Water and Wastewater Challenges for San Antonio 2013

Size: px
Start display at page:

Download "Water and Wastewater Challenges for San Antonio 2013"

Transcription

1 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce

2 Water Operations Growth and Service Requirements Water Customers 460,845 Service Area 927 sq. miles Miles of Main ~6,100 miles Metered Use 71 billion gals. Page 2

3 Wastewater Operations Growth and Service Requirements September 11, 2013 Wastewater Customers 411,184 Service Area 722 sq. miles Miles of Sewer Mains 5,163 miles Manholes 97,000 Lift Stations 158 Major Treatment Plants 3 Annual Treated Flow 49.9 billion gals. Page 3

4 SAWS System Challenges Infrastructure, Performance and Water Supply Procurement of diverse supplies Regulatory Constraints and Higher Costs Reduction of Sanitary Sewer Overflows (SSOs) Compliance with the Law Increasing efficiency Maintenance and replacement of aging infrastructure Integration of new supplies and customers BexarMet Page 4

5 Permitted Supplies and Demand Supply Sources Unrestricted Firm in a Drought of Record* SAWS SAWS DSP Total SAWS DSP Total Edwards Aquifer 208, ,945 35, ,530 99,248 20, ,887 Trinity Aquifer 3,000 3,000 5,800 8, ,000 2,000 Carrizo Aquifer (Local) - 6,400 1,000 7,400 6,400 1,000 7,400 Canyon Lake - 8,500-8,500 8,500-8,500 Carrizo Aquifer (Regional) - 17,200 2,800 20,000 17,200 2,800 20,000 Lake Dunlap - - 3,500 3,500-3,500 3,500 Medina ,000 13, Subtotal 211, ,045 61, , ,348 29, ,287 Aquifer Storage & Recovery 4,916 93,000-93,000 93,000-93,000 Total 216, ,045 61, , ,348 29, , Demand All Sources 217,000 44, , *Includes EARIP commitment Page 5

6 Drought of Record Supply Gaps 600,000 No New Supplies , ,000 acre-feet 300, ,000 62,974 79,666 61, , Current Supplies EARIP Commitment ASR Supply Permitted Supply Gap Dry Demand (143 GPCD) Worst case scenario with no additional supplies Page 6

7 November 20, 2013 J-17 levels (with and with Memorial Day Rains) Feet MSL Stage 1 Stage 2 Stage 3 Memorial Day Rain 12.2 Stage 4 Stage 5 Provisional 10-Day Avg. Page 7

8 Saving for a dry day Aquifer Storage & Recovery (ASR) $250 million Investment Delivered 40 million gallons/ day to help delay stage 3 in 2011 Page 8

9 Aquifer Storage & Recovery Began Storing Again September 18 September 11, , ,000 acre feet 80,000 60,000 40,000 20,000 Volume in storage through Sept 28 = 80,564 af 0 Page 9

10 Filling the Supply Gaps Strategic Elements Additional Edwards Supplies (underway) Brackish Groundwater Desalination (underway) Expanded Local Carrizo Aquifer (new element) Regional Water Supply Project (RFCSP underway) Demand Reductions (national leader) Page 10

11 Planned Supplies Brackish Desalination Program Southern Bexar County on SAWS property Three-Phase Program Phase 1: 12,200 ac-ft/yr (2016) Phase 2: 12,200 ac-ft/yr (2021) Phase 3: 6,105 ac-ft/yr (2026) $229 million estimated total program cost $145 million for Phase 1 Currently under design Construction award in Feb 2014 Page 11

12 Planned Supplies Expanded Carrizo a New Project Concept In conjunction with ASR Local Carrizo wells Geology and preliminary feasibility indicate up to 21,000 acre-feet of production Total capital costs $34,000,000 Page 12

13 Planned Supplies Integration Pipeline 45-mile integration pipeline Phase I complete by 2016 Phase II complete by 2022 Provides transport flexibility Desal supply Local Carrizo Aquifer supply ASR supply Crosses former BexarMet area to far west side $182 million estimated program cost Page 13

