ROOFING. Community Development Department Building Division 952-939-8394 eminnetonka.com



Similar documents
Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Detached accessory structures that contain no conditioned floor area are exempt.

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

HCD DSA OSHPD 1 2 1/AC AC SS

ROOF ASSEMBLIES CHAPTER 9

Asphalt Shingle Application Requirements

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

780 CMR ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

RB271 06/07 R807.1 RB272 06/07 R Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

CHAPTER 7: Building Systems ROOFING SYSTEMS

Shingle Installation Guide

NRCA s steep-slope manual is thoroughly revised for 2013

Residential Roofing Guide

Directions For Applying Malarkey Laminate Shingles

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

CHAPTER 5 ASPHALT-SHINGLE ROOFING

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

POST AND FRAME STRUCTURES (Pole Barns)

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year.

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

SHINGLE APPLICATION GUIDE

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application

Classic Products, Inc. ClickLock Standing Seam Installation Manual

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Chapter 9: INSTALLING ROOFING

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

The Wo rd. Shingle Warranties - Getting Real

Materials and Colors

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

SECTION COMPOSITE ROOF TILE SYSTEMS

Titan Old World Spanish Tile

SECTION PREFORMED METAL STANDING SEAM ROOFING

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

Mark Cramer Inspection Services, Inc.

Preformed Metal Roofing and Siding

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

How To Build A Roof Tile Deck

Chapter 6 ROOF-CEILING SYSTEMS

Installation Manual for STANDING SEAM ROOFING

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Dollars & Sense of Compliance!

SECTION STANDING SEAM METAL ROOFING

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals Magnolia Ave. Chino, CA 91710

Patio Covers / Carports

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Chapter 3 Pre-Installation, Foundations and Piers

Preventing Ice Dams on Roofs

EcoTouch Insulation with PureFiber Technology

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER:

What makes DECRA Roofing Systems unique?

Section Page Section Page

Please read the entire document before purchasing and installing any of these products

Florida Building Code Advanced Training: Residential Roofing Shingles

CHAPTER 6 ASPHALT ROLL ROOFING

Ver. 2. Guide to. Inspecting Residential Brick Veneer

LP OSB Sheathing & Structural 1 Sheathing

ROOF INSPECTION REPORT

4572 N Old US 31, Rochester, IN Toll Free: Fax: DETAIL MANUAL. and guide to Ramco Supply products

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

Metal Roof Systems in High-Wind Regions

TARRANT COUNTY DETAIL STANDARDS

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

COMMONLY USED RESIDENTIAL BUILDING CODES

providing documentation that validates the year of construction. Acceptable documents include

Residential Decks. Planning and Development Services Department

SECTION ROOFING TILE

During storm events, a roof is expected to perform many functions from preventing water intrusion

G VYCOR DECK PROTECTOR

Protecting YOUR NEW HOME FROM Wind Damage

How To Compare Roofing Material

Woodcrest. Shingles. Woodcrest Autumn Maple

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Transcription:

ROOFING Community Development Department Building Division 952-939-8394 eminnetonka.com This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code and good building practice. While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy or completeness. Responsibility for compliance with applicable codes and ordinances falls on the owner or contractor. For specific questions regarding code requirements, refer to the applicable codes or contact the building division. SCOPE The scope of this handout will be limited to the installation of four types of roofing materials. Asphalt Shingles Wood Shingles Mineral-surfaced Roll Roofing Wood Shakes PERMITS, INSPECTIONS, AND LICENSES Building permits are required for all roofing projects. Permits can be obtained from Minnetonka City Hall, 14600 Minnetonka Blvd. Permits are issued at the time of application. E-permits are available. The building department goal is to conduct one final inspection when the work is completed. Pictures will be required of the ice barrier underlayment with property identification. You will receive information at the time you obtain your permit as to the inspection process. All contractors engaged in roofing work must have a state contractor's license and show proof of the license to obtain a permit. Specific questions regarding contractor licenses should be directed to the Minnesota Department of Labor and Industry, (651) 284-5012 or 1-800-342-5354. DEBRIS The removal of existing roofing materials often results in this debris moving about the neighborhood on windy days. Shingle wrappers and other construction debris are nuisances to other neighbors when they find this material in their yards. As you install a new roof on your dwelling, we ask that you exercise courtesy towards your neighbors by regularly policing your yard and adjoining areas for debris that may blow around. GENERAL All roof covering materials must be delivered in packages bearing the manufacturer s identifying marks and approved testing agency labels when required. All asphalt shingles must be either self-sealing or interlocking. Roof decks must be solidly sheathed for asphalt shingles or mineral-surfaced roll roofing. Solid sheathing may be plywood, OSB, or 1-inch nominal boards. Wood shingles and shakes may be applied over solid or spaced sheathing. Roof decks that are rotted or unsound must be repaired prior to reroofing. 1

