Urban Tolling in Norway



Similar documents
Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too

Road Tolling in Norway a brief introduction

National road user charging standards in Norway

Norwegian road tolling: scope, limits and perspectives for the future

AutoPASS Requirement Specification

Key figures Norwegian Public Roads Administration

A Users Guide to Tolling

Wages and Working Conditions in Norway

Background to the Norwegian Ministry of Transport and Communications support for the measures

Financing Public Transport

Automatic ticketing at ferry crossings

The Follo Line Project

How Singapore and London Have Used Congestion Pricing to Reduce Congestion and Improve the Environment

Senior/T.A.P. User Guide. Get a new ID card and a new level of service.

Transport planning in the Stockholm Region

A greener route to the capital

INVITATION FIA EUROPEAN TRAFFIC EDUCATION CONTEST (ETEC) 5 7 SEPTEMBER 2014 LILLESTRØM, NORWAY

Tendering of passenger rail traffic in Norway

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

Hydrogen as strategy in Climate Action Plan for Hordaland

Carpooling in Bergen, Norway with an app called Carma. By: Kristian Amlie, Carpool enthusiast 26th of March MMØresund

Bjørn Kjos (CEO) Oslo, 27. April 2006 Norwegian Air Shuttle ASA

ALL-ELECTRIC CAR SUBSCRIPTION

Business Systems Department Overview

The Royal Norwegian Yacht Club (KNS) wishes you welcome to the Melges 24 Open Norwegian Championship 2013.

Highway Bergen - Haugesund

Parking Business Plan

Toll Collection Systems

Objective. (From Statskog SF s charter )

Oslo T-bane, Norway

CHAPTER 3 AVI TRAVEL TIME DATA COLLECTION

Transport Demand Management

Incremental Changes and Disruptive Impacts in Tolling. By Philip Miller, P.E., AECOM

The challenge: tranform the Urban Mobility model to make Milano a more Livable city. Agency for Mobility, Environment, Territory - City of Milan

SUMMARY OF HYDROGEN STRATEGY AKERSHUS AND OSLO

The Oslo Pass - Oslo (Norway)

Henrik Blomé. 12 March 2014

Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø

Electronic Toll Collection

AFC BUS TAXI BIS. Solutions for Traffic Information and Fare Collection

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

City of Vantaa New Plans and Projects

OSLO, a new step for the city - port relationship

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture

The Norwegian High Speed Rail Assessment Project

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Electronic Road Pricing The Singapore way

Supplier conference. Passenger counting solutions. Oslo, 14th January 2016

Urban Mobility India 2011 The IBM Smarter Cities Solutions: Opportunities for Intelligent Transportation

Field report. Semester abroad at Østfold University College in Halden, Norway. WS 12/13 Nadine Balter

Norwegian electromobility policy for 2020

FREE FLOW TOLLING CASE STUDY M50 BARRIER-FREE TOLLING. Dublin-Ireland

The Port of Oslo. A cleaner way to Norway s capital. 3,350 mobile phones arrive in Oslo by sea every day. photo: bård ek

This is why the Swedish Transport Administration was formed

Best Practice on Electronic Ticketing

Coastal Highway Route E39 Project

Service Quality Performance Report 2013

Regional Transportation Management Centre

The Danish Transport System. Facts and Figures

The Norwegian High Speed Rail Assessment

PORTS OF. sh i p to no r way

Sustainable transport in Stockholm. Gustaf Landahl City of Stockholm

To open the door of your studio we would like to know your time of arrival at Amsterdam Schiphol Airport or Amsterdam Central Train Station.

Latest anf Future Development Plans in Helsinki

GENERAL CAR PARK (UNSECURED) TERMS AND CONDITIONS

A-CDM from an airport perspective Oslo Airport

The Mersey Gateway Project

ONLINE DATABASE ON GOOD PRACTICES.

