COOLING TECHNOLOGY INSTITUTE



Similar documents
COOLING TECHNOLOGY INSTITUTE

AIR CONDITIONING TECHNOLOGY

800 class NATURAL DRAFT COUNTERFLOW COOLING TOWER

/ Marley Class 800 Mechanical Draft Cooling Tower /

Tim Facius Baltimore Aircoil

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

How do I measure the amount of water vapor in the air?

Check-list for auditors. Audit visit at candidate registered laboratories

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS

WET BULB GLOBE TEMPERATURE MEASUREMENT AT THE Y-12 NATIONAL SECURITY COMPLEX

Cooling Tower Basics and Common Misconceptions

Evaporative Cooling System for Aquacultural Production 1

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power

Tube Control Measurement, Sorting Modular System for Glass Tube

Humid Air. Water vapor in air. Trace Glasses 1% Argon (A) Water vapor (H 2

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Temperature. LumaSense Technologies, Inc. supplies a unique selection of very precise calibration

Technical Manual. FAN COIL CONTROLLER COOLING or HEATING ANALOG or PWM Art A

COMMERCIAL HVAC EQUIPMENT. Condensers and Cooling Towers

An Approach for Water Cost of Cooling Water System in Oil Refinery

Environment-Laboratory Ambient Conditions

Eurovent Certification

REGULATORS 175/153 Series

Commissioning - Construction Documents (Page 1 of 6)

BB-18 Black Body High Vacuum System Technical Description

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Element D Services Heating, Ventilating, and Air Conditioning

ME Heat Transfer Laboratory. Experiment No. 7 ANALYSIS OF ENHANCED CONCENTRIC TUBE AND SHELL AND TUBE HEAT EXCHANGERS

T5 Watt-Miser Linear Fluorescent lamps

Dual Laser InfraRed (IR) Thermometer

An Introduction to. Metrics. used during. Software Development

Procedure Terms of reference of the support structure of the CDM Executive Board

CE6500 Energy Recovery Ventilator

SAMPLE PWS FOR HRC MEO

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

ISO 9001:2015 Internal Audit Checklist

Closed Circuit Cooling Towers

Board Charter. HCF Life Insurance Company Pty Ltd (ACN ) (the Company )

Engineering Recommendation on: Accumulators Revised Issued January 10, 1979 Page 1 of 7

ISO/IEC QUALITY MANUAL

How To Save Energy With High Pressure Control

Chapter 3.5: Fans and Blowers

Testing methods applicable to refrigeration components and systems

Bylaws. Federation of International Lacrosse

Schedule 3(A) Room Air Conditioners

Multicultural Council of Tasmania GUIDE FOR MANAGEMENT COMMITTEE MEMBERS

Energy Recovery Ventilation Equipment

Performance Rating of Room Fan- Coils

Heating, Ventilation & Air Conditioning Equipment

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

ASHRAE Climatic Data Activities. Dru Crawley Didier Thevenard

Shell and Tube Heat Exchanger

Texas Commission on Environmental Quality Page 1 Chapter Control of Air Pollution from Nitrogen Compounds

Brillig Systems Making Projects Successful

Energy savings in commercial refrigeration. Low pressure control

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

Audit, Business Risk and Compliance Committee Charter Pact Group Holdings Ltd (Company)

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.

Air Conditioner Cooling Capacity Test AS/NZS :1998

GENERAL ELECTRIC COMPANY EMPLOYMENT DATA PROTECTION STANDARDS

TWE+TTA TWE+TWA T.R.

Stack Sampling Stack sampling or source sampling

Energy Efficient Server Room and Data Centre Cooling. Computer Room Evaporative Cooler. EcoCooling

ABB PSPS Erich Steinmann; Generator control-2013

District Cooling Plant : Refrigeration Plant Simulation

SJT / SJM / SJP Large Vertical Pumps

Thermal environments. Tel

cmn_lecture.2 CAD OF DOUBLE PIPE HEAT EXCHANGERS

Cooling and Heat Exchanger Solutions

AABC Specifications for Testing and Balancing HVAC Systems

Summary Report. Department of Innovation, Industry, Science and Research. Industry and Small Business Policy Division

INFO HTK. Hybrid dry cooler. The reference for hybrid dry cooling ,000 kw

T5 LongLast. GE Lighting DATA SHEET

AVL FUEL MASS FLOW METER & FUEL TEMPERATURE CONTROL

EXHIBIT A THE TIMKEN COMPANY BOARD OF DIRECTORS GENERAL POLICIES AND PROCEDURES

Optimization of Water - Cooled Chiller Cooling Tower Combinations

BOARD CHARTER. Its objectives are to: provide strategic guidance for the Company and effective oversight of management;

