Offshore Drilling. Deep Water Challenges



Similar documents
API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

New Generation of Deepwater BOP Stacks. Dominique Allegre CAMERON Paris, October 23rd 2013

Offshore Structures. Offshore Drilling Equipment

APPENDIX D. Offshore Drilling Well Control

Deepwater Horizon Disaster

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

BOP Basic Safety Functions. Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS

Subsea Drilling Systems

10 Wireline operations

Setting a Global Standard. SingleBore Subsea Completion System

BOP PRESSURE TESTING PROCEDURE

Deepwater Horizon Accident Investigation Report

AOG 2015 Acoustic System to Monitor Wellhead Fatigue in Real-time. March 12 th

Department of the Interior

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

PETROLEUM PRODUCTION MASTERCLASSES

A CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS

DRILLING PRODUCTS AND EXPERIENCE

Subsea School The training program

Estimation of shear force for blind shear ram blowout preventers

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

How To Build A Kingkong Production System

Risk Assessment Data Directory. Report No. 434 A1 March Appendix 1

Subsea wellhead systems. Advanced solutions for extreme conditions

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

SIEM WIS AS. Siem WIS. UTC June 2008 By Jan Atle Andresen

This document, and more, is available for download from Martin's Marine Engineering Page -

Send your directly to

Rigorous Qualification and Development Program

AADE-07-NTCE-30. Underwater Seafloor Drilling Rig Adel Sheshtawy, AADE, USDR Inc.

Deepwater Horizon: Lessons learned for the Norwegian Petroleum Industry with focus on Technical Aspects

creating progress for the future

COMPARATIVE ANALYSIS BETWEEN SURFACE AND SUBSEA BOP OFFSHORE DRILLING SYSTEMS IN WAVES AND CURRENT

LINKING SEABED TO SURFACE

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

An Introduction to Oil and Gas Well Servicing

Total Subsea Solutions

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Well control equipment. Matanović Davorin, professor

Plug and Abandonment Forum

Aker Drilling Riser Brazil

Texas Oil Tools Subsea Well Intervention Equipment

DecisionSpace Well Engineering Software

Deepwater Horizon Oil Spill. BP 2010 Gulf of Mexico Oil Spill

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

E-Line and Braided Line. E-Line Open Hole wireline

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

Diagnosing Hydraulic Problems

ARCTIC S SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE

RISER SYSTEMS. Our world class innovation solving your riser challenges

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Setting a Global Standard. HIPPS: High Integrity Pressure Protection System

Nautilus Minerals. presentation to AFTP. Paris, October

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Parker Subsea Drilling. BOP Umbilicals, Hotlines and Stack Hoses

Helping Our Customers Achieve Superior Results. Offshore Handling Equipment

12/08/2015. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems. August 2015

Unit 24: Applications of Pneumatics and Hydraulics

Drilling for Deepwater Data: A Forensic Analysis of the Gulf of Mexico Deepwater Horizon Disaster

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at

NEXT GENERATION ELECTRICAL AND OPTICAL CABLE TERMINATION SYSTEMS FOR THE DRILLING INDUSTRY

Breaking new ground in subsea excavation and trenching.

Capital drilling equipment

MUX Control of subsea BOP without an Umbilical

Mobile Home Pre-Inspection Checklist

RESEARCH REPORT 013. Hazard assessment of well operations from vessels HSE

TECHNICAL INFORMATION

MERMAID FLEET PROFILE SUBSEA SERVICES

Utility Distribution Systems

Subsea Engineering Days 2015

Topics of the Presentation

DOE Award Number: TITLE PAGE. Phase I Topical Report. Don L. Hanosh

Deepwater Horizon Oil Spill - An Ethical Analysis

NORSOK STANDARD DRILLING & WELL OPERATIONS

Blue Logic Auto Release STAVANGER 2015

Fishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares

SPE/IADC WELL CONTROL ASIA PACIFIC 2009 Velocity string installation in deep live gas wells.

