Join the UK Nuclear Renaissance AREVA Presentation & EPR Reactor Product 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1
Luc Oursel AREVA NP CEO 2 AREVA NP 2
My Objective for today You to understand the opportunity that exists for UK equipment manufacturers & suppliers to support EPR new build projects in UK and external to UK, How you become an AREVA global supplier And, to outline, Scope, Process, Timeline & Next Steps... 3 AREVA NP EPR is a trademark of the AREVA Group 3
Energy: Our Core Business Front End Division Reactors and Services Division Back End Division Transmission & Distribution Division Enrichment services Fuel fabrication Reactors Chemistry Renewable energies Mining Recycling MOX fuel fabrication Used fuel treatment Services Transmission Other sources of electric power Distribution Unique integrated supplier able to manage nuclear assets throughout their lifetime 4 AREVA NP EPR is a trademark of the AREVA Group 4
Global New Build Anticipated Global New Build & Lifetime Extension Programme = 350GW AREVA ambition is to win 30% AREVA expects to deliver some 60 new power plants by 2030 all over the world 5 AREVA NP EPR is a trademark of the AREVA Group 5
EPR reactor, the FIRST Generation III+ under construction: First project site: Olkiluoto 3 October 2006 July 2007 April 2008 January 2009 6 AREVA NP EPR is a trademark of the AREVA Group 6
Progress in construction: activities on site IRWST Turbine hall Reactor Pressure Vessel s arrival on site 7 AREVA NP EPR is a trademark of the AREVA Group 7
EPR reactor, the FIRST Generation III+ under construction: Second project site: Flamanville 3 First of the new EDF EPR reactor fleet Generating power and revenue by 2012 Copyright EDF 8 AREVA NP EPR is a trademark of the AREVA Group 8
EPR reactor, the FIRST Generation III+ under construction: Third project site: Taishan 1 & 2 SG Tube Plate 9 AREVA NP EPR is a trademark of the AREVA Group 9
Industry leaders moving towards EPR reactor projects COL submitted to NRC USA Technology selected South-Africa Short-listed (offer submitted) UK Pre-licensing (GDA) Under preparation India France January 29, 2009, French Government announced the launching of the Penly 3 project, second EPR of French fleet Italy February 24, 2009, EDF and ENEL announced intent to develop a fleet 10 AREVA NP EPR is a trademark of the AREVA Group 10
UK Market Objectives & Strategy Multiple & Concurrent new builds in the first wave Estimate total new build market: 20-25 GW Estimate «first wave new build» = 5-6 sites, 4 to 10+ EPR projects EPR Alliance of Major European Utilities About 2 4 EPRs JV1 About 2 EPRs JV2 4 EPRs By Spring, we should know which clients, which sites, By Autumn, we should know which vendors, By Christmas, we should know which Consortia, which Tier 1s 2009 = the year to develop industrial landscape & start 1st wave Projects 11 AREVA NP EPR is a trademark of the AREVA Group 11
Forging the industrial landscape in 2009 Developing skills and supply chain UK partners are working with AREVA on two parallel campaigns AREVA has done this before and is doing it today on 4 projects worldwide Skills Skills development Skills Skills to to deliver deliver EPRs EPRs Skills Skills for for lifetime lifetime support support of of EPRs EPRs Work Work with with Nat Nat Skills Skills Academy, Academy, trade trade associations associations & Universities Universities Rejuvenating UK UK supply supply chain chain An An open open transparent transparent system, system, Engage, Engage, then then qualify qualify UK UK supply supply chain chain Form Form a group group of of qualified qualified suppliers. suppliers. Maximising UK s industrial horsepower 12 AREVA NP EPR is a trademark of the AREVA Group 12
Creating a UK industrial supplier base Signing Flagship Partners to bring certainty Balfour Beatty Construction, Civils, Mechanical & Electrical. (Supported by Vinci) Rolls-Royce Engineering, Manufacturing, Supply Chain. Two key Flagship companies to partner AREVA to Forge the landscape... Prepare new build.. Build Flagships with complementary skills and expertise 13 AREVA NP EPR is a trademark of the AREVA Group 13
New build, an economic opportunity for UK UK skills & investments needed 25 GW new build programme represents between 10,000 and 15,000 British jobs in manufacturing & construction for 25 years, plus jobs associated with 60 years of operations, Civil, Construction, Installation & Commissioning will be dominated by UK companies The major opportunity to be maximised is UK Equipment Suppliers & Equipment Manufacturers, Start National with AREVA, Go Global with AREVA A significant opportunity, an industrial rejuvenation 14 AREVA NP EPR is a trademark of the AREVA Group 14
Creating qualified UK suppliers Start in UK, then go Global with AREVA A 2 step process, first step achieved in 6 months Together we can achieve local UK delivery for EPR projects 15 AREVA NP EPR is a trademark of the AREVA Group 15
The Product: The UK EPR Reactor Pierre-Jean Phliponeau International Marketing EPR Reactor Project Manager 16 AREVA NP EPR is a trademark of the AREVA Group 16
17 17 AREVA NP EPR is a trademark of the AREVA Group
Reactor Cooling System Primary loops Steam Generators Pressurizer Reactor Coolant Pumps Reactor Pressure Vessel Reactor Cooling System (Primary pipes) 18 AREVA NP EPR is a trademark of the AREVA Group 18
EPR Reactor Plot Plan 1/2 Nuclear Island Turbine Island Diesel Generators 3-4 Building Safeguard Building 1 Fuel Building Reactor Building Turbine Building Safeguard Buildings 2+3 Nuclear Auxiliary Building Diesel Generators 1-2 Building Safeguard Building 4 Waste Building 19 AREVA NP EPR is a trademark of the AREVA Group 19