Effects of Air-Conditioning System on the Building Occupants Work Performance. Norhidayah Md Ulang, Faizal Baharum and Shahril Nizam Ismail

Water cooled chiller plant (cp/vs)

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents.

imagine SOLAR AIR CONDITIONING MADE EASY

REAL-TIME DUST AND AEROSOL MONITORING

Instructions Forming a Maryland Limited Liability Company

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations

Energy Design Resources Commissioning Plan Outline Template

Second Place: Industrial Facilities or Processes, New

1 DESCRIPTION OF THE APPLIANCE

Appendix G Process For Protection of Proposal Information For

RS Stock No Instruction Manual RS-1340 Hot Wire Anemometer

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Head Loss in Pipe Flow ME 123: Mechanical Engineering Laboratory II: Fluids

Contents. Document information

Re: CAPSA Pension Plan Governance Guidelines and Self-Assessment Questionnaire

Transcription:

COOLING TECHNOLOGY INSTITUTE MULTI-AGENCY TESTING PROGRAM 2009 ANNUAL REPORT Prepared by: THE MULTI-AGENCY TESTING COMMITTEE Mark Shaw, Chair Rich Aull, Vice Chair Paul Lindahl, Vice Chair For: The Cooling Technology Institute P.O. Box 73383 Houston, Texas 77273 February 8, 2010

1.0 Introduction 1.1 Background For over fifty years, the Cooling Technology Institute (CTI) has provided cooling tower performance testing services to members and non-members alike. Starting in January 1993, the CTI has provided these testing services through several testing agencies, each examined, qualified, and licensed by the CTI to conduct such tests. The documents establishing the program, and under which it currently operates, were developed by a task force under the auspices of the CTI Performance & Technology Committee. Currently, four agencies are licensed to conduct thermal performance tests -- CleanAir Engineering, Inc.; Cooling Tower Testing Associates, Inc.; Cooling Tower Technologies Pty. Ltd.; and McHale & Associates, Inc. Also, two agencies are licensed to conduct drift testing -- CleanAir Engineering, Inc.; and McHale & Associates, Inc. For additional information on the licensed test agencies (as of January 1, 2010), addresses, and whom to contact, please see Appendix A. 1.2 Organization The program is administered by the CTI Multi-Agency Testing Committee, which works closely with the licensed agencies to ensure tests bearing the CTI name are conducted by qualified, impartial personnel; using good, calibrated instrumentation; in full compliance with the intent of the applicable CTI codes and standards. The licensed agencies operate in accordance with a License Agreement, which includes a Testing Manual prepared specifically for this program. The first level of oversight for the general operation of the program is the Thermal Testing Program Committee, which is comprised of the licensed thermal testing agencies and includes the chair of the Multi-Agency Testing Committee and the chair of the Performance and Technology Committee as non-voting members. This committee also provides a forum where the licensed agencies can discuss, and hopefully resolve among themselves, any technical or administrative problems that may arise. The resolution of questions regarding the activities of the licensed testing agencies falls to either of two CTI committees: a) Technical issues regarding the interpretation of test codes and the Testing Manual are the province of the Performance and Technology Committee and the Multi-Agency Testing Committee. b) The Multi-Agency Testing Committee handles administration of the license agreements. 1

The Multi-Agency Testing Committee, supported as necessary by the Performance and Technology Committee, maintains the License Agreement Testing Manual, screens potential new agencies, and conducts technical audits of agencies as required. The Multi-Agency Testing Committee has responsibility for business related audits of new and current agencies, and coordinates the activities of the Thermal and Drift Testing Program Committees. It should be emphasized that these review and oversight activities are in no way permitted to compromise the confidential aspects of individual tests. Although the Multi-Agency Testing Committee and the P & T Committee are available to assist in the resolution of any questions concerning interpretation and implementation of CTI Codes and Standards as they may pertain to a specific test, such involvement is provided only at the request of all the official parties to the test. CTI endeavors to meet the testing needs of the worldwide cooling tower industry, including tower users, manufacturers, contractors, and suppliers. The Thermal and Drift Testing Program Committees, chaired by the chair of the Multi-Agency Testing Committee, works to ensure the needs of the users of the CTI testing services are being met. The Multi-Agency Testing Committee is structured with a Chair and two Vice Chairs. The User, Supplier and Manufacturer categories of the CTI membership are each represented, assuring that at least one of the three is likely to be free of a conflict of interest in any specific situation. 2.0 Testing Services 2.1 General The CTI currently offers the following tower testing services as part of the Multi-Agency Testing Program: Thermal Performance Acceptance Testing. Thermal Performance Status Testing. Special Tests. Drift Testing. Agencies licensed under the Thermal Testing Program may conduct acceptance, performance status, and special thermal testing. Acceptance and performance status tests are generally conducted in accordance with CTI ATC-105, although tests may be conducted using another thermal testing code with the consent of all the parties to the test. Special testing includes any subpart of testing according to CTI ATC-105. A parallel licensing program for Drift Testing is in 2

