1 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce
2 Water Operations Growth and Service Requirements Water Customers 460,845 Service Area 927 sq. miles Miles of Main ~6,100 miles Metered Use 71 billion gals. Page 2
3 Wastewater Operations Growth and Service Requirements September 11, 2013 Wastewater Customers 411,184 Service Area 722 sq. miles Miles of Sewer Mains 5,163 miles Manholes 97,000 Lift Stations 158 Major Treatment Plants 3 Annual Treated Flow 49.9 billion gals. Page 3
4 SAWS System Challenges Infrastructure, Performance and Water Supply Procurement of diverse supplies Regulatory Constraints and Higher Costs Reduction of Sanitary Sewer Overflows (SSOs) Compliance with the Law Increasing efficiency Maintenance and replacement of aging infrastructure Integration of new supplies and customers BexarMet Page 4
5 Permitted Supplies and Demand Supply Sources Unrestricted Firm in a Drought of Record* SAWS SAWS DSP Total SAWS DSP Total Edwards Aquifer 208, ,945 35, ,530 99,248 20, ,887 Trinity Aquifer 3,000 3,000 5,800 8, ,000 2,000 Carrizo Aquifer (Local) - 6,400 1,000 7,400 6,400 1,000 7,400 Canyon Lake - 8,500-8,500 8,500-8,500 Carrizo Aquifer (Regional) - 17,200 2,800 20,000 17,200 2,800 20,000 Lake Dunlap - - 3,500 3,500-3,500 3,500 Medina ,000 13, Subtotal 211, ,045 61, , ,348 29, ,287 Aquifer Storage & Recovery 4,916 93,000-93,000 93,000-93,000 Total 216, ,045 61, , ,348 29, , Demand All Sources 217,000 44, , *Includes EARIP commitment Page 5
6 Drought of Record Supply Gaps 600,000 No New Supplies , ,000 acre-feet 300, ,000 62,974 79,666 61, , Current Supplies EARIP Commitment ASR Supply Permitted Supply Gap Dry Demand (143 GPCD) Worst case scenario with no additional supplies Page 6
7 November 20, 2013 J-17 levels (with and with Memorial Day Rains) Feet MSL Stage 1 Stage 2 Stage 3 Memorial Day Rain 12.2 Stage 4 Stage 5 Provisional 10-Day Avg. Page 7
8 Saving for a dry day Aquifer Storage & Recovery (ASR) $250 million Investment Delivered 40 million gallons/ day to help delay stage 3 in 2011 Page 8
9 Aquifer Storage & Recovery Began Storing Again September 18 September 11, , ,000 acre feet 80,000 60,000 40,000 20,000 Volume in storage through Sept 28 = 80,564 af 0 Page 9
10 Filling the Supply Gaps Strategic Elements Additional Edwards Supplies (underway) Brackish Groundwater Desalination (underway) Expanded Local Carrizo Aquifer (new element) Regional Water Supply Project (RFCSP underway) Demand Reductions (national leader) Page 10
11 Planned Supplies Brackish Desalination Program Southern Bexar County on SAWS property Three-Phase Program Phase 1: 12,200 ac-ft/yr (2016) Phase 2: 12,200 ac-ft/yr (2021) Phase 3: 6,105 ac-ft/yr (2026) $229 million estimated total program cost $145 million for Phase 1 Currently under design Construction award in Feb 2014 Page 11
12 Planned Supplies Expanded Carrizo a New Project Concept In conjunction with ASR Local Carrizo wells Geology and preliminary feasibility indicate up to 21,000 acre-feet of production Total capital costs $34,000,000 Page 12
13 Planned Supplies Integration Pipeline 45-mile integration pipeline Phase I complete by 2016 Phase II complete by 2022 Provides transport flexibility Desal supply Local Carrizo Aquifer supply ASR supply Crosses former BexarMet area to far west side $182 million estimated program cost Page 13
14 Page 14
15 Water Management Strategies Filling the Supply Gaps Planned Supply Source Recommended Strategy Additional Edwards Rights 10,900 ac-ft/yr acquired in 2013 Brackish Desal Plant Expanded Local Carrizo 11,200 ac-ft/yr on-line in ,400 ac-ft/yr in ,000 ac-ft/yr in ,000 ac-ft/yr on-line in ,000 ac-ft/yr in ,000 ac-ft/yr in 2026 Regional Water Supply Project (RFCSP) Up to 50,000 ac-ft/yr starting in 2018 Demand Reduction - Water savings from programs to reduce dry year GPCD to 135 1,650 ac-ft/yr - Drought restrictions (Stage 1) Starts at 650 Edwards level - Drought restrictions (Stg. 3 & 4) No worse than 1x per week Page 15
16 Recommended Strategy Drought 600,000of Record , ,000 acre-feet 300, , , Current Supplies EARIP Commitment Planned Supplies ASR Supply Dry Demand (143 GPCD) Page 16
17 Recommended Strategy Drought 600,000of Record , ,000 3,110 acre-feet 300, , , Current Supplies EARIP Commitment Planned Supplies Permitted Supply Gap ASR Supply Dry Demand (143 GPCD) Page 17
