AREVA Advanced nuclear power plants



Similar documents
AREVA. Solutions for Nuclear & Renewable Power Generation

AREVA, an unparalleled experience in building nuclear reactors

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

US EPR nuclear technology and market outlook

AREVA: supply chain network principles and company s vision

Solutions for Nuclear & Renewable Power Generation

The EPR reactor the reference for New Build

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

AREVA: Global leader in low-carbon power generation

Olkiluoto 3 Project June 2010

The EPR design: the European reference

New nuclear project financing Warsaw, June 26, 2013 p. 1

AREVA is Clean Energy and American Jobs Ohio Manufacturers Association April 28, 2010 Columbus, OH

DESIGN OF EPR. Bernard DEBONTRIDE France, AREVA FRAMATOME ANP Plants Sector Nuclear Engineering

Drivers and approach for the design of the EPR reactor

Rosatom Investment Projects. Perspective in Europe and in the world

Akkuyu Nuclear Power Plant the first NPP plant configured on BOO principles

Structural Integrity and NDE Reliability II

Nuclear Consultancy & Engineering Services

A Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA

Swiss media visit to Olkiluoto August 15, 2014

U.S. EPR Design Overview

Workshop GESEL - UFRJ: O presente e o futuro da energia nuclear no Brasil

Physics and Engineering of the EPR

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

POWER & RENEWABLE ENERGY SERVICES

POWER & RENEWABLE ENERGY SERVICES

Nuclear Design Practices and the Case of Loviisa 3

Nuclear Safety. Policy

Q Q Change Change LFL

The World Nuclear Supply

Flamanville 3 Nuclear Power Plant

Global Nuclear Power Developments Asia Leads The Way

TOSHIBA s Nuclear Energy Activities

Join the UK Nuclear Renaissance. Procurement & Quality Process

Teollisuuden Voima Oyj - General Presentation January Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

An overview of available reactor designs 2012 Jim Thomson

Olkiluoto 3 Experience

A Reviewof AkkuyuNPP Project in Turkey After Fukushima Daiichi Accident

Long term operation integrated processes for delivering extended asset performance

Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants

The ABWR Project at Shimane-3, Japan

Presentation of Grupo ACS. September 2009

Human Factors in Design and Construction Regulatory Perspective

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

Olkiluoto 3 Basic Facts

Introduction of the education and training courses to support emerging countries

AES-92 for Belene: The Mystery Reactor

PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation

Nuclear Safety First POWER

TECHNIP AT A GLANCE 2014

AXA INVESTMENT MANAGERS

Proud to be here, since 1853

Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland

New units at the Paks NPP background of the project and human resource issues

How To Improve Safety At A Nuclear Power Plant

The Role of Nuclear Knowledge Management

Financing Nuclear Power Projects: Challenges and IAEA Assistance in Capacity Building

Westinghouse Electric Company Overview

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Introductions: Dr. Stephen P. Schultz

TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser

WANO CORPORATE PEER REVIEW PROGRAM

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

The TVEL Fuel Company of Rosatom CREATING FUTURE TODAY

Pocket Guide Pocket Guide

AP1000 Technology: Passive & Proven

Post- Fukushima accident. Peer review report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board

Advanced Construction Methods for New Nuclear Power Plants

RELIABLE PERFORMANCE IN ONE PACKAGE

Disclaimer. purposes only. Not for distribution in the United States, Japan, Australia, Italy or Canada.

Fukushima Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel

CGGVeritas announces Q results

Press Release. FY 2012/13 Alstom achieves a solid commercial and operational performance and free cash flow turns positive

Building on +60 GW of experience. Track record as of 31 December 2013

Electrical Systems. Emergency Diesel Generator Solutions

Nuclear Education & Training in France. Support to Newcomer and Expanding Countries

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director

GLOBAL DATA CENTER INVESTMENT 2013

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

Transcription:

AREVA Advanced nuclear power plants Bernard Bastide AREVA Brazil and South America VP University of Rio de Janeiro III Semana da Engenharia Nuclear UFRJ August 2013

AREVA presentation AREVA EPR projects ATMEA1 projects UFRJ August 2013 2

AREVA presentation AREVA EPR projects ATMEA1 projects UFRJ August 2013 3

AREVA Group 2012 Key Figures Luc Oursel Chief Executive Officer Paris Global Headquarters 9.342Bn in Annual Revenues 45.4Bn in Backlog More than 50% of our 2012-2015 revenue is in backlog Over 80% of the Group s revenue from recurring business 4.8% of revenues in R&D spend 10 billion investments already made in the last 5 years Strong strategic action plan launched Dec.2011 47,000 Employees 51 Manufacturing Sites in 5 continents 8,000 Active Patents held UFRJ August 2013

