ORDIC FIBERGLASS, INC. Wind Farm Products



Similar documents
CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions

In-Ground Basketball System Owners Manual

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Underground Service Requirements and Instructions

Merrimac Municipal Light Department. Residential Developments Policy

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

Fiberstars Lighted Laminar Flow Fountain Installation Manual

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

1 Town of Lyons Electrical Distribution System Design Standards

Section A. GENERAL INFORMATION

Owner's Manual & Assembly Instructions

Chapter 10 - Scaffolding Systems

Rack installation instructions

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

International Greenhouse Company

SKT-SP Tangent Terminal

POLE MOUNT SYSTEM-3 INSTALLATION

POLE MOUNT SYSTEM EX-3 INSTALLATION

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

Fiberstars Mini Lighted Laminar Flow Fountains

2100 AD Mirror Elevator Ball Nut Replacement Procedure

SLACK PERFORMANCE KARTS

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND

Cabinets 101: Configuring A Network Or Server Cabinet

Gas Meter Clearances and Service Installation Requirements

CABINET OPTIONS AND DESIGNATORS

Remote Head REMO ONE. Code Manual

EZ-48-3AB Weather Station Mounting Tripod and Mast

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Hollow or Cinder Block Wall Mount Job Aid

I BEAM TRACK INSTALLATION

Stainless Steel and Mild Steel Enclosures. Stainless Steel and Mild Steel Enclosures

Hydraulic Excavators

Installation Instructions

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

AZEK Rail Install Guide

ITS specification Jointing chambers and pull pits (ITS-02-02)

SECTION 22 LIGHTNING PROTECTION SYSTEM

RadianceRail Installation Guide

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

AERIAL FIBER OPTIC CABLE PLACEMENT

OWNER S MANUAL Table Tennis Table Patent Pending

KIRÁLY TRADING KFT H-1151 Budapest Mogyoród útja tel: Clamps Clamping devices

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

Lathe Milling Attachment

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

MODEL 2400 RAISED BED PLASTIC MULCH LAYER OPERATING MANUAL

Owner's Manual & Assembly Instructions

INSTALLATION INSTRUCTIONS FOR VW MK5

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Best/Flex Roller Expandable Conveyor

FTC DIY Mountain Build Guide

CETAC Z-Drive Assembly

Dismantling and Reassembly Guide

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

F-Series Camera Mounting Accessories

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

INSTALLATION INSTRUCTIONS

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp and 1250 Amp

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction

Solstice/Sky Water Pump Replacement

INSTALLATION INSTRUCTIONS

SMarT_Foundation [Simple Modular Technology] Assembly and Installation Instructions (U.S. Patent Pending)

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

TERMINATION ENCLOSURE OPTIONS

MESA SOLE Outdoor Electronic Enclosure

Section 21. Telecommunication Hardware. BuyLog Catalog 21-1

Specifications for Residential Property Owners Connection to New Public Sewer

HYDRAULIC TABLE CART 500-LB.

K17.12 Door closers K17. Doors

Wall braces with a swivel head are included to accommodate all roof pitches.

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Summary of ET Plus Guardrail End Treatment Inspections

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

Mounting Tripod Kit Installation Manual

TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities

Rack Installation Instructions

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

Owner's Manual & Assembly Instructions

Pole Lathe and Shave Horse Design

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

DLC:GH B6CJ6A HJEEA:B:CI

Front axle components, overview

Multi-Pitch Pitching Machine USER MANUAL

Ceiling Mounted Folding Attic Ladders Installation Instructions

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Transcription:

Wind Farm Products

Box Pad Solutions Nordic leads the way with the first chuted fiberglass box pad. This unique design enables workers to fit the chute against the tower s base cable opening. Underground cables from the tower are protected by the box pad all the way to the pad-mount transformer. Nordic s standard RT (reinforced top) box pads support thee phase grounding transformers. Nordic has been manufacturing RT box pads for over 25 years. Two chuted box pads provide the solution for connecting a transformer with another piece of equipment. Both box pads have chutes for underground cable to run from the tower to the pad mount equipment. By having each piece of equipment in-line, underground cables could be pre-cut to length and terminated with elbows. These chuted box pads supported over 15,000 lbs. of weight. They also offered cable training. The box pad s deep and wide cavity allowed cables to be looped around the inside of the perimeter of the box pad. In case of an elbow failure, the extra cable can be used to attach a new elbow. Page 2

Box Pad Testing Nordic Fiberglass conducted a topload weight test by using two steel tubes placed parallel to the 2x6 supports. A total of 24,649 lbs. of plates including the two steel tubes was placed on the GS-82-81-36RTC1- MG-66x30 from October 28, 2008 through February 24, 2009 (see diagram1). Nordic used the Mitutoyo brand measuring device with MeasurLink software forrecording the deflection at the points below.(see diagram 2) Deflection Results, 2/24/09: Point 1: 0.061 Point 2: -0.065 Point 3: -0.022 Point 4: 0.213 Point 5: 0.499 Point 6: 0.465 Point 7: 0.142 Point 8: 0.165 Point 9: 0.232 Steel Tubes Diagram 1. Steel Tubes The deflection results after the 24,649 lbs. was removed 2/25/09: Point 1: 0.014 Point 2: -0.098 Point 3: -0.044 Point 4: 0.061 Point 5: 0.112 Point 6: 0.174 Point 7: 0.041 Point 8: 0.033 Point 9: 0.078 9 8 7 6 5 4 1 2 3 Diagram 2 Page 3