18 Successful Water Management Increased supplies by 39% since 2004 Including Aquifer Storage & Recovery (ASR), increased by 79% ASR Storing water even during drought Cornerstone of regional Edwards Aquifer Recovery Implementation Program solution Historic Regional Water Partnership with Schertz-Seguin Local Government Corporation Saving ratepayers over $88 million International Model of Water Conservation Page 18
19 Sanitary Sewer Overflows Compliance with the Clean Water Act In March 2007, SAWS was orally notified by the EPA of alleged failures to comply with the Clean Water Act due to the occurrence of sanitary sewer overflows. Negotiations with the EPA/DOJ are ongoing any settlement, consent decree, or enforcement action will result in the imposition of a civil penalty and in required capital improvements and increased annual maintenance and operating expenses - SAWS Comprehensive Annual Financial Reports (CAFRs) Disclosure ( ) Page 19
20 September 11, 2013 SSOs YTD Page 20
21 Page 5 75 percent of sewer spills in San Antonio are caused by grease and debris. Page 21
22 Page 6 All 5,200 miles of SAWS sewers will be examined over the next 4 to 10 years. Page 22
23 Page 8 Pipes found in poor condition or too small that cause spills may be repaired or replaced. Page 23
24 Page 10 Page 24
25 Sewer Spills Reduced Sewer Investments are Working September 11, of rain of rain Sewer Spills Page 25
26 Successful Innovation September 11, 2013 Award-winning Environmental Trifecta Nation s Largest Direct Recycle System Public/Private Partnership for Gas to Energy Compost diverted from landfills Largest Solar Farm in Texas built next to largest energy meter in San Antonio CPS Energy/Sun Edison/SAWS Partnership Producing more power than the combined use of ASR, Dos Rios and the Desal Plant In-Pipe Hydroelectric Power System Brackish Groundwater Desalination Page 26
27 2014 Rate Request Reduced by 62% Budget Cuts Help Reduce Rate Request September 11, 2013 Previous Rates Forecast 13.5% O&M Budget Cuts - 2.9% Increased Revenue Projections - 2.7% Capital Financing Savings - 1.6% Removal of RFCSP Integration* -0.6% Capital Budget Reallocation -0.6% Current Rate Request 5.1% Excludes COSA Stormwater, assumes no change to pass-through fees *Regional Water Supply Project will be brought separately to the City Council for consideration. Page 27
28 Commitment to Efficiency Reducing Costs for the Ratepayer Over $10 Million in 2014 budget reductions 41 positions eliminated Voluntary Retirement Incentive to reduce more Reductions in fleet size and use Continued cost sharing and benefit adjustments Doing more with less Innovation & Efficiency Department created by redirecting existing positions Page 28
29 Efficiency Gains * Combined SAWS & DSP September 11, % 10% 9.0% More Customers % Change 5% 0% -5% -10% -15% *Projected 13.1% Fewer Employees Page 29
30 Two-Year Rate Request Request approval of a multi-year rate adjustment for 2014 and rate adjustment equal to 5.1% 2015 rate adjustment not to exceed 5.3% Subject to oversight by City of San Antonio Five-Year Water Supply Fee increases granted in 2000 Houston has automatic increases based on Producer Price Index + Customer Growth Page 30
31 Average Monthly Residential Bill Reduced 2014 & 2015 Request September 11, 2013 Proposed Total SAWS $52.91 $55.71 Increase $ $2.58 $2.80 Increase % 5.1% 5.3% Average residential bill before EAA and TCEQ pass-through fees. Assumes water usage = 7,788 gallons & wastewater usage = 6,178 gallons, ICL, Standard rates Page 31
32 2014 Customer Bill Impact 86% of Request Supports Water Supply & Sewer System September 11, 2013 Wastewater 39% $0.99 $0.37 Water Supply 47% $1.22 Water Supply Integration Pipeline Phase 1 - $144M Capital Regional Carrizo Project $7.4M operating increase over 2013 Wastewater (Consent Decree Compliance) Sewer Main & Lift Station Replacement - $89M Capital Clean, Inspect and Repair the Sewer System $7.2M Operating increase over 2013 Water Delivery 14% Based on Average Residential Bill Water Delivery Main replacements and production upgrades - $71M Capital Page 32
