Water/Wastewater Capital Improvement Plan

Similar documents
DeSoto County is not a water service provider and does not operate any

Kansas City s Overflow Control Program

FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

GOALS, OBJECTIVES AND POLICIES

Name: Date: P.O. Box 2449, San Antonio, Texas (210) Number of Taps

Vista Ridge Water Transmission & Purchase Agreement

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT

City of Cape Coral, Florida FY Proposed Operating Budgets

BEAUMONT S PIONEERING CFD

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

California Wastewater

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

Sanitary Sewer Master Plan

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

William E. Dunn Water Reclamation Facility. Facility Overview & Information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

City of Gardner Electric, Water and Wastewater Utilities. Request for Information (RFI) 1. Purpose of Request

Aquatera 2015/16 Business Plan Highlights

Unauthorized Discharges and Sanitary Sewer Overflows

Facing The Challenges In Houston s Water System: Past, Present, and Future

Preserve the Tax-Exempt Status of Municipal Bonds

NEVADA CITY WASTEWATER TREATMENT INQUIRY

Town of New Castle Utility Department Introduction

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

5. Environmental Analysis

PROJECT NAME BACKGROUND STATUS

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Testimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness

Texas Commission on Environmental Quality Page 1 Chapter Design Criteria for Domestic Wastewater Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

Capital Improvement Plan Utilities-Wastewater

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE

FY Springs Funding Projects

Florida Department of Environmental Protection

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

How To Improve Water Quality In East Pacificon

Altoona Water Authority. Infrastructure Overview

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

Project Rankings. Fiscal Year Capital Improvement Plan

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Texas State University Utility Analysis. Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA

MINUTES OF REGULAR MEETING NORTHAMPTON MUNICIPAL UTILITY DISTRICT HARRIS COUNTY, TEXAS. January 20, 2014

Purpose and Approach. Introduction

City of Charlottetown Wastewater Treatment Expansion & Upgrading

Allegany County Combined Sewer Overflows - Long Term Control Plan

Process and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April

Water and Wastewater Challenges for San Antonio 2013

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

DRAFT Public Outreach Document for What s an SSMP?

Biological wastewater treatment plants of BIOGEST

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Number September 2014 SEWER LIABILITY

EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness

Standard Operating Procedures for Flood Preparation and Response

Drain & Tank Cleaning

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

Innovative I/I Analysis Leads to Sustainably Program

Saudi Aramco Project Development

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

San Francisco s Non-potable Water Programs

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Technical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS

Description of the Water Conserv II Facility

INTRODUCTION AND BACKGROUND

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

Cambridge Wastewater Treatment Facility

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

El Paso Water Utilities Public Service Board. Application for Renewal Industrial Wastewater Discharge Permit

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

American Society of Civil Engineers

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water

On-site Treatmentt for Domestic Wastewater in Thailand Suwanna. K. Boontanon Mahidol Univ. 2

Executive Summary Consent Decree

SANITARY SEWER OVERFLOW EVALUATION REPORT

Transcription:

Water/Wastewater Capital Improvement Plan FY 2017 Georgetown Utility Systems Advisory Board June 10, 2016

Capital Improvement Plan Program funding sources: Operating Revenue (utility rates) Impact Fees Capital Improvement Plan addresses need for superior water, wastewater, irrigation service, and electric. Determined by many factors Customer base growth Service improvement Rehabilitation of aging infrastructure State and federal requirements Competitive advantage Contractual obligations

Water Services - Georgetown Water Mains - $6,274,000 Leander Interconnect - $575,000 Approximately 2,000 LF of 12 line. Potential interconnect with Leander water system Potentially provide up to 6 million gallons per day Provide redundancy Western District West Loop - $2,119,000 Along SH 29 (Wolf Ranch to DB Wood) Replace existing 8/12 lines with 24 Redundancy to Wolf Ranch Development and Pastor Pump Station Assist with distribution of Round Rock water CR 255 - $3,000,000 Approximately 7 miles (Daniels Mountain tank site to SH 29) Continuation of Western District line replacement under design and partially funded FY 16 Maintenance and rehabilitation (multiple breaks, poor bedding, substandard material) Street Rehab - $330,000 W. 11 th Street (Main-Rock) Western District Line Upgrades - $250,000 As needed to meet TCEQ requirements

Water Services - Georgetown Water Treatment - $6,100,000 Lake Treatment Plant Maintenance - $600,000 Estimated to need approximately 2 million gallons per/year Lake intake maintenance Increase intake capacity to almost 38 million gallons Additional treatment will be required Estimated at $12 million (FY 18/19) South Lake Treatment Plant - $1MM Site Selection (2017) Permits (2018) Design (2019-2020) New treatment facility (2022-23) 5-10 year development plan Approximately 12 million gallons initially Approximately $35 million total

Water Services - Georgetown Water Treatment Domel Pump Station - $4,500,000 Add filtration to Domel Pump Station rehabilitation project (funded in FY 16). Potential risk of losing 3 million gallons per day if certain contaminants are found.

Water Services - Georgetown Water Storage -$6,030,000 Sun City Elevated Storage Tank - $3,050,000 Replace existing 400,000 gallon elevated tank Construct new 1.5 million gallon elevated tank Required to meet growing demands Sequoia Ground Storage Tank - $2,500,000 3-4 million gallon tank on existing site Ground tank instead of elevated in Georgetown Village Increased treated water storage to help Lake Plant peak Very competitive tank pricing currently available Tank Rehabilitation - $480,000 Repair and rehabilitate existing metal tanks Typically required every 12-15 years Airport Road Reuse tank (2017) Daniels Mountain small tank (2018) Daniels Mountain large tank (2019)

Wastewater Services Wastewater Improvements - $13,636,000 Edwards Aquifer Recharge Zone (EARZ) 2015 - $1,500,000 Continuation of existing program Identification and replacement of damaged sewer lines and manholes Street Projects - $136,000 W. 11 th Street (Rock Main) Berry Creek Interceptor - $12,000,000 Initial phase of construction planned for late 2016 (Sun City to Airport Road) Airport Road to Pecan Branch Wastewater Treatment Plant Proposed funding for potential Public-Private Partnership with Homestead Development Provide permanent wastewater capacity to expanded Sun City, Shell Road, and Hwy 195 Corridor Ultimately take Sun City Lift Station offline

Wastewater Services Lift stations - $4,532,000 Park Lift Station and Force Main - $3,982,000 Existing San Gabriel Wastewater Treatment Plant Lift Station Required repairs of existing station and capacity expansion for development Lift Station Upgrades - $550,000 TCEQ/SSO plan requirements Redundant power Electrical/control system upgrades Lift stations to be prioritized based on field conditions Irrigation System No improvements proposed

Wastewater Services Plant Upgrades - $10,155,000 Pecan Branch Wastewater Treatment Plant Expansion - $7,948,000 1.5/1.8 million gallons per day to 3.0/3.6 million gallons per day TCEQ mandate to initiate construction based on actual plan flows Design previously initiated 18 month construction schedule (additional $3,600,000 FY 18) Ultimate terminus for Berry Creek Interceptor (Sun City, Shell Road, Hwy 195, Berry Creek areas) San Gabriel Wastewater Treatment Plant Belt Press - $2,207,000 Sludge dewatering currently manual, inefficient, limited capacity, and weather dependent Belt press will mechanically & chemically dewater sludge Free up drying bed space onsite