Second Place: Industrial Facilities or Processes, New



Similar documents
TES for Medical Center

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

Direct Fresh Air Free Cooling of Data Centres

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned

Tips to Reduce Chilled Water Plant Costs

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Denver International Airport Total Facility Optimization. Josh Foerschler Aurom Mahobian

Sea Water Heat Pump Project

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

OPTIMAL POLYGEN COOLING CONCEPT FOR ST. OLAVS HOSPITAL IN TRONDHEIM, NORWAY

NEW JERSEY CENTER OF EXCELLENCE

Flexibility, Efficiency In San Antonio Arena

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

The New Data Center Cooling Paradigm The Tiered Approach

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Building Performance With District Cooling

HVAC Systems: Overview

Princeton University Microgrid

Data Center. Ultra-Efficient chilled water system optimization. White paper. File No: Date: december 03, 2015 Supersedes: new Date: new

The Different Types of Air Conditioning Equipment for IT Environments

ABSTRACT DCMCCT PROJECT OVERVIEW

Commissioning - Construction Documents (Page 1 of 6)

Heat Recovery In Retail Refrigeration

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

21.1 Functions, Basic Configuration, and Interfaces

Analysis One Code Desc. Transaction Amount. Fiscal Period

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

European Code of Conduct for Data Centre. Presentation of the Awards 2016

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

The Data Center Dilemma - A Case Study

By Steven C. Severini, P.E., Member ASHRAE

Enclosed Football Stadium Design History and Lessons Learned

THIRD QUARTER 2011 TECO

Thermal Coupling Of Cooling and Heating Systems

Heating & Cooling Efficiency

Drives and motors. A guide to using variable-speed drives and motors in data centres

Centrifugal Fans and Pumps are sized to meet the maximum

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Water cooled chiller plant (cp/vs)

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

How to Build a Data Centre Cooling Budget. Ian Cathcart

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Case Studies: Infrared Heating in Industrial Applications

Seven Steps to Maximizing Central Plant Efficiency

10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

District Cooling Plant : Refrigeration Plant Simulation

HVAC: Cool Thermal Storage

Secondary Loop Chilled Water In Super High-Rise

Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications

Award-Winning Innovation in Data Center Cooling Design

Reducing Data Center Energy Consumption

Rules of Thumb Energy Efficiency in Buildings

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Continuous Commissioning of the Dallas/Fort Worth International Airport

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Creating Efficient HVAC Systems

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling

The Thermal Bus Opportunity A Quantum Leap in Data Center Cooling Potential

Typical Cooling Load Profile

THERMAL STORAGE WITH ICE HARVESTING SYSTEMS

Increasing Energ y Efficiency In Data Centers

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Maximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages

Energy Audits Waste Water Treatment Plants

Analysis of data centre cooling energy efficiency

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

FINAL REPORT LIFE-CYCLE COST STUDY OF A GEOTHERMAL HEAT PUMP SYSTEM BIA OFFICE BLDG., WINNEBAGO, NE

Multifamily Central Heat Pump Water Heating

DEVELOPMENT OF A CAMPUS WIDE DISTRICT CHILLED WATER SYSTEM SAMFORD UNIVERSITY

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

2016 Dry Cleaning Compliance Calendar

Texas State University Utility Analysis. Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA

Benefits. Air-Cooled Systems

HEATING, VENTILATION & AIR CONDITIONING

Energy Efficiency: Integrated Design and HVAC Systems HEALTHCARE - TOP 5 GREEN BUILDING STRATEGIES

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

Mechanical Systems Proposal revised

TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO

Analysis of IECC2003 Chiller Heat Recovery for Service Water Heating Requirement for New York State

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Integrated Solar Radiant Systems

Large Energy Savings Per Installation VFDs for Large Chillers

THE ROOFPOINT ENERGY AND CARBON CALCULATOR A NEW MODELING TOOL FOR ROOFING PROFESSIONALS

Circulator Fan Performance Testing Standards BY CHRISTIAN TABER, BEMP, HBDP, MEMBER ASHRAE

Energy Efficiency in Buildings

Adaptive Cooling in Data Centers. Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009

Next Generation Data Center Infrastructure

One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story

Transcription:

Second Place: Industrial Facilities or Processes, New Photo: Paul Howell Texas Medical Center in Houston is the largest medical center in North America. It has a chilled water system of 160,000 tons. Big Plant in a Small Space By Blake E. Ellis, P.E., Member ASHRAE; and Raymond J. Mosier, P.E., Member ASHRAE Everything is big in Texas, including the Texas Medical Center in Houston (the largest medical center in North America) and the plant that provides its energy. 1 Thermal Energy Corporation (TECO) was operating an 80,000 ton (281 360 kw) chilled water system in 2007 that served the Texas Medical Center. Planning efforts indicated cooling load demand would double to 160,000 tons (562 720 kw) over the next decade. An area just east of the existing central plant was identified as available for expansion. This area was less than half the size of the existing plant, but it was the only land available for expansion. About the Author Blake Ellis, P.E., is a principal at Burns & McDonnell where he leads the OnSite Energy & Power group in the Kansas City, Mo. He is the program chair for ASHRAE Technical Committee 6.2, District Energy. Raymond Mosier, P.E., is an associate mechanical engineer at Burns & McDonnell in Kansas City, Mo. 28 ASHRAE Journal ashrae.org July 2013 This article was published in ASHRAE Journal, July 2013. Copyright 2013 ASHRAE. Reprinted here by permission from ASHRAE at www. tecothermalenergy.com. This article may not be copied nor distributed in either paper or digital form by other parties without ASHRAE s permission. For more information about ASHRAE, visit www.ashrae.org.