14 Page 14

15 Water Management Strategies Filling the Supply Gaps Planned Supply Source Recommended Strategy Additional Edwards Rights 10,900 ac-ft/yr acquired in 2013 Brackish Desal Plant Expanded Local Carrizo 11,200 ac-ft/yr on-line in ,400 ac-ft/yr in ,000 ac-ft/yr in ,000 ac-ft/yr on-line in ,000 ac-ft/yr in ,000 ac-ft/yr in 2026 Regional Water Supply Project (RFCSP) Up to 50,000 ac-ft/yr starting in 2018 Demand Reduction - Water savings from programs to reduce dry year GPCD to 135 1,650 ac-ft/yr - Drought restrictions (Stage 1) Starts at 650 Edwards level - Drought restrictions (Stg. 3 & 4) No worse than 1x per week Page 15

16 Recommended Strategy Drought 600,000of Record , ,000 acre-feet 300, , , Current Supplies EARIP Commitment Planned Supplies ASR Supply Dry Demand (143 GPCD) Page 16

17 Recommended Strategy Drought 600,000of Record , ,000 3,110 acre-feet 300, , , Current Supplies EARIP Commitment Planned Supplies Permitted Supply Gap ASR Supply Dry Demand (143 GPCD) Page 17

18 Successful Water Management Increased supplies by 39% since 2004 Including Aquifer Storage & Recovery (ASR), increased by 79% ASR Storing water even during drought Cornerstone of regional Edwards Aquifer Recovery Implementation Program solution Historic Regional Water Partnership with Schertz-Seguin Local Government Corporation Saving ratepayers over $88 million International Model of Water Conservation Page 18

19 Sanitary Sewer Overflows Compliance with the Clean Water Act In March 2007, SAWS was orally notified by the EPA of alleged failures to comply with the Clean Water Act due to the occurrence of sanitary sewer overflows. Negotiations with the EPA/DOJ are ongoing any settlement, consent decree, or enforcement action will result in the imposition of a civil penalty and in required capital improvements and increased annual maintenance and operating expenses - SAWS Comprehensive Annual Financial Reports (CAFRs) Disclosure ( ) Page 19

20 September 11, 2013 SSOs YTD Page 20

21 Page 5 75 percent of sewer spills in San Antonio are caused by grease and debris. Page 21

22 Page 6 All 5,200 miles of SAWS sewers will be examined over the next 4 to 10 years. Page 22

23 Page 8 Pipes found in poor condition or too small that cause spills may be repaired or replaced. Page 23

24 Page 10 Page 24

25 Sewer Spills Reduced Sewer Investments are Working September 11, of rain of rain Sewer Spills Page 25

26 Successful Innovation September 11, 2013 Award-winning Environmental Trifecta Nation s Largest Direct Recycle System Public/Private Partnership for Gas to Energy Compost diverted from landfills Largest Solar Farm in Texas built next to largest energy meter in San Antonio CPS Energy/Sun Edison/SAWS Partnership Producing more power than the combined use of ASR, Dos Rios and the Desal Plant In-Pipe Hydroelectric Power System Brackish Groundwater Desalination Page 26

27 2014 Rate Request Reduced by 62% Budget Cuts Help Reduce Rate Request September 11, 2013 Previous Rates Forecast 13.5% O&M Budget Cuts - 2.9% Increased Revenue Projections - 2.7% Capital Financing Savings - 1.6% Removal of RFCSP Integration* -0.6% Capital Budget Reallocation -0.6% Current Rate Request 5.1% Excludes COSA Stormwater, assumes no change to pass-through fees *Regional Water Supply Project will be brought separately to the City Council for consideration. Page 27

28 Commitment to Efficiency Reducing Costs for the Ratepayer Over $10 Million in 2014 budget reductions 41 positions eliminated Voluntary Retirement Incentive to reduce more Reductions in fleet size and use Continued cost sharing and benefit adjustments Doing more with less Innovation & Efficiency Department created by redirecting existing positions Page 28

29 Efficiency Gains * Combined SAWS & DSP September 11, % 10% 9.0% More Customers % Change 5% 0% -5% -10% -15% *Projected 13.1% Fewer Employees Page 29