33 2015 Customer Bill Impact 85% of Request Supports Water Supply & Sewer System September 11, 2013 Wastewater 62% $1.72 Water Supply 23% $0.65 $0.43 Water Delivery 15% Based on Average Residential Bill Wastewater (Consent Decree Compliance) Sewer Main & Lift Station Replacement - $120M Capital Clean, Inspect and Repair the Sewer System $1.8M operating increase over 2014 Water Supply Edwards Purchases, Recycled Water Improvements, Expanded Carrizo - $30M Capital Regional Carrizo Project $2.5M operating increase over 2014 Water Delivery Main replacements & Production Upgrades $47M Capital Page 33
34 Managing a Historic Drought Challenges Edwards supplies cut by 30% Medina Lake under 5% capacity Trinity Aquifer levels decline Medina Lake 2013 Successful Water Management Averted Stage 3 Restrictions in 2013 Aquifer Storage & Recovery proves its success again International Model of Conservation Local Carrizo Aquifer supply Page 34
35 Average 2013 Residential Bills SAWS Will Remain Among the Lowest in Texas $120 $100 $88.95 September 11, 2013 $91.79 $ $80 $60 $40 $37.38 $53.22 $55.70 $60.15 $60.80 $20 $- El Paso SAWS 2013 SAWS 2014 Ft. Worth * Dallas Houston ** Corpus Christi Austin *** * Fort Worth monthly charges proposed to increase on January 1, 2014 ** Houston wastewater charges based solely on water usage *** Austin monthly charges approved to increase on November 1, 2013 Monthly charges as of October 2013, Based on 7,788 Gal. Water (Standard)/6,178 Gal. Wastewater. Includes EAA and TCEQ Fees. Page 35
36 2013 Commercial Bills 50,000 Gallons Water and Wastewater (2 Meter) September 11, 2013 $900 $800 $700 $600 $500 $400 $300 $200 $100 $- $ $ $ $ El Paso Dallas SAWS 2013 SAWS 2014 $ $ Ft. Worth Houston * * Houston wastewater charges based solely on water usage ** Austin monthly charges will rise on November 1, 2013 Monthly charges as of October 2013, Based on 50,000 gallons consumption. Includes EAA and TCEQ Fees. $ Corpus Christi $ $ Austin ** Page 36
37 2013 Industrial Bills 850,000 Gallons Water and Wastewater (6 Meter) September 11, 2013 $14,000 $12,000 $10,000 $12,661 $12,126 $8,000 $6,000 $4,000 $4,078 $5,703 $6,011 $6,169 $6,731 $8,500 $9,108 $2,000 $- El Paso SAWS 2013 SAWS 2014 Dallas Ft. Worth Houston * Corpus Christi Austin ** * Houston wastewater charges based solely on water usage ** Austin monthly charges will rise on November 1, 2013 Monthly charges as of October 2013, Based on 850,000 gallons consumption. Includes EAA and TCEQ Fees. Page 37
38 Lowest Rate Growth of Major Texas Cities 6,000 Gallon Residential Water & Sewer Bill September 11, 2013 $100 $80 $60 Austin Houston Dallas $40 $20 SAWS $3.95 Below Average SAWS SAWS $20.10 Below Average $ Current Page 38
39 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce
Vista Ridge Water Transmission & Purchase Agreement
Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake
More informationFollow Up Items from 1 st RAC Meeting
Follow Up Items from 1 st RAC Meeting Lou Lendman Budget Manager Rate Advisory Committee Distribution of Customers by Class Page 2 1 Distribution of Water Customers by Class SAWS and DSP (2013) Class SAWS
More informationJeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
More informationCity of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
More informationSAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
More informationInnovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha
Innovative Water Technologies Programs 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha The following presentation is based upon professional research and analysis
More informationLand Use Assumptions Plan for Water Supply, Water Service and Wastewater Service
San Antonio Water System 2014 2023 Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service DRAFT May 2013 Land Use Assumptions Plan Chapter 395 of the Texas Local Government Code
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationSan Diego Water Resources Mix and Drought Planning
Supply Reliability for San Diego through a Diverse Water Resources Mix and Drought Planning Dana L. Friehauf, San Diego County Water Authority DWR/NWRI Drought Response Workshop November 6, 2012 1990-91:
More informationUnauthorized Discharges and Sanitary Sewer Overflows
TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental
More informationTEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer
TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.
More informationPUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING
PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?
More information2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
More informationFISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
More informationCondensate Free Water
Condensate Free Water F-1014 October 9, 2009 WaterSmart09 Phil Weynand Manager Conservation CONDENSATE RECOVERY Page 2 CONDENSATE Definition Page 3 Atmospheric moisture that has condensed because of a
More informationSanitary Sewer Overflow Initiative: Information for Prospective Participants
TCEQ GENERAL INFORMATION Field Operations Support Division GI-389 Revised August 2012 Sanitary Sewer Overflow Initiative: Information for Prospective Participants What is the SSO Initiative? Sanitary sewer
More informationDRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
More informationHow To Get A Plan For A Water Treatment Plant
Sanitary Sewer Overflow Initiative What is a Sanitary Sewer Overflow (SSO) A type of unauthorized discharge of untreated or partially treated wastewater from the collection system or it s associated components.
More informationGOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
More informationM E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
More informationTexas. DeVry Impact. Summary Statistics. Earnings by Education Level. Total Wage Growth Over Studied Period. 65% Growth $44,262. 42% Growth $39,478
Texas DeVry Inc. s eight Texas locations 1 produced $82.7 million in economic impact in FY2010. As part of this economic impact, DeVry Inc. schools supported 809 jobs. Wage Impact annually, while the degree
More informationSanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
More informationWastewater Treatment - How to Reduce FOG in Dallas, Texas
Cease the Grease Background Implementation in 2005 To reduce FOG entering the wastewater system Enforcement Education Public Outreach Goals Reduce Environmental Impact Pollution Prevention Cost Savings
More informationLabor Market Demand Analysis for Green Jobs. October 2009. The Alamo Colleges defines green to include jobs and related skills in renewable
Labor Market Demand Analysis for Green Jobs October 2009 Anson Green Alamo Colleges San Antonio, Texas Karen Steinberg Council on Applied and Experiential Learning El Paso, Texas The Alamo Colleges defines
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationSAN ANTONIO WATER SYSTEM
SAN ANTONIO WATER SYSTEM Organization Efficiency Study September 30, 2013 This page intentionally left blank 405 Lexington Ave New York, NY 10174 United States Tel: 212-973-2900 www.paconsulting.com September
More informationAustin Energy Quarterly Report. Austin Energy. April 26, 2011. Mission: Deliver clean, affordable, reliable energy and excellent customer service.
Austin Energy Quarterly Report Austin Energy April 26, 2011 Mission: Deliver clean, affordable, reliable energy and excellent customer service. Agenda Electric Rate Design Status Report Residential Rate
More informationThe Texas Commission on Environmental Quality (agency or commission) adopts an amendment to
Texas Commission on Environmental Quality Page 1 The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to 116.603 without changes to the proposed text as published in
More informationPlan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
More informationAlmonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
More informationCity of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
More informationProposed San Antonio Sustainability Plan
Department of Urban and Regional Planning Proposed San Antonio Sustainability Plan URP 5453 Urban and Regional Sustainability University of Texas at San Antonio Spring 2014 Part 1 Introduction Background
More informationName: Date: P.O. Box 2449, San Antonio, Texas 78298 (210) 233-3683. Number of Taps
PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;
More informationAmerican Society of Civil Engineers
American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply
More informationLSC-Montgomery. Institutions Attended, Fall 2009 Academic Students. LSC-Montgomery
Alamo Community College District 5 Alvin Community College 4 Austin Community College 49 Blinn College 141 Brazosport College 1 Cisco Junior College 2 Clarendon College 1 College of the Mainland 1 Collin
More information3.1.8 Utilities and Service Systems
3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation
More informationExecutive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an
More informationUpdate on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor
Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these
More informationCrystal Clear SUD Crystal Clear WSC
Water Conservation & Drought Contingency Plan Crystal Clear SUD Crystal Clear WSC Committed to Providing Clean, Safe Water for All Our Residents 2014 ADDRESS PHONE WEB 2370 FM 1979, San Marcos, TX 78666
More informationHarris - Galveston Subsidence District
