THE GEYSERS PIPELINE PROJECT



Similar documents
THE GEYSERS Renewable, Geothermal Energy. Mike Rogers, Senior Vice President Calpine Geothermal Operations

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

5. Environmental Analysis

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

GOALS, OBJECTIVES AND POLICIES

5.14 Floodplains and Drainage/Hydrology

San Francisco s Non-potable Water Programs

Foothill Municipal Water District Recycled Water Project

Aquatera 2015/16 Business Plan Highlights

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES

9.1. Adequacy of Available Data and Monitoring Efforts

Proposed General Plan Update Goals, Policies, and Implementation Actions

3.1.8 Utilities and Service Systems

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment

2010 Salida Community Priorities Survey Summary Results

Development impact fees can also create a strong financial incentive to discourage inefficient land development patterns by:

Associated Students of the University of California, Merced Resolution #14. Resolution in Support of the California High-Speed Rail Project

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

DeSoto County is not a water service provider and does not operate any

American Society of Civil Engineers

NAPA COUNTY WATERSHED SYMPOSIUM

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Water and Wastewater Challenges for San Antonio 2013

City of Fresno Department of Public Utilities. Strategic Business Plan

Environmental Guidelines for Preparation of an Environmental Management Plan

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION. February 12, 2015

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

A Marketing Strategy for Urban & Community Forestry in the West

OVERVIEW ABOUT WBI ENERGY

Office of Capital Facilities

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT

Daybreak s Environmental History

CWSRF Project Descriptions and Examples for Green Project Reserve

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Wyoming Idle and Orphan Well Draft Plan. Table of Contents

How To Manage Water Resources In The Yakima Basin

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

SECTION 1 PURPOSE AND POLICIES

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

BP Texas City Refinery

August 21, Dear Valued Colleague and Stakeholder:

Special Publication SJ2004-SP24 East Central Florida Water Supply Initiative St. Johns River Water Supply Project

Greg Argel, Regional Realty Officer Northwest Regional Office, BIA Telephone : (503) greg.argel@bia.gov

5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS

Public Opinions, Attitudes and Awareness Regarding Water in Colorado

SUBDIVISION AND DEVELOPMENT REGULATION

Project Planning. Project Planning. Map Presentations of System Deficiencies and Project Corridors. Selected. Corridors for the System Plan

MAY 28, 2014 GRAND JURY REPORT "SUSTAINABLE AND RELIABLE ORANGE COUNTY WATER SUPPLY: ANOTHER ENDANGERED SPECIES?"

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

How To Manage Waste In The Northwest Tokson

SAMPLE MULTI-YEAR LEASE AGREEMENT

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Chapter 1 Introduction

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

CIVIL ENGINEERING ASSOCIATE, 7246

PREPARING INDUSTRIAL ENGINEERING REPORTS

INTRODUCTION AND BACKGROUND

MEMORANDUM. March 9, 2007

Package Treatment Plant Policy and Procedure

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned

Using Technology to Administer a Reclaimed Water Program. Abstract

Iowa Smart Planning. Legislative Guide March 2011

INTRODUCTION AND SUMMARY

Recommended Practices Associated with Hydraulic Fracturing Operations

Chapter Impacts of the Proposed Project

Regulatory Options for Membrane Treatment and Residuals Management

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS

The Small Business Renewable Energy Task Force

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

ARIZONA DEPARTMENT OF WATER RESOURCES

REQUEST FOR PROPOSAL. Employee Benefits Brokerage and Consulting Services. Duckett Creek Sanitary District

Municipal Utility Districts The Pros/Cons of a MUD as Your Neighbor

California Wastewater

An ordinance amending Chapter I of the Los Angeles Municipal Code by adding new Sections and to establish the Green Building Program

DRAFT Public Outreach Document for What s an SSMP?