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA

Setting a Global Standard. SDX BOP Stack Subsea Wellhead Connectors


UNDERWATER ENGINEERING SERVICES. Visit Us Online At Part of the ATR Group

AGM presentation 13 May 2009

Example. Fluid Power. Circuits

Introduction to Subsea Production System

DirectCommand Installation DirectCommand 3-Channel Spreader Kit

Case 2:10-md CJB-SS Document Filed 01/15/15 Page 1 of 44 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF LOUISIANA * *

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Helping Our Customers Achieve Superior Results. Top Drive

Hurricanes and the Offshore oil and Natural Gas Industry

Deepwater Horizon Accident Investigation Report

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Inspection of risers with submarine robotics; technology, risks and regulations

Transcription:

Offshore Drilling Deep Water Challenges

Well Control Old movies sometimes had an oil rig where rig workers are running away from the derrick, excitedly yelling We hit a gusher! That is not an acceptable way to discover oil now, from an environmental or safety standpoint. On an offshore rig, the only escape is by lifeboat.

Offshore Drilling Rigs In the late 1800 s the first offshore well was drilled in a lake in Ohio In 1896 drilling was performed from a pier extended into the Santa Barbara Channel. 1923 first well in the Caspian Sea 1937 first well in the Gulf of Mexico As drilling move to deeper waters, Jack Up drilling rigs were built. The most recent generation rigs are limited to 450 500 feet.

Drill Ships Later, drill ships and semi submersible rigs were developed for deeper water. Initially they were anchored, until in 1970 the first Dynamically Positioned (DP) ship was built.

Semi submersibles Semi submersibles, also known as column stabilized drilling units, don t have the storage capacity of drill ships but are better able to operate in areas severe sea states. The first DP semi was built by the Halifax Shipyard and launched in 1977. It was also the last of 7 drilling rigs built in Halifax. The newest generation rigs, Semis and drillships, can be operated in 12,000 feet of water and drill to depths of 40,000 feet. Currently there are approximately 60 floating drilling rigs under construction in shipyards, almost entirely in Singapore, Korea and China. Semi submersibles, also known as column stabilized drilling units, don t have the storage capacity of drill ships but are better able to operate in areas with severe sea states.

Blow Out Prevention There are two means to prevent a gusher when drilling for oil and gas. The primary means is hydrostatic pressure with drilling mud, primarily using the mineral barite as a weight component. The secondary means is the BOP, or blow out preventer. The BOP is an arrangement of valves, rams preventers, annular preventers, connectors and control system. BOPs for land rigs and jack ups are a fairly simple system, as shown. Because they are on the surface and accessible at all times the control system is not complex.

Subsea BOPs A typical subsea BOP weighs in a range from 450 850,000 lbs. They have more complex control systems and usually additional ram and annular preventers. Typical deepwater BOPs today have an internal diameter of 18 3/4 and are rated to 15,000 psi maximum wellbore pressure. The BOP is run subsea after the surface well has been drilled and a wellhead has been landed and cemented in the seabed.

Choke and Kill Valves Valves called choke and kill valves on the BOP allow for high pressure gas and oil to be transmitted to the drilling rig to bring a well under control.

Lower Marine Riser Package The BOP has two sections, the Lower Marine Riser Package (LMRP)and lower stack. The LMRP usually has one annular, one connector to attach to lower BOP, the control system, gas bleed valves and a flex joint.

Marine Riser and Telescopic Joint The BOP is run to the wellhead with Marine Riser pipe. This provides a means to return drilling fluids to the surface. Auxiliary lines on the riser provide hydraulic supply fluid (95% water, 5% soluble oil. Up to 50% glycol in cold weather areas.) High pressure choke and kill lines provide a means to bring any gas or other high pressure influx to the surface safely. Because floating rigs move, there is a motion compensation system, a telescopic joint and a flex joints on the top and bottom of the riser string. A telescopic joint can have a stroke from 55 to 70.

Marine Riser Tensioning System The marine riser is kept in tension with large pistons operated with an air/oil system at pressures up to 3,000 psi. The riser may be connected via a tensioning ring to wire rope which is reeved over sheaves on the pistons or the pistons may be connected directly to the riser tensioner ring.

Buoyancy As drilling progressed to deeper water, buoyancy modules were added to the marine riser to reduce the supported load.

Connectors Special hydraulically operated connectors, supplied by several manufacturers, are used to connect the LMRP to the lower BOP and to connect the BOP stack to the wellhead.

Flex joints To allow for rig movement away from the well center, there are flex joints located at the top and bottom of the marine riser string. Some drill ship also install and intermediate flex joint. Flex joints have typically have a maximum range of 10 degrees but the rig would disconnect the LMRP from the lower BOP before the angle reached 5 degrees.

