CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:



Similar documents
Charrette Small Group Session Friday, January 27. 8:30 am 10:00 am

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division. CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Instructions/General Information

DRAFT Construction & Demolition Recycling Ordinance. Environmental Commission September 2, 2015

TurnerTalk Online Waste Tracking System User s Guide for Reviewers and Haulers. Version 3.0 Date: May 15, 2009 Turner Construction Company

City of Toronto Waste Audits Presented to Residual Waste Working Group

Local Recycling Centers-Los Angeles County

Construction & Demolition Waste Management Plan Resource Guide for Contractors

Waste Management for Hotels and Restaurants. Dan Ruben

ACKNOWLEDGEMENT OF RECEIPT OF THE CITY OF DUBLIN CONSTRUCTION AND DEMOLITION DEBRIS ORDINANCE INFORMATION PACKET

Presenter: Michael Buono, Director of Program Development Environmental Service Management Group, Inc.

THE PRICE OF SOLID WASTE MANAGEMENT SERVICES IN VERMONT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Construction and Demolition Recycling Inc. Recycling and Donation Program

Sustainability in construction at Creighton

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Wisconsin Statewide Waste Characterization Study

CHAPTER 14: CONSTRUCTION AND DEMOLITION DEBRIS RECOVERY ORDINANCE*

Green Building: Recycling Construction Renovation and Reclamation. Sponsored by:

Construction and Demolition Debris Waste Management Requirements

REQUEST FOR PROPOSAL City of Peachtree Corners FOR

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL

SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING

Construction, Demolition and Deconstruction Information

Building Condition Assessment Report

Estimating Database Checklist

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Deconstruction Requirements Code Language

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

FACTS ABOUT: Recycling MONTGOMERY COUNTY RECYCLING

SUMMARY OF WORK FOR GENERAL CONTRACTOR

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Cascade Remodeling Inc. PO Box Portland, OR Catalyzing Euphoria Phone (503) , FAX (503) CCB # 67007

Contracts. Definitions. Guidelines for contractors and subcontractors

Joseph Laquatra and Mark R. Pierce

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor

How To Insure Against Problems With Your Home Warranty

RESIDENTIAL SERVICES. compost recycle landfill

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Artisan Contractors General Liability Contractors Equipment Program

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Facility Rules & Regulations for the I-95 Landfill Complex

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Deconstruction Rapid Assessment Tool

CITY OF SANTA CLARA FACILITIES CERTIFIED TO DIVERT AT LEAST 50% OF INCOMING MATERIALS UPDATED MAY 2009

BOULDER COUNTY CONSTRUCTION AND DEMOLITION INFRASTRUCTURE STUDY, MATERIALS GENERATION ESTIMATE AND MARKET ANALYSIS

Appendix 19.1 Outline Project Construction and Demolition Plan

3.1.8 Utilities and Service Systems

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

Where Did All the Barracks Go?

FSC STANDARD FSC CHAIN OF CUSTODY STANDARD FOR PROJECT CERTIFICATION. FSC-STD (Version 1-0) EN

Important Information for Owners of Buildings in Flood Zones

Welcome To Mallard Park

Government Policies for Increasing the Recycling of Construction and Demolition Debris

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

CONDITION OF QUALITY ITEMS

Department of Public Works. Recycling policy for buildings and civil infrastructure

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

A guide to our recycling And waste management services

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Notice to Property Owners

Inspecting to a higher standard.

cüéä wxçà tä VâáàÉÅ [ÉÅxá

ater Quality & Waste Management

ORDINANCE NO. 3 OF 2009

Substantial Improvement/ Damage Review

Sample Rehabilitation Proposal: Narrative

San Mateo County Countywide Integrated Waste Management Plan. Multi-Jurisdiction Non-Disposal Facility Element (NDFE) (June 2010 amendment)

100 North Senate Avenue, Indianapolis, IN Phone: (317) Toll Free: (800)

Disposal based survey of the commercial and industrial waste stream in Sydney

Construction & Demolition Waste Management in Green Star Discussion Paper

Office of Inspector General

waste reduction Environmental Utilities Business Waste Reduction Guide reduceandsave

Regional Code Collaboration

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Landfill/Mandatory Recycling

ESTIMATING 2003 BUILDING-RELATED CONSTRUCTION AND DEMOLITION MATERIALS AMOUNTS

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

MEMORANDUM. General: Foundation:

17,280 square feet Overview:

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Guidelines of Best Management Practices for the Operation of Post Consumer (Tear 0ff) Asphalt Shingle Recycling Facilities

Asbestos Procedures. Asbestos Products

Avoiding the Landfill: The Recycling of Vinyl Roof Membranes

Bid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)

1420 Creek Trail Drive Jefferson City, MO Office Fax

ADVANCED CONSTRUCTION

Gramercy Place Condo Association, Inc.

