SEMCO MARITIME energy experience
Safety briefing
3 NO COMPROMISE HSE&Q Health, Safety, Environment and Quality Safety is the key factor of every project We insist on adhering to globally approved standards in health and safety Our staff receive regular training in the latest health and safety tools and procedures We help our customers minimise the environmental impact of their projects and operations We ensure that all our processes and projects meet the highest international standards Third-party certified: ISO 9001 ISO 14001 OHSAS 18001 ISO 3834-2 Assessments: PQAN Certificate Assessment First Point Achilles Sellihca
4 OUR RESPONSIBILITY responsibility for local communities
Our story 5 Semco Energi and Semco Marine in Odense are consolidated into one division in the name of Semco Maritime, a business unit under Semco A/S. Semco Maritime aquires Secure Systems ApS and becomes Premier Cisco Partner. Capelrig is acquired. This opens up a new chapter in Semco Maritime s story. Semco Marine offshore office is established in Esbjerg. Semco Maritime is certified according to OHSAS 18001 and ISO 14001. The business units Switchboard and Marine Service are sold. Semco Maritime opens production plant in Vietnam. 1980 1996 1998 2000 2003 2006 2007 2008 2010 2011 2012 C.W. Obel becomes the owner of SN Holding including Semco A/S. The business unit Fire Protection is sold to Danfoss and C.W. Obel. Esbjerg Oilfield Services is acquired and integrated in full with existing activities. Acquisition of Danish Rope Access. Semco A/S is divided in two companies Semco Danmark A/S (Bravida) and Semco Maritime A/S. Norse Electronics (telecom) and OIS, Norway is sold. Semco Maritime takes over the project engineering and consultancy department of Delpro A/S Semco Maritime acquires AGR in Norway.
Semco Maritime 6 Participates as a general contractor or subcontractor within the following market sectors: Oil & Gas Wind Power Rig Projects Power Projects Semco Maritime offers a wide range of products & technology solutions.
Semco Maritime Focus Areas 7 Nordsø Mellemøsten Latinamerika Udvalgte lande Sydøstasien Headquartered in Esbjerg, Denmark With subsidiaries in Norway, the UK, Dubai, Singapore, Vietnam, Central America and the USA
Finance 8 Turnover EBIT 327,20 172,45 211,12 179,20 170,24 237,42 7,40 6,19 2,03 2,38 5,07 14,1 2007 2008 2009 2010 2011 2012 Values shown in millions EUR
352 1.009 338 1.041 332 1.041 422 916 437 983 411 1.206 9 Number of head count (average) 1.800 1.600 1.400 1.200 1.000 800 600 400 200 0 2007 2008 2009 2010 2011 2012 Head count DK Head count abroad
BUSINESS OPERATIONS 10 Management Group Support Wind, Oil & Gas Products & Technology Rig Projects Power projects
FABRICATION FACILITIES - ESBJERG 11
Offshore Industry Wind, Oil & Gas
Market information 13
Market information 14
Market information 15
Market information 16
Market information 17
Market information 18
Market information 19
Market information 20
Market information 21
Market information 22
OIL & GAS max uptime for oil & gas assets
EPCI FACILITIES CONTRACT 24 Semco Maritime have entered into a long term agreement with DONG Energy for maintenance and modification of their offshore Oil & Gas installations in Denmark and later in Norway and the UK. (EPCI Facilities Contract) Engineering Procurement Prefabrication Installation and testing Operation support - manpower
PROJECT: HESS BROWN FIELD & Hock up 25 Semco Maritime and Rambøll Oil & Gas have set up an integrated project team for this project. The Brownfield project includes: Engineering Procurement Prefabrication Installation and testing The challenge is that all changes will take place on a platform which is still in operation. Brown Field on South Arne 120.000 on- and offshore hours Hock Up including carry-over work approx. 350.000 and offshore hours