Rams Pipe rams close around the drill pipe to seal off the wellbore and come in fixed sizes or variable, with variable rams having a designated range of pipe sizes they can accommodate. Shear Rams are designed to cut drill pipe and some sizes of casing. Casing is the pipe used to line the wellbore as the well gets deeper.

Annular Preventers Annular preventers can seal off on any dimension from open hole to the largest drill pipe or casing in the wellbore. The highest pressure rating of an annular preventer is 10,000 psi, which is below the highest pressure rating of a ram preventer, which is 15,000 psi. A 20,000 psi ram BOP is in the development stages.

Choke Manifold Choke manifolds are a series of gate valves and valves with variable orifices which are used to bring a well, which has had an influx of high pressure fluids into the wellbore, under control. High pressure wellbore fluid is directed to a degasser where the drilling mud is separated from the gas and the gas is vented to atmosphere.

Control Systems Subsea BOP have control systems that are supplied with fluid from a pump and accumulator system on the rig. Anchored rigs typically have a fully hydraulic system, with hydraulic pilot signals sent from the surface to operate the functions on the BOP subsea. Early dynamically positioned drill ships had electro hydraulic systems. With these systems an electric signal is send to a solenoid on the BOP which then sends a hydraulic pilot signal to a control valve. Multiplex (MUX) systems were developed to enable an ever increasing number of functions to be operated with just a few conductors in the MUX cable.

Control Systems Specifications Hydraulic control systems operate with supply pressure of 3,000 psi. MUX systems operate with supply pressure of 5,000 psi. Most functions are typically operated with 1,500 psi. Hydraulic fluid is supplied through rigid conduit pipe on the riser to accumulators in the BOP.

Control Panel Every rig must have a BOP control panel at the driller s station as well as one in a safe location away from the drill floor.

Control Pods BOPs must have completely redundant control systems on the BOP. These control systems are called pods and are designated Blue Pod and Yellow Pod in all systems, no matter which manufacturer. Some pods have redundant subsea electronic modules (SEMs) withing the pod for additional redundancy.

Safety Features To prevent accidental operation of critical functions, such as the BOP connectors and the shear rams, clear, pinned covers are installed on those functions.

Emergency Systems There can be as many as six emergency systems in a BOP to operate critical functions in the case of the loss of the primary control system. Emergency Disconnect Sequence (EDS) In a case where a DP rig has lost station keeping ability, the EDS is a one button system that allows the wellbore to be secured by closing the shear rams. The hydraulic functions to the lower BOP are then vented and the LMRP is separated from the lower BOP by unlatching the connector. An over pull is preset on the riser tensioners and the LMRP lifts from the lower BOP. A riser recoil system prevents a sling shot effect. After the EDS button is activated, the sequence takes about 55 seconds maximum.

Acoustic systems A limited number of emergency functions (typically shear rams and LMRP connector) can be operated from the rig using a hydrophone transmitting to transducers on the BOP. It is uncertain if these systems will work in a well control situation where considerable noise is generated from flow in the wellbore. Remote operated vehicles (ROVs) have pumps which can operate functions through a hot stab plugged into a dedicated receptacle in panel. The limitations of an ROV is the time to deploy from the rig to the sea bed and the limited flow rate of their pumps. A newly published standard by the American Petroleum Institute (API) specifies ROVs should be able to operate BOP functions in the same time as the primary control system. (rams 45 second to close)

Dead man systems will close the shear rams in the event all hydraulic and electric control is lost on the BOP. This would typically only happen if the riser string parted. In deepwater if the riser is lost, then the hydrostatic pressure of the drilling mud, which is needed to contain wellbore pressure, would be reduced as it is replaced by sea water. Closing the shear rams secures the well. Automatic Disconnect System (ADS) closes the shear rams when the lower flex joint reaches a preset angle. Autoshear closes the shear rams in the event the LMRP is unintentionally disconnected.

Locking Systems Because at certain wellbore pressures it is possible for rams to be opened by the wellbore pressure if the control system is lost, locking systems have been developed to keep the rams closed if the control system pressure is lost. Some system automatically lock the ram when it is closed but some locking systems must be operated separately.