988) 4,000 5,000 teu 285x40x13m $49m Post Panamax Plus (2000) 6,000 8,000 teu 300x43x14.5m $98m No room for the new mega ships However, the impact of the expanded Panama Canal on global trade is tempered by the fact that the new canal is already effectively obsolete for the largest ships operating today. Maersk s recently delivered series of Triple E container ships the largest in the world with a capacity of 18,000 teu are almost a quarter-mile long (400m), wider than a motorway and taller than a 20-storey office block. With an actual width of 59 meters xiv they are too wide to access even the expanded Panama Canal. These mega ships were never really designed to go from Asia to the US East Coast, explains Capt. Hansen. Although they are able to transit the Suez Canal and ply the China to Europe route port infrastructure to load and unloads vessels of this size is very limited. There are perhaps eight or nine ports in the world where the flagship of this fleet, the Emma Maersk, can be unloaded and AGCS believes it is doubtful whether this number will grow beyond 16 in the next five to seven years. Meanwhile, the canal authority itself has recognized that it needs to reassess its available resources for the expanded canal. In its latest annual report, ACP reports that it has broadened its capacity model scope to analyze crew variations in the present and new locks for tugboats, launches, and line handler crews; simulate maintenance periods at the locks and tie-up stations; and simulate resources and optimized transit scheduling through the canal and at Pacific ports xv. New Panamax (2014) 12,000 13,000 teu 366x49x15.2m $100m+ Triple E (2013) 18,000 teu 400x59x15.5m $140m Adapted with permission from The Geography of Transport Systems, Jean-Paul Rodrigue Insured vessel values: AGCS Insured vessel values are approximate. Based on value Allow +/- 10% variance Cargo values not included Source: Allianz Global Corporate & Specialty xiv www.maersktechnology.com/stories/stories/pages/triple-evessels.aspx xv www.acp.gob.pa/eng/general/reporte-anual/2013/flash.html, page 21 16

RISK CHALLENGES Port challenges To cater for those larger ships which are able to transit the expanded canal in 2015 a raft of changes are needed at global ports to allow the safe handling of post- Panamax-size ships. Bigger and a greater number of ship-to-shore cranes are required to handle increased container volumes. While Panamax-size ships can be worked by four or five cranes, larger ships arriving via the expanded Panama Canal will need to be worked with at least six cranes. This means port and shipping workers must undergo training in order to mitigate any operational risks. Another potential risk is the fact that following the expansion of the canal higher concentrations of insured goods will be transported on bigger ships, which will call in at US ports and terminals, many of which are exposed to hurricanes. For example, a large portion of Superstorm Sandy losses in 2012 were due to storm surge that flooded ports in the Northeast region. 4,400 Container capacity for ships transiting Panama Canal today 12,600 Container capacity for ships transiting Panama Canal after expansion Additional container storage is also needed to house a potential doubling in capacity and gate-processing capability will need to be improved to avoid bottlenecks at the choke points in ports. Navigability is critical: air and water drafts need to be sufficient to allow safe passage of the larger container ships, while 50-meter depth with no tidal restrictions is the bare minimum needed. Landside connections also need to be considered. Ports are attempting to get into the game and stay in the game. There is substantial commercial risk on the East Coast with ports expanding their container capacity in the hope of gaining market share. Ports in the US West Coast have also spent millions to expand their capacity in order to protect a market share that they already have, explains Capt. Breese. And there are other risks, according to Capt. Kinsey: Just because you build it will they come? It takes more than just a deep enough channel and large enough cranes to service these post-panamax vessels. Additional infrastructure upgrades will be needed in the form of larger gantry cranes to work these larger ships and to handle the increase in volume/throughput. Another major challenge is the actual handling of larger vessels. Port operating procedures will have to be reviewed with regard to wind and weather constraints given the tight operating margins that these ships will be facing. And of course the potential impact of any shipping incident is much wider than just impeding progress through the Panama Canal, however disruptive this would be. With more larger ships on the move in the surrounding region any incident could also impede traffic at major ports in the US and elsewhere, resulting in a potential increase in business interruption losses. None of the major US ports currently operate as regional hubs for global shipping lines, although this is not always a result of depth restrictions. According to a US Maritime Administration report on the expanded Panama Canal, all the major West Coast container ports (Los Angeles, Long Beach, Oakland, Seattle, Tacoma, Vancouver, and Prince Rupert) have enough water depth to accommodate the larger ships, while four major ports on the East Coast can handle these ships already (Baltimore, MD and Norfolk, VA) or will be able to do so by the time the expanded Panama Canal opens (Miami, FL and New York/New Jersey). Other East Coast ports are making preparations for dredging to channel depths of 45 feet or more, a depth that can accommodate the majority of the post- Panamax ships xvi. A US Army Corps of Engineers Institute for Water Resources report summed up the potential for US ports, stating: The expanded canal could provide a significant competitive opportunity for US Gulf and South Atlantic ports and for US inland waterways if we are prepared xvii. xvi www.marad.dot.gov/documents/panama_canal_phase_i_report_-_20nov2013.pdf xvii www.iwr.usace.army.mil/portals/70/docs/portswaterways/rpt/june_20_report_summary_u.s._port_and_inland_waterways_modernization.pdf 17