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

TABLE OF CONTENTS. Norwegian Hotel Industry Overview Pg. 2

Fjord Line AS a company running on LNG. Presentation, Thursday March 5th 2015

The New Mobility: Using Big Data to Get Around Simply and Sustainably

Penalty Fares information

44 TH ASECAP STUDY & INFORMATION DAYS 2016

Policies and progress on transport access, including access for the rural population and low-income households

Coastal Highway Route E39 Project Overview

Introducing the easy, quick, cheaper way to travel through the Mersey Tunnels

Living and working in Norway

Bluetooth - Evaluation and results

Transcription:

Urban Tolling in Norway Practical Experiences, Social and Environmental Impacts and Plans for Future Systems Kristian Wærsted Senior Engineer (NPRA)

Road tolling in Norway 70 years of road tolling experience to finance expensive infrastructure (mountains / fjords) More than 100 road toll projects implemented Toll collection normally lasts for 15 years 45 road toll projects in operation today Urban toll systems in the last 20 years Point payment only (open systems) Norway has been a pioneering country in developing cost efficient road tolling

Tolling Projects in Norway by 2005 City Projects Single Projects Toll collection on ferries Tromsø (fuel tax) Rv 17 Helgeland Br. Namsos E69 Magerøya AutoPASS tolling Trondheim Bergen (1986), our first toll ring Ålesund* (1987), the first toll plaza with EFC in the world The toll rings in Oslo (1990) and Trondheim (1991) are other important pioneering projects * Rv 566 Osterøy Br. E39 Nordhordland Br. Bergen Rv 562 Askøy Br. Fv 207 Bjorøy E39 Triangular Link E39 Krifast Rv 661 Straumen Br. Rv 658 Ålesund Tunnels Rv 61 Hareid - Sulesund Rv 653 Eikesund - Rjånes Rv 5 Naustdal Tunnel E39 Teigen - Bogen E39 Borevik - Jektevik Rv 544 Halsnøy Link Rv 47 T Link E39 Rennesøy Rv 519 Finnøy N. Jæren Rv 13 Ryfast E39 Øysand - Thamshamn Rv714 Hitra - Frøya Rv 45 Gjesdal E39 Lister Pack Rv 9 Setesdalsveien E18 N. Vestfold Tønsberg E18 Aust-Agder Kristiansand Rv 755 Skarnsund Br. E6 Trondheim - Stjørdal Rv 64 Skålavegen Sykkylven Br. Rv 5 Fjærland - Sogndal Rv 5 Fodnes - Mannheller Rv 551 Folgefonn Tunnel E134 Rullestad ravine Rv 35 Lunner - Gardermoen Oslo Rv 23 Oslofjord Link E18 Askim (Østfold Pack) E6 at Moss (Østfold Pack) Rv108 Hvaler Tunnel

Road toll revenues have been growing rapidly during the last 20 years 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 Million NOK (2000) 100 NOK = 15 USD 231 0 0 188 690 502 1038 881 1243 1980 1985 1990 1995 2000 1096 Urban Other Toll revenues now contribute approx. one third of the investments in national roads

Planning procedure for Norwegian road toll projects Establishment of local toll company NPRA Regional Office Ministry of Transport Start of project Local initiative Local political agreement NPRA Directorate of Public Roads National Parliament

Organisation of road tolling Ministry of Transport and Communications NPRA Regional Office Procurement and Ownership NPRA Directorate State money Investment project Collecting System and AutoPASS User Money Contract Local Toll company Operator company Bank loans

Ålesund (1987), the first toll plaza with EFC in the world (located between two 4 km subsea tunnels between the city of Ålesund and the airport)

Layout of a Norwegian EFC lane Invalid passing Warning, few trips left Valid passing (not in use in Oslo) The AVI and camera systems manage high speeds Due to traffic safety, the maximum speed limit is set to 60 km/hour

A manned Oslo toll plaza on a western arterial The subscription lane ( abonnement ) has a high capacity, approx. 1600 veh/hour Approx. 300 veh/hour capacity in coin machine and attended ( manuell ) lanes No expansion of total road area was necessary

Low cost unattended toll plazas were introduced in Trondheim in 1991 EFC antenna Video cameras Low capacity coin machines Plaza computer and electronics

Low capacity P-type coin machines in unattended self service toll plazas The lower unit is for light vehicles The upper unit is for heavy vehicles The P-type coin machines have: Slot for inserting coins Printer for receipts Button to activate intercom for assistance

The last step is implementing Fully automatic free flow toll plazas will it be the new hit? No stop at the toll plazas Drivers without AutoPASS (EFC) will be videoed and billed monthly for the exact fee In Bergen and Tønsberg since February 2004 Picture shows the major toll station in Tønsberg