30 Two-Year Rate Request Request approval of a multi-year rate adjustment for 2014 and rate adjustment equal to 5.1% 2015 rate adjustment not to exceed 5.3% Subject to oversight by City of San Antonio Five-Year Water Supply Fee increases granted in 2000 Houston has automatic increases based on Producer Price Index + Customer Growth Page 30

31 Average Monthly Residential Bill Reduced 2014 & 2015 Request September 11, 2013 Proposed Total SAWS $52.91 $55.71 Increase $ $2.58 $2.80 Increase % 5.1% 5.3% Average residential bill before EAA and TCEQ pass-through fees. Assumes water usage = 7,788 gallons & wastewater usage = 6,178 gallons, ICL, Standard rates Page 31

32 2014 Customer Bill Impact 86% of Request Supports Water Supply & Sewer System September 11, 2013 Wastewater 39% $0.99 $0.37 Water Supply 47% $1.22 Water Supply Integration Pipeline Phase 1 - $144M Capital Regional Carrizo Project $7.4M operating increase over 2013 Wastewater (Consent Decree Compliance) Sewer Main & Lift Station Replacement - $89M Capital Clean, Inspect and Repair the Sewer System $7.2M Operating increase over 2013 Water Delivery 14% Based on Average Residential Bill Water Delivery Main replacements and production upgrades - $71M Capital Page 32

33 2015 Customer Bill Impact 85% of Request Supports Water Supply & Sewer System September 11, 2013 Wastewater 62% $1.72 Water Supply 23% $0.65 $0.43 Water Delivery 15% Based on Average Residential Bill Wastewater (Consent Decree Compliance) Sewer Main & Lift Station Replacement - $120M Capital Clean, Inspect and Repair the Sewer System $1.8M operating increase over 2014 Water Supply Edwards Purchases, Recycled Water Improvements, Expanded Carrizo - $30M Capital Regional Carrizo Project $2.5M operating increase over 2014 Water Delivery Main replacements & Production Upgrades $47M Capital Page 33

34 Managing a Historic Drought Challenges Edwards supplies cut by 30% Medina Lake under 5% capacity Trinity Aquifer levels decline Medina Lake 2013 Successful Water Management Averted Stage 3 Restrictions in 2013 Aquifer Storage & Recovery proves its success again International Model of Conservation Local Carrizo Aquifer supply Page 34

35 Average 2013 Residential Bills SAWS Will Remain Among the Lowest in Texas $120 $100 $88.95 September 11, 2013 $91.79 $ $80 $60 $40 $37.38 $53.22 $55.70 $60.15 $60.80 $20 $- El Paso SAWS 2013 SAWS 2014 Ft. Worth * Dallas Houston ** Corpus Christi Austin *** * Fort Worth monthly charges proposed to increase on January 1, 2014 ** Houston wastewater charges based solely on water usage *** Austin monthly charges approved to increase on November 1, 2013 Monthly charges as of October 2013, Based on 7,788 Gal. Water (Standard)/6,178 Gal. Wastewater. Includes EAA and TCEQ Fees. Page 35

36 2013 Commercial Bills 50,000 Gallons Water and Wastewater (2 Meter) September 11, 2013 $900 $800 $700 $600 $500 $400 $300 $200 $100 $- $ $ $ $ El Paso Dallas SAWS 2013 SAWS 2014 $ $ Ft. Worth Houston * * Houston wastewater charges based solely on water usage ** Austin monthly charges will rise on November 1, 2013 Monthly charges as of October 2013, Based on 50,000 gallons consumption. Includes EAA and TCEQ Fees. $ Corpus Christi $ $ Austin ** Page 36

37 2013 Industrial Bills 850,000 Gallons Water and Wastewater (6 Meter) September 11, 2013 $14,000 $12,000 $10,000 $12,661 $12,126 $8,000 $6,000 $4,000 $4,078 $5,703 $6,011 $6,169 $6,731 $8,500 $9,108 $2,000 $- El Paso SAWS 2013 SAWS 2014 Dallas Ft. Worth Houston * Corpus Christi Austin ** * Houston wastewater charges based solely on water usage ** Austin monthly charges will rise on November 1, 2013 Monthly charges as of October 2013, Based on 850,000 gallons consumption. Includes EAA and TCEQ Fees. Page 37