place, with testing conducted in accordance with CTI ATC-140. Thermal testing agencies are licensed to conduct Type A, Type B, or both types of testing. Type A testing utilizes mercury-in-glass thermometry with manual readings. It is generally used when the expense of Type B testing is inconsistent with the cost of the tower being tested. Type B testing employs remote data acquisition equipment for temperature measurement and some other measurements. Agencies with a Type A license are required to have the minimum amount of equipment to conduct a mercury-in-glass test on a small cooling tower such as a factory assembled tower. Agencies with a Type B license are required to have the minimum amount of equipment required to test a single, large tower in full accordance with ATC-105 and the Testing Manual. Information on testing services can be obtained from the CTI offices in Houston or from any of the licensed CTI testing agencies. When an inquiry for a specific test is received at the CTI office, a list of the licensed agencies, including a brief summary of their capabilities, is provided. A copy of the agency information summary, current as of the date of this report, is included in Appendix A. Potential clients contact the agency of their choice to obtain pricing and scheduling information. When requested, the agency sends a copy of CTI FSP-156, Preparation for an Official CTI Thermal Performance, Plume Abatement, or Drift Emission Test. After the test has been conducted by the CTI agency selected by the customer, a report number is issued by the CTI office and a final report is sent to the parties to the test. 2.2 Thermal Performance Acceptance Testing and Performance Status Testing Thermal performance acceptance and performance status tests of natural draft and mechanical draft, evaporative and wet/dry cooling towers, and closed circuit cooling towers are conducted under the provisions of CTI ATC-105, Acceptance Test Code for Water-Cooling Towers or Supplement to ATC-105, Acceptance Test Code for Closed Circuit Cooling Towers, unless otherwise specified by the parties to the test. An acceptance test is conducted on a new or refurbished tower to determine if the performance meets the manufacturer s contractual guarantee. The tower manufacturer and tower purchaser are given sufficient notice to witness the acceptance test and the collected test information is distributed to both parties. If a thermal performance test is not being conducted to determine compliance with a contractual guarantee, it is considered a performance status test. 2.3 Drift Testing Drift testing is conducted in accordance with ATC-140, Isokinetic Drift Measurement Test Code for Water Cooling Towers, unless otherwise specified by the parties to the test. As with thermal tests, drift tests may be either acceptance or status tests. 3

2.4 Special Tests Special tests include any tests which can be conducted using a portion of ATC-105 without determining tower capacity. An example is measurement of water flow rate by Pitot traverse. 2.5 Other, Non-licensed Testing CTI test codes exist for other types of testing, including Sound (ATC-128) and Plume Abatement (ATC-150). At this time, a thermal testing license program and a drift testing license program are available. Testing according to other CTI test codes, such as for sound, are not subject to the license and are available outside the CTI Licensing Program. CTI intends to develop a licensed testing program for sound testing, but currently this activity remains outside the scope of a CTI Testing License. 3.0 CTI Testing Activities for 2009 In calendar year 2009, a total of seventy-nine (79) thermal and special tests were conducted. A distribution of the tests by type is shown in Table 1 below. Table 1. Distribution of Tests by Type 2009 2008 2007 2006 2005 Acceptance New 37 39 40 33 40 Acceptance -- Refurbished 13 11 3 8 9 Acceptance Total 50 50 43 41 49 Performance New 4 5 1 2 4 Performance Refurbished 0 4 3 4 2 Performance Old 24 16 26 14 12 Performance Total 28 25 30 20 18 Special 1 3 6 4 3 Grand Total (Thermal Tests) 79 78 79 65 70 The overall average of the Tower Capabilities, the maximum and minimum capabilities, and the number of tests with one or more parameters out of code are shown for each type of test in Table 2 below. Approximately two-thirds of the tests (68%) were conducted with no more than one parameter out of code. The acceptance tests also had 66% falling into this category. 4