AREVA Group Across the Globe France 39% of revenue 56% of workforce North & South America 17% of revenue 15% of workforce Europe & CIS (outside France) 25% of revenue 22% of workforce Africa & Middle East 2% of revenue 6% of workforce UFRJ August 2013

Supervisory Board AREVA Group Organization Executive Board Mining Front-End Reactors & Services Back-End Renewables Engineering & Projects International Commercial Organization Functional Departments UFRJ August 2013

AREVA, Safety is the Cornerstone of our Strategy Safety of our Customers Supporting utilities in demonstrating and upgrading the safety of their fleet Safety of our Operations Maintaining the highest level of safety throughout the lifecycle of our nuclear facilities Safety of our Products A wide new-generation reactor portfolio that offers the highest safety features 30+ solutions in Safety Analysis, Safety Upgrades and Safety Procedures Reduced accident frequency rate (number of accidents per million hours worked) from 6.6 in 2004 to 1.7 in 2011 UFRJ August 2013 7

A comprehensive Reactor Portfolio to better serve Utilities needs Main Technical Data Thermal power Net power Thermal efficiency Target design availability # loops (secondary) Steam pressure Operation cycle length Collective dose Design service life I&C PWR PWR BWR 4,590 MWth 1,650 Mwe 37% 92% 4 77 bar up to 24 months <0.5 mansievert/yrs 60 yrs Full digital 3,150 MWth 1,150 Mwe 37% 92% 3 72 bar up to 24 months <0.5 mansievert/yrs 60 yrs Full digital 3,370 MWth 1,250 Mwe 37% 92% N/A 75 bar up to 24 months <0.5 mansievert/yrs 60 yrs Full digital AREVA s portfolio is based on proven and evolutionary models constantly optimized to meet utilities needs worldwide. UFRJ August 2013

AREVA Nuclear New Build Perspectives TVO 1 EDF 4 GDF Suez Iberdrola 2 PGE 4 UniStar PPL Ameren 3 CEZ* 2 EUAS 4 KSA 4 CGNPC 2 Legend JAEC 1 NPCIL 2 Exclusive discussions ongoing ETN? 1 Participation in tenders Upcoming opportunities NASA 1 Eskom 6 Up to *AREVA s appeal pending Number of units Exclusive discussions ongoing for the construction of up to 12 nuclear reactors Participation in tenders for 4 nuclear reactors Upcoming opportunities for the construction of at least 19 nuclear reactors UFRJ August 2013

AREVA presentation AREVA EPR projects ATMEA1 projects UFRJ August 2013 10

Bringing AREVA Gen III project experience for building NPP in Brazil 83%* 01/04/2013 Olkiluoto 3 Taishan 1&2 Dome July 2013 Flamanville 3 The World s First Advanced Fleet to be deployed. 11

Ol3- Reactor Building Inner dome installation - September 2009 Inner Dome lifted and installed on September 6 th, 2009 Shipment delivery of the Reactor Dome from Poland to OL3 Site on May 4, 2009 AREVA Welding of the Dome completed in September 2009 AREVA AREVA AREVA

OL3- Main Primary Components Reactor Pressure Vessel installation June 18, 2010 AREVA Introduction of the RPV in Reactor Building using the Polar Crane June 18, 2010 AREVA

OL-3 Conventional Island Turbine Hall AREVA AREVA

OL3 construction site AREVA

The value of AREVA experience Construction duration from first concrete to dome lifting (# of months) TSN 1 AREVA experience will be leveraged in new build project in Brazil 16

AREVA presentation AREVA EPR projects ATMEA1 projects 17

A Joint Venture between two world nuclear leaders 1 NUCLEAR ISLAND DESIGNED 2 WORLD LEADING NUCLEAR SUPPLIERS 1 JOINT VENTURE

Brief Overview of The Company ATMEA s Expertise and Capabilities - Company name: ATMEA S.A.S. - Office Location: Paris La Defense - President & CEO: Andreas Goebel - Deputy CEO: Satoshi Utsumi - Establishment: November 2007 - Capital: 126 Million Euros - Scope of activities: Development, Marketing & Sales, Construction & Commissioning activities for the 1100 MWe class Generation III+ ATMEA1 Nuclear Island - The ATMEA company is the exclusive vendor of the ATMEA1 Nuclear Island TM ATMEA1 Reactor: A mid-sized Generation III+ PWR