38 Lowest Rate Growth of Major Texas Cities 6,000 Gallon Residential Water & Sewer Bill September 11, 2013 $100 $80 $60 Austin Houston Dallas $40 $20 SAWS $3.95 Below Average SAWS SAWS $20.10 Below Average $ Current Page 38

39 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce

Vista Ridge Water Transmission & Purchase Agreement

Vista Ridge Water Transmission & Purchase Agreement Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake

More information

Follow Up Items from 1 st RAC Meeting

Follow Up Items from 1 st RAC Meeting Follow Up Items from 1 st RAC Meeting Lou Lendman Budget Manager Rate Advisory Committee Distribution of Customers by Class Page 2 1 Distribution of Water Customers by Class SAWS and DSP (2013) Class SAWS

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

SAWS SSO Reduction Program

SAWS SSO Reduction Program SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major

More information

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha Innovative Water Technologies Programs 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha The following presentation is based upon professional research and analysis

More information

Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service

Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service San Antonio Water System 2014 2023 Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service DRAFT May 2013 Land Use Assumptions Plan Chapter 395 of the Texas Local Government Code

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

San Diego Water Resources Mix and Drought Planning

San Diego Water Resources Mix and Drought Planning Supply Reliability for San Diego through a Diverse Water Resources Mix and Drought Planning Dana L. Friehauf, San Diego County Water Authority DWR/NWRI Drought Response Workshop November 6, 2012 1990-91:

More information

Unauthorized Discharges and Sanitary Sewer Overflows

Unauthorized Discharges and Sanitary Sewer Overflows TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental

More information

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.

More information

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)

More information

Condensate Free Water

Condensate Free Water Condensate Free Water F-1014 October 9, 2009 WaterSmart09 Phil Weynand Manager Conservation CONDENSATE RECOVERY Page 2 CONDENSATE Definition Page 3 Atmospheric moisture that has condensed because of a

More information

Sanitary Sewer Overflow Initiative: Information for Prospective Participants

Sanitary Sewer Overflow Initiative: Information for Prospective Participants TCEQ GENERAL INFORMATION Field Operations Support Division GI-389 Revised August 2012 Sanitary Sewer Overflow Initiative: Information for Prospective Participants What is the SSO Initiative? Sanitary sewer

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

How To Get A Plan For A Water Treatment Plant

How To Get A Plan For A Water Treatment Plant Sanitary Sewer Overflow Initiative What is a Sanitary Sewer Overflow (SSO) A type of unauthorized discharge of untreated or partially treated wastewater from the collection system or it s associated components.

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

Texas. DeVry Impact. Summary Statistics. Earnings by Education Level. Total Wage Growth Over Studied Period. 65% Growth $44,262. 42% Growth $39,478

Texas. DeVry Impact. Summary Statistics. Earnings by Education Level. Total Wage Growth Over Studied Period. 65% Growth $44,262. 42% Growth $39,478 Texas DeVry Inc. s eight Texas locations 1 produced $82.7 million in economic impact in FY2010. As part of this economic impact, DeVry Inc. schools supported 809 jobs. Wage Impact annually, while the degree

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

Wastewater Treatment - How to Reduce FOG in Dallas, Texas

Wastewater Treatment - How to Reduce FOG in Dallas, Texas Cease the Grease Background Implementation in 2005 To reduce FOG entering the wastewater system Enforcement Education Public Outreach Goals Reduce Environmental Impact Pollution Prevention Cost Savings

More information

Labor Market Demand Analysis for Green Jobs. October 2009. The Alamo Colleges defines green to include jobs and related skills in renewable

Labor Market Demand Analysis for Green Jobs. October 2009. The Alamo Colleges defines green to include jobs and related skills in renewable Labor Market Demand Analysis for Green Jobs October 2009 Anson Green Alamo Colleges San Antonio, Texas Karen Steinberg Council on Applied and Experiential Learning El Paso, Texas The Alamo Colleges defines

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM SAN ANTONIO WATER SYSTEM Organization Efficiency Study September 30, 2013 This page intentionally left blank 405 Lexington Ave New York, NY 10174 United States Tel: 212-973-2900 www.paconsulting.com September

More information

Austin Energy Quarterly Report. Austin Energy. April 26, 2011. Mission: Deliver clean, affordable, reliable energy and excellent customer service.

