Stormwater, Asset Management, and Wastewater



Similar documents
Kansas City s Overflow Control Program

Bridges & Culverts Condition by Quantity

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

SEWER CLEANING, INSPECTION AND ASSESSMENT

Sanitary Sewer Master Plan

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

SECTION AS-BUILT DOCUMENTATION

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

Asset Management: A Best Practice

The City of Owen Sound Asset Management Plan

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO , Construction Permit No. CP , Callaway County

DEPARTMENT OF ENVIRONMENTAL QUALITY

DRAFT Public Outreach Document for What s an SSMP?

Organically Growing an Asset Management System in the City of Novi, Michigan

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations

Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

SANITARY SEWER MASTER PLAN

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

Bulletin. Gerard D. Perry, Director of Accounts. DATE: August Sewer Rate Relief Fund FY2015

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

The Clean Water Project What Is The Stormwater Impact?

Sanitary Sewer Overflows Response to EPA Rule Making

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

Sewer System Management Plan (SSMP) Development Guide

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Name: Date: P.O. Box 2449, San Antonio, Texas (210) Number of Taps

Standard Operating Procedures Storm Drain System Maintenance

Asset Management Plan

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

Sanitary Sewer Overflow (SSO) Incident Report Form

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

Task F: Financial Plan

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Sewer System Management Plan (SSMP) Eastern Municipal Water District

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

SECTION 5 DRAFTING STANDARDS

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

Beechmont Park Project

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

LEAD COLLECTION SYSTEMS WORKER

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

Using GIS to Track and Prioritize Your Assets

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Water and Sewer Utilities

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

How To Install An Overhead Sewer

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Altoona Water Authority. Infrastructure Overview

ANNUAL REPORT OF LOAN AWARDS THE VERMONT ENVIRONMENTAL PROTECTION AGENCY (EPA) POLLUTION CONTROL REVOLVING FUND - ALSO KNOWN AS THE CWSRF

Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Request for Proposal Public Works Asset Management System

CLEANING, INSPECTION, AND TESTING OF SEWERS

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF PLACERVILLE ENGINEERING DIVISION

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

Home Drainage & Causes of Basement Flooding. Water

Master Planning and Hydraulic Modeling

Asset Management Guidance for Wastewater and Stormwater Systems

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

City of Mebane Wastewater Collection and Treatment Facility

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 656. WATER POLLUTION CONTROL FACILITY CONSTRUCTION STANDARDS

Tim Schneller, P.E. GBA Engineers and Architects

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

Transcription:

Stormwater, Asset Management, and Wastewater

New NPDES Permit Requirement by the MDEQ Asset Management Program Staffing Mapping Collection Systems Inventory and Assessment of Fixed Assets Budget and Rate Sufficiency Annual Reporting

In 2012 Public Acts 511, 560, and 562 were passed by Michigan Legislators to created the new grant and loan program, authorizing $450M of the Great Lakes Water Quality Bond to be deposited into the Strategic Water Quality Initiatives Fund for the SAW Programs. The Saw Grant Program has a $2M maximum grant per applicant, 10% match for the first million dollars, and 25% match for the second million dollars.

673 applications totaling $541M were received December 2, 2013. In March 2014, a lottery drawing of all approved applications was conducted to determine sequence of grant awards. (The City of Brighton was selected on the 253 rd draw)

1 st Round FY14 SAW Grants/ Loans $101,397,855 2nd Round FY15 SAW Grants/ Loans $91,048,501 3rd Round FY16 SAW Grants/ Loans $97,000,000

DEQ Approved Project Costs 1. Wastewater Asset Management Plan Cost $414,100 2. Stormwater Asset Management Plan Cost $169,100 Eligible Cost Subtotal $583,200 Less 10% Local Match -$58,320 SAW Grant Amount $524,880

New NPDES Permit The City of Brighton s new NPDES permit for the our Wastewater Treatment Facility on Hamburg Road was issued on August 1, 2014, which included the new Asset Management Program (AMP) requirements