WIND RESISTANCE REQUIREMENT Minnesota State Building Code (MSBC) requires all buildings to meet a 90 mph 3 second gust standard. Manufactures may use one of any three standards to test their shingles. The chart below shows the classification ratings. Wind Speed UL 997 or ASTM D3161 ASTM D7158 60 mph Class A -- Not code acceptable 90 mph Class D Class D Code acceptable 110 mph Class F -- Code acceptable 120 mph -- Class G Code acceptable 150 mph -- Class H Code acceptable To verify compliance with MSBC, check the wind resistance classification printed on the packaged bundle of roof covering material. See below for an example. REROOFING - R907 All old roof coverings must be removed before installing any new roof coverings. Existing flashing in good condition may be reinstalled. Any sheathing that is replaced must be installed and fastened according to the code. ICE AND WATER BARRIERS An ice and water barrier is required on all roofs except for detached accessory buildings (garages). The barrier may be at least two layers of underlayment cemented together or a self-adhering polymer modified bitumen sheet. There are several manufacturers who make materials specifically for this requirement that are marketed under differing trade names. The ice and water barrier must extend from the edge of the eaves to a point 24 inches inside the exterior wall line of the building. Ice and water barriers are not required along the rakes or in valleys. 2

VENTILATION Ventilation of enclosed attics and enclosed rafter spaces is required. Ventilating openings must be provided with corrosion-resistant mesh with openings of 1/8 inch to 1/4 inch. For attics without ceiling vapor barriers, 1 square foot of net free ventilating area should be provided for each 150 square feet of attic area. For attics with vapor barriers or without ceiling vapor barriers and having at least 50% but not more than 80% of the ventilating area provided by ventilators located in the upper portion of the space to be ventilated and at least 3 feet above the eave vents and the balance of the ventilation provided in the eave vents, ventilation may be 1 square foot of net free ventilating area for each 300 square feet of attic area. ROOF EDGING, GUTTERS, DRAINAGE Roof edging and gutters are not required by the code. Application of roof edging should be in accordance with the shingle manufacturers written instructions. Gutters may be useful in directing water away from buildings reducing erosion, settlement, and wet basements. Lead-outs on downspouts should extend far enough from the building to result in positive drainage. FLASHING Flashing is required at all wall and roof intersections, wherever there is a change in roof slope or direction, and around roof openings. When flashing is metal, it must be corrosion resistant metal with a thickness of not less than 0.019 inch (No. 26 galvanized sheet) (R903.2.). Kick-out flashing must be installed in new construction where the lower portion of a sloped roof stops within the plane of an intersecting wall cladding, in such a manner as to divert or kick out water away from the assembly. Kick-out flashing may be either factory made or field fabricated. Kick-out flashing is not required for reroofing however its installation is good building practice. Flashing against vertical front walls, soil stacks, vent pipes, and chimney flashing must be in accordance with the asphalt shingle manufacturer's printed instructions. Sidewall flashing shall be by the step flashing method and is required whenever wall and roof intersections occur. Crickets or saddles are required on the ridge side of any chimney greater than 30 inches wide. Cricket or saddle coverings must be of sheet metal or of the same material as the roof covering. 3

4

Asphalt Shingles Fasteners for asphalt shingles must be galvanized steel, stainless steel, aluminum, or 12 gauge shank with a minimum 3/8 diameter head and of a length to penetrate through the roofing materials and a minimum of ¾ into roof sheathing or when roof sheathing is less than ¾ thick, the fastener shall penetrate through the sheathing. FASTENER SCHEDULE FOR ROOFING Mineral - surfaced Wood Shingles Roll Roofing Roll roofing must be installed in accordance with the manufacturer s installation instructions. Fasteners for wood shingles must be corrosion-resistant with a minimum of ½ into the sheathing. For sheathing less than ½ in thickness, the fastener shall extend through the sheathing. A minimum of two fasteners per shingle are required. Wood Shakes Fasteners for wood shakes must be corrosion-resistant with a minimum penetration of ½ into the sheathing. For sheathing less than ½ in thickness, the fastener shall extend through the sheathing. A minimum of two fasteners per shake are required. 5