Laser detection and DSRC Rear camera Front camera

Urban toll rings in Norway May 2004 City Plazas Start End Pop. in ar. In op.* AADT ** EFC % Tags NOK /Pbe Bergen 1 8 1986 2004 300 16/5 60 - - 5-10 Oslo 19 1990 2007 900 24/7 250 81 400 10-20 Trondheim 12 17 23 1991 1998 2003 2005 250 11/5 12/5 100 94 150 10 15 Kristiansand 5 1997 2007 100 24/7 55 83 30 10 N. Jæren (Stavanger) 21 2001 2011 230 12/5 150 90 110 5/10 Namsos 3 2003 2017 15 12/5 7 87 10 13 Tønsberg 6 2004 2019 50 24/7 50 84 35 15 Bergen 2 8 2004 2014 300 24/6 100 85 105 15 * Hours a day and days a week ** During hours of operation

The Oslo Package 1 Motivation: To build 50 predefined projects in ten years instead of 35 with state funds only Joint venture between Oslo (60%) and the neighbour county of Akershus (40%) Oslo Akershus Users contribute with 55% of funding The toll ring (white lines) covers all roads in three corridors 50% of Oslos population live outside the toll ring AADT in the payment direction is approx. 250 000 Approx. 1 bill. NOK per year income, approx. 10% operation cost

Oslo Toll Ring layout E18 E18 E6 E6 For economical and political reasons the best place for a toll ring was about halfway between the city border and the city centre. Only four minor roads had to be closed in order to make the ring watertight

Toll plaza no.2 on an E18 on-ramp 11 out of 19 toll plazas are minor withonelanefor subscription and one attended lane only

Toll plaza no.11 on E6 north is the largest in Oslo. It has 3+1 AutoPASS lanes

Toll plaza no.14 on E6 south You will arrive here when approaching Oslo from Stockholm or Copenhagen

Toll fees in the Oslo Toll Ring Heavy vehicles have an allowed total weight higher than 3500 kg Pre-paid trip subscribers get up to 43% discount Monthly, semi-annual or annual subscriptions of unlimited use give even higher discounts Public transport, MC, ELcars, ambulances, and handicapped persons do not pay

Oslo Toll Ring Experiences Overall reduction in traffic: 3-5% Growth in public transport: 6-9% Situation back to normal after only a few months Off peak drivers most sensitive to pricing No capacity problems in the plazas Higher workload and more comprehensive computer systems in the back office system than expected Users do not always behave as expected

Opinion polls unveil a negative attitude to the toll ring in Oslo The increase in negative attitude in 2001 is due to: 1. introduction of Oslo Package no.2 : NOK 2,- extra per passing allocated for public transport only 2. a fear that the toll ring will not be removed in 2007 which was the original decision The toll ring opened 1. Febr. 1990

How was it possible to implement a toll scheme in Oslo that 70% were against? Bergen initiated a successful toll ring in 1986 Road traffic conditions were choking The major political parties agreed The toll is to finance road infrastructure Limited collection period, only 15 years Additional extra funding from the State is part of the plan Low fees Those opposed to car driving appreciate that the motorists have to pay 20% of toll income is earmarked public transport User friendly fee structure (?) (multi-trip subscriptions with discount and season tickets)

What do we get? The major projects in the Oslo Package 1 are several urban road tunnels The most important of those is Festningstunnelen (The Castle Tunnel) below City Hall Square: 6 lanes, 1,6 km long, cost 2 bill.nok The City Hall Square is here X It was important for the acceptance of the toll scheme that the Castle Tunnel opened 2 weeks before the toll collection started.

The City Hall Street before opening The Castle Tunnel

The City Hall Street after opening The Castle Tunnel

The City Hall Square after opening The Castle Tunnel The AADT was reduced from 90 000 to 0 vehicles New tram line opened A new plaza for walking, festivals and exhibitions

The traffic goes here (down to -45 m)

Community importance of urban tunnels Reduced delay due to removal of bottlenecks Road space above ground can be made available for other uses Removed barrier effects from the surface street network Reduced above ground traffic noise Less pollution (high chimneys, filtering) Improved traffic safety

What does the future hold? The Oslo Toll Ring expires in 2007 will it: 1. be removed? 2. be extended (like the toll ring in Bergen)? 3. get a time differentiated fee system to manage traffic during peak hours (congestion charging)? 4. be replaced by an other type of congestion charging scheme? ): A project group is working on Oslo Package 3. So, time will show.

