GUIDE FOR TESTING POWER TRANSFORMERS. Type test & Special test. 11/11/02 Pagina 1 di 7

Similar documents
GUIDE FOR TESTING POWER TRANSFORMERS

Testing of Power Transformers. Routine tests, Type tests and Special tests

INTERNATIONAL STANDARD

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Presentation of the France Transfo factories

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Outer Diameter 23 φ mm Face side Dimension 20.1 φ mm. Baffle Opening. Normal 0.5 Watts Maximum 1.0 Watts Sine Wave.

SURGE PROTECTIVE DEVICES

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & Instructions For Installation, Operation & Maintenance

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

The following table shows approximate percentage wise the

INTERNATIONAL STANDARD

Rules for Classification and Construction Additional Rules and Guidelines

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer

A Practical Guide to Dielectric Testing

IEEE802.3poep Study Group Revision of isolation requirements in IEEE802.3 clause 33.

Unified requirements for systems with voltages above 1 kv up to 15 kv

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO

Siemens AG Power Transmission and Distribution Medium Voltage Division Mozartstr. 31c Erlangen Germany.

FAQs-Main switchboard design criteria

Automated test systems for distribution transformers Part II. Detailed analysis of the test system features EVENTS ABSTRACT KEYWORDS

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO)

Transformers. Special transformers Reactors products

Electrical Safety Tester Verification

Equipment: Power Supply, DAI, Transformer (8341), Variable resistance (8311), Variable inductance (8321), Variable capacitance (8331)

Rated Power(W) 8W 2. EG-LED W 3. EG-LED W

Guidance for upgrading to GB (IEC : 2005, MOD)

Power transformers. Special transformers Railway

T Substation Maintenance and Commissioning Test Equipment

R=Required by Lab S=May be subcontracted IEC SYSTEM FOR CONFORMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES

THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating.

Medium-voltage Transformers

Measuring leakage currents in electromedical devices in accordance with IEC EN 62353

Alternating Current and Direct Current

The standards mentioned in this document

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

PM734F - Technical Data Sheet Winding 28

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Instrument Transformers Application Guide

FRAX 150 Sweep Frequency Response Analyzer

See Horenstein 4.3 and 4.4

Current and Temperature Ratings

Capacitors for A.C. motor applications

PC software icos Advanced

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

Medium voltage circuit breaker

Power over Ethernet plus Isolation requirements. David Law 3Com

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets. 17th April 2012

Electrical network protection. Protection guide. Guide

Three-Phase Electric Power Distribution for Computer Data Centers

Three phase circuits

A wave lab inside a coaxial cable

Technical Specification for Oil insulated Transformers U m < 24 kv up to 1250 kva

16 Transformer and Transformer-feeder Protection

APPENDIX A PIN-OUT OF RJ12 / RJ45 CONNECTORS. RJ12 connectors

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy

How to design SMPS to Pass Common Mode Lightning Surge Test

Chemical resistance Accidental

Short Circuit Current Calculations

WINDING RESISTANCE TESTING

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN

DS 600. A contact free flux gate based current measurement sensor 600A rms

Occupational Profile: Electrical & Electronics Engineering Technician

HV glass suspension insulator U70BS and U70BL type Ball and socket type Standard profile

Lightning Arresters P KVA P KVA. Description & Installation

THE VALUE OF POWER FACTOR TESTING

R.C.C.B. s two-pole LEXIC

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

Electrical network protection. Protection guide. Guide G 51G 51G 51G 51G. network protection solutions

CC-Link Ver.1.10 Compatible

Electricity Service Standards

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

INTERNATIONAL STANDARD

RM17TE V AC. Main. Product or component type. Product specific application. Relay monitored parameters 250 V DC 5 A DC

Understanding Insulation Resistance Testing

Earth Fault Detection Basics in Theory


SECTION DRY-TYPE TRANSFORMERS

Chapter 12: Three Phase Circuits

Automotive Electronics Council Component Technical Committee

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

ANSI Watthour Meter Testing & Certification Programs

EARTHING SYSTEM CALCULATION

Residual Current Circuit Breaker

IEC >>> IEC GUIDE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

Lab 8: DC generators: shunt, series, and compounded.

VEO. V4PF480Y/277VSYTK02 Art.Nr.: V4PF480Y/277VSYTK02P Art.Nr.: TECHNICAL DATA

TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin

DRM75A 230V 20/100A DIN rail single phase two wire energy meter

PI734D - Technical Data Sheet

PI734B - Technical Data Sheet

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

Triplen Harmonics Mitigation 3 Phase Four-Wire Electrical Distribution System Using Wye- Zig-Zag Transformers

Type: EASY719 DC RC Article No.: Ordering information Relay outputs Quantity 6 Power supply V DC 24 V DC. Description

Transcription:

GUIDE FOR TESTING POWER TRANSFORMERS Type test & Special test 11/11/02 Pagina 1 di 7

GUIDE FOR TESTING POWER TRANSFORMERS... 1 Type test & Special test... 1 Introduction... 3 1 Type test... 4 1.1 Lightning impulse test... 4 1.2. Temperature rise test... 5 2 Special test... 6 2.1 Measurement of sound level... 6 2.2 Short-circuit withstand test... 7 2.3 Zero sequence impedance measurement... 7 2.4 Condensation test...7 2.5 Condensation and humidity penetration test... 7 2.6 Low-temperature test... 7 11/11/02 Pagina 2 di 7