2013 ASHRAE Technology Award Case Studies Analysis of several options suggested a two-step approach to meet the increased cooling load demand. The first step was to add 8.8 million gallons (33.3 million L) of thermal energy storage (TES), which became operational in January 2010. The second step was the addition of the new East Chilled Water Building (ECHB), which became operational in May kw 12,000 10,000 8,000 6,000 4,000 2,000 2011 with 32,000 tons (112 544 kw) of chilled water production, bringing the system total to 120,000 tons (422 040 kw) of production. The ECHB has provisions for an ultimate production capacity of 80,000 tons (281 360 kw). Energy Efficiency Modern chilled water plant design philosophy uses variable speed drives (VSDs) for the major pieces of equipment such as chillers, cooling tower fans and pumps to optimize energy efficiency. However, at the time this project was being designed, VSDs had never been applied to the 8,000 ton (28 136 kw) chillers required for this project. Several chiller options were analyzed including constant speed 5 kv and 15 kv motors and VSDs serving 5 kv motors. After several iterations, the configuration selected was to use VSDs with a 15 kv input to reduce the electric cable costs and a 5 kv output to drive the 7,000 hp (5220 kw) motors on each chiller. VSDs were also used on the 24,000 gpm (1514 L/s) chilled water pumps and the cooling tower fans. In addition to the VSDs, the efficiency of the new chillers was 0.094 kw/ton (0.027 kw/kw) lower than the existing chillers. The result of the all variable speed chilled water plant design was an average reduction in energy use of 3.4 MW during the first year of operation. Figure 1 shows the energy savings in kw for every hour from August 2011 through July 2012. During this period, a total of 303 million ton-hours of chilled water Figure 1: Hourly energy savings in kw. Planned Maintenance was produced with the new chillers saving a total of 26.1 GWh of electricity. This is an average decrease of 12.7% in annual energy use. The project site is extremely compact. (Figure 2) Consequently, a project goal was established to maximize the potential chilled water production capacity on the space-constrained site. This resulted in the cooling towers being located on the roof of the plant to provide the most compact arrangement. Initial desires were to locate the condenser water basins at grade; however, given the condenser water pump energy requirement, locating the basins as high as possible was desired to reduce the required net static head on the pumps. The final location saved nearly 3 MW of condenser water pumping energy versus condenser water basins located at grade. The savings are nearly equal to the energy saved by the variable speed chiller plant concept. Innovation Maximizing the amount of chilled water production per square foot of the project site was a project goal because TECO did not have additional property on which to expand. Capacity of the chilled water plant was constrained by the footprint of the cooling towers on the roof. Several plant arrangements were studied, but single inlet counter flow cooling towers with a 15 F (8.3 C) range for the condenser water temperature provided the highest heat rejection per square foot of tower footprint while using only slightly more energy (2%) than the most efficient cooling towers. Locating the cooling towers on the roof with no room for a basin to extend beyond the tower, and a roof that could not extend beyond the basin presented a unique challenge. The solution was to design an integral basin/roof structure. Counter flow cooling towers were placed directly on the roof with water cascading onto the roof structure. The water then flows across the roof where Building at a Glance East Chilled Water Building Location: Houston Hourly Data Trend Line 0 1 Aug. 1 Sept. 1 Oct. 1 Nov. 1 Dec. 1 Jan. 1 Feb. 1 Mar. 1 Apr. 1 May 1 Jun 1 Jul. Owner: Thermal Energy Corporation Principal Use: Chilled water production Includes: Roof mounted cooling towers, condenser water sumps, chiller level, electrical distribution and pumping systems. Employees/Occupants: Unoccupied Gross Square Footage: 104,000 Conditioned Space: 104,000 ft 2 (tempered to 85 F [29 C]) Substantial Completion/Occupancy: May 2011 Occupancy: 40% of total chilled water capacity is built out National Distinctions/Awards: 2012 ACEC Honor Award July 2013 ASHRAE Journal 29

