Specifications for Cold Room Solutions, Inc. Walk-In Cold Rooms. Cold Room Specifications SECTION I GENERAL



Similar documents
SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

SECTION MORTUARY REFRIGERATORS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Refrigeration Installation 101

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION HEAT PUMPS

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

How To Make A House Safe

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Nominal Life Expectancy for Building Components

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MRI RF SHIELDING DESIGN

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Excerpts from the Canadian National Building Code (NBC)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

Acumen Enterprises, Inc.

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

Print Shop/Mail Room

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

Scope: Communications and Electronic Systems addressed in this section include:

Inspecting to a higher standard.

Packaged Terminal Air Conditioner Wall Sleeve Installation

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

SECTION STANDING SEAM METAL ROOFING

EcoTouch Insulation with PureFiber Technology

Utility Distribution Systems

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Solar Panel Installations

CLEAR-DIVISIONS CENTERFOLD

Electrical Wiring Technical Bulletin

Wastewater Capital Projects Management Standard Construction Specification

B. Related Sections: 1. Section Raceway and Boxes for Electrical Systems.

SECTION PREFORMED METAL STANDING SEAM ROOFING

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Preformed Metal Roofing and Siding

Pre-Drywall Inspection Report

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

HomeSpec REPORT SUMMARY

CONDENSATION IN REFRIDGERATED BUILDINGS

The City of Basehor, Kansas

SECTION AIR CONDITIONING UNIT

Bold items are particular to the City of Euless

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

CLEAR-DIVISIONS APERTO

CLEAR-DIVISIONS VARIOFOLD

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Security Systems Intrusion Alarm

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Fire Pump Plan Review March 2010

Vision Home Inspection

TABLE 1. Rugged cast aluminum alloy casing,celcon waterways with nichrome parts White (unless stainless steel housing)

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

PDmB, Inc. Definitions

City of Oviedo Commercial Shell Building Permit Application Guidelines

City of San Diego, CWP Guidelines

DESIGN CLARIFICATION (DC)

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

WHEN IS A PERMIT REQUIRED?

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

October 5, 2015 Dear Client,

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

2. What building projects are exempted? (permit not required)

Transcription:

STION I GNRAL Specifications for old Room Solutions, Inc. 1.01 STION INLUS A urnish and install walk-in cold rooms. Include all insulated walls, ceilings, doors, mechanical refrigeration systems, controls, gages, internal lighting, and other ancillary items required for a completely fabricated and operational walk-in. 1.02 RLAT OUMNTS A Related work specified elsewhere: The following work is not included as part of this Section and is to be performed by the designated trades: 1. Roofing: Sleepers or curbs for remotely located equipment and all related roofing and flashing work. 2. Insulation: Sprayed-on under floor insulation applied to building deck below each cold room (if insulated floor panels are not specified). 3. Laboratory quipment: Such as fume hoods, workbenches and casework. 4. looring: loor covering in each cold room to be provided by the looring contractor. 5. Plumbing: Open drain lines to within two feet of each walk-in. Rough-ins for floor sinks, plumbing, drains and water piping for mechanical systems. 6. Mechanical: All ducting to and from the building system to each cold room for proper ventilation. Water supply and return lines to each water cooled condenser (if water cooled units are specified), including isolation valves. Proper supply and return air to each air cooled condensing unit (if air cooled units are specified and located inside the building) to maintain ambient conditions of less than 90. 7. ire Sprinklers: ry sprinkler suppression system inside each walk-in. 8. lectrical: Appropriate number of electrical circuits (quantity and size to be confirmed) brought to a pull box located above each cold room and to each condensing unit. A fused disconnect must be provided for each condensing unit. 1.03 SYSTM SRIPTION A Maintain cold room temperature of +5 ±2. Humidity control will/will not be required. If required, give RH set point and acceptable variance (standard is 60% ±10%). 1.04 SUMITTALS A Submit five (5) copies to be retained and distributed by the Owner, Architect and/or Owners Representative. Submit complete materials list, including catalog data of all materials, equipment, and products for Work in this Section. Include refrigeration calculations and electrical requirements. Submit complete shop fabrication and installation drawings, including plans, elevations, sections, and details. rawings shall be in the form of reproducible or photocopies and not to exceed 11 inches x 17 inches is size. Submit detailed anchorage and attachment drawings and calculations provided by a licensed engineer. Rooms shall be designed and constructed to meet the requirements for the seismic zone appropriate for the area in which construction is taking place. Page 1 of 6 03/07/11