ATMEA1 Reactor main features Reactor Type 3-Loop PWR Safety System 3 train reliable active system with passive features + 1 diversified safety train Electrical output 1100 1150 MWe (Net) Severe Accident Management Core catcher Hydrogen re-combiners Core 157 Fuel Assemblies Resists airplane crash Pre-stressed Concrete Containment Vessel Steam Pressure More than 7 MPa I&C Full Digital 1 6 1. Reactor Building 2 3 2. Fuel Building 4 4 3. Safeguard Building 4. Emergency Power Building 5 5. Nuclear Auxiliary Building 6. Turbine Building

ATMEA1 Reactor Main Features Main Nuclear Island Buildings Pre-stressed Concrete Containment Vessel Safeguard building and Fuel building with thickened concrete wall Protection against large commercial airplane crash (APC) in compliance with US-NRC regulation and European practice Safety systems and components are protected: Either by segregation or bunkerization to secure the required safety functions Against Tsunami/Flooding in leak tight buildings APC protected EPS B EPS X EPS A EPS C

Typical 3- loop configuration Design based on ASME Boiler and Pressure Vessel Code Experienced materials reflecting the latest experiences of AREVA and MHI Design applying the latest technologies of AREVA and MHI Technology is coming from the latest Generation III+ design, EPR TM and APWR Experience feedback from about 130 nuclear power plant constructions and operation Proven Technology Primary components - General

Assessment results confirmed robustness of the current ATMEA1 design and its adequate grace time as similar Generation III+ evolutionary reactors ATMEA s Approach to First Lessons Learned from Fukushima Resistance against external hazards Design margin and absence of cliff-edge effect Long-term containment integrity under severe accident conditions For now no need for design modifications in terms of safety options First lessons learned from Fukushima have validated ATMEA1 s safety approach ATMEA will make a close follow-up of national and worldwide consensus regarding additional safety dispositions that could be raised in the wake of Fukushima accident

ATMEA s achievements and current activities We are here today 2006/2007 2008 2009 2010 2011 2012 2013 2014 Conceptual Design Definition of main features Project engineering manual Conceptual safety features ATMEA1 selection IAEA Report Jordan Project Standard Detailed Design ASN* Review Conclusion of ASN Safety Options Review CNSC* (Canada) Review Final decision pending Report Basic Design Functional requirements Safety requirements General arrangement Core system & component design Standard Preliminary Safety Analysis Report *ASN: French Safety Authority *CNSC: Canadian Nuclear Safety Commission Japan/ Turkey IGA for the 2 nd Turkey NPP with 4 ATMEA1

Ready for Bidding and Licensing IAEA Assessment report Standard PSAR following US-NRC structure, PSA Level 1 and Level 2 French Safety Authority (ASN) Assessment Canadian Safety Authority (CNSC) Assessment

ATMEA Worldwide Activities ATMEA1 Reactor selected in many countries as a potential technology for New Power Plant Canada Hungary Slovenia Vietnam Turkey Brazil Jordan Malaysia Argentina Opportunities / Negociations going on Japan driven business

ATMEA opportunities (1/2) Jordan bid: Selection still pending Main Jordanian issues: financing and operator (the strategic partner ) ATMEA1 still in the final phase Vietnam Ninh Thuan 2 Japan has agreed to build and finance 2000 MW Selection by Japan and Vietnam governments in 2014: ATMEA1 well positioned Brazil Confirmation of nuclear development policy expected soon No tender process expected for the 2 pre-identified sites Public/Private Partnership (PPP) Site pre-feasibility study underway by ATMEA for ETN

Turkey SINOP ATMEA opportunities (2/2) IGA agreement signed on May 3 rd between Japan and Turkey for exclusive negotiations about 4 ATMEA1 units The IGA allows exclusive negotiation on detailed terms until signature of the Host Government Agreement (HGA) between Turkey and the Industrial team: MHI, ITOCHU, GDF SUEZ and local Turkish Utility EUAS. It also authorizes the start of the «Feasibility Study». Technology proposed by MHI is ATMEA1 (Gen III+ AREVA-MHI design) possibly adapted to the site. Commercial operation of 1st unit is targeted in 2023. Site location : SINOP Peninsula, on the Black Sea allocated by Turkey, without ownership, to the Project Company, free of charge until the end of decommissioning. GDF SUEZ will partner with the project and offer its expertise as a developer, operator of nuclear power plants Anticipated Project Structure : 49% Equity by Turkish Government (EÜAŞ, local Turkish Utility and Turkish industrials) and 51% for the Japan Consortium (MHI,ITC and GDF SUEZ).

6 ATMEA1 units in Brazil in the future Why not?

Obrigado!