Austin Energy Quarterly Report. Austin Energy. April 26, 2011. Mission: Deliver clean, affordable, reliable energy and excellent customer service. Austin Energy Quarterly Report Austin Energy April 26, 2011 Mission: Deliver clean, affordable, reliable energy and excellent customer service. Agenda Electric Rate Design Status Report Residential Rate

More information

The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to

The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to Texas Commission on Environmental Quality Page 1 The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to 116.603 without changes to the proposed text as published in

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

Proposed San Antonio Sustainability Plan

Proposed San Antonio Sustainability Plan Department of Urban and Regional Planning Proposed San Antonio Sustainability Plan URP 5453 Urban and Regional Sustainability University of Texas at San Antonio Spring 2014 Part 1 Introduction Background

More information

Name: Date: P.O. Box 2449, San Antonio, Texas 78298 (210) 233-3683. Number of Taps

Name: Date: P.O. Box 2449, San Antonio, Texas 78298 (210) 233-3683. Number of Taps PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply

More information

LSC-Montgomery. Institutions Attended, Fall 2009 Academic Students. LSC-Montgomery

LSC-Montgomery. Institutions Attended, Fall 2009 Academic Students. LSC-Montgomery Alamo Community College District 5 Alvin Community College 4 Austin Community College 49 Blinn College 141 Brazosport College 1 Cisco Junior College 2 Clarendon College 1 College of the Mainland 1 Collin

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an

More information

Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor

Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these

More information

Crystal Clear SUD Crystal Clear WSC

Crystal Clear SUD Crystal Clear WSC Water Conservation & Drought Contingency Plan Crystal Clear SUD Crystal Clear WSC Committed to Providing Clean, Safe Water for All Our Residents 2014 ADDRESS PHONE WEB 2370 FM 1979, San Marcos, TX 78666

More information

Harris - Galveston Subsidence District

Harris - Galveston Subsidence District Harris - Galveston Subsidence District History of Subsidence, Regulation, and Water Management in the Houston Region Michael J. Turco - General Manager ASSOCIATION OF WATER BOARD DIRECTORS GUEST LECTURE

More information

Addressing Declining Elevations in Lake Mead

Addressing Declining Elevations in Lake Mead Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station

More information

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

Outlet: Austin Business Journal (online) Date: December 17, 2014 Unique Visitors Per Month: 151,284 Link:

Outlet: Austin Business Journal (online) Date: December 17, 2014 Unique Visitors Per Month: 151,284 Link: Outlet: Austin Business Journal (online) Unique Visitors Per Month: 151,284 Link: http://www.bizjournals.com/austin/prnewswire/press_releases/georgia/2014/12/17/la92883?ana=prnews Outlet: Dallas Business

More information

50 LARGEST CITIES WATER/WASTEWATER RATE SURVEY A BLACK & VEATCH 2012/2013 REPORT

50 LARGEST CITIES WATER/WASTEWATER RATE SURVEY A BLACK & VEATCH 2012/2013 REPORT 50 LARGEST CITIES WATER/WASTEWATER RATE SURVEY A BLACK & VEATCH 2012/2013 REPORT 2 50 LARGEST CITIES WATER/WASTEWATER SURVEY TABLE OF CONTENTS EXECUTIVE SUMMARY 4 Average Residential Typical Bills Continue

More information

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection

More information

City of Mebane Wastewater Collection and Treatment Facility

City of Mebane Wastewater Collection and Treatment Facility City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

Sanitary Sewer Overflow Report Form

Sanitary Sewer Overflow Report Form Preliminary report Final report Revised final report Sanitary Sewer Overflow Report Form Sanitary Sewer Overflow Sequential Tracking Number: Reported to: Sent Regional Board a fax Left Regional Board a

More information

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving

More information

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS (408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination

More information

Tuesday, June 14, 2016 2:00 PM

Tuesday, June 14, 2016 2:00 PM Agenda Arlington City Council Special Meeting Council Briefing Room 101 W. Abram St., 3rd Floor Tuesday, June 14, 2016 2:00 PM I. CALL TO ORDER II. WORK SESSION A. City Council Committees B. Economic Development

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011 MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City

More information

Tim Schneller, P.E. GBA Engineers and Architects

Tim Schneller, P.E. GBA Engineers and Architects Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.

