YTE Suspension. Installation & Maintenance

Similar documents
SELF-STEERING AXLE TABLE OF CONTENTS

O SL. BPW Original spare parts Air suspensions series O / SL / AL BPW BERGISCHE ACHSEN BPW ORIGINAL SPARE PARTS. BPW Original spare parts

Rating when used as a weight carrying hitch without spring bars:

MEASURING WHEEL ALIGNMENT

Ford F-250 / /2 Coil Kit. Ford F-250, F Part#:

F250 6 RADIUS ARM KIT

Checking Wheel Brakes Wear

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Front axle components, overview

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

1993 SUSPENSION Volkswagen Front. EuroVan

Owner s Manual Read and keep this manual. Patents World Wide

Street-Lynx. Reilly MotorSports, Inc. Installation Manual

Competition 4 & 6 suspension Lift Toyota Landcruiser & nissan patrol

AIR-SUSPENSION. Art. nr.: L.L C.M. Auxiliary Air Suspension. Designed for: Mitsubishi L200. From: 2007& UP RDW 71/

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

AXLE SHAFTS - FRONT Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

TECHNICAL BULLETIN. Meritor WABCO Cab Leveling Valves and Chassis Leveling Valves. How the Cab Leveling and Chassis Leveling Valves Work

VW Caddy W INSTALLATION INSTRUCTIONS

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)

Little British Car Co.

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Freightliner AirLiner Suspension 32.05

SECTION 2B WHEEL ALIGNMENT TABLE OF CONTENTS

FRONT SUSPENSION Click on the applicable bookmark to selected the required model year

STEERING HANDLEBAR/FRONT WHEEL/ FRONT SHOCK ABSORBER

INTRODUCTION KINGPIN REPLACEMENT

6,100 7,000 lb. Spring Axles

WARNING TO END USER, INSTALLER AND SELLER OF THIS PART!

One and Two-piece Torque Rods and Replacement Bushings LIT NO:

Tooling List 17mm Socket 17mm Wrench 24mm Wrench 26mm Wrench 3/8 Drive Ratchet Torque Wrench

SLACK PERFORMANCE KARTS

BPW TRANSPEC AIR LIGHT II SERIES AIR SUSPENSIONS SPARE PARTS CATALOGUE FOR AUSTRALIAN ASSEMBLED AXLES

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

»Product» Safety Warning

1000-LB. TRAILER JACK OWNER S MANUAL

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

R O A D M A S T E R, I N C.

INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb

HYDRAULIC LIFT TABLE CART 2200-LB.

Model No: VS SAFETY INSTRUCTIONS VS INTRODUCTION & APPLICATIONS VS CONTENTS. 2.1 Introduction. 2.

88-98 Chevy / GMC Fullsize 4WD 6-Lug 2"- 2 1/2" Suspension Lift Installation Instructions

92-00 Civic/ Integra/ Del Sol/ CRX Rear Kit Part No

WHEEL ALIGNMENT SPECIFICATIONS & PROCEDURES

WHEEL ALIGNMENT 4WD SA 6

2,500 3,700 lb. Spring Axles

Check for deteriorated, shifting or missing tie-down pads. Replace if needed.

SCION tc COIL OVER SUSPENSION Preparation

MGB Chrome Bumper Conversion

ARVINMERITOR UNITIZED FRONT WHEEL HUB INSPECTION AND MAINTENANCE

STEERING SYSTEM - POWER

WHEEL ALIGNMENT SPECIFICATIONS & PROCEDURES

VT SERIES. Owners Manual VARIABLE TRAVEL MOUNTAIN BIKE

Installation Manual. SKU# series (Base Rails) SKU# series (Overhead Racks)

Front brakes (FN- 3), servicing

Drive shaft, servicing

uline.com SPECIFICATIONS

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Installation Instructions

R O A D M A S T E R, I N C.

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

PRIMAAX EX / PRIMAAX Rear Air Suspension for Mack Vehicles

Speed-Mat Rectangle Cutter

INSTRUCTION. Industrial Sewing Machines. No First published : June 1997 Second edition : March 2001

I BEAM TRACK INSTALLATION

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

Installation manual. 3 suspension system Ford F150. Part # Part # Important customer information: Ford F150

4,000 6,000 lb. Spring Axles

Operation of the overrun braking system.

