SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS



Similar documents
SECTION WINDOW FILM. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved

SECTION METAL WALL PANELS

Selecting Energy Efficient New Windows in Florida

A. Work on this project shall consist of, but is not limited to, the following:

Selecting Energy Efficient New Windows in Texas

Selecting Energy Efficient New Windows in Georgia

Selecting Energy Efficient New Windows in Arizona

Selecting Energy Efficient Replacement Windows in Nevada

Scotchgard Multi-Layer Protective Film 1004

Selecting Energy Efficient New Windows in California

ENERGY SAVING WINDOW FILMS S LAR CONTROL

Spandrel Glass Types and Recommendations

SECTION STANDING SEAM METAL ROOFING

SECTION SERIES 1500 VINYL PATIO DOORS

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Zero peel strength of acrylic pressure sensitive adhesive is at about 45 C (-50 F).

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Technical Data Sheet. Whiteboard Film 3M WH-111. Product Description. Product Characteristics. Revision G, September 2015

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

POZZI WINDOW COMPANY LIMITED WARRANTY WINDOWS, DOORS AND COMPONENT PARTS

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC ALUMINUM WINDOWS Guide Specs

Comparative Analysis of Retrofit Window Film to Replacement with High Performance Windows

SECTION VINYL WINDOWS. A. The General Conditions, Supplementary Conditions, and Division 01 - Requirements apply.

NFRC THERMAL PERFORMANCE TEST REPORT. Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning)

Colorado State University. Durrell Center Roof Repair

Division 9. SignaFlor Pad and Pour Flooring System

SECTION GUARDA SECURITY WINDOW SCREENS

Columbia flooring will resist fading from exposure to sunlight or artificial light.

Despite spending many thousands of pounds on a beautiful new conservatory, it is a sad fact that many suffer from intolerable heat and glare problems

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Section Polished Concrete Finishing. Vexcon

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

WINDOW FILM. Buyer s Guide

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

SECTION POLISHED CONCRETE FINISHING

Application Instructions for Avery Dennison Films SF S LTR EZ RS, Conform Chrome

BENTLEY ELEMENTS COLLECTION LVT

Adhesive Transfer Tapes with Adhesive 200MP 467MP 468MP 467MPF 468MPF 7952MP 7955MP 7962MP 7965MP 9172MP 9185MP 9667MP 9668MP

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Sun Windows General Information Sun New Construction Window Installation Instructions

TEST REPORT. Rendered to: BRISTOLITE SKYLIGHTS Santa Ana, California

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

Product Guide Specification

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

SECTION PREFORMED METAL STANDING SEAM ROOFING

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

Sapa: SECTION ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

ad notam INSTALLATION GUIDE MONITOR ON GLASS MOUNTING SYSTEM (MGS) Art.No. MGS-xxxx

3-Part Specification Railing Cable Systems

WINDOW FILMS FOR ENERGY CONTROL Value in Weatherization Programs

Tundra Series Windows January 2016

FEBRUARY, UT Unitwall System 1 EC GLAZED ALUMINUM CURTAIN WALLS Guide Specs

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

Main Street. Porcelain Stone. Distinctly American. Uniquely Crossville.

SC2000 CEMENT BONDING PROCEDURES

In the Fall 2002 issue of HHE News I examined

Fiberglas, Exterior Wall Thermal Insulation

How to Build a Printed Circuit Board. Advanced Circuits Inc 2004

Residential Windows, 3 rd edition Corrected index 1

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Basement Window Installation Guide Hopper and Sliding

GigaCrete Specification PlasterMax

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Double Coated Urethane Foam Tapes

The Anatomy of a Label

Active and Passive Sash Replacement

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

Aspect Metal Peel & Stick Tile Installation Guide

Document Library TS Data Sheet M Windo-Weld Super Fast Urethane. Data Sheet. Public

AKRAPLAST Sistemi S.p.A. - I Novate Milanese (Mi) - via Cascina del Sole, 70 Tel: (+39) Fax: (+39)

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

3M Thermal Bonding Film AF42

Pilkington Reflite Handling and Processing Guidelines Solar Control

Important Information

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

Thermal Breakage Prediction

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

Architectural Concrete Masonry

City of San Diego, CWP Guidelines

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Tractor Painting Tips

White rust on galvanized and galvanized pre-painted steel. Technical Information

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Attached is one (1) copy of Addendum 1, hereby made a part of the above referenced ITB.