New NPDES Permit Asset Management requirements went in affect August 1, 2014 The permittee shall at all times properly operate and maintain all facilities (i.e. the sewer system and treatment works as in Part 41 of the NREPA), and control systems installed or used by the permittee to operate the sewer system and treatments works, and achieve and maintain compliance with the conditions of this permit (also see Part II.D.3 of this permit). The requirements of an Asset Management Program function to achieve the goals of effective performance, adequate funding, and adequate staffing and training. Asset management is a planning process for ensuring that optimum value is gained for each asset and financial resources are available to rehabilitate and replace those assets when necessary. Asset Management is centered on a framework of five (5) core elements: the state of the asset, the required sustainable level of service, the assets critical to sustain performance, the minimum life-cycle, and the best long-term funding strategy.

Asset Management Program Program requirements for development and implementation: Staffing Mapping Collection Systems Inventory and Assessment of Fixed Assets Budget and Rate Sufficiency Annual Reporting

The permittee shall provide an adequate staff to carry out the operation, maintenance, repair, and testing functions required to ensure compliance with the terms and conditions of this permit. The level of staffing needed shall be determined by taking into the account the work involved in the operating the sewer system and treatment works, planning for and conducting maintenance, and complying with this permit.

The permittee shall complete a map of the collection system it owns and operates. The map shall be of sufficient detail and a scale to allow easy interpretation. The collection system information shown on the map shall be based on current conditions and shall be kept up-todate and available for review by the Department.

All sanitary sewer lines and related manholes. All outfalls, including the treatment plant outfall(s). All pump stations and force mains. The wastewater treatment facility(ies), including all treatment processes. All surface waters (labeled). Other major appurtenances, such as siphons and air release valves. A numbering system which uniquely identifies manholes, catch basins, overflow points, regulators, and outfalls. The scale and N arrow. Pipe diameter. Date of installation. Type of material. Distance between manholes. Direction of flow. The manhole interior material. GPS coordinates. Rim elevations. Invert elevations.

Fixed Asset Inventory Description Location Year installed Present condition Depreciated value Replacement cost Business Risk Evaluation Rate the probability of failure of the fixed asset on a scale of 1-5, using criteria such as maintenance history, failure history, and remaining % of useful life. Rate the criticality of the asset on a scale of 1-5, based on the consequence of failure vs. the desire level of service for the facility. Compute the Business Risk Factor of the asset

Beginning and ending dates of fiscal year. Name of department, committee, board or organization that sets rates for the operation of the Sewer System and Treatment Works. Amount in the permittee s replacement fund in dollars for year specified in accordance with the approved schedule. Replacement fund of all assets with a useful life of 20 years or less. Expenditures for maintenance, corrective action, and capital improvement taken during the fiscal year. OM&R budget for fiscal year. Rate calculation demonstrating sufficient revenues to cover OM&R expenses or, alternatively, an implementation schedule for rates adjustments to ensure sufficient revenue to cover OM&R expenses.

A written report that summarizing asset management activities completed during the previous year and planned for the upcoming year will be submitted to the MDEQ on or before August 1 st of each year. A description of staffing levels maintained during the year. A description of inspections and maintenance activities conducted and corrective actions taken during the previous year. Expenditures for collections system maintenance, treatment works maintenance activities, corrective actions, and capital improvements during the previous year. A summary of assets/areas identified for inspection/action (including capital improvement) in the upcoming year based on the five core elements and Business Risk Factors. A maintenance budget and capital improvement budget for the upcoming year. An updated asset inventory. An updated OM&R report with updated rate schedule.

Purchase Asset Management software/hardware/training. Purchase GIS software/hardware/training. Create an asset management plan for the sanitary sewer system. Create an asset management plan for the stormwater collection system. Create an asset management plan for the WWTP. Complete a Business Risk Evaluation of all critical assets (wastewater & stormwater). Develop a GIS website to include sanitary & storm system conditions, record drawings, and lead sheets. Update the Capital Improvement plan to incorporate the AMPs. Complete a new Rate Study based on the AMPs to determine a funding plan for CIP and ongoing OM&R expenses. Implement a schedule for rate adjustments as necessary.