More information

CITY OF KRUM Sanitary Sewer. Corrective Action Plan. February 5, 2009. Prepared by: Freese and Nichols, Inc.

CITY OF KRUM Sanitary Sewer. Corrective Action Plan. February 5, 2009. Prepared by: Freese and Nichols, Inc. Corrective Action Plan CITY OF KRUM Sanitary Sewer Corrective Action Plan February 5, 2009 Prepared by: Freese and Nichols, Inc. 4055 International Plaza Suite 200Fort Worth, TX 76109 817/735-7300 Corrective

More information

Comprehensive Sewer Surveys in 9 Basins

Comprehensive Sewer Surveys in 9 Basins Sanitary Sewer Overflow Consent Decree Presentation to Anacostia Watershed Management Committee Washington Suburban Sanitary Commission March 1, 2012 1 Three Phases of SSO Consent Decree 2 Comprehensive

More information

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title: READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions

More information

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy

More information

Foothill Municipal Water District Recycled Water Project

Foothill Municipal Water District Recycled Water Project Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,

More information

EAST BAY REGIONAL SEWER PROGRAM

EAST BAY REGIONAL SEWER PROGRAM EAST BAY REGIONAL PRIVATE SEWER LATERAL PROGRAM The East Bay Regional Private Sewer Lateral Program is a joint effort to protect San Francisco Bay. This guidebook explains the program and provides guidelines

More information

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION. and Civil Action No.

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION. and Civil Action No. UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION UNITED STATES OF AMERICA, and Civil Action No. STATE OF TEXAS, Plaintiffs, v. SAN ANTONIO WATER SYSTEM, Defendant. CONSENT DECREE

More information

CRS Report for Congress

CRS Report for Congress Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland

More information

Water Conservation Successes Response to Citizen Report. Drema Gross Resource Management Commission June 21, 2011

Water Conservation Successes Response to Citizen Report. Drema Gross Resource Management Commission June 21, 2011 Water Conservation Successes Response to Citizen Report Drema Gross Resource Management Commission June 21, 2011 Purpose of Presentation Context for discussion Water Use Trends Council Direction Response

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

California Energy Commission 2015 Accomplishments

California Energy Commission 2015 Accomplishments California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new

More information

FINANCE FY 2015 PROPOSED BUDGET WORK SESSION DEBT MANAGEMENT PLAN. Presented by Ben Gorzell, Jr. Chief Financial Officer

FINANCE FY 2015 PROPOSED BUDGET WORK SESSION DEBT MANAGEMENT PLAN. Presented by Ben Gorzell, Jr. Chief Financial Officer FINANCE FY 2015 PROPOSED BUDGET WORK SESSION DEBT MANAGEMENT PLAN Presented by Ben Gorzell, Jr. Chief Financial Officer FY 2015 Proposed Budget City of San Antonio 1 Types of Debt Issued General Obligation

More information

Real-time energy and water quality management system designed for success!

Real-time energy and water quality management system designed for success! Real-time energy and water quality management system designed for success! Texas Water 2012 San Antonio, TX April 13, 2012 Manuel Perez Energy Manager Peter Martin Vice President Brian Skeens Global Technology

More information

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0

More information

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular

More information

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

Hydrologic Data Program Overview. Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC)

Hydrologic Data Program Overview. Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC) Hydrologic Data Program Overview Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC) J. Mark Null Chief South Texas Program Office USGS Texas Water Science Center

More information

Irvine Ranch Water District Drought Response What Works and Plans for 2015

Irvine Ranch Water District Drought Response What Works and Plans for 2015 Irvine Ranch Water District Drought Response What Works and Plans for 2015 2015 Drought Response Workshop February 25, 2015 Fiona Sanchez Director of Water Resources Presentation Agenda IRWD Background

