Abstract Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE Student drop-off and pick-up activity at school sites throughout the country have increased in recent years as a result of greater percentages of students being driven to school. This is largely due to concerns regarding security and safety and decreases in school busing programs. Many existing schools were designed in the 1950 s, 1960 s and 1970 s when most children were expected to walk and bike to school or be transported by a school funded busing program. The drop-off and pick-up zones at these older schools are not adequately designed to serve current drop-off and pick-up demand. Further, available land to expand the drop-off/pick-up zone is frequently constrained at these schools. Site constraints can also occur at new schools, creating the same design challenges. This paper summarizes design modifications that were recommended at several existing schools to improve drop-off and pick-up operations. The design modifications utilized dual and in the case of a new school design, triple drop-off/pick-up lanes to maximize the drop-off/pick-up area. Several example site plans for recent projects are provided. Some before and after data regarding vehicle queuing is also included. Some overall guidelines regarding site planning and the appropriate amount and location of curb space to provide for drop-off and pick-up operations is also provided. Possible topics for future study are also suggested. Introduction This paper summarizes parking lot modifications at several schools to improve drop-off and pick-up operations. The design modifications utilized dual, and in the case of a new school, triple drop-off/pick-up lanes to maximize the drop-off/pick-up stacking length. Several example projects are provided. Some before and after data regarding vehicle queuing is also included. Guidelines regarding site planning and the appropriate amount and location of curb space to provide for drop-off and pick-up operations are also discussed. Traffic Congestion at Schools A Recurring Problem Trip Generation, 8 th Edition, Institute of Transportation Engineers (ITE), 2008, estimates that elementary schools generate about 1.29 trip ends per weekday, with 0.45 during the AM peak hour and 0.28 during the afternoon peak hour. This is a significant increase from the rate of 1.02 trip ends per weekday, with 0.30 during the AM peak hour and 0.26 during the afternoon peak hour in Trip Generation, 6 th Edition, 1997. In fact, traffic counts conducted at several schools in the past several years have consistently been higher than the averages quoted in the most recent trip generation publication. Some of this is because the trip generation publication includes data collected in earlier versions of the manual, including in the 1960 s. Suffice it to say, it is generally recognized that trip generation rates from elementary, middle and high schools have all increased noticeably over the past several decades. The traffic increases are a result of several factors. These include reduced walking and biking, as well as reduced school bus programs. Some school districts have also 1
implemented magnet school programs to achieve racial integration, resulting in many students attending schools several attendance areas away from where they live. Further exacerbating the situation, many schools have increased enrollment that is accommodated by construction of portable classrooms and increased class sizes. The increased enrollment, in combination with higher trip generation rates per student, can result in an even larger discrepancy between the currently experienced traffic volumes and those estimated at the time the school was planned and constructed. Typical Congestion Relief Toolbox A variety of strategies are regularly used to address this problem, some to reduce demand, some to increase capacity. Traffic demand reduction can be accomplished by enhancing school bussing, promoting carpooling; promoting walking and bicycling; and staggering arrival and dismissal times for various grades at an individual school. A change in policies regarding the spatial layout of large new development is also a very important strategy in order to create more walkable communities. For example, it is beneficial to locate schools with the major arterials serving as the attendance area boundaries, in order to minimize students being required to cross these major pedestrian barriers. Consideration is also being given to developing schools with smaller enrollments, so that more school sites are located within a given population area to reduce the attendance areas for each school, thereby increasing the percentage of students that live within reasonable walking distances. With regard to vehicular traffic operations and increasing capacity, bottlenecks can be eliminated or mitigated at the school entrance, the school exit, as well as by not providing adequate on-site parking. Capacity can also be increased for non-motorized vehicles, including pedestrian and bicycle enhancements. Schools should be designed to have pedestrian and bicycle access from as many routes as feasible in order to minimize walking distances and improve pedestrian safety and convenience. Site planning and design should accommodate vehicular circulation by providing adequate parking lot capacity and providing exit and entrance designs that accommodate traffic demand. All of the above strategies should