Box Pad Installation 1. Measure the bottom width and depth of the box pad flanges. 2. Measure down 6 below the top surface and mark that spot. 3. Then measure from that spot to the bottom of the box pad, that is the maximum burial depth. 4. Dig a hole approximately 6 deeper than the maximum burial depth and 12 wider than the bottom flange dimensions of the box pad. 5. Add 6 of gravel to the bottom of the hole, machine tamp and level it. 6. Place the box pad on the leveled gravel bed. 7. Using a level, ensure that the top surface is level. If not level, add or remove gravel, re-tamp and level again. 8. Back-fill with loose earth material. 9. Do not back-fill with chunks of frozen material or large rocks next to the ground sleeve. 10. Pack the back-fill material by foot tamping, no machine tamping. Page 4

Box Pad /Uni-strut Installation Guidelines: 1. Attach cable straps to the 4 eyebolts located at the 4 corners of the box pad. Figures 1 2. Lift the entire box pad off the ground. 3. Attach the 4 uni-strut plates to each corner of the box pad, using the pre-drilled holes. (See Figures 1) 4. Slide the uni-strut over the uni-strut plate as far as allowed. Two short uni-strut channels towards the tower side and two longer uni-strut channels away from the tower. Tighten the nuts. Do this to all four corner uni-strut assemblies. (See Figures 1) Figures 2 5. Move the box pad to the foundation and line up the box pad s chute near the opening of the tower. Adjust the height of the box pad until the top of the box pad is level to the top of the tower pedestal. (See Figures 2) 6. Level the entire box pad. Loosen the uni-strut bolts allowing the uni-struts to drop and contact the tower foundation. When level, tighten the nuts. 7. After the box pad is level, attach the box pad chute to the tower s pedestal using the two pre-drilled holes in the chute flange. Figure 3 8. Backfill and compact the entire foundation, leaving a trench around the box pad. (See Figure 3) 9. Proceed with pouring a cement slurry around the box pad. Covering 3 above the base flange on the inside and outside of the box pad. (See Figure 4) Front section view of box pad Tower Pedestal Top Surface Slurry Mix is poured 3 to 4 over the box pad s outside fl anges and inside the box pad. Tower Pedestal Apron Conduit Holes Backfi ll 10. When the slurry has cured, backfill around the box pad, so the final grade is about 4-6 inches below the top surface. Hydraulic tamping is not recommended. (See Figures 4) Figures 4 Page 5

Cabinet Solutions Nordic sectionalizing cabinets are the junction point solution for collection systems. Each cabinet is part of the daisy chain solution from the towers to the substation. Nordic s 600Amp cabinets will accommodate up to 3; 2, 3 or 4-point 35kV 600A Elastimold or Cooper dead-break junctions with U-straps. 18 or 36 extensions are available for extra depth for large cable bends for todays underground cable requirements. Uni-strut channel for cable clamping are designed to hold cables upright for less elbow fatigue. ND-6830 rotational lid rotates on pivot bolts creating a lower center of gravity that reduces the force required to open the cabinet. ND-450 cabinet has a stainless steel hinge and two cam arms to lock the lid in place. Both cabinets allow for spacious cable training. In case of a elbow failure, extra cable slack can be used to attach a new elbow. Copper grounding systems available. Installed ND-683054 cabinet ND-683054-MG-PA71-43564-B3B 43564 Page 6 ND-450-MG-10135-43564-W3E 43 with 18 High Extenion

Cabinet Installation All Nordic Fiberglass cabinets and extensions are shipped separately. Bolt cabinet to extension before installation begins. (If using the 36 high extension, make sure the treated 4x4 is installed) 1. Measure the bottom width and depth of the extension fl anges. 2. Measure 10 down from the top of the cabinet locking system, mark that spot. 3. Then measure from that spot on the cabinet to the bottom of the attached extension, that s the maximum burial depth. 4. Dig a hole approximately 6 deeper than the maximum burial depth and 12 wider than the bottom fl ange dimensions of the extension. 5. Add 6 of gravel to the bottom of the hole, machine tamp and level it. 6. Close the cabinet lid and tighten the penta-head bolt(s). 7. Hook-up lifting slings to the cabinet s 4 eyebolts. 8. Lower the cabinet & extension into the hole. 9. Using a level, ensure that the cabinet is level. If not level, add or remove gravel, re-tamp and level again. 10. Backfi ll with loose dirt, no chunks of dirt or rocks, no machine tamping. 11. Finish grade approximately 6 below locking system. 12. Unscrew the penta-head bolts and open the lid. ND-450-MG-10135-43564-B3B shown installed with the ND-450-MG-18EXT, 18 high extension. Extensions allows for cables that need a greater bending radius. Also availabe is a 36 high extension called the ND-450-MG- 36EXT. For the ND-683054 cabinet, an 18 high extension is available called the ND-683054-MG-18EXT, for the 36 high unit, it s called the ND-683054-36EXT. Be sure to ask about cable support brackets for both cabinets since the weight of the hanging cable pulls down on the junction and elbow causing fatigue. Page 7

Cross Bonding Enclosures Nordic s ND-130-MG-ZHP003-X-X fi berglass cabinet for cross bonding cable applications. Three installed surge arrestors provide stable electrical fl ow by protecting against over current situations. MPP-141480-MG-CB is an 80 high plastic pedestal with accommodations for three arrestors. Splice Cabinets One of the newest Nordic innovations is the ND-362436-MG-TBS-X-X cabinet for cable splices (pictured to the right inset). Customer supplied cable clamps on a strut assembly hold the cables in place for a secure splice. Up to three splices can be made in this enclosure. Extensions are available. For numerous splices, check our ND-683054-MG-X-X-X and the ND-450-MG-X-X-X. Hand Holes & Above Grade Pedestals For fi ber optic splices ND-683054-MG-X-X-X ND-450-MG-X-X-X PHH-212115-MG PSP-151530-MG-L6350 PSPX-151530-MG Page 8