REFERENCE PROJECT: SNORRE A 26 Project Scope shortly: Upgrade Vibration Monitoring System General scope of work is to replace existing vibration, condition monitoring systems and network. The contract covers replacement of 15 racks. This includes new field monitoring racks, a new network including local database servers, VDU display, keyboard and software. Costumer: Location: Project type: Period: Statoil Norway EPCIC Oct. 2012-2013
PROJECT: HALFDAN BB 27 Project Scope shortly: Fabrication of Wellhead Module Semco Maritime has performed the detailed design and subsequently manufactured and tested the 600- ton module for Halfdan BB in 9 months. Costumer: Location: Project type: Period: Mærsk Olie & Gas A/S Denmark Design, engineering, fabrication 2007
Wye Structure for Subsea7 28
WIND POWER strengthening wind power
HORNS REV II 30 Project Scope shortly: Accommodation module for Horns Rev II Design and fabrication of accommodation module with 24 rooms, galley, canteen, TV-room, changing room, offices etc. Also design, production and commissioning of PAGA, Tele/data and entertainmen Costumer: Location: Project type: Period: DONG Energy Denmark Design and fabrication 2008
WALNEY 1 + 2 31 Project Scope shortly: Walney 1-183 MW Walney 2-183 MW Constructed sequentially. Collects the electricity from the wind turbines and step up the voltage to 132kV for the local grid. Costumer: Location: Project type: Period: DONG Energy United Kingdom Design, fabrication and installation 2010
SEA FASTENING & PILE GRIPPERS 32 Sea fastening of: Nacelle Hub Towers Blades Re-calculation of barges/vessels Reinforcements Semco Maritime has extensive experience with sea fastening design, engineering, fabrication and installation for several offshore wind turbine components
Sea-fastening MPI Discovery 33
ABJV Barge 2012 34
RIG PROJECTS ingenuity and team spirit
Rig Projects Projects 36 We upgrade, repair and maintain rigs anywhere in the world. From 2011 it will be possible to upgrade even larger rigs in Esbjerg Facilities in Esbejrg: Load out: 1.000 T Total length: 2270 m Max. depth at high water: 9.3 10.5 m Modules from our new facilities in Vietnam: Built according to DNV 2.7.1 Standard modules Customised modules
PRODUCTS & TECHNOLOGY robust and reliable solutions
Products & Technology 38 For 30 years we have been supplying the energy sector with a wide range of components, systems and solutions. Delivery of our systems and services all over the world - including: Telecommunication systems Firefighting systems Fire protection systems Wellhead control systems Produced water systems Explosion-proof components Component sales: Junction boxes, cables, beacons and sounders, telephone systems and lighting equipment.
PROJECT: GREATER EKOFISK AREA 39 Project Scope shortly: Frame Agreement for supply of Telecommunication Systems This is a Frame Agreement for all Telecommunication systems for the whole Greater Ekofisk Area development project including systems for implementation of Integrated Operation. This includes also collaboration with the different Topside and Brownfield EPCI contractors. Costumer: Location: Project type: Period: ConocoPhillips NO Norway EPC Jan. 2010 2015 + 2+2
POWER PROJECTS more power to people worldwide
Power Projects 41 Turnkey projects - We are a supplier-independent turnkey contractor to diesel, hydro and gas around the world. Power plants: We have completed more than 50 cogeneration plants world wide. Operation and maintenance of power plants: As your partner, we focus on maximizing your return on investments, ensuring that your plant delivers low-cost, reliable power. Transmission lines and substations: We offer full-scope contracting and independent consultancy on transmission lines and substations at all voltage levels. We have completed power infrastructure projects in: Central America, India, The Philippines, China, Egypt, Vietnam, Greenland, Africa, The Maldives
Male Power Plant 42 Semco Maritime has in consortium with MAN Diesel been awarded the contract for STELCO IV Upgrade of Male Power Plant, the Maldives Islands Extension of turnkey power plants
www.semcomaritime.com Dedicated people, exceeding expectations