Acrylic Enamel Topcoat

Transcription:

PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED SECTIONS A. Section 08 41 13 Aluminum-Framed Entrances and Storefronts: Glazing system to receive solar control film. B. Section 08 63 00 Metal-Framed Skylights: Skylights to receive solar control film. C. Section 08 81 00 Glass Glazing: Glass and glazing materials to receive solar control film. 1.3 REFERENCES A. American Society for Testing and Materials (ASTM), latest edition: 1. D1044 - Standard Test Method for Resistance of Transparent Plastics to Surface Abrasion. 2. E903 Standard Test Method for Solar Absorptance, Reflectance, and Transmittance of Materials Using Integrating Spheres. 3. E308 Standard Practice for Computing the Colors of Objects by Using the CIE System. B. National Fenestration Rating Council (NFRC), latest edition: 1. 100: U-Factors; expressed as Btu/ sq. ft. x h x deg F (W/sq. m x K). 2. 200: Solar Heat Gain Coefficient. 3. 302: Optical Spectral Data Verification Program C. Optics/Window 5.2 A computer tool for Analyzing Window Thermal Performance; Lawrence Berkeley Laboratory. 1.4 ACTION SUBMITTALS A. Submit in accordance with requirements of Section 01 33 00. B. Product Data: Submit manufacturer s product data for each type of window film specified. C. Samples: Submit 12-inch square sample of each window film [and color] specified for verification purposes. 1.5 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: Submit manufacturer s maintenance data for each solar control film installed for inclusion in Operation and Maintenance Manuals.

1.6 QUALITY ASSURANCE A. Abrasion resistance test results: 1. ASTM D1044: CS10 abrasive wheels, 500 gram weight, 50 cycles, increase in haze is less than 5%. B. Mock Ups: Build mockups to verify selections made under sample submittals and to evaluate surface preparation techniques and application workmanship. 1. Construct mockups in the location and of the size indicated or, if not indicated, as directed by Architect. 2. Approved mock ups may remain as a part of the completed Work if undisturbed at time of Substantial Completion. C. Preinstallation Conference: Conduct conference at project site to discuss methods and procedures relating to the installation of solar control films. 1.7 DELIVERY, STORAGE, AND HANDLING A. Deliver solar control films to Project Site in manufacturer s unopened packaging. B. Store and protect solar control films in compliance with manufacturer's directions and as required to prevent damage to materials from condensation, temperature changes, direct exposure to sun, or other causes. 1.8 FIELD CONDITIONS A. Environmental Conditions: Do not proceed with application of solar control films when ambient and substrate temperature conditions are outside the limits permitted by film manufacturer or when substrates are wet from rain, frost, condensation, or other causes. 1.9 WARRANTY A. Manufacturer s Warranty: Manufacturer s standard limited warranty in which manufacturer agrees to repair or replace materials that do not comply with requirements or fail in materials or workmanship within the specified warranty period. 1. Warranty Period: 10 Year (Interior Film applications) Limited Warranty against cracking, peeling, bubbling, delamination, or demetallization when properly installed and maintained on suitable substrates. B. Installer s Warranty: Installer's standard form in which installer agrees to repair or replace solar control films that do not comply with requirements or fail in workmanship within the specified warranty period and shall be included with the contract for installation. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: Johnson Laminating & Coating Inc.; 20701 Annalee, Carson, CA 90746; (310) 635-4929; www.johnsonlaminating.com. B. Substitutions: Not allowed.