BULLETIN NO. 6. Car-Share Requirements and Guidelines for Car-Share Spaces ZONING ADMINISTRATOR. 1. Car-share Basics PURPOSE: OVERVIEW:

Olivenhain Municipal Water District 2014 Strategiic Pllan

Addressing Declining Elevations in Lake Mead

Request for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Center

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

Description of Fund Types and Funds

STAFF REPORT. DATE: March 3, TO: City Council. Rob White, Chief Innovation Officer Sarah Worley, Deputy Innovation Officer

Design Criteria & Service Goals

PUBLIC WORKS DEPARTMENT CITY OF PACIFIC GROVE 2100 Sunset Drive Pacific Grove, CA Telephone: (831) / Facsimile: (831)

Final Regulations for Oil and Gas Surface Activities (Amendments to 25 Pa. Code Chapters 78 and 78a, Subchapter C)

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

Overview of Proposition 1 TRACIE BILLINGTON, CHIEF FINANCIAL ASSISTANCE BRANCH DIVISION OF INTEGRATED REGIONAL WATER MANAGEMENT

Transcription:

THE GEYSERS PIPELINE PROJECT Mark Dellinger Lake County California Sanitation District Eliot Allen Criterion Planners/Engineers ABSTRACT A unique public/private partnership of local, state, federal and corporate stakeholders are constructing the world's first wastewater-to-electricity system at The Geysers. A rare example of a genuinely "sustainable" energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities' effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project's unique sponsorship, function and environmental impacts, its implementation has required: 1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; 2) acquisition of 25 local, state, and federal permits; 3) negotiation of six federal and state financial assistance agreements; 4) negotiation of six participant agreements on construction, operation and financing of the project, and 5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project's success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally. PROJECT ORIGINS Like many areas in California, growth in Lake County has strained its public infrastructure, including County-operated wastewater systems. In the 1980s, the Lake County Sanitation District (LACOSAN), which provides sewer service to the communities of Clearlake, Lower Lake, and Middletown, found its wastewater systems deficient in terms of both treatment quality and disposal capacity. These deficiencies prompted the state to order LACOSAN to upgrade its treatment process and find a means of disposing of larger quantities of effluent. Finding environmentally-acceptable and affordable solutions for these requirements was not easy, and LACOSAN spent several years evaluating alternative treatment and disposal options, including agricultural irrigation, created wetlands, and ultimately geothermal injection. At the same time in the late 1980s, the region's geothermal power industry began to experience productivity declines in The Geysers steamfield. Power plant steam usage was exceeding the steamfield's natural recharge rate and steam production was falling dramatically. The geothermal heat source remained constant; but, injection of additional water was needed to convey the geothermal heat to steam production wells. With the support of the California Energy Commission and Geysers operators, a joint Lake and Sonoma County survey was conducted of potential injection water sources available in The Geysers region, including surface waters, groundwater, and municipal wastewater. This study concluded that surface and groundwater supplies were already over committed; but, the wastewater effluent could satisfy two critical needs at once--first, as an environmentally-superior wastewater disposal method, and second, as a continuous supply of steamfield recharge water that could help mitigate Geysers productivity declines. DEVELOPMENT PROCESS Once the project concept emerged, a group of key stakeholders convened to investigate its feasibility and pursue project development. The core group included LACOSAN, the Northern California Power Agency (NCPA), Calpine Corporation, Unocal Corporation, and Pacific Gas & Electric Company (PG&E). The group pursued four simultaneous tracks of project development during 1991-96:! Technical. A series of geothermal reservoir analyses and pipeline engineering studies examined reservoir impacts from effluent injection and multiple pipeline alignments and operating strategies. The results of these studies were then cost estimated and subjected to a series of life-cycle economic analyses. Together with the environmental track described below, this process iterated to a final design concept and working cost estimate;! Environmental. Along with reservoir and pipeline technical studies, preliminary environmental surveys were performed to build a database and identify possible design and construction conflicts with environmental resources. An explicit strategy from the outset was emphasis on early identification of environmental issues, 21