ASSEMBLY MANUAL SE-4S35

Prepared by Graham from SuperPro August 2011

12. REAR WHEEL/BRAKE/SUSPENSION

DiscPlus DX195 and DX225 Air Disc Brakes

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

ReadyLift (Part# ) Strut Extension, Installation Instructions Toyota Tundra New Body Style 2WD & 4WD

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS

4.5 LIFT BOX KIT DODGE RAM 2500 & WD DIESEL ENGINE ONLY FTS23031

DM-PD (English) Dealer's Manual PD-MX80

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

758 Heavy-duty Ratchet Guy Wire Cutter

S-Cam Air Brakes. Braking Systems - Air. Operation

Section A. GENERAL INFORMATION

Volkswagen Phaeton 44-2 Wheel and tire mounting Wheel mounting Mounting tires Pressing off tires Dismounting tires Mounting tires

CorkSport Mazdaspeed 6 Rear Sway Bar Mazdaspeed 6

HORIZONTAL INSTALLATION

TECHNICAL INFORMATION

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

R O A D M A S T E R, I N C.

ESTATE WAGON MODEL 300 OWNER MANUAL

Go-kart for little race-drivers

OWNER S MANUAL. Permolock C3. Docking system for Power wheelchair in vehicle

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

Transcription:

YTE Suspension Installation & Maintenance For Your Trailer Axle Suspension Needs Call York : Head Office Singapore YTESuspguide.RevC.May2008 York Transport Equipment (Asia) Pte. Ltd. No. 5 Tuas Avenue 6, Singapore 639295 Email : enquiry@yorktpt.com.sg Tel : (65) 6861 0577 Fax : (65) 6861 4045

Hanger Installation and Welding (YTE 75, YTE 75/90 & YTE 90 Suspension) First position the two front hangers on the frame, ensuring they are the square to the frame and located in line longitudinally and transversely. All diagonal measurements and dimensions to be within 2mm maximum variation. Position the rest of the suspension hangers on the frame, see dimensional detail drawings for layouts, all spacings to be held to within 2mm of those shown. Tack weld the hangers in position and recheck their position before final welding. The material of the hanger is of cast steel BS3100-A2. All welding to be low hydrogen electrodes (such as Kobelco LB-52U) or equivalent M.I.G process. Weld all around the top of each hanger bracket - 10mm continuous fillet weld. After installation of all hanger brackets, fit between the front hangers and all pairs of equaliser hangers either a pipe or channel cross bracing. Fully weld the ends of the cross bracing to their respective hangers. (See Fig. A) Axle Seat Installation and Welding Choose Center: See Page 3. Choose Brake Chamber Position: See Pages 4-6. YTE 75 Suspension Page 4 YTE 75/90 Suspension Page 5 YTE 90 Suspension Page 6 Axle Seat Installation and Welding: See Pages 7-9. YTE 75 Suspension Page 7 YTE 75/90 Suspension Page 8 YTE 90 Suspension Page 9 5? 0x5 TUBE (TUBE NOT SUPPLIED) Fig. A Position axle seats at correct centres. (Must match suspension hanger centres.) The centre bolt holes of axle seats must be at the top of axle for overslung suspensions and the bottom centre for underslung suspensions. Axle seats must be flat and parallel with each other. Tack weld the axle seats in position and recheck their positioning before final welding. The material used for the spring seat is cast steel BS3100-A2. Weld the axle seats to the axle using low hydrogen electrodes (such as Kobelco LB-52) or equivalent M.I.G process and 8mm fillet weld. It should not exceed more than 30mm for 6 round axle or 40mm for 6 square axle above or below the axle centre line. Axle Bottom Plate Installation and welding: See Page 10. (for YTE 90 Suspension Only) Spring Assembly Assemble the springs onto the axles, ensuring that: The hook end of the spring is to be fitted to the rear of the axle on all axle positions. Tighten U-bolt nuts evenly to a torque of: - M22 (for 8 leaf spring) 500/540 Nm. - M24 (for 10 leaf spring) 640/680 Nm. 2

YTE 75, 75/90 & 90 Suspension Spring Center Calculation F 175 min for YTE 75 200 min for YTE 75/90 & YTE 90 Width of chasis beam S E 150 for YTE 75 175 for YTE 75/90 & YTE 90 Width of equaliser hanger 150 for YTE 75 Overslung hangers 240 for YTE 75 Underslung hangers 160 for all YTE 75/90 & YTE 90 Hangers S = Tyre Section Width D = Wheel Rim Offset A = 0.5*S + D 150 Width of all front and rear hanger Front pin mounted inwards A D Gap 40 min. (60 for Off Road) Edge of tyre Edge of chassis beam Spring Center, C=T-2(A+40+0.5F) Axle Track Length, T Overall Tyre Width, B=T+2A 3