Harris - Galveston Subsidence District History of Subsidence, Regulation, and Water Management in the Houston Region Michael J. Turco - General Manager ASSOCIATION OF WATER BOARD DIRECTORS GUEST LECTURE
More informationAddressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
More informationPUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System
PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,
More informationCity and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO
More informationOutlet: Austin Business Journal (online) Date: December 17, 2014 Unique Visitors Per Month: 151,284 Link:
Outlet: Austin Business Journal (online) Unique Visitors Per Month: 151,284 Link: http://www.bizjournals.com/austin/prnewswire/press_releases/georgia/2014/12/17/la92883?ana=prnews Outlet: Dallas Business
More information50 LARGEST CITIES WATER/WASTEWATER RATE SURVEY A BLACK & VEATCH 2012/2013 REPORT
50 LARGEST CITIES WATER/WASTEWATER RATE SURVEY A BLACK & VEATCH 2012/2013 REPORT 2 50 LARGEST CITIES WATER/WASTEWATER SURVEY TABLE OF CONTENTS EXECUTIVE SUMMARY 4 Average Residential Typical Bills Continue
More informationCHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall
CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection
More informationCity of Mebane Wastewater Collection and Treatment Facility
City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014
More informationCOMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
More informationSanitary Sewer Overflow Report Form
Preliminary report Final report Revised final report Sanitary Sewer Overflow Report Form Sanitary Sewer Overflow Sequential Tracking Number: Reported to: Sent Regional Board a fax Left Regional Board a
More informationRouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
More informationELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
More informationTuesday, June 14, 2016 2:00 PM
Agenda Arlington City Council Special Meeting Council Briefing Room 101 W. Abram St., 3rd Floor Tuesday, June 14, 2016 2:00 PM I. CALL TO ORDER II. WORK SESSION A. City Council Committees B. Economic Development
More informationINTRODUCTION AND BACKGROUND
Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,
More informationMEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011
MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City
More informationTim Schneller, P.E. GBA Engineers and Architects
Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.
More informationCITY OF KRUM Sanitary Sewer. Corrective Action Plan. February 5, 2009. Prepared by: Freese and Nichols, Inc.
Corrective Action Plan CITY OF KRUM Sanitary Sewer Corrective Action Plan February 5, 2009 Prepared by: Freese and Nichols, Inc. 4055 International Plaza Suite 200Fort Worth, TX 76109 817/735-7300 Corrective
More informationComprehensive Sewer Surveys in 9 Basins
Sanitary Sewer Overflow Consent Decree Presentation to Anacostia Watershed Management Committee Washington Suburban Sanitary Commission March 1, 2012 1 Three Phases of SSO Consent Decree 2 Comprehensive
More informationREAD THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:
READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions
More informationSanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN
Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy
More informationFoothill Municipal Water District Recycled Water Project
Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,
More informationEAST BAY REGIONAL SEWER PROGRAM
EAST BAY REGIONAL PRIVATE SEWER LATERAL PROGRAM The East Bay Regional Private Sewer Lateral Program is a joint effort to protect San Francisco Bay. This guidebook explains the program and provides guidelines
More informationUNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION. and Civil Action No.
UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION UNITED STATES OF AMERICA, and Civil Action No. STATE OF TEXAS, Plaintiffs, v. SAN ANTONIO WATER SYSTEM, Defendant. CONSENT DECREE
More informationCRS Report for Congress
Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland
More informationWater Conservation Successes Response to Citizen Report. Drema Gross Resource Management Commission June 21, 2011
Water Conservation Successes Response to Citizen Report Drema Gross Resource Management Commission June 21, 2011 Purpose of Presentation Context for discussion Water Use Trends Council Direction Response
More informationCASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
More informationecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
More informationCalifornia Energy Commission 2015 Accomplishments
California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new
More informationFINANCE FY 2015 PROPOSED BUDGET WORK SESSION DEBT MANAGEMENT PLAN. Presented by Ben Gorzell, Jr. Chief Financial Officer
FINANCE FY 2015 PROPOSED BUDGET WORK SESSION DEBT MANAGEMENT PLAN Presented by Ben Gorzell, Jr. Chief Financial Officer FY 2015 Proposed Budget City of San Antonio 1 Types of Debt Issued General Obligation
More informationReal-time energy and water quality management system designed for success!