be vigorously pursued. The focus of this article is the other component of school vehicular capacity, which is the on-site drop-off/pick-up provisions, in conjunction with on-site vehicular storage for pick-up and drop-off operations. School Pick-up and Drop-off Design Considerations Several studies have developed curb drop-off/pick-up capacity as a function of enrollment. The first was developed by the North Carolina Department of Transportation. It can be found at http://www.ncdot.org/doh/preconstruct/traffic/congestion/cm/msta/docs/school_calculator.xls. It estimates a drop-off/pick-up queue length of about 1.65 feet per student. The South Carolina Department of Transportation has developed a guideline of about two linear feet of dropoff/pick-up stacking per student, with a minimum of about 900 feet. It is included as Table 1. The Texas Transportation Institute, as indicated in Table 2, estimates that 1.5 feet of on-site stacking length should be provided per student. Previous surveys performed by Hatch Mott MacDonald at five elementary and middle schools indicate that about 1.6 to 2.0 feet should be provided per enrolled student. This is within the range estimated by all three of the above references. The actual requirement will, of course, vary depending upon the percentage of 2
students who use other modes of transportation besides single-passenger automobile. Additional study should be performed to better establish this relationship. Table 1 South Carolina DOT Recommendations for On-Site Stacking Length. School Type Elementary Middle High Student Population 200 600 600 1400 200 600 600 1200 400 800 800 2500 Loop Drive Stacking Length (linear feet) (m) 900 1200 (274.5 366) 1200 1500 (366 457.5) 900 1200 (274.5 366) 1200 1500 (366 457.5) 800 1200 (244 366) 1200 1500 (366 457.5) Note: For high school populations greater than 2500 students, consider two separate student pickup/drop-off loops. Source: South Carolina DOT Table 2 Texas Institute Recommended On-Site Stacking Length School Type Elementary Middle High Student Population Less than 500 500 or more Less than 600 600 or more 400 800 800 2500 Loop Drive Stacking Length (linear feet) (m) 400 750 (122 229) 750 1500 (229 458) 500 800 (153 244) 800 1600 (244 488) 800 1200 (244 366) 1200 1500 (366 458) Note: For high school populations greater than 2500 students, consider two separate student pickup/drop-off loops. Source: Texas Transportation Institute The schools studied by our firm not only included on-site pick-up and drop-off areas, but also curb frontage along the public streets. These are often used in addition to the on-site facilities. In fact, one school had no on-site pick-up and drop-off facilities, but had a total of over 3,000 feet of curb frontage to accommodate its 780-student enrollment. The school occupies almost an entire block in a suburban location. Traffic congestion at this location is actually minimized by allowing vehicles to arrive from virtually any direction. Multiple Drop-off/Pick-up Lanes Concept The question now arises, What do we do if we cannot achieve the substantial amount of dropoff/pick-up capacity recommended by the various public agency guidelines? The answer is to consider multiple, parallel drop-off on-site facilities. This involves creating a curbed drop-off area that allows students to exit their vehicle onto a sidewalk inside the parking lot. A fence is 3
provided on the school building side of the sidewalk area in order to direct students to an internal crosswalk. The crosswalk preferably is controlled by a stop sign with school safety patrols. Four example schools where the system has been constructed are described in the following discussion. Nordstrom School The first school is Nordstrom Elementary School in Morgan Hill, California. The site plan that existed before the double drop-off system was implemented is included as Figure 1. It has an enrollment of about 700 students. A total of 500 feet of drop-off/pick-up area was provided (a ratio of about 0.8 feet of on-site stacking per student), with a total of 54 short- and long-term parking spaces. The school is located on Dunne Avenue, which is a four-lane arterial with 17,000 vehicles per day and a 45 MPH speed limit. Parking is allowed along the school frontage on Dunne Avenue in spite of the significant conflicts that would result from parking maneuvers on this high-speed, moderate-volume arterial. Off-site student pick-up and drop-off occurred on Peppertree Drive, a street that intersects Dunne Avenue approximately several hundred feet to the east of the school. In fact, the school website recommends that parents consider Peppertree as a drop-off/pick-up alternative. Off-site student pick-up and drop-off also occurred in a parking lot that serves a public park immediately to the west of the school. Nevertheless, queues regularly spilled out of the school entrance and onto Dunne Avenue. This would create significant conflicts with the relatively high-speed through traffic. The City of Morgan Hill Police Department assigned traffic enforcement on a daily basis to attempt to reduce travel speeds in front of the school because of the severe perceived safety problem. Figure 1 Nordstrom Elementary School Site Plan Before Improvements Figure 2 illustrates the modified parking lot with a second drop-off lane parallel to the existing drop-off lane. This added approximately 275 feet of additional on-site curb length, which