How To Improve Your Aviation Efficiency

Similar documents
AN AIRCRAFT TAXI SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR PARK. W. Swain Ottman Angela C. Ford Gregory R.

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

Air Traffic Management Services Plan

Block 0: Capabilities within our Grasp

Federal Aviation Administration. Air Traffic. Flow Management. Presented to: MIT By: Date: FAA Command Center October 5, 2006

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

Area Navigation (RNAV) and Required Navigation Performance (RNP)

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

Traffic Flow Management. December 2010

SITA AIRCOM Service (VHF & Satellite)

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

FAA International Strategies 2010 to 2014 Western Hemisphere Region

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Training program for S2 (TWR) rating

Air Support services are centred on four core practice areas, as indicated below and briefly described later on.

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Performance-based Navigation and Data Quality

FAA Familiarization Briefing

Departure Efficiency Benefits of Terminal RNAV Operations at Dallas-Fort Worth International Airport

PBN Aeronautical Charts and Procedure Design

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

SWIM Connect SWIM Partnerships: Collaboration with the FAA s Decision Support Service (DSS) Programs 3:00 PM. Federal Aviation Administration

Airport Modelling: Capacity Analysis of Schiphol Airport in 2015

FLORIDA STATE COLLEGE AT JACKSONVILLE COLLEGE CREDIT COURSE OUTLINE

Air Traffic Management

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Comment submission: Date for submission of comments: Comments will be received until 5:00 P.M., Eastern Time, on August 18, 2008.

Performance management Identification of metrics

the safety maker in aviation

Analytics That Allow You To See Beyond The Cloud. By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business

While flight plan calculations are necessary for safety and regulatory compliance, they also provide airlines with an opportunity for cost

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

Overview of NM and CDM

Air Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013

Airport Performance Measurement

Departures to the south from Runways 16L and 16R.

Direct Approach Consulting Inc.

Minneapolis-St. Paul International Airport: Performance-Based Navigation (PBN) Process Recap and Insights

FAA / NAA DISPATCHER CERTIFICATE TRAINING PROGRAM

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA- INDIAN OCEAN REGION. 23 April 2004

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

What is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies.

CNS/ATM SYSTEMS IN INDIA

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India


ICAO Strategic Objective: Economic Development of Air Transport Electronic Tools for Dissemination of Air Transport Data

THE GLOBAL AIRLINE INDUSTRY

SESAR BENEFITS: TOMORROW STARTS NOW

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Pricing Framework July 2012

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

Case study: The Olympic Challenge

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

Aviation Demand Forecasting

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

From patchwork to network:

Pilot Briefing for Helsinki-Vantaa Real Flight Event

Software Centre 4 th June 2015

Info NEWS MEDIA GUIDE

ATAC International Business Development Strategy 2012/2013

Beechcraft 1900D: Fuel, Emissions & Cost Savings Operational Analysis

U.S. Airport Slot Regulations

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 30 JUNE 2015

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Air Traffic Management Solutions

Space Based ADS-B. Transforming the Way you See the Sky March, COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.

AIRLINE PASSENGER SERVICE COMMITMENT 28 March 2001

Flight information that keeps pilots a step ahead.

OR Applications in the Airline Industry

FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research

AGENCY: Federal Aviation Administration (FAA), Department of Transportation.

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

Airspace. Chapter 14. Introduction

Preliminary Cost Benefit Analysis CS#7 Network Infrastructure Performance Monitoring and Analysis

Corporate Report COUNCIL DATE: March 31, 2008

Mitigating the Impacts of Space Weather on Aviation Operations

Risk In the Value Stream at United Airlines. Mike Quiello

TENDER FOR IT INTEGRATION AT THE BVI AIRPORTS AUTHORITY

Getting the Best Out of Big Data. Roland Krieg Senior Executive Vice President IT Frankfurt Airport

Pilot Briefing Stockholm/Arlanda

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

How To Calculate The Cost Of Atc Zero At Chicago Airport

Jargon Buster. Amadeus APIS ASK ATA ATC ATD. BA2Buy BAA BABS. Agents Discount Tickets (AD75 - pay 25% of fare)