YTE 75 Suspension Camshaft & Brake Chamber Positions (Note 1) OVERSLUNG 5" ROUND AXLE BEAM R5/O/75 22.5 CAM LOCATION - R5-1 CAM LOCATION - R5-2 0 OVERSLUNG 6" SQUARE AXLE BEAM S6/O/75 CAM LOCATION - S6-1 CAM LOCATION - S6-2 UNDERSLUNG 5" ROUND AXLE BEAM R5/U/75 30 CAM LOCATION - R5-3 CAM LOCATION - R5-2 0 UNDERSLUNG 6" SQUARE AXLE BEAM S6/U/75 CAM LOCATION - S6-2 Note 1: Optional brake chamber position is only for approval application on good highway without overloading (< 11 Ton). 4

YTE 75/90 Suspension Camshaft & Brake Chamber Positions (Note 1) OVERSLUNG 5" ROUND AXLE BEAM R5/O/75-90 22.5 CAM LOCATION - R5-1 CAM LOCATION - R5-2 0 OVERSLUNG 6" SQUARE AXLE BEAM S6/O/75-90 CAM LOCATION - S6-1 CAM LOCATION - S6-2 UNDERSLUNG 5" ROUND AXLE BEAM R5/U/75-90 22.5 CAM LOCATION - R5-1 CAM LOCATION - R5-2 0 UNDERSLUNG 6" SQUARE AXLE BEAM S6/U/75-90 CAM LOCATION - S6-1 CAM LOCATION - S6-2 Note 1: Optional brake chamber position is only for approval application on good highway without overloading (< 11 Ton). 5

YTE 90 Suspension Camshaft & Brake Chamber Positions (Note 1) OVERSLUNG 6" ROUND AXLE BEAM R6/O/90 OPTIONAL R6/O/90-U 22.5 CAM LOCATION - R6-1 CAM LOCATION - R6-2 0 OVERSLUNG 6" SQUARE AXLE BEAM S6/O/90 CAM LOCATION - S6-1 CAM LOCATION - S6-2 UNDERSLUNG 6" ROUND AXLE BEAM R5/U/90 22.5 CAM LOCATION - R6-1 CAM LOCATION - R6-2 0 UNDERSLUNG 6" SQUARE AXLE BEAM S6/U/90 CAM LOCATION - S6-1 CAM LOCATION - S6-2 Note 1: Optional brake chamber position is only for approval application on good highway without overloading (< 11 Ton). 6

YTE 75 Suspension Welding 100 No Welding 900027 5" Round Beam Overslung 25 Max. 5" Round Beam Underslung 25 Max. 100 No Welding 900027 No Welding At Top & Corner 900008 6" Square Beam Overslung 6" Square Beam Underslung No Welding At Top & Corner 900008 7

YTE 75/90 Suspension Welding 100 No Welding 900027 5" Round Beam Overslung 25 Max. 5" Round Beam Underslung 25 Max. 100 No Welding 900046 No Welding At Top & Corner 900008 6" Square Beam Overslung 6" Square Beam Underslung No Welding At Bottom & Corner 900211 8

YTE 90 Suspension Welding 130 No Welding 930030 6" Round Beam Overslung 30 Max. 6" Round Beam Underslung 30 Max. 130 No Welding 930044 No Welding At Top & Corner 930011 6" Square Beam Overslung 6" Square Beam Underslung No Welding At Bottom & Corner 930051 9

Only For YTE 90 Overslung With U-Bolt Top To Bottom Welding of Bottom Clamp Plate 930030 8 8 930053 No Welding At Bottom 6" Round Axle Beam 930011 8 8 6" Square Axle Beam Welding Procedure: 1. Position the bottom clamp plate at correct location right below the spring seat. Make sure the bottom clamp seat firmly against axle beam 2. Fillet weld 8 mm bottom clamp plate. Make Sure No Welding At Bottom of Axle Beam. 3. Assemble U-bolts and tighten all the nuts to 640-680 Nm. 10