EPR Reactor Plot Plan 2/2 Nuclear Island (NI) Turbine Island (TI) Balance Of Plant (BOP) + Civil Works 1 Reactor Building 2 Fuel Building 3 The Safeguard Buildings 4 The Diesel Buildings 5 Nuclear Auxiliary Building 6 Waste Building 7 Turbine Building 20 AREVA NP EPR is a trademark of the AREVA Group 20
The Reactor Cooling System needs support functions to be sheltered in dedicated surrounding buildings To fill and drain during outages To control chemistry in daily operation To control Pressurizer level (water inventory) In daily operation In upset conditions (safeguard systems) To process the effluents (liquid, gazeous) To transfer fuel to and from the fuel storage pool Additionally, all the buildings need support functions Electrical distribution HVAC systems (Heating, Ventilation and Air Conditioning) Fire protection systems Audio systems Control systems of all sorts (access, security, activity, ) / 21 AREVA NP EPR is a trademark of the AREVA Group 21
Inside the buildings The Reactor Building shelters the Reactor Cooling System Reactor Pressure Vessel Steam Generators Reactor Cooling Pumps Pressurizer And much other large and small equipment The Nuclear Auxiliary Building shelters most of the equipment dealing with daily operation support functions (primary water inventory and chemistry control) The Wastes Building collects, stores and treats liquid and solid radioactive wastes The 4 Safeguard Buildings shelter most of the safeguard equipment 4x100% redundant safeguard systems 4 Safeguard Buildings The Control-Room is located in one of the Safeguard Buildings The Fuel Building shelters the fresh fuel, the spent fuel in an interim storage pool and the associated handling equipment The two Diesel Buildings shelter the four emergency diesel generators and their support systems 22 AREVA NP EPR is a trademark of the AREVA Group 22
Possible scope of supply for an EPR Reactor NSSS (Nuclear Steam Supply System) 23 AREVA NP EPR is a trademark of the AREVA Group 23
Possible scope of supply for an EPR Reactor BNI (Balance of Nuclear Island) 24 AREVA NP EPR is a trademark of the AREVA Group 24
Possible scope of supply for an EPR Reactor NI (Nuclear Island = NSSS + BNI) 25 AREVA NP EPR is a trademark of the AREVA Group 25
The EPR Reactor: from paper to concrete The path to greatest certainty 26 AREVA NP EPR is a trademark of the AREVA Group 26
EPR Reactor, the best from French and German technology German KONVOI (~1300 MWe) Neckar 2 Emsland Isar 2 French N4 (~1450 MWe) Chooz 1-2 Civaux 1-2 The EPR reactor provides more safety and better economics with the certainty of a proven and evolutionary technology 27 AREVA NP EPR is a trademark of the AREVA Group 27
EPR reactor, the FIRST Generation III+ under construction: Nth of a Kind Under Construction Olkiluoto 3, Finland Flamanville 3, France Under Construction Project Preparation Taishan 1&2, China Calvert Cliffs 3, U.S. Predictability based on experience 28 AREVA NP EPR is a trademark of the AREVA Group 28
AREVA never stopped designing and building PWRs Generation I Generation II Generation III+ 1 PWR 1 unit, France 77 PWR (up-to 1400 MWe) 54 units, France 10 units, Germany 15 units, export 7 PWR (1300 to 1500 MWe) 4 units, France 3 units, Germany 4 PWR under construction (1600+ MWe) 1 unit, Finland 1 unit, France 2 units, China 1950 1970 1988 2010 1 model 6 models N4, KONVOI EPR reactor 102 NPP built, of which 87 PWRs feeding innovation and providing certainty 29 AREVA NP EPR is a trademark of the AREVA Group 29
EPR reactor design currently being licensed by leading safety authorities Construction License February 2005 April 2007 Licensing Launched Design Certification Application December 2007 Submission June 2007 On-going We have experience in meeting different national licensing requirements and processes. AREVA supports a shorter licensing process by providing comprehensive reference documents 30 AREVA NP EPR is a trademark of the AREVA Group 30
Outstanding safety level 31 AREVA NP EPR is a trademark of the AREVA Group 31
EPR reactor aircraft hazard protection in the post 9-11 World EPR reactor designed to withstand impact of: Large Commercial Jet & Military Aircraft At various Elevations & From different Sides Simply, yes, the EPR reactor resists commercial and military aircraft crashes 32 AREVA NP EPR is a trademark of the AREVA Group 32
Redundant and diverse EPR reactor safety systems EPR reactor is protected against: Multiple failure while providing online maintenance flexibility 4 times redundant safeguard systems 2 1 3 4 Common cause failures safety system diversity: - Every system has a diversified back-up Four Train concept and physical separation External hazards through systematic physical separation of the safety systems Proven yet evolutionary safety systems deliver high reliability levels 33 AREVA NP EPR is a trademark of the AREVA Group 33
Consequences of a severe accident are limited by both passive and active safety systems Passive System (Short term) Active System (Long term) IRWST Reactor pit & Sacrificial concrete Spreading area 1. Temporary retainment in the reactor pit (gravity and metal gate) 2. Spreading in the large surface dedicated area (metal gate melting and gravity) 3. Flooding and cooling of the spreading area using IRWST (In-containment Refueling Water Storage Tank) 1. Removal of containment heat: Recirculation and coolant heat exchange Containment spray system No need for significant off-site measures improves public acceptance 34 AREVA NP EPR is a trademark of the AREVA Group 34
AREVA s EPR reactor, a worldwide fleet in the making! Thank you for your attention 35 AREVA NP EPR is a trademark of the AREVA Group 35
36 AREVA NP 36