More information

Sanitary Sewer Overflow Enforcement : A National Perspective

Sanitary Sewer Overflow Enforcement : A National Perspective Sanitary Sewer Overflow Enforcement : A National Perspective LOREN DENTON, CHIEF MUNICIPAL ENFORCEMENT BRANCH WATER ENFORCEMENT DIVISION U.S. ENVIRONMENTAL PROTECTION AGENCY Topics Covered 2 SSOs National

More information

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,

More information

Office of the City Manager WORKSESSION March 17, 2015

Office of the City Manager WORKSESSION March 17, 2015 Office of the City Manager WORKSESSION March 17, 2015 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works Subject:

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance Table of Contents Section Page Executive Summary i Introduction iii Five Year Goals iii Performance Measure Types iv Performance Plan Logic Model v Benchmarking, Strategic Planning, Performance Accountability

More information

Aligning Asset Management Strategy with Service Level Objectives

Aligning Asset Management Strategy with Service Level Objectives Aligning Asset Management Strategy with Service Level Objectives The successful outcome of an asset management program is the achievement of targeted service levels at the least cost and risk to the utility.

More information

CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES

CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.

More information

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program

More information

Groundwater Law Today and Tomorrow: Court Decisions and Their Impact

Groundwater Law Today and Tomorrow: Court Decisions and Their Impact Groundwater Law Today and Tomorrow: Court Decisions and Their Impact 14 th Annual Bell County Water Symposium November 18, 2014 - Belton Presented by: Ty Embrey tembrey@lglawfirm.com (512) 322-5829 816

More information

Essential Water. Customer Charter

Essential Water. Customer Charter Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) City Council Agenda: 10/13/14 5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) A. REFERENCE AND BACKGROUND: City Council is asked to approve the City of

More information

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency

More information

Subotal - Community and Technical Colleges 476

Subotal - Community and Technical Colleges 476 1 of 5 Academic Students ACCD - Northwest Vista College 1 ACCD - Palo Alto College 1 ACCD - San Antonio College 1 ACCD - St. Philip's College 2 Austin Community College 1 Cisco Junior College 1 Collin

More information

Sewer Overflow Response Plan (SORP)

Sewer Overflow Response Plan (SORP) Sewer Overflow Response Plan (SORP) December 16, 2013 This page intentionally left blank Submitted 12/16/2013 Sewer Overflow Response Plan (SORP) i SEWER OVERFLOW RESPONSE PLAN TABLE OF CONTENTS 1.0 INTRODUCTION

More information

Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator

Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS VILLAGE OF CORRALES WASTEWATER UTILITY (SEWER) SYSTEM AND INDIVIDUAL PROPERTY OWNER SERVICE CONNECTIONS I. AVAILABILITY OF SEWER SERVICE; WHEN CONNECTION IS REQUIRED. Q. Where

More information

About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328

About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328 UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water 2 Effluents and Waste 3 Compliance 5 Key Performance 7 Indicators About this document In, UPS reported its annual Corporate

More information

From and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established:

From and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established: Article 21. Water and Sewer Rates and Service Charges. From and after January 1, 2015, through December 31, 2015, the following rates for water deliveries to each class of service are established: Sec.

More information

Percent Increase. Dollar Impact. Water 2,000 $53.45 9.9% $5.29 $58.74 4.5% $2.65 $61.39. Water 5,000 $72.20 9.9% $7.15 $79.35 4.5% $3.58 $82.

Percent Increase. Dollar Impact. Water 2,000 $53.45 9.9% $5.29 $58.74 4.5% $2.65 $61.39. Water 5,000 $72.20 9.9% $7.15 $79.35 4.5% $3.58 $82. September 3, 2013 Dear Valued Customer: On September 3, 2013, SWWC Utilities, Inc. (SWWC) filed a request with the Texas Commission on Environmental Quality (TCEQ) and the city in which we serve customers

More information

Sanitary Sewer Overflows Response to EPA Rule Making

Sanitary Sewer Overflows Response to EPA Rule Making Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s