serves 11 parked vehicles, for a total on-site stacking length of about 775 feet, or about 1.1 feet of onsite stacking per student, a 50% increase above the pre-improvement condition. This is somewhat below the recommended ratio, but much better than before the improvement. The double drop-off facility not only increases on-site stacking length, but also increases the throughput capacity by allowing these 11 vehicles to perform drop-off and pick-up operations simultaneously with the original location. The second drop-off/pick-up area is also used for visitor parking when not used for drop-off/pick-up operations. In order to replace the teacher parking that was removed for the second drop-off lane, a paved portion of the on-site playground was converted into 24 parking spaces immediately to the northeast of the parking lot. 4
Figure 2 Nordstrom Elementary School Site Plan After Improvements Discussions with the school district as well as the principal of Nordstrom School indicate that they are extremely happy with the dramatic improvement in traffic operations that have resulted from this fairly straightforward improvement. There is still some queue spillover onto Dunne Avenue, but far less than the pre-existing condition. Because the second drop-off lane is used for visitor parking from 8am to 1pm, some perpendicular parking takes place prior to the end of the drop-off activity. This reduces the capacity of the second drop-off lane. However, it usually does not begin until after arrival traffic flows have begun to subside. Boronda Meadows Elementary School A second example is the Boronda Meadows Elementary School in Salinas, California. The school is located on the opposite side of the expressway from the neighborhood. It is noted that this is not a desirable location for an elementary school. However, this was the only site available and it is also a magnet school, including students from the entire school district. Figure 3 illustrates the parking lot layout developed by the school architect. The school is located on Davis Road, which is a 45 MPH expressway on the west side of Salinas. It carries about 35,000 vehicles per day. Larkin Street extends into the site as the school s main entrance and exit. Larkin Street is a two-lane collector street. Parking is prohibited on Davis Road and Larkin Street. All pick-up and drop-off activities, as well as parking, must be completely accommodated on-site. Larkin Street extends approximately 125 feet from the nearby apartment complex driveway to the end of the on-site left turn lane. A total of about 350 feet is provided from Davis Road to the end of the on-site left turn lane. Off-site queuing is therefore provided. The school has an enrollment of about 700 students with 15% percent travelling by bus to and from the school. Students are prohibited from crossing Davis Road at Larkin Street even though this intersection is signalized. The preliminary site plan proposed by the architect included approximately 800 feet of drop-off and pick-up curb space, and included one section of double drop-off. The curb length immediately adjacent to the school adjacent to the double drop-off area was proposed to be reserved for busses. This resulted in a total of about 500 feet of automobile drop-off/pick-up area. An additional 400 feet of on-site queuing was provided, for a total of about 900 feet of on-site stacking and drop-off/pick-up length. This is a ratio of about 1.3 feet per student. It is evident that the preliminary site plan would not be adequate to ensure that no vehicle queuing would extend onto Larkin Street. There was great concern about the ability to handle all of the drop-off/pick-up and vehicle queuing on-site. Because this is a highly sensitive location given the adjacent expressway, a higher on-site stacking ratio is desirable. 5
Figure 3 Boronda Meadows Elementary School Site Plan Before Improvements The site plan was revised as illustrated on Figure 4, which is the plan that was constructed. This includes a triple drop-off/pick-up area as well as a double drop-off/pick-up area. Both dropoff/pick-up areas immediately adjacent to the school buildings are reserved for busses. The final site plan provides a total of 700 feet of drop-off and pick-up area in addition to the 400 feet of on-site queuing, for a total of approximately 1,100 feet of on-site drop-off/pick-up and queuing. The ratio of on-site stacking to students is 1.6, which is adequate when considering there is queuing provided on Larkin Street where it enters the site. There has been no queue spillover onto Davis Road. Students are funneled to the crosswalks at each end of the island. Stop-control is provided on the exits from each drop-off/pick-up area. Each of the drop-off/pickup islands has a fence along the site closest to the school buildings. Figure 4 Boronda Meadows Elementary School Site Plan After Improvements Soquel Elementary School The Soquel Elementary School is located in Soquel, California, immediately northeast of the City of Capitola in Santa Cruz County. It is a part of the Soquel Union Elementary School District. This current school building was constructed in 1921 and has a current enrollment of about 430 students. It is located on Porter Street, which is a two- to four-lane arterial that carries about 12,000 vehicles per day. The speed limit on Porter Street is 25 MPH. Parking is prohibited along the school frontage on Porter Street. Pedestrians may also access the school via a pedestrian bridge across Soquel Creek. 6