Table 2. Summary of 2009 Thermal Test Results Type of Test # Tests % Tower Capability Parameters out of Code Max Avg. Med. Min. 0 1 2 3 4 Acceptance New 37 142.6 99.7 98.7 73.8 12 11 8 6 0 Acceptance -- Refurb. 13 135.0 105.8 102.0 80.0 2 8 3 0 0 Acceptance All 50 142.6 101.3 100.1 73.8 14 19 11 6 0 Performance New 4 112.0 99.3 96.5 92.0 2 2 0 0 0 Performance Refurb. 0 n/a n/a n/a n/a 0 0 0 0 0 Performance Old 24 93.5 78.8 80.5 52.8 6 10 6 2 0 Performance All 28 112.0 81.8 83.0 52.8 8 12 6 2 0 Overall 78 142.6 94.5 96.0 52.8 22 31 17 8 0 The number of tests (expressed as a percentage) with any particular parameter out of code are shown in Table 3 below for each type of test and overall. The parameter most often out of code was the fan horsepower, which occurred on 40% of all tests, followed by cooling range and flow on approximately 31% of all tests. On acceptance tests on new cooling towers, fan horsepower was out of code on 49% of the tests and cooling range was out of code on 35% of the tests. 5

Table 3. Test Parameters Out of Code Percentage of Tests Type of Test Wet Bulb Range Flow Fan HP Wind Dry Bulb Acceptance New % of Tests 14% 35% 19% 49% 5% 0% Max. Dev. -12 o C 1.1 m/s (-21 o 135% 31% -30% -- F) (2.5 mph) Acceptance Refurb. % of Tests 8% 23% 31% 38% 8% 0% Max. Dev. -9 o C 0.9 m/s (-16 o -37% 61% -23% -- F) (2.1 mph) Performance New % of Tests 0% 25% 0% 25% 0% 0% Max. Dev. -- -36% -- -23% -- -- Performance Refurb. % of Tests 0% 0% 0% 0% 0% 0% Max. Dev. -- -- -- -- -- -- Performance Old % of Tests 4% 29% 54% 29% 0% 0% Max. Dev. -10 o C -63% -42% -37% -- -- (-17 o F) All Tests % of Tests 10% 31% 31% 40% 4% 0% Max. Dev. -12 o C (-21 o F) 135% 61% -37% 1.1 m/s (2.5 mph) -- The thermal test results are shown graphically in several figures. The thermal acceptance test results for new cooling towers are shown on Figure 1 as a function of the design circulating water flow rate. The average capability of tests that were less than 100% was 93%. The thermal acceptance test results for rebuilt cooling towers are shown on Figure 2. The performance test (tests performed without contractual guarantee compliance determination) results are shown on Figure 3. The combined thermal test results for all thermal tests are shown on Figure 4. A historical overview of the thermal performance testing is shown on Figure 5. The thermal test results were analyzed to determine if there were any obvious trends or insights. The test results were grouped into the design flow bands identified in STD-202, shown on Figure 6, to determine if a particular cooling tower size range was problematic with regard to thermal performance on new cooling tower acceptance tests. Also shown on Figure 6 is the thermal capability without the horsepower correction for the same tests, the test results for each design flow range segregated between initial tests and retests, and the average as-tested capability of tests with a capability less than 100%. The test results were analyzed to show the affect of the number of parameters out of code, as shown on 6

Figure 7, on new cooling tower acceptance tests. The test results were analyzed to show the thermal performance results on acceptance tests on new cooling towers as a function of the degree of difficulty as shown on Figure 8. The degree of difficulty was calculated as the ratio of temperature cooling range to enthalpy approach (saturated enthalpy of air at the cold water temperature minus the saturated enthalpy of the entering wet bulb). A trend line was added to the data, which indicates a slightly positive trend with increasing degree of difficulty. The test results were analyzed, as shown on Figure 9, to show the thermal performance test results for acceptance tests on new cooling towers as a function of the design hot water temperature. The test results for thermal acceptance tests were sorted, as shown on Figure 10, to show a breakdown of the thermal performance test results for crossflow and counter flow cooling towers for both new and rebuilt towers and new back-to-back towers. A histogram of the thermal capability test results of acceptance tests on new towers for the last five years is shown on Figure 11. It is interesting to note that although the mean capability is nearly 100 percent, the standard deviation is approximately 10 percentage points. The CTI Office requested feedback from each test representative party to each test performed by the licensed test agencies. A total of 18 survey responses were received. Every response indicated that they would use the test agency again and would recommend them to others for testing services. A summary of the survey responses is shown on Table 4. 7