2.2 DESCRIPTION A. Scenic View: Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control, with an abrasion resistant coating on one side and a mounting adhesive on the other. 1. Uniformity: No noticeable visual defects, such as pinholes, streaks, thin spots, scratches, or banding In accordance with the IWFA visual acceptance standard, after installation. 2. Variation in Solar Specifications across Width: +/- 3 % average at any portion of the length. 3. Thickness: Nominal 1.5 mils (38 microns) with no evidence of coating voids, after the removal of the release liner. 4. Identification: Labeled in accordance with manufacturer s specifications. 2.3 INTERIOR FILM PERFORMANCE CRITERIA A. General: Solar specifications represent film mounted to 1/8 inch (3mm) clear glass, unless noted otherwise. B. Scenic View SV 10: Capacities in accordance with ASTM E903: 1. Film Appearance: Silver. 2. Visible Light Transmission: 8%. 3. Solar Energy Rejected/Heat Reduction: 82%. 4. Visible Light Reflectance (Exterior): 58%. 5. Visible Light Reflectance (Interior): 25%. 6. Shading Coefficient: 0.21. 7. Solar Heat Gain Coefficient: 0.18. 8. U Factor: NFRC; 1.06. 9. Solar Energy Absorption: 40%. 10. Solar Transmission: 6%. 11. Solar Reflectance: 53%. 12. UV Rejection: 99%. 13. Glare Reduction: 91%. 14. NFRC Certification Number: JLC-K-024. PART 3 EXECUTION 3.1 EXAMINATION A. Examine glazing system for upgrade viability prior to installation of window film. B. Verify satisfactory glass quality, sufficient edge bite and spacing, and elasticity of gasket material. Glass substrate should be free of defects, imperfections or damage of any kind including broken, chipped, cracked, or abraded areas. C. Verify frame and gasket are of satisfactory condition so as to not interfere with installation or typical thermal expansion and contraction of glazing system. D. Any unsatisfactory conditions must be corrected prior to proceeding with installation.

3.2 PREPARATION A. Comply with manufacturer s instructions for recommended surface preparation, cleaning and protection of the entire fenestration system. B. Prior to installation, clean glass thoroughly. Use mounting solution (recommended content: one capful of baby shampoo to 1 gallon of water) along with tools such as; squeegees, scrub pads, lint free towels and scrapers to ensure the glass surface is clean and smooth. 1. Ensure surface is free of any decals, debris, and dirt. 2. Clean frames and gasket material with towels and solution. 3. Use a final spray and squeegee cleaning to control dust as needed. C. Protect window frames and adjacent surfaces to prevent damage from water used during cleaning and installation. Use towels, tape, drop cloths and any other means recommended by manufacturers of adjacent materials to protect floors, walls and frames. 3.3 SOLAR CONTROL FILM APPLICATION A. Install window film in accordance with manufacturer's instructions. B. Thoroughly clean and dry glazing system. C. Cut film neatly and square to a slightly larger size than the exposed glass area. D. Remove release liner and spray both adhesive and glass surface with mounting solution to permit positioning on glass. Place film with adhesive side on glass, ensuring entire glass surface is covered. E. Spray outside surface with solution and squeegee film into place working from the center outward and from the top down, stopping a few inches from the edges. F. Trim film to align with edges of exposed glazing, leaving approximately 1/16 to 1/8 gap from the edge of the film to the gasketing of the window system to permit edge lay down. Use sharp blades recommended for this purpose. Replace blade after approximately 4 cuts. G. Repeat spraying and squeegee procedure, vigorously moving water from center to right and left edges working from top down to bottom. H. Bump edges by applying firm pressure to force water out the edge using a hard card wrapped with a paper towel to ensure anchorage of the film edges. I. Once installation is complete, clean work area thoroughly. J. While some water may remain between the film and glass surface for up to 30 days, excessive amounts must be addressed immediately according to manufacturer s instructions.

3.4 SITE QUALITY CONTROL A. After installation and dry out period, film shall meet the IWFA visual acceptance standard. In general, the film shall appear uniform and unobtrusive when viewed from 10 feet. The film shall be free of physical defects such as wrinkles, creases, cuts or pinholes. The edges shall be consistent and appropriately distanced from frame. B. If installed film does not meet visual acceptance standard criteria, remove and replace with new film. 3.5 CLEANING A. Window film may be cleaned with standard household glass cleaners following the 30 day dry out period. Do not use abrasives or chemicals not specifically intended for glass. The soap based mounting solution described above is recommended. 1. Soft cloths or synthetic sponges are recommended; use a squeegee for removing the solution. B Construction Waste Management: Manage construction waste in accordance with provisions of Division 1 Section Construction Waste Management. C. Replace damaged solar control film before Substantial Completion. END OF SECTION 2013 Johnson Laminating and Coating Inc. All Rights Reserved. A copyright license to reproduce this specification is hereby granted to non-manufacturing engineers, architects and specification writers.