Specifications for old Room Solutions, Inc. Submit record As-uilt drawings. Submit complete operating and maintenance manuals that describe proper operating procedures, maintenance and replacement parts. 1.05 QUALITY ASSURAN A Walk-in supplier shall have a minimum of ten (10) years of documented experience and be an established organization and production facility specializing in this type of equipment. Supplier shall have the demonstrated ability to produce the specified equipment of the required quality and the proven capacity to complete an installation of this size and type within the required time limits. Use all means necessary to protect Work of this Section before, during, and after installation. 1.06 OORINATION A Work in this Section requires close coordination with Work in lectrical, Mechanical, ire Sprinkler and Architectural Sections. oordinate all Work to assure an orderly progress in the project. Walk-in supplier has full responsibility to provide structural backing for all wall mounted shelving, furnishings and equipment as shown. Walk-in supplier has full responsibility for the following: 1 Making openings for service penetrations to and from the walk-in. 2 Properly sealing all service penetration into the walk-in with silicone. 3 ield check all dimensions and make any adjustments in the walk-in size for a proper fit. 1.07 XTN GUARANT A Walk-in supplier shall provide a written guarantee of ten (10) years that the insulated structure shall be free of defects in material and workmanship and that it will not deteriorate excessively or otherwise fail to perform. Walk-in supplier shall provide a written guarantee of five (5) years for each compressor. STION II PROUTS 2.01 APTAL MANUATURRS A old Room Solutions (925) 462-2500 3942 Valley Ave., Ste. L Pleasanton, A 94566 All products specified in this section shall be provided by a single manufacturer. Page 2 of 6 03/07/11

Specifications for old Room Solutions, Inc. 2.02 INSULAT ROOMS A Wall and ceiling panels. 1 Insulated panels shall be minimum 4 thick, be of modular construction incorporating wall and ceiling panels and be of woodless type construction. Panels shall consist of insulation sandwiched between interior and exterior metal skin. Panel edges to have tongues and grooves that cam-lock together assuring an air tight vapor proof joint. onstruction shall allow disassembly for possible relocation or expansion at a later date. 2 All panel insulation shall be lass 1 foamed-in-place 2.2 lb. density polyurethane foam insulation expanded with Ozone Safe 245a and UL certified as having a flame spread rating of 25 or less and smoke density no greater than 450 per ASTM 84. M 4880 compliant panels available upon request. 3 The sheet metal finish will be: a. Interior surface = 26 GA stucco embossed galvanized steel with a baked polyester white finish. b. xposed exterior surfaces = 26 GA stucco embossed galvanized steel with a baked polyester white finish. c. Unexposed surfaces = 26 GA stucco embossed mill galvanized steel. d. Other finishes available upon request. elete line d if above finished are acceptable. G H oor construction. 1 oor construction shall match the insulated panels. ach entrance to have a clear opening of 36 wide by 78 H. oors shall be flush mounted, in-fitting and have a replaceable magnetic gasket on three sides and a neoprene adjustable gasket at the sill. oor hardware shall include three (3) Kason #1248 hinges, Kason #1094 door closer and a Kason #K-77/487 latch/release. In addition, each door shall be equipped with a 14 x 14 heated viewing window. loor panels. 1 old rooms not located on a concrete slab-on-grade will require sprayed-on insulation applied to the underside of the building deck below each cold room or insulated floor panels. If insulated floor panel are to be provided, the floor panels shall be capable of withstanding loads of up to 500 PS. Wearing surface to be 18 GA type 304 #4 stainless steel over ½ non-wood underlayment. An AA compliant transition ramp to be built into the insulated floor panel at each door. When insulated floor panels are not specified or required, the wall sections shall be built with cam-locks to secure to a 3 high seismic anchoring screed. If ceiling supports are required to support the insulated ceiling panels, steel support system is to be external to the room with no visible connections from the interior. losure panel trim of the same material and finish as adjacent panels shall be provided to close openings between insulated panels and building walls. Seal all joints, openings, piping, electrical and ductwork penetrations (regardless of trade). Seal both sides of penetrations (if possible) and inside electrical conduit once wires have been pulled. All construction to be NS labeled. Page 3 of 6 03/07/11