Table 4. Quality Survey Response Summary Number of Responses Statistical Data Cooling Technology Institute (CTI) Multi-Agency/Client Feedback Form 1 Overall quality of the work. 0 0 0 12 6 4.3 4.0 4.0 0.5 2 Usefulness of the testing results. 0 0 2 11 5 4.2 4.0 4.0 0.6 3 The effectiveness and professionalism of written communication. 0 0 1 13 4 4.2 4.0 4.0 0.5 4 Proposals were clear and appropriate. 0 0 1 13 4 4.2 4.0 4.0 0.5 5 Responsiveness of client requests. 0 0 0 8 10 4.6 5.0 5.0 0.5 6 Timeliness and flexibility of test scheduling. 0 0 0 7 10 4.6 5.0 5.0 0.5 7 Timeliness of preliminary result. 0 0 2 8 8 4.3 4.0 5.0 0.7 8 Timeliness of final report. 0 0 2 10 6 4.2 4.0 4.0 0.6 9 Completeness and professionalism of reports. 0 0 1 13 4 4.2 4.0 4.0 0.5 10 Professionalism and conduct while on site. 0 0 0 10 8 4.4 4.0 4.0 0.5 11 Test preparation was adequate and appropriate equipment was available for testing. 0 0 1 12 5 4.2 4.0 4.0 0.5 12 Safety awareness and conduct while on site. 0 0 0 14 4 4.2 4.0 4.0 0.4 13 Accuracy and completeness of billing/invoicing. 0 1 0 11 4 4.1 4.0 4.0 0.7 14 Condition of equipment. 0 0 1 13 4 4.2 4.0 4.0 0.5 15 Test completed within budget. 0 0 2 9 5 4.2 4.0 4.0 0.7 Yes No 16 Would you use this test agency again for testing purposes? 18 0 17 Would you recommend this test agency to others? 18 0 8 Unsatisfactory Somewhat Dissatisfied Satisfactory Very Good Exceeded Expectations Average Median Mode Standard Deviation

Figure 1 2009 COOLING TOWER THERMAL TESTS ACCEPTANCE TESTS -- NEW COOLING TOWERS 160 Test Capability -- % Design Flow 150 140 130 120 110 100 90 80 70 60 50 40 10 100 1,000 10,000 100,000 Water Flow Rate (l/s) 9

Figure 2 2009 COOLING TOWER THERMAL TESTS ACCEPTANCE TESTS -- REBUILT COOLING TOWERS 160 TestCapability -- % Design Flow 150 140 130 120 110 100 90 80 70 60 50 40 10 100 1,000 10,000 100,000 Water Flow Rate (l/s) 10

Figure 3 2009 COOLING TOWER THERMAL TESTS PERFORMANCE TESTS Test Capability -- % Design Flow 160 150 140 130 120 110 100 90 80 70 60 50 40 10 100 1,000 10,000 100,000 Water Flow Rate (l/s) PERF - REBUILD PERF - OLD PERF - NEW 11

Figure 4 2009 COOLING TOWER THERMAL TESTS ALL TESTS Test Capability -- % Design Flow 160.0 150.0 140.0 130.0 120.0 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 10 100 1,000 10,000 100,000 Water Flow Rate (l/s) ACCEPT-NEW ACCEPT-REFURB PERFORMANCE 12

Figure 5 130 THERMAL PERFORMANCE -- HISTORIC OVERVIEW Test Capability % Design Flow 120 110 100 90 80 70 60 50 40 30 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 YEAR Note: From 1988 to 1994, acceptance test data did not distinguish betw een new and refurbished tow ers Accept-NEW Accept-REFURB Performance 13

Figure 6 2009 Thermal Acceptance Tests New Cooling Towers Average Capability, % 110 105 100 95 90 85 80 0-100 (0-1,585) 101-1,000 (1,586-15,850) 1,001-10,000 (15,851-158,500) 10,001-100,000 (158,501-1,585,000) Design Flow Band, l/s (gpm) As Reported w/o HP Correction 1st Test Retest <100% 14

Figure 7 Capability versus Parameters Out-of-Code for Acceptance Tests on New Towers 160 Capability, % 140 120 100 80 60 40 0 1 2 3 4 5 Parameters Out-of-Code 15