The Mayor of London s Submission:

EUROCONTROL Training Activities 2013

Training Pilot & Technician Outlook Pilot & Technician Outlook 1

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

Airport Master Plan Demand/Capacity Analysis and Facility Requirements Summary

AIRFIELD DRIVING TEST

1.3 The Terms and Conditions for the Booking System apply to all booking related pages and functions.

AFRAA AIRLINE PASSENGER SERVICE COMMITMENT

Transcription:

ATM Collaborative Research in Latin America CANSO Feb 13 The information contained in this document is GE proprietary information and is disclosed in confidence. It is the property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but without limitation, it is not to be used in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, designs, or configuration changes or to obtain FAA or any other government or regulatory approval to do so. If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this document shall appear in any such reproduction in whole or in part. The information contained in this document may also be controlled by the U.S. export control laws. Unauthorized export or re-export is prohibited.

I find out what the world needs, then I proceed to invent it. -Thomas Edison, Founder, General Electric GE Aviation

If I had asked my customers what they wanted, they would have said A faster horse Henry Ford 3 GE Aviation

Collaborative Research in Brazil DECEA Request: ID bottlenecks & improvements Growing air traffic demand Surface and airspace congestion Efficiency = Deal with the growing demand Reduce operating costs Reduce environmental impact GE Aviation

ICAO forecasts.8% annual traffic growth in LatAm to 5 Number of departures / year expected to increase from 5M in 5 to 5M+ in 5 Source: Long-term Traffic and Aircraft Movement Forecasts, International Civil Aviation Organization, http://www.icao.int/sustainability/pages/eap_fp_forecast_longterm.aspx 5 GE Aviation

Flight costs Capacity <-> Demand Motivation Expanded Infrastructure New Technologies Per seat cost reduction Growth / Expansion Rationalization Cost Current technology & infrastructure limits 6 GE Aviation

Objectives Measure Analyze ID Improvements 7 GE Aviation

Collaboration leading to innovation Exchange of knowledge ANSPs Airports Exchange of ideas Operators 8 GE Aviation

File: BrazilDemoV1_baselinemetrics Sheet: Plan Baseline 6 6 DepartureDist 6 EnrouteDist 3 1 ArrivalDist 3 1 6 8 1 1 1 DepartureTime 8 6 6 EnrouteTime 3 1 1 1 16 18 ArrivalTime 3 1 15 5 3 DepartureFuel 6 6 EnrouteFuel 3 1 ArrivalFuel Measure, Analyze, Improve GE Efficiency Analysis Airline Data (FOQA, Netline) 6 8 1 Visualization 6 8 1 Metrics 6 8 1 1 Playback Control Generate Scenario Modeling & SImulation ATC Weather Airline Ops Flow Control Airspace, Airport Data Surface Gates Airspace Sequencing

Model existing operations Airports Airways & routes Sector boundaries TMA, Enroute and area control modeled 1 September 1

Model existing operations SIDs, STARs & arrival procedures at all airports Including RNP AR arrivals at SDU Detailed airport model Runways, taxiways, gates and parking spots 11 September 1

Airspace analysis & efficiency model

Conclusion Innovation and technical advancement have been at the core of GE since its founding New technologies and processes needed to deal with increasing traffic levels in an environmentally and socially responsible manner GE Global Research collaborating with ANSPs and operators Evaluating existing operations Identifying promising new technologies and operations Both current and future traffic patterns

AIRPORT DATA Brazil collaborative research objectives System capacity Controller Workload Demand vs. Capacity Separation Statistics Fuel Costs Delay MEASURE OPERATIONS ANALYZE PERFORMANCE ID POSSIBLE IMPROVEMENTS RNP Arrival Management Flow Management Surface Management passenger traffic AIRSPACE DATA database AIRLINE DATA time Quantify both current operations and potential changes to identify areas for improved efficiency & capacity recoverable costs base cost

Brazil Airline Efficiency Development Technical Challenges & Proposed Solutions Airlines / ANSP Data Simulation Optimization Development GE AETHER Performance Metrics Measure Analyze Decision Support Airlines Controllers Airports Research leads to solutions Improve 16 September 1