Specifications for old Room Solutions, Inc. 2.03 ONTROLS A ach walk-in is to be provided with a control panel consisting of the following components: 1 Painted steel enclosure meeting NMA 4 & 12 ratings. 2 Allen-radley Micrologix series programmable controller including analog temperature input & thernet adapter. 3 More A7-T8 8 color touchscreen including room temperature display, temperature setting adjustment, alarm setting adjustment, alarm monitoring, alarm logging and temperature logging to a US drive. 4 Alarm contacts for remote monitoring. 5 100Ω RT temperature sensor(s). 6 Humidity controls if required (Architect to confirm) 7 Note: To meet the A 21 R part 11 requirements a remote data logging system is required. Please contact the factory for information if this will be required. If refrigeration redundancy is called for, include a lead-lag controller capable of automatically switching the refrigeration systems on a daily basis and should an alarm condition occur, the stand-by system should automatically come online to maintain a constant temperature. 2.04 LIGHTING A Provide 4 2-tube fluorescent light fixtures suitable for the environment in each cold room. allasts to be T5HO with low temperature rating. A minimum light level of 60 c as measured 40 A is to be provided. ach door section shall include an interior and exterior light switch. The interior light switch to have a constant burning pilot light and the exterior switch to have an indicating pilot light. 2.05 RRIGRATION SYSTM A General the refrigeration system shall use refrigerants acceptable to the Authority having jurisdiction. Utilize R-404A refrigerant, or approved equal. No type refrigerants will be acceptable. All refrigeration piping required shall be furnished and installed by the walk-in manufacturer. All refrigeration line joints shall be brazed with Stay-Silv 15 brazing alloy. All piping shall be pressure leak tested and witnessed by the Owner. ondensing units and evaporator coils to be from the same manufacturer and be UL listed. ondensing units must be of adequate capacity to achieve and maintain the individual room operating temperature requirements and must be sized to handle additional loads appropriate for the application. Units to be complete in all respects including high/low pressure control, receiver, sight glass, liquid line drier, expansion valve and all other necessary equipment to achieve the cited performance. Units to be air-cooled and located per the drawings. (Architect to confirm) All inter-connecting piping between the evaporator coils and condensing units shall be installed under the section. Refrigeration lines shall be insulated to prevent any condensation. Insulation exposed to the weather must have additional protection from the elements. Where piping passes through floor slabs, core drill slab and install pipe sleeves. Provide firestopping Page 4 of 6 03/07/11

Specifications for old Room Solutions, Inc. at penetrations to achieve the specified fire rating. All hangers to support tubing to meet local codes and conditions. Provide seismic bracing if required. Space hangers appropriately for the smallest diameter line. G ondensate drain line to be run in copper tubing to nearest floor sink. To prevent condensation, drain line is to be insulated where it exits the insulated panels. H Pressurize and leak test the entire refrigeration system. 2.06 LTRIAL A All electrical components utilized within each walk-in shall be UL listed. Work performed under ivision 16 shall provide the appropriate circuits to each condensing unit and a pull box located above each cold room. All interconnecting and control wiring to be by walk-in supplier. A fused disconnect is to be provided at each condensing unit by IV 16. xposed conduit inside the cold room shall be kept to a very minimum. Verify placement of all exposed piping and conduit with the Owner s Representative prior to installation. Wiring to be THHN or THWN conductors and MT conduit. To minimize penetrations, all electrical circuits shall enter the room via a minimum number of conduits, preferably one. The conduit through the wall or roof and all conduit inside the walkins shall be PV. A seal-off fitting rouse-hinds type or ZS or equal shall be placed immediately outside the room and properly sealed. Receptacles: 1. Where receptacles/data outlets are shown on Plans, provide arlon PV type junction boxes recessed in the insulated panels with ¾ PV conduit stubbed up through the top of the insulated ceiling panels. 2. Provide wire and connection to GI receptacles. oordinate height of receptacles with Architect. 3. There shall be no more than four (4) receptacles on any given circuit. 4. ata receptacles, cabling and wall plates to be provided by others. 5. Provide a recessed junction box as required for the building fire alarm system. 2.07 PLUMING A The walk-in supplier shall install a condensate drain line from each evaporator coil to drain located outside the walk-in. inal connection of condensate drain line to waste system by ivision 15. STION III XUTION 3.01 SIT ONITIONS A Prior to installation of walk-ins, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this installation may properly commence. Verify the work can be installed in strict accordance with all pertinent codes and regulations, the original design, approved submittals, and manufacturer s recommendations. Page 5 of 6 03/07/11

Specifications for old Room Solutions, Inc. In the event of a discrepancy, immediately notify the Architect in writing. 3.02 INSTALLATION A Install all cold rooms in accordance with manufacturer s written instructions and reviewed shop drawings. Install sheet metal closure trim that matches insulated panel finish between all building walls and insulated panels. Verify placement of all exposed piping and conduit with the Owner s Representative prior to installation. Install interconnecting accessories in accordance with the manufacturer s written recommendations and located for ease of servicing. Provide piping in accordance with good engineering practice. Suction line insulation shall be sized and installed to prevent condensation. Provide individual traps for condensate drains. G Test all equipment operation and performance of each walk-in. Make all adjustments and repairs as required. H lean all rooms inside and out, including the roof of each walk-in. Remove all debris and marks. Page 6 of 6 03/07/11