ASPHALT SHINGLES - R905.2 Asphalt shingles may only be used on roof slopes of two units vertical in 12 units horizontal (2:12) or greater. For roof slopes from 2:12 to 4:12, double underlayment is required. Underlayment must conform to ASTM D 226, Type I; ASTM D 4869, Type I; or ASTM D 6757. For slopes of 4:12 and greater, underlayment must be applied shingle fashion. Laps must be a minimum of 2-inches. End laps must be offset by at least 6 feet. For normal application, strip shingles must be fastened with a minimum of four nails. For interlocking shingles, two nails are required. See the manufacturer's installation instructions. Valleys must be lined in accordance with the shingle manufacturers written instructions. In addition, valleys may be of any of the following: For open valleys lined with metal, the valley lining must be at least 24 inches wide and of galvanized steel of at least 26 gage or other approved materials. For open valleys, two plies of roll roofing may be permitted. The bottom layer must be at least 18 inches wide and the top layer at least 36 inches wide. For closed valleys (valleys covered with shingles), valley lining of one ply of smooth roll roofing complying with ASTM D 224 Type II or Type Ill and at least 36 inches wide or one of the two methods previously listed may be used. MINERAL SURFACED ROLL ROOFING- R905.5 Mineral surfaced roll roofing may only be applied on roofs with a slope of 1:12 or greater. Mineral surface roll roofing must conform to ASTM D 3909 or ASTM D 6380, Class M. Mineral surface roll roofing must be installed in accordance with the manufacturer's installation instructions. Low-slope Underlayment slopes from 2:12 to 4:12 6

WOOD SHINGLES - R905.7 Wood shingles must be installed on slopes that are at least 3:12 or greater. They must be made of a naturally durable wood of grades 1, 2, or 3 approved by the Cedar Shake and Shingle Bureau. A label of an approved grading or inspection bureau or agency must identify each bundle of shingles. Wood shingles must be installed in accordance with the manufacturer's instructions and the following. Wood shingles must be laid with a side lap of not less than 1 ½ between joints in courses and no two joints in any three adjacent courses" shall be in direct alignment. Spacing between shingles may not be less than 1/4'' nor more than 3/8". Weather exposure may not exceed what is specified in the accompanying table. Wood shingles must be attached to the root with two fasteners per shingle. Fasteners should be not more than ¾ from the edge of the shingle and not more than 1" above the exposure line. WOOD SHINGLE WEATHER EXPOSURE AND ROOF SLOPE Length Exposure (inches) Roofing Material (Inches) Grade 3:12 pitch to <4:12 4:12 pitch or steeper No. 1 3 ¾ 5 Shingles of naturally durable wood 16 18 24 No. 2 3 ½ 4 No. 3 3 3 ½ No. 1 4 ¼ 5 ½ No. 2 4 4 ½ No. 3 3 ½ 4 No. 1 5 ¾ 7 ½ No. 2 5 ½ 6 ½ No. 3 5 5 ½ 7

WOOD SHAKES - R905.8 Wood shakes must be installed on roof slopes of 3:12 or greater and must be installed in accordance with the manufacturer's installation instructions and the code. Wood shakes must be laid with a side lap of not less than 1 ½ inches between joints in adjacent courses. Spacing between shakes in the same course must be between 1/8 inch and 5/8 inch for shakes and taper sawn shakes of naturally durable wood and 1/4 inch and 3/8 inch for preservative taper sawn shakes. Fasteners for wood shakes must be corrosion resistant. Shakes must be attached with two fasteners per shake. Fasteners must be positioned not more than 1 inch from each edge and not more than 2 inches above the exposure line. The starter course at the eaves must be doubled and the bottom layer may be 15-inch, 18-inch, or 24-inch wood shakes or shingles. Fifteen-inch or 18-inch wood shakes may be used for the final course at the ridge. Shakes must be interlaid with 18-inch-wide strips of No. 30 felt shingled between each course in such a manner that no felt is exposed to the weather by positioning the lower edge of each felt strip above the butt end of the shake it covers a distance equal to twice the weather exposure. Underlayment must comply with ASTM D 226, Type I. 8

WOOD SHAKE WEATHER EXPOSURE AND ROOF SLOPE Roofing Material Length (Inches) Grade Exposure (inches) 4:12 pitch or steeper Shingles of naturally 18 No. 1 7 ½ durable wood 24 No. 1 10 Preservative-treated taper sawn shakes of naturally durable wood Taper-sawn shakes of naturally durable southern yellow pine 18 No. 1 7 ½ 24 No. 1 10 18 No. 2 5 ½ 24 No. 2 7 ½ 18 No. 1 7 ½ 24 No. 1 10 18 No. 2 5 ½ 24 No. 2 7 ½ 9 Revised 2014