Figure 8 Capability vs Degree of Difficulty for Acceptance Tests on New Cooling Towers Capability, % 160 140 120 100 80 60 40 0 1 2 3 4 5 Ratio of Range to Enthalpy Approach 16

Figure 9 Capability versus Hot Water Temperature for New Towers Capability, % 160 140 120 100 80 60 40 25 30 35 40 45 50 55 Hot Water Temperature, C 17

Figure 10 2009 Thermal Acceptance Tests 115 Average Capability, % 110 105 100 95 90 85 80 New Crossflow Rebuilt Crossflow New Counterflow Rebuilt Counterflow New Back-toback Cooling Tower Type 18

Figure 11 Histogram of Capability of Acceptance Tests of New Cooling Towers 2005-2009 Frequency 60 50 40 30 20 10 0 70 75 Mean: 99.8 Std Dev: 10.0 Median: 100.2 Mode: 103 80 85 90 95 100 105 110 Capability, % 115 120 125 130 More 19

APPENDIX A 20

CTI Licensed Thermal Testing Agencies Effective 1/1/2010 License Type* Agency Name Address Contact Person / E-mail / Web site Telephone Number FAX Number A, B Clean Air Engineering, Inc. 7936 Conner Rd Powell, TN 37849 U.S.A. Kenneth Hennon khennon@cleanair.com www.cleanair.com (800) 208-6162 (865) 938-7569 A, B Cooling Tower Technologies Pty. Ltd. PO Box N157 Bexley North, NSW 2207 AUSTRALIA Ronald Rayner coolingtwrtech@bigpond.com 61 2 9789 5900 61 2 9789 5922 A, B Cooling Tower Test Associates 15325 Melrose Drive Stanley, KS 66221 U.S.A. Thomas E. Weast cttakc@aol.com www.cttai.com (913) 681-0027 (913) 681-0039 A, B McHale & Associates, Inc. 6430 Baum Drive Knoxville, TN 37919 U.S.A. Thomas C. Wheelock tom.wheelock@mchale.org www.mchale.org (865) 588-2654 (865) 934-4779 * Type A license is for the use of mercury-in-glass thermometers; typically used for smaller towers. Type B license is for the use of remote data acquisition devices, which can accommodate multiple measurement locations required by larger towers. 21

CTI Licensed Drift Testing Agency Effective 1/1/2010 Agency Name Address Contact Person / E-mail / Web site Telephone Number FAX Number Clean Air Engineering, Inc. 7936 Conner Rd Powell, TN 37849 U.S.A. Kenneth Hennon khennon@cleanair.com www.cleanair.com (800) 208-6162 (865) 938-7569 McHale & Associates, Inc. 6430 Baum Drive Knoxville, TN 37919 U.S.A. Thomas C. Wheelock tom.wheelock@mchale.org www.mchale.com (865) 588-2654 (865) 934-4779 22

Data on CTI Licensed Thermal Testing Agencies Effective 1/1/2010 Agency Name License Type* Licensed Testing Agency Since Number of Lead Testers** Number of Data Loggers** Pipe Diameters covered by Pitot Tubes Total Number Wet Bulb Instruments Geographic Preference CleanAir Engineering, Inc. A&B 5/1/2006 9 20 150 5260 mm (6 207 ) >150 Worldwide Cooling Tower Technologies Pty. Ltd. A&B 3/19/1992 1 4 150-3600 mm (6" - 142") 40 Worldwide Cooling Tower Test Associates A&B 1/1/1997 2 9 50-4265 mm (2" - 168") 60 Worldwide McHale & Associates, Inc. A&B 1/1/2006 4 >60 150-5500 mm (6" - 216") >100 Worldwide * Type A license is for the use of mercury-in-glass thermometers, typically used for smaller towers. Type B license is for the use of remote data acquisition devices, which can accommodate multiple measurement locations required by larger towers. ** Maximum number of concurrent tests will be limited by the number of lead testers and/or the number of data loggers. 23

Data on CTI Licensed Drift Testing Agencies Effective 1/1/2010 Agency Name Licensed Testing Agency Since Number of Lead Testers* Number of Drift Sampling Trains* Geographic Preference CleanAir Engineering, Inc. 5/1/06 4 3 Worldwide McHale & Associates, Inc. 5/1/06 3 3 Worldwide * Maximum number of concurrent tests will be limited by the number of lead testers and/or the number of drift sampling trains. 24