Real-time energy and water quality management system designed for success! Texas Water 2012 San Antonio, TX April 13, 2012 Manuel Perez Energy Manager Peter Martin Vice President Brian Skeens Global Technology
More informationSewer System Management Plan (SSMP) 2009. Eastern Municipal Water District
Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0
More informationDistrict of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS
CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular
More informationWork Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationHydrologic Data Program Overview. Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC)
Hydrologic Data Program Overview Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC) J. Mark Null Chief South Texas Program Office USGS Texas Water Science Center
More informationIrvine Ranch Water District Drought Response What Works and Plans for 2015
Irvine Ranch Water District Drought Response What Works and Plans for 2015 2015 Drought Response Workshop February 25, 2015 Fiona Sanchez Director of Water Resources Presentation Agenda IRWD Background
More informationSanitary Sewer Overflow Enforcement : A National Perspective
Sanitary Sewer Overflow Enforcement : A National Perspective LOREN DENTON, CHIEF MUNICIPAL ENFORCEMENT BRANCH WATER ENFORCEMENT DIVISION U.S. ENVIRONMENTAL PROTECTION AGENCY Topics Covered 2 SSOs National
More informationCMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center
CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,
More informationOffice of the City Manager WORKSESSION March 17, 2015
Office of the City Manager WORKSESSION March 17, 2015 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works Subject:
More informationTOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
More informationCHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014
CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying
More informationExecutive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance
Table of Contents Section Page Executive Summary i Introduction iii Five Year Goals iii Performance Measure Types iv Performance Plan Logic Model v Benchmarking, Strategic Planning, Performance Accountability
More informationAligning Asset Management Strategy with Service Level Objectives
Aligning Asset Management Strategy with Service Level Objectives The successful outcome of an asset management program is the achievement of targeted service levels at the least cost and risk to the utility.
More informationCITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.
More informationM I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program
M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program
More informationGroundwater Law Today and Tomorrow: Court Decisions and Their Impact
Groundwater Law Today and Tomorrow: Court Decisions and Their Impact 14 th Annual Bell County Water Symposium November 18, 2014 - Belton Presented by: Ty Embrey tembrey@lglawfirm.com (512) 322-5829 816
More informationEssential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
More informationMaricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001
Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical
More informationA Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
More information5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)
City Council Agenda: 10/13/14 5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) A. REFERENCE AND BACKGROUND: City Council is asked to approve the City of
More informationElement 3: OVERFLOW EMERGENCY RESPONSE PLAN
Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency
More informationSubotal - Community and Technical Colleges 476
1 of 5 Academic Students ACCD - Northwest Vista College 1 ACCD - Palo Alto College 1 ACCD - San Antonio College 1 ACCD - St. Philip's College 2 Austin Community College 1 Cisco Junior College 1 Collin
More informationSewer Overflow Response Plan (SORP)
Sewer Overflow Response Plan (SORP) December 16, 2013 This page intentionally left blank Submitted 12/16/2013 Sewer Overflow Response Plan (SORP) i SEWER OVERFLOW RESPONSE PLAN TABLE OF CONTENTS 1.0 INTRODUCTION
More informationStacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the
More informationSTEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS VILLAGE OF CORRALES WASTEWATER UTILITY (SEWER) SYSTEM AND INDIVIDUAL PROPERTY OWNER SERVICE CONNECTIONS I. AVAILABILITY OF SEWER SERVICE; WHEN CONNECTION IS REQUIRED. Q. Where
More informationAbout this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328
UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water 2 Effluents and Waste 3 Compliance 5 Key Performance 7 Indicators About this document In, UPS reported its annual Corporate
More informationFrom and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established:
Article 21. Water and Sewer Rates and Service Charges. From and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established: Sec.
More informationPercent Increase. Dollar Impact. Water 2,000 $53.45 9.9% $5.29 $58.74 4.5% $2.65 $61.39. Water 5,000 $72.20 9.9% $7.15 $79.35 4.5% $3.58 $82.
September 3, 2013 Dear Valued Customer: On September 3, 2013, SWWC Utilities, Inc. (SWWC) filed a request with the Texas Commission on Environmental Quality (TCEQ) and the city in which we serve customers
More informationSanitary Sewer Overflows Response to EPA Rule Making
Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY
More informationChapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
More information