RISK CHALLENGES Proposed routes for the Nicaragua canal and current Panama route Photo: Wikimedia Commons $40bn Chinese/Nicaraguan-backed alternative canal poses challenge to Panama expansion plans Having been mooted for many years, plans for the development of an alternative to the Panama Canal in the Central American region appear to have taken a significant step forward, following the recent announcement by the Nicaraguan government that it has approved a route for a $40bn project proposed by the Hong Kong Nicaragua Canal Development Investment Co Ltd (HKND Group). At over 170 miles (278km) long, the proposed shipping canal would run from the Brito River which connects the Pacific to Lake Nicaragua one of the world s largest lakes to Punta Gorda on the Caribbean coast. This would be more than three times the length of the Panama Canal, with which it would compete directly for business. Completion of the proposed canal, as initially outlined, could take 500km off on a typical Asia-East Coast North America journey. The proposed dimensions of the canal will be between 230m and 520m wide and 28m deep, enough to handle today s largest container ships, of 18,000-plus teu. Increased competition in the region could obviously jeopardize the growth projections in the Panama Canal s expansion plan, particularly given ships over 13,000 teu cannot access the expanded canal; a limitation that has led HKND Group to argue around 17% of the global fleet will be unable to use this world-famous shipping route. Meanwhile, the shipping fleet is only getting bigger. AGCS calculates that shipping capacity grows by around 30% every four to five years, meaning the arrival of 24,000 teu carriers can be anticipated by 2018. Construction on the Nicaraguan canal is expected to begin in December, with the aim of finishing in 2019 and operations slated to commence in 2020. This represents an ambitious timeframe given the Panama Canal s much smaller expansion started in 2007 and is not scheduled to be finished until next year. 18

CONTACT Contact Us For more information, please contact your local Allianz Global Corporate & Specialty Communications team. LONDON MUNICH NEW YORK Hugo Kidston hugo.kidston@allianz.com +44 203 451 3891 Bettina Sattler bettina.sattler@allianz.com +49 89 3800 14303 Jacqueline Maher jacqueline.maher@agcs.allianz.com +1 646 472 1479 PARIS SINGAPORE Florence Claret florence.claret@allianz.com +33 158 858863 Wendy Koh wendy.koh@allianz.com +65 6395 3796 Follow AGCS: on Twitter @AGCS_Insurance and on Linked In www.agcs.allianz.com Credits Editor Greg Dobie Journalist Carly Fields Design Kaz Kapusniak Copyright 2014 Allianz Global Corporate & Specialty SE. All rights reserved. The material contained in this publication is designed to provide general information only. Whilst every effort has been made to ensure that the information provided is accurate, this information is provided without any representation or warranty of any kind about its accuracy and Allianz Global Corporate & Specialty SE cannot be held responsible for any mistakes or omissions.