Axle Assembly Fit the axle, spring assembly into position and connect to the front and equaliser hangers through the torque arms, making sure the spring hooked ends fit into the equalisers. Insert spring retaining bolts into the equalisers and hangers. Assemble the adjustable torque arms to the same length as the corresponding fixed torque arms. Fit the fixed torque arms on the kerb (near) side and the adjustable torque arms on the road (off) side of the trailer. a) On tandem and tri-axle suspensions the centre and rear torque arms will be longer than those on the front axle. b) On all underslung suspensions the adjustable torque arms must be installed with the clamp bolts to the top or as shown on the assembly drawings. Torque Arm Bush Installation Fit the end of the torque arm in the suspension bracket and insert the bushes from each side, fit torque arm pin, flat washers and self locking nut, ensuring that the torque arms are central in the suspension bracket. Tighten torque arm pin self locking nuts to: - M24 150/200 Nm. (Rubber bushes) - M24 240/270 Nm. (Poly bushes) The Way Of Bush Installation: The rubber bush is the standard one for most highway suspension. When the rubber bushes are properly tightened to 150/200 Nm, the bush material protrusion will be less than 2 mm.(see Fig. B). The poly (polyamide) bush is designed for heavy duty operation (rough road, heavy duty and intensive operation). After initial proper tightening, the bush material protrusion should not be more than 7 mm each side (See Fig.C). Both rubber and poly taper bush need to be compressed as much as possible for maximum service life. In practices, the bush should be tightened in such a way to get minimum bush material protrusion: 1). Lubricate all tapered rubber or poly bushes on the outer surfaces with liquid soap solution (not detergent or rubber grease) before fitting into the suspension castings. 2). Manually (low speed, not very fast speed when using torque gun) tighten the nut with spanner as far as possible. If operator use torque gun (speed is too fast) from the beginning, the bush material protrusion will be bigger and bushes will not be compressed properly. Fig. B Rubber Bushes 150-200 Nm 240-270 Nm Fig. C Poly Bushes <2mm <2mm <7mm <7mm 11

Axle Alignment and Adjustment Measure from the centre of the kingpin to the centre of each end of the front axle and adjust as necessary with the adjustable torque arm screws until the dimensions are equal. Alignment of the rear axle (axles) is then made by checking the distance between the centre of the front axle and rear axle (axles) at both sides of the trailer. Adjust as necessary with the adjustable torque arm screws until the dimensions are equal. Note : Alignment can also be achieved with an optical device or laser system designed specifically for this purpose. A=B +/-2 mm C=D +/-1 mm E=F +/-1 mm Kingpin Tighten the torque arm clamp bolts to a torque of : 95 Nm (M12). Be careful!: Torque wrench must be used here. Over-tightening will damage the thread of clamping bolt. For each adjustable torque arm end, 2 clamping bolts should be tightened alternatively for at least 4 times so that both clamping bolts achieve 95 Nm. (see Page 16) Adjustment of Equaliser Position (See next Page 13) When considering the suspension and axle to be fitted to a new trailer always take into account the angle of slope as shown in Fig. D. If this angle of slope is greater than that shown below for each type of suspension in the laden condition then the equaliser will have excessive tilt (see Fig. E). This tilt will reduce the equaliser movement causing the equaliser to strike hanger or chassis frame under uneven (rough) road conditions. This can be overcome by welding a 25 mm thick packer to the spring seats (see Fig. F). The same result can be achieved by welding spacers between the main frame and the top of suspension hanger brackets (see Fig. G). If the angle of slope is greatly in excess of the following slopes, a spring seat or packer of greater height of 25mm will be required to combat the equaliser tilt. Tandem suspension: One in fifty (25mm higher on front axle) Tri-axle suspension: One in one hundred (25 mm higher on front axle, 12 mm higher on center axle) Note: No higher spring seats or packers are necessary if the bottom of the trailer main beam and the ground are parallel. Tri-axle suspension: Experience has shown that the correct installation of tri-axle suspension is more critical than that of tandem suspensions. When the trailer angle of slope in the laden condition is greater than the angle of slope specified then reduced equaliser travel will cause uneven axle loading (possibly overloading some axles). Overloading on some axles can cause excessive tyre wear or even failure, particularly when corning. Therefore, it is imperative when installing tri-axle suspension that attention is paid to the laden trailers angle of slope. If the slope is greater than one in two hundred, then spring seat of correct height or packers of correct thickness must be fitted to both the front axle and center axles (The highest spring seat or packers being fitted to the front axle). A B C D E F 12

Trailer Slope vs. Equaliser Position Angle of slope Fig. D Fig. E Fig. F Fig. G 13