As indicated on the aerial photo that represents conditions before parking lot modifications were constructed (Figure 5), there was no defined drop-off/pick-up area within the school parking lot. The drop-off/pick-up activities were conducted in the circulation aisle on the easterly side of the parking lot near the school buildings. A total of about 280 feet of on-site stacking was provided, which is a ratio of 0.65 feet per student. This is an extremely low ratio, but mitigated by the small enrollment and attendance area, which allows a higher than typical percentage of students walking. The pedestrian access across Soquel Creek also allows an alternative access for pedestrians and pick-up and drop-off activities at the rear of the school grounds. Nevertheless, traffic entering the site for student pick-up and drop-off regularly spilled over onto Porter Street, resulting in traffic congestion on Porter Street and creating an undesirable safety situation. Figure 5 Soquel Elementary School Aerial Photo Representing Existing Conditions Pedestrians entering the school grounds from Porter Street to the south walked along the fences on the southerly and easterly portions of the parking area. The parking area was also used for school bus storage, which further reduced the on-site parking supply and severely constrained the pick-up and drop-off operations. A double drop-off/pick-up area was recommended to improve the drop-off and pick-up operations. The school district decided to first implement the system on a temporary basis before committing to a permanent installation. Figure 6 provides a photograph of the temporary installation. The school district authorized the design and installation of the temporary system about three weeks prior to the end of the school year in order to test the system and, if it functioned acceptably, to construct a permanent installation during the summer. The temporary system was designed and implemented in approximately one week. It was in place for testing for about two weeks prior to the end of school. The school district was extremely satisfied with the improvement in traffic operations resulting from the temporary installation and decided to implement a permanent design. Figure 7 illustrates the permanent design which is currently in place. The project included an improved parking lot layout, the removal of school bus storage and the construction of a raised drop-off island, as well as a sidewalk along the southerly perimeter of the site. The new configuration includes about 400 feet of on-site stacking, which is a ratio of about 0.9 feet per student, or nearly 50% more than previously provided. Again, this is less than desirable, but the maximum that could be added to the site. 7
Figure 6 Soquel Elementary Temporary Improvements Figure 7 Soquel Elementary Permanent Drop-off/Pick-up Design Discussions with the school district indicate that they are extremely happy with the resulting traffic operations. There has been little or no queue spill-over onto Porter Street since the improvements were constructed. Main Street Elementary School The fourth example is Main Street Elementary School, which is also a part of the Soquel Union Elementary School District. Subsequent to witnessing the dramatic improvements that resulted at the Soquel Elementary School, the school district decided to implement a similar program at Main Street Elementary School. The Main Street School primarily serves a rural area of Santa Cruz County. It is located on Main Street, which is a two rural collector with a 25 mph speed limit and carries 8,000 vehicles per day. It has sidewalks along the school side of the street, but no sidewalks across the street or outside the immediate neighborhood. Roadways in the vicinity are very narrow and do not have pedestrian facilities. It is nearly impossible to construct pedestrian facilities on some of these roadways because of the hilly terrain. The school has about 450 students and about 460 feet of on-site stacking before improvements. This is a ratio of about 1.0 feet per student, which is about the ratio of Soquel Elementary School after improvements. However, before improvements were implemented, vehicle queues extended for approximately one-quarter mile in each direction along Main Street, resulting from the inability of vehicles to enter the school grounds. Through traffic on Main Street was forced to experience significant delays as they attempted to negotiate Main Street in the immediate vicinity of the school. The far more severe deficiency in operations may be due to a higher amount of students being driven to and from school than Soquel Elementary School. Its much larger rural attendance area is at least one factor. The dynamics of socio-economics and other factors were not explored as a part of the design effort. It was simply obvious that serious traffic deficiencies existed and needed to be corrected. Figure 8 illustrates the parking lot layout before the construction of a double drop-off area. Figure 9 illustrates the construction of Phase I of the ultimate revision of the entire parking lot. The project is being implemented in phases because the school district does not have the funds to construct the entire project. Phase I creates a double drop-off area only in the circular area of the 8