Cost of Repair Worksheet

Fund 110 Refuse Disposal

HENRY COUNTY SOLID WASTE ORDINANCE

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Transcription:

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled. Dirt (clean fill) may be disposed of at sites that use dirt as Alternative Daily Cover. Prior to issuance of the Certificate of Occupancy, the applicant shall submit to Environmental Services recycling manifests from all disposal sites, recycling sites and landfills that accepted demolition, excavation and/or general construction waste and recycled materials from this site. Date: Project Address: Project(s): Demolition New Construction Alteration Addition Project Square Footage: Project Valuation $ *Estimated total cubic yards to be hauled from this location Prepared by (print): Contractor Owner Other Mailing Address: Phone: FAX: e-mail: Project Description: Schedule: Estimated start date Estimated completion date ------------------------------------------------------------------------------------------------------------ DO NOT WRITE BELOW THIS LINE. FOR USE BY CITY STAFF ONLY Waste Reduction and Recycling Plan Review Results WRP reviewed by: Telephone No. Estimated diversion rate by contractor: WRP Approved: yes no Date 1

For each of the following categories of recycling, reuse and disposal activities, describe those strategies you plan to utilize for the project listed above. 1. Salvage & Deconstruction Activities (recovering reusable items from remodeling or demolition projects). This includes stand-alone items (appliances), easy to remove items such as doors, mantelpieces, and removal of reusable structural items by hand (lumber, wood siding, roof tiles). 1a. Do you plan to salvage materials from this project prior to remodel or deconstruction activities? If you checked yes to question 1a, please list the items that will be salvaged: Doors, windows, jambs, casing toilets, sinks, other fixtures, hardwoods, wood siding, cabinets and shelving, carpet and pad, bricks, acoustical ceiling, lights, fans, ceramic roof tiles structural materials, reusable lumber, bricks, other items (please list): 1. 2. 3. 4. 5. Yes No 1b. Source separation of materials: Yes No Do you plan to source separate any materials for recycling on this project? (e.g. separation of items such as wood, concrete, metal into separate bins for delivery to a recycling facility that will process for recycling) This would include materials that will be recycled at a landfill as daily cover or as landfill roadbase. 1c. For each material you plan to salvage or source separate, note the hauler and facilities to be utilized: Materials Hauler Facility 2. On-site reuse: Yes No Do you plan any on-site reuse activities for this project? For example: reuse of wood forms from other projects for concrete; on-site crushing of concrete for on-site use; use of reusable containers or pallets for material deliveries, etc. If yes, please describe: 3. Inert fill use: Yes No Please note whether any source separated dirt or mixed inerts (dirt, concrete, asphalt)will be delivered to an inert landfill (accepts only inert material) or for any other non-landfill use. 3a If yes, please note material and destination. Hauler Facilty 2

4. Mixed C&D recycling facilities: 4a. Please note whether any mixed debris will be delivered to a mixed C&D recycling facility for mechanical and/or manual separation of recyclables. If yes, please note the facility and name the hauler who will deliver the material for recycling. Facility (check one) X Hauler Crown Disposal Co., Inc. 818-266-8681 Athens Services 888-336-6100 G.O. Rodriguez Trucking 909-596-3747 Arrow Services, Inc. 626-336-2255 Interior Removal Specialist, Inc. 323-357-6900 5. Disposal at a landfill or transfer station: Yes No 5a Will any materials from this project be disposed of at a landfill or transfer station? 5b If yes, identify the haulers who will deliver the disposed debris and the disposal facility. Hauler Facilty 6. Educational Strategies: Describe how you plan to inform and ensure participation by your workers and any subcontractors of your diversion goals and Waste Reduction and Recycling Plan activities. Waste Management Plan Form 3

Project Address: Estimation of Amounts That Will Be Reused, Recycled, and Disposed Summarize the information provided in Part One of this Waste Reduction and Recycling Plan on the following chart. For "Type of Activity", note whether recycling, salvage and/or deconstruction, on-site reuse, inert fill, transfer station, landfill, or mixed C&D recycling. Type of Material Type of Activity (See list above)* Quantities Recycled Disposed Mixed Materials Mixed C&D Materials Mixed Inerts Separated materials (e.g. asphalt, lumber, yard trimmings, concrete, etc. Asphalt Brick Concrete Dirt/Clean Fill Lumber Roofing Materials Metals Yard Trimmings Sheetrock Salvaged Items (eg fixures, lumber,etc)** Other*** Facility Used (Where material will be takenplease list names of recycling facilities, transfer stations, landfills for dirt only, etc) Method of Transport (hauler from page 3, party removing dirt etc.) s: *See Conversion Table attachment to convert cubic yards to tons. **Estimate in pounds where necessary and convert to partial tons (see Conversion Tables and Form attachment). ***e.g. on-site reuse. Estimated Recycling Rate: % (Tons recycled divided by total tons disposed and recycled, then convert to a percentage) C & D Conversion Table 4

Project Address: Check document submitted with this Conversion Table Waste Management Plan Check each conversion being used. Mixed structural C&D Materials 1 cubic yard = 500 pounds Mixed Inerts 1 cubic yard = 1 ton Dirt, Brick, Concrete, Asphalt 1 cubic yard = 1 ton (separated from other materials) Loose Lumber 1 cubic yard = 150 pounds Asphalt Shingles 1 cubic yard = 419 pounds Asphalt/Tar Roofing 1 cubic yard = 2,919 pounds Wood Shake Shingle Roofing 1 cubic yard = 435 pounds Metals 1 cubic yard = 906 pounds Yard Trimmings 1 cubic yard = 108 pounds Sheetrock 1 cubic yard = 394 pounds Salvaged Items Salvaged items Estimated Pounds 2000 = Tons i.e, Cabinets 100 2000 =.05 Note: With the exception of salvaged items, conversions should only be used if a facility does not have scales or if the load is so small that the facility charges a flat rate instead of weighing it. If you believe you have justification for using a different conversion than above, please explain below. Please remember to submit this form with your Waste Management Plan or Compliance Report if you use volume to weight conversions to calculate recycled or disposed tonnages. 5