2013 Technology Award Case Studies First Costs One intriguing aspect of this project was the extremely high cost of the surrounding land, which has a tremendous impact on TECO s ability for future expansion of the plant. This conit is collected in a series of basins. The roof system is designed to absorb the constant pounding of the water and can be repaired or re-roofed two cells at a time while maintaining the other eight cells in operation (Figure 3). Other innovative ideas include the first variable speed 8,000 ton (28 136 kw) chillers mentioned in the Energy Efficiency section, a crane system and the chilled water pumping scheme. Operation & Maintenance Chilled water production at this site began in 1969 and TECO has maintained a 0.99998 reliability factor, being down only seven hours since inception. Providing reliable chilled water to the medical center is a priority, and this project revised the operating strategy to integrate the function of all three chilled water plants and the new TES tank. This strategy provides increased flexibility to adapt to emergencies while Figure 2: Project site. maximizing energy efficiency. Within the plant, the chillers are arranged in a variable primary pumping arrangement with dedicated primary pumps. A bypass piping loop was installed to allow any chilled water pump to serve any chiller. This configuration will allow future installation of chillers with differing pressure drops without having to match the head of the machine with the largest pressure drop (as would be required if the pumps were installed in a headered arrangement) (Figure 4). Maintenance issues were addressed with an overhead crane system on the chiller level (third floor) capable of removing a compressor or a motor from a chiller and transferring it through openings in the second and third floor slabs to load it directly onto the bed of a truck on the first floor. The truck can then transport the part to be repaired without it ever touching the floor (Figure 5). The pump suction and discharge piping on the first floor was also arranged to allow a minimum of 10 ft (3 m) of clearance below the piping with clear aisles provided between the pump lineups. This arrangement allows forklift access to any pump for motor or pump casing removal. Monorails are provided above each pump to facilitate this process. Figure 3 (left): Cooling tower with sumps below walkway; (right): Integral basin/roof (viewed from the walkway above the sumps). This was especially noteworthy given the condenser water, and chilled water pumps are 600 hp and 1,000 hp (447 kw and 746 kw), respectively (Figure 6). In addition, this plant is tempered to 85 F (29 C) to provide a more habitable work environment in the summer for the maintenance staff. A big improvement during the Houston summers over the existing central plant, which is unconditioned. Finally, many vendors for equipment such as valves, pumps, controls, chillers and cooling towers were chosen to match the existing vendors to minimize spare parts inventories and the number of new components the maintenance staff would be required to maintain. Cost Effectiveness Designing a cost effective project requires the evaluation of the interrelationship of all project costs including first costs, operational costs and maintenance costs. 30 ASHRAE Journal ashrae.org July 2013

Advertisement formerly in this space.

2013 Technology Award Case Studies Figure 4: Chilled water flow. straint factored into several decisions including the decision to maximize the potential chilled water capacity on the available site. Cost effective decisions were made in several areas including constructing the plant building in one phase versus two, saving construction overheads and inefficiencies. Cooling towers were changed from concrete Figure 5: Overhead crane system. to field-erected fiberglass to minimize the weight on top of the building and eliminating a building expansion joint during construction to ensure structural integrity with a 120 mph (193 kmh) wind loading. Finally, the net result of making cost effective decisions was that the project was constructed $15 million under budget. Operation Costs The first portion of this article highlights some of the Crane Operating Zone energy efficiency improvements. These improvements resulted in more than $1 million energy savings during the first year of operation. The real-time electricity pricing made large energy savings possible during peak days of the year. Figure 7 shows this energy savings on an hourly basis, peaking at more than $16,000 that was saved in a single hour when electricity was selling at $3,000/MWh. 32 ASHRAE Journal ashrae.org July 2013 Floor Openings for Cable

2013 Technology Award Case Studies Environmental Impact When this plant is fully built out, it will have an 80 MW electrical service. Therefore, reducing the amount of electrical energy this plant consumes provides its greatest positive environmental impact. Efforts to reduce energy use have been described in other sections. Another feature of this plant that has a positive environmental impact is that the condenser water sumps were used for storm water retention for the building footprint. The cooling tower basins were sized to provide full storage capability for a 25 year, 24-hour storm event. By collecting the rainwater in the sumps, this water can be used in the condenser water system, reducing demand on the city water system, as well as Figure 6: Pump maintenance access. $18,000 $16,000 $14,000 $12,000 $10,000 $8,000 $6,000 $4,000 $2,000 $0 1 Aug. 1 Sept. 1 Oct. 1 Nov. 1 Dec. 1 Jan. 1 Feb. 1 Mar. 1 Apr. 1 May 1 Jun 1 Jul. Figure 7: Hourly energy savings. reducing the flow to the storm water system, even during large rain events. Photo credit: Paul Howell Conclusion New chilled water production plants are fairly commonplace, but not at this scale or under such extreme site constraints. A strong focus on the configuration and arrangement of components on the site was crucial to the success of the project. These integration benefits included: Reduced condenser water pumping costs resulting from elevated condenser water sumps; Recycling of all rainwater falling on the building footprint; Accommodation for moving large equipment directly to grade by the provision of a crane system; and Provision of adequate maintenance access to the equipment and maintaining consistency of plant equipment eliminated the need for additional maintenance staff. However, with a future electrical load of nearly 80 MW in the building, minimizing energy consumption was of utmost importance to the operating costs for the owner as were the environmental benefits. The result of reducing electricity consumption by 3.4 MW every hour is that this plant operates for a total of 26.1 GWh of electrical energy savings for the year of operation, resulting in more than $1 million in savings. This is an increase in energy efficiency of 12.7% for the entire first year of operation. Advertisement formerly in this space. References 1. Ellis, B. 2012. TES for medical center. ASHRAE Journal 54(11):28. July 2013 ASHRAE Journal 33