parking lot immediately adjacent to the school buildings. This was enough to create some additional drop-off/pick-up and vehicle storage on-site to make a noticeable improvement in traffic operations. The on-site stacking after Phase I improvements was increased by 120 feet to a total of 580 feet, representing a ratio of about 1.3 feet per student, an increase of about 25% above the original condition. Figure 8 Main Street School Parking Lot Before Improvements Figure 9 Main Street School Parking Lot After Phase I Improvements Figure 10 illustrates the ultimate improvement to be implemented at the school. This will be constructed when funding is available. The ability to create the expansion of the double drop-off area without impacting the on-site parking supply is due to the extremely wide landscape islands in the perpendicular parking lot area. Narrowing the landscape areas allows for the additional drop-off, pick-up and bypass lanes to be constructed. The on-site stacking after ultimate improvements will increase by an additional 160 feet to a total of 740 feet, representing a ratio of about 1.6 feet per student, an increase of about 60% above the original condition. Figure 10 Main Street School Ultimate Improvements to be Implemented 9
Summary and Conclusions All four of these schools experienced dramatic improvements in traffic operations, including reduced queue spill-over onto the public street system, reduced time for drop-off and pick-up waiting by parents, reduced confusion (with resulting potential safety improvements), and virtually universal acceptance by school representatives and parents. It must be mentioned that the improved pick-up and drop-off designs have not solved all of the problems at these schools. The main remaining issue concerns vehicles exiting the schools onto the public streets. This has become the remaining bottleneck, although it does not appear to result in substantial impedance to pick-up and drop-off activities at any of these schools. Additional study is needed to determine the effect of double drop-off /pick-up lanes on the service rates for loading and unloading students, safety, appropriate traffic control, use of raised crosswalks, geometrics, budget estimates, effect on traffic generation rates, change in on-site versus off-site drop-off rates from expanding on-site capacity, to name a few. Also, additional work could be done to expand the data base for the North Carolina School Calculator. It is evident that schools generate varying amounts of traffic and on-site vehicle stacking requirements. One size does not fit all. The independent variables need to be established in order to better design school parking and student loading and unloading areas. In conclusion, a double drop-off/pick-up lane configuration should be considered where congestion occurs at existing pick-up and drop-off operations, or where the amount of on-site or school-frontage pick-up and drop-off curb lengths are significantly less than the guidelines described earlier in this report. Author Keith B. Higgins, PE, TE Vice President Hatch Mott MacDonald 1300-B 1 st Street Gilroy, CA 95020 Phone: (408) 848-3122 Fax: (408) 848-2202 keith.higgins@hatchmott.com 10
References Cooner, P.E., Scott et. al. Operational and Safety Guidelines for Roadway Facilities Around Schools: Review of Existing Guidelines. Texas Department of Transportation, in cooperation with the U.S. Department of Transportation Federal Highway Administration. Texas Transportation Institute: October 2002. Cooner, P.E., Scott et. al. Operational and Safety Guidelines for Roadway Facilities Around Schools: Recommended Guidelines. Texas Department of Transportation, in cooperation with the U.S. Department of Transportation Federal Highway Administration. Texas Transportation Institute: October 2003. Cooner, P.E., Scott et. al. Operational and Safety Guidelines for Roadway Facilities Around Schools: Overview of Project Activities and Findings. Texas Department of Transportation, in cooperation with the U.S. Department of Transportation Federal Highway Administration. Texas Transportation Institute: November 2003. Cooner, P.E., Scott A et. al. Summary of Guidelines for Roadway Facilities Around Schools. Texas Transportation Institute; Texas A&M University System. Project Summary Report 0-4286-S: January 2004. Cynecki, Michael, Hefferan, Jennifer and VanPelt, Daniel. Multi-Modal School Site Planning, Design and Transportation for Primary Grades (K-8). Gorove/Slade Associates, City of Phoenix Streets Department, District of Columbia DOT. ITE Webinar sponsored by The National Center for Safe Routes to School: February 2010. Gattis, James L, Nicewander, W. Allen and Toothaker, Larry E. Estimating Parking Accumulation Demands at Elementary Schools. ITE Journal. Institute of Transportation Engineers: October 1995. Gilroy Elementary and Middle School Traffic Study. Hatch Mott MacDonald: March 2006. Guidelines for School Transportation Design. South Carolina Department of Transportation. MSTA School Traffic Calculator. North Carolina Department of Transportation. http://www.ncdot.org/doh/preconstruct/traffic/congestion/cm/msta/docs/school_calculat or.xls. Toolbox to Address Safety and Operations on School Grounds and Public Streets Adjacent to Elementary and Middle Schools in Iowa.. Iowa Department of Transportation, office of Traffic and Safety. Final Report: August 2006. Trip Generation, Editions 3 8. Institute of Transportation Engineers, 1983-2008 11