Introduction Type test Unless otherwise specified, the following type tests, when required, shall be performed on one transformer for each constructional tipology : Lightning impulse test Temperature rise test Special tests Unless otherwise agreed, the following special tests shall be performed, when required, on one transformer for each constructional tipology : Measurement of sound level Short-circuit withstand test Zero-sequence impedante measurement Condensation test Condensation and humidity penetration test Low-temperature test Heating-shock test at 5 C Heating-shock test at 25 C 11/11/02 Pagina 3 di 7

1 Type tests 1.1 Lightning impulse test The voltage test shall be in accordance with List 1 or List 2 of Table no.5 of IEC Standards 60076-4, depending on the insulation level of the transformer. The test impulse shall be a full standard lightning impulse : 1,2 µs ± 30% 50 µs ± 20% The test voltage shall normally be of negative polarity. The circuit of the generator and the measuring connections must remain unchanged during calibration and during full voltage tests, The test sequence per line terminal shall be one calibration impulse at a voltage included between 50% and 75% of the full voltage, followed by three impulses at full voltage. During a test on a line terminal, the remaining line terminals are earthed (either solidly or through low impedance). During the calibration and during the tests, an oscilloscope shall clearly record the wave shape of the impulses ( duration of the front, duration up to half-value). The test is successful if there are not significant differences in the records of current. CONNECTION SCHEME B 1U A C D E 1V 2U 2V F 1W 2W G 11/11/02 Pagina 4 di 7

1.2. Temperature rise test The test is for verifying whether the temperature rise limits of the windings, as agreed at the time of the enquiry, are respected. The test can be carried out by means of two different methods: Simulated loading method (in accordance with. IEC 60726 p.21.1.3) The method used is defined at the time of the enquiry. The average temperature rise shall be determined by means of the variation of winding resistance. The core temperature rise shall be determined by use of a thermometer. All the carries at rated conditions shall be performed in accordance with IEC 60726. Simulated loading method Temperature rise test is made by utilising the rises obtained on two tests, one with no-load loss only, and one with load-loss only. The no-load test, at the rated voltage and rated frequency, is continued until steady state conditions are obtained; individual winding temperature rises are then calculated by measurement of hot windings resistance, that shall be carried out as shortly as possible after disconnection. The short.circuit run with rated current flowing in one winding and the other winding short-circuited, is started immediately following the no-lpad run, and continued until steady state conditions are obtained; individual windings temperature rises are then calculated as above mentioned. The total winding temperature rise of each winding, with rated current in the winding and normal exitation of the core, shall be calculated in accordance with IEC Standards 60726. CONNECTION SCHEME 11/11/02 Pagina 5 di 7

2 Special test 2.1 Measurement of sound level The test procedure is in accordance with IEC Standard 60076-10. At first, the background noise level shall be measured. Then, the transformer shall be powered at rated voltage and frequency under no-load conditions (with the tap-changer selected on the principal tapping), in order to carry out transformer noise level measurements. They shall be performed in several points located around the transformer, placed at a distance of 0,3 m from the machine unless, due to safety reasons or following agreement between supplier and purchaser, the distance is increased to 1m. Measuring positions shall be spaced at a distance of at most 1 metre one from another; anyway, a minimum of 6 positions is required. The measurements shall be carried out at half the equipment height, if this does not exceed 2,5m; otherwise, they shall be performed at 1/3 and 2/3 of the component height. After performing transformer sound level measurement, the machine is de-energised and background noise level is measured again; At the end, the final transformer sound level shall result by applying a correction by taking into account the lower background noise level. In case there is a high difference between the transformer and background noise level (>8 db) no correction shall be applied. CONNECTIONN SCHEME 11/11/02 Pagina 6 di 7

2.2 Short-circuit withstand test The test shall be performed in accordance with IEC Standards 60076-5 in external laboratories. 2.3 Zero sequence impedance measurement This test can be performed if either of the windings is either star connected or zig-zag connected, with accessible neutral conductor. When the neutral is not accessible, zero sequence impedance is infinite. In case of two windings star-delta connected, zero-sequence impedance shall be measured on the star-connected winding and it will result approximately equal to short-circuit impedance, whose determination is described in par. 5.1.3. Zero- sequence impedance shall be measured by applying a single-phase voltage at rated frequency between the terminals of the winding under test, short-circuited, and the neutral. 2.4 Condensation test The test shall be performed in accordance with attachment ZA of HD 538 Standards in external laboratories. 2.5 Condensation and humidity penetration test The test shall be performed in accordance with attachment ZA of HD 538 Standards in external laboratories. 2.6 Low-temperature test The test shall be performed in accordance with attachment ZB of HD 538 Standards. 2.7 Heating-shock test (-5 C ; -25 C) The test shall be performed in accordance with attachment ZB of HD 538 Standards. 2.8 Fire-behaviour test The test shall be performed in accordance with HD 464 S1/A3, in external laboratories. 11/11/02 Pagina 7 di 7