quick preparation of documentation for objective evaluation of those issues, and design coordination to then avoid significant sensitivities before they could become impediments or controversies. The environmental track concluded with the preparation of the project EIR/EIS;! Legal. Over the course of the technical and environmental reviews, the stakeholders also negotiated an initial agreement-in-principle for overall project development, and then detailed construction, operating, and related financing and water supply agreements, and! Financial. The group members were also engaged at the same time in securing their individual construction cost shares and raising construction funds from public agencies with allied program goals. As finally designed, the project consists of a 29-mile, 20-inch diameter pipeline that will carry 7.8 million gallons per day of treated wastewater effluent and Clear Lake make-up water to The Geysers for injection at existing wells operated by NCPA, Calpine and Unocal. Figure 1 summarizes the Figure 1. 29-mile route from Clear Lake to The Geysers. Make-up lake water will be used to take maximum advantage of pipeline capacity during the early years of the pipeline's life; as effluent flows increase over time with population growth, make-up lake water quantities will be reduced proportionately. To move the effluent and lake water, the pipeline will use six pump stations totaling 7,370 hp, including a 1,600 ft final lift from the Bear Canyon operator and entrance up to the injection area in the southeast Geysers. Depending on steam recovery rates for the injected effluent, the project is expected to create up to 70 MW of generating capacity at six existing power plants operated by NCPA and PG&E, or as much as 625,000 MWh annually. The project's total construction cost is $45 million, including $8 million in wastewater treatment plant improvements. Construction costs are being shared by the core group of participants, known as the Joint Operating Committee (JOC), with additional funding from the California Energy Commission, California Water Resources Control Board, U.S. Department of Energy, U.S. Department of Commerce, U.S. Department of the Interior, and the U.S. Environmental Protection Agency. Approximately 40% of the construction costs are industry-funded, 20% are County funded, and the remaining 40% is divided equally between economic development and energy resource funds from the federal and state agencies. Additionally, the industry participants are investing several million dollars in secondary pipelines terminus to injection wells in the steamfield. The project's annual operating costs are estimated at approximately $1.5 to 2 million. The JOC members have signed a 25-year operating agreement wherein LACOSAN will operate the pipeline as far as the Middletown area, after which it will be industry-operated to its terminus in the steamfield. LACOSAN will pay an annual O&M cost share equivalent to its normal disposal costs, with the industry participants paying the remaining O&M costs based on the quantity of effluent they each receive at their wellheads. PERMITS AND AGREEMENTS A major aspect of the project from the outset was its institutional complexity, and the need to reach legal and administrative agreement with numerous public and private stakeholders representing a myriad of environmental, regulatory, operator, and property interests. Table 1 summarizes the project's five major categories of institutional requirements, and the specific permits and other items that were completed, negotiated, and/or acquired during 1991-96. Initially, considerable effort was devoted to negotiating agreement among the JOC members to pursue project development. This was embodied in a 1991 agreement-in-principle that set out the project's basic goals and committed stakeholders to consensus decision making. Extensive effort also went into negotiating federal geothermal royalty reduction agreements that allow lower industry royalty payments in exchange for larger industry construction cost shares, plus a longer overall term of payments as a result of the effluent-extended reservoir life. A critical agreement also had to be negotiated with adjacent Yolo County for a portion of 22

their water rights to Clear Lake for the make-up water needed during the project's early years when effluent flows will be relatively small in relation to pipeline capacity. Another set of agreements and special legislation were arranged for financial assistance provided by state and federal agencies. In order to structure the project's environmental review, a memorandum of understanding was negotiated between the BLM, who administers federal geothermal leases held by Calpine and NCPA, and LACOSAN as the primary local sponsoring agency. BLM was designated as the lead agency for federal environmental review and LACOSAN was designated as the lead agency for state environmental review. Once underway, the EIR/EIS process focused on effluent injection-induced seismicity, possible groundwater contamination from effluent injection, sensitive plants impacts from pipeline construction, sensitive stream crossings by the pipeline, archaeologic site impacts, and Clear Lake water quality impacts. Analysis of these and other environmental issues revealed no significant adverse impacts that could not be adequately mitigated. Following the preparation and certification of the EIR/EIS, records of decision were prepared for BLM, as well as DOE and EPA because of their funding roles. LACOSAN also prepared a detailed Mitigation, Monitoring and Operating Plan (MMOP) as required by state laws to insure that pipeline construction and operations comply with the mitigations stipulated in the EIR/EIS, and that the project continues to function in an environmentally-acceptable manner over its operating life. A separate set of BLM environmental stipulations was also negotiated to ensure that pipeline construction and operations on federal lands are similarly compliant with the EIR/EIS. As an example of the project's attention to both environmental soundness and public involvement, one of the MMOP measures was establishment of a seismic monitoring advisory committee whose citizen and industry members will regularly examine seismic data for any indication of effluent-induced activity. Permitting of the project was organized according to five segments, or reaches, of the pipeline. For each reach, a variety of local, state, and federal permits were required depending upon the urban or rural character of the reach and the presence or absence of sensitive environmental resources. Of the project's total 25 permits, the major ones included: federal and state archaeologic clearances, state fish and game authorizations for sensitive stream crossings and the Clear Lake intake, public highway and road encroachments, construction storm-water pollution prevention, and air quality management. Finally, in addition to public right-of-way encroachments, easements had to be obtained from 163 private land owners over the 29-mile pipeline alignment for construction and ongoing maintenance access. 23