User financing will be needed for a very expensive extension of the Castle Tunnel across Bjørvika bay (Bjørvika Tunnel) The Castle Tunnel Bjørvika The Black Valley Tunnel The medieval city The Ekeberg Tunnel

The new Bjørvika Tunnel will make room for a new district of Oslo between the new opera house (A) (under construction) and the medieval part of Oslo (B). Shall the State or the City pay for it? ): The road users are once more the solution A B

Future solution in Oslo An amendment to the Road Traffic Act giving the formal base for congestion charging has been passed in Parliament Politicians, both on national and municipal level want to keep their promise to remove the existing toll ring in 2007 The city council is in favour of user payment also after 2007 to finance road and public transport infrastructure One of the solutions under discussion is a toll collection cordon with time differentiation of fees Other, possible solutions are also under consideration So, will we see a new system being opened 1. January 2008??

Congestion Charging light favouring public transport Fees (pbe): NOK 3,- (1 unit) in both directions NOK 6,- (2 units) in both directions + Double fees in peak periods + Free periods late evening and night + Double fees for heavy vehicles. City borders The toll ring

Nord-Jæren (Stavanger) and Trondheim have zonal systems with unattended toll plazas 1998 Unattended toll plaza in the centre of Trondheim (K) 1999 Coin machines

A bidirectional multicordon road pricing system in Oslo will demand fully automatic free flow toll plazas similar to those in Tønsberg and Bergen Tønsberg Bergen

Free flow toll plaza challenges Drivers have a right to be offered to pay cash in accordance with the Norwegian Act of finance Trips may be paid with cash at certain petrol stations within two days How to inform uninformed drivers Privacy Anonymus tags are offered

Informational traffic signs in free flow toll plazas Bomring/Toll ring x,x km Automatisk bomstasjon 1 4 5 Extra pre-warning about free flow plazas 6 Information lay-by* 2 Information lay-by* 7 3 Pre-warning about toll Faktura tilsendes Post payment kr 15,- kr 30,- kr 0,- Information about fees (close to gantry) 8 AutoPASS eller faktura tilsendes Main warning about free flow plazas Ikke stopp / Do not stop Information on the gantry 9 Faktura tilsendes Post payment 100m Information in English Spørsmål om bompasseringen? Toll payment questions? 02012 About the call center (after the gantry) * With a large information board

Fully automatic toll plazas in Bergen

New traffic signs and symbols

AutoPASS A technical specification for EFC owned by NPRA Independent of industry and open to all from 1999 In full compliance with CEN and ETSI standards for DSRC Designed for interoperability

History of EFC in Norway a summary 1987 The worlds first EFC plaza in operation at Ålesund 1990 The first EFC City Toll Ring in Oslo 1991 The first unmanned Toll Ring in Trondheim 1997 The AutoPASS project was launched 2000 The AutoPASS implementation started 2004-02-01 Full National Interoperability for EFC 2004-02-02 Introduction of fully automated, free flow toll plazas

The AutoPASS lanes lies to the right in a manned freeway toll plaza

NorITS (Nordic Interoperability for Tolling Systems)

NorITS - The Great Belt Link Sweden Denmark Opened in 1998. 25 000 crossings per day. One toll plaza with 22 lanes (6 EFC lanes) and a revenue of 330 M per year! 160 000 OBUs issued

NorITS - The Ôresund Bridge Denmark Sweden Opened in 2000 Traffic in excess of 10 000 veh/day One toll plaza with 22 lanes (8 EFC lanes). 100 000 OBUs issued

The NorITS Toll Station Solution NORITS toll station antenna Software AutoPASS transaction Software BroBizz transaction Software PISTA transaction AutoPASS OBU BroBizz OBU PISTA OBU

Thank you for your attention! For more information: Please contact Mr. Kristian Wærsted E-mail: kristian.warsted@vegvesen.no Phone: +47 22 07 37 35 Mobile: +47 915 195 89 Fax: +47 22 07 33 08