Adjustment of Equaliser Position, Continued. The height of spring seat or packer can only be determined by considering each installation individually after determining the fifth wheel height (laden), wheel base, tyre size, the trailer beam design, suspension height (laden) etc. When the suspension has been matched to the designed laden fifth wheel height, the recommended variation should be within 38mm for wheel base and 50mm for the length of kingpin to center of suspension. Equaliser Bump Stops (1540 Spacing on YTE 75/90 & YTE 90 Suspension Only) For YTE 75/90-1540 axle spacing design, bump stops must be fitted at either end of all equalisers as drawings below. These bump stops are used for preventing damage or premature failure of hanger and equaliser when the equalisers rotate to their maximum position. This extreme position of the equalisers can occur (locked within the equaliser hanger) due to operations on very rough road conditions and incorrect installation of suspension on trailer frames where trailer frame slope is not taken into account (see pages 2 & 3). The extra load applied to the equaliser hanger and equaliser, in this condition causes damage and possibly failure of the castings. Please take note that the stops are welded to trailer frame (main beam). The bump stops are not supplied as part of the suspension kit. 50 255 Overslung 50 1540 Spacing 50 50 255 Underslung 140mm Packer 1540 Spacing Final Inspection A visual inspection of the suspension after installation and assembly should be carried out to ensure that all components are correctly located and seated, as incorrect location or misalignment of the components will greatly reduce the service life of the suspension. 14

Servicing Intervals (On Highway). First Service - 500 km. - Check all torque settings and re-torque. Every 5,000 km or every 3 weeks. - Check all torque settings (Especially U-bolt and torque arm pin nut). - Grease equaliser shafts (straight bush design only) using an EP2 grease or equivalent. It is recommended that the vehicle is lifted (jacked up) so that the load is removed from the equalisers when greasing these points. For vehicles operating in severe and dusty conditions it is recommended that the bushing is greased daily. Every 50,000 km or every 6 months. - Check and lubricate as for 5,000 km service. - Check the torque arm bushes, equaliser shaft bushes for wear or deterioration and replace as necessary. - Check the leaf springs for wear, cracks or corrosion and replace as necessary. - Inspect the remainder of the suspension for wear or deterioration and replace any suspect parts as necessary. - Check tyre wear and adjust the axle alignment as necessary. Axle alignment must be checked when ever severe kerbing, accident damage or the torque arm bushes have been replaced during servicing. Servicing Intervals (Off Road Intensive Operation). First Service (or after parts changing) 500 km or 1 week. - Check all torque settings and re-torque (Especially U-bolt and torque arm pin nut). Daily. - Daily greasing of the equaliser bushings can be done by service staff or an automatic lubricating machine. It is recommended that the suspension equaliser bushings (straight design only) are lubricated daily. To lubricate the equaliser bushings the load should be removed from the suspension by lifting up (jacking) the unit. Weekly. - Check all torque settings (Especially U-bolt and torque arm pin nut) with torque wrench. Every 15,000 km or Monthly. - Check all torque settings and lubricate as for daily and weekly service. - Check the torque arm bushes, equaliser shaft bushes for wear, replace as necessary. - Check the leaf springs for wear, cracks or corrosion and replace as necessary. - Inspect the remainder of the suspension for wear or deterioration and replace any suspect parts as necessary. - Check tyre wear and adjust axle alignment as necessary. Axle alignment must be checked whenever severe kerbing, accident damage or the torque arm bushes have been replaced during servicing. 15

YTE 75 Suspension M22-500/540Nm M24-640/680Nm M24-290/350Nm (Rubber or Poly Taper Bush) M16-75/85Nm M24 (Rubber Bush) - 150/200Nm M24 (Poly Bush) - 240/270Nm M12-90/100Nm 2 nuts to be tightened alternatively for 4 times. M24-290/350Nm (Rubber or Poly Taper Bush) M24 (Rubber Bush) - 150/200Nm M24 (Poly Bush) - 240/270Nm M22-500/540Nm M24-640/680Nm M16-75/85Nm M12-90/100Nm 2 nuts to be tightened alternatively for 4 times. M24-640/680Nm YTE 75/90 & 90 Suspension M30-290/350Nm (Bronze or Vesconite Bush) M24 (Rubber Bush) - 150/200Nm M24 (Poly Bush) - 240/270Nm M16-75/85Nm M12-90/100Nm 2 nuts to be tightened alternatively for 4 times. M30-290/350Nm (Bronze or Vesconite Bush) M16-75/85Nm M24 (Rubber Bush) - 150/200Nm M24 (Poly Bush) - 240/270Nm M12-90/100Nm 2 nuts to be tightened alternatively for 4 times. M24-640/680Nm 16