CHALLENGES AND ACCOMPLISHMENTS Implementing the effluent pipeline project has been a major institutional challenge in several respects. First, as something that has never been attempted before, it automatically raised technical, legal, and regulatory concerns to above average heights. Second, it was jointly sponsored by public and private organizations that have historically often been adversarial; but, who found themselves benefitted by a partnership where they could work together toward mutually advantageous objectives. Finally, the complexity of a 29-mile linear facility crossing multiple jurisdictions and dozens of sensitive environmental sites significantly increased the scope and amount of environmental and regulatory scrutiny. The project's strategy for dealing with these challenges included: 1) an inclusive "open door" policy that emphasized information sharing and collaborative planning among all interested parties; 2) involvement of agency permitting staff in early feasibility studies to insure their familiarity with the project, and solicit their input; 3) commissioning of special environmental studies to analyze specific options and questions as they arose, before they could become problematic to the project development process; 4) aggressive information outreach to citizens and civic groups, particularly environmental organizations, to insure their familiarity with the project; and 5) use of consensus decision making by the JOC members to insure that each step of the development process had the full commitment of all stakeholders. The project also emphasized the involvement of state and federal legislators whose districts were impacted by the project, insuring that they were aware of the problems the project was responding to, and the benefits expected if implemented as planned. As a result of this strategy, the project's legal and institutional accomplishments to date include:! An EIR/EIS completed and certified within 18 months and without any appeals,! All permits acquired within 18 months without any agency imposition of extra project costs or any delays to the project's schedule,! No appeals or other legal challenges to any of the permits or project agreements, and! All legal, institutional, and environmental work completed within or under budget, in a total amount equivalent to approximately 3.5% of project construction costs. CONCLUSION The project's construction ground breaking took place on October 6, 1995. As of this writing, construction is underway on all of the pipeline reaches, with completion and start-up expected in August 1997. In an age of dwindling resources, increasing competitive pressures, and bureaucracy, the Southwest Geysers Effluent Pipeline Project is a testament to the power of synergistic innovation and public/private partnering. In this case, the community liability of waste water is being converted into a sustainable geothermal energy asset. From a geothermal development perspective, the significance is not the uniqueness of the wastewater-to-electricity concept; but, rather the ability to implement geothermal projects more successfully where they can be linked to convergent community needs and partnerships. Comparable opportunities for innovation and collaboration exist throughout the Pacific Rim and elsewhere internationally. ACKNOWLEDGMENTS The effluent pipeline would not be under construction as of this writing were it not for the thousands of hours of collective effort of: Tom Box, Steve Brodnansky, Gary Brown, Dean Cooley, Steve Enedy, Roger Gwinn, Brian Koenig, Paul Richins, Bill Smith, Mark Winsor, and approximately 300 other individuals. REFERENCES California Energy Commission, December 1991. Geysers KGRA Generating and Steam Resources Study, Docket 89-INF-1, Sacramento, CA. Criterion Planners/Engineers, December 1990. Study of Water Availability and Additional Strategies for Geysers Resource Management, Lake and Sonoma Counties, CA. Criterion Planners/Engineers, February 1992. Southeast Geysers Effluent Pipeline Preliminary Engineering and Economic Analysis, Lake County, CA. Criterion Planners/Engineers, 1994. Southeast Geysers Effluent Pipeline MMOP Implementation Guide, Lake County Sanitation District, Lakeport, CA. Criterion Planners/Engineers, 1995. Southeast Geysers Effluent Pipeline Permitting & Funding Mapbook, Lake County Sanitation District, Lakeport, CA. Criterion Planners/Engineers, Mach 1996. Southeast Geysers Effluent Pipeline Environmental Compliance Manuals, Volumes 1-4, Lake County Sanitation District, Lakeport, CA. Dewante & Stowell, 1991. Southeast Regional Wastewater System Facilities Plan, Lake County Sanitation District, Lakeport, CA. 24

Environmental Science Associates Inc., September 1994. Environmental Impact Report/Environmental Impact Statement for the Southeast Geysers Effluent Pipeline Project, Lake County Sanitation District, Lakeport, CA. Lake County Sanitation District, September 1994. Southeast Geysers Effluent Pipeline Project Mitigation, Monitoring & Operation Plan, Lakeport, CA. GeothermEx Inc., July 1991. Geysers Reservoir Productivity Decline Analysis, Lake and Sonoma Counties, CA. 25