Biomass & Waste Co-firing Experience at Vattenfall



Similar documents
Clean coal from a Vattenfall perspective

Stora Enso Fors Ltd Sweden

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

Integrating renewable energy sources and thermal storage

How To Run A Power Plant In Celje

Use of Substitute Fuels in Large Combustion Plants (LCPs)

Good Practice Form

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Waste to Energy in Düsseldorf. for a clean city.

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Bioenergy. A sustainable energy source.

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

Weiss A/S Presentation. by Bo Johansen

Well Positioned for the Future

Experience with co-combustion of biomass and waste in coal-fired power plants

A Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: Internet: office@polytechnik.at

Rauhalahti Biomass CHP Plant

Kymijärvi - Lahden Lämpövoima Oy Finland

M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN Lahti Finland Tel matti.kivela@lahtienergia.

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid

Biomass co-firing and full conversion

BIOMASS RESEARCH at ECN. Bram van der Drift

How To Build A Swebo Biotherm

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin,

Energy Efficiency and Renewable Energy Sources in Sweden

Low grade thermal energy sources and uses from the process industry in the UK

of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C

Role of Northern European forestry in the energy production chain, case Fortum. Jari Nylén Purchasing Manager Fortum Power and Heat Oy, HEAT

A Review of Biomass Boiler Technologies. Fernando Preto CanmetENERGY, Natural Resources Canada

SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013

Alternative fuels in cement manufacturing

Ligentoplant - The biomass cogeneration. Ligento green power GmbH

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri

Cofiring of biomass in coal-fired power plants European experience Dr Colin Henderson IEA Clean Coal Centre

R&D in Vattenfall Johan Söderbom

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

New Bio Solutions. DONG Energy. Pyroneer November May 2013

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation

Fortum Otso -bioliquid

Switch from gas to biomass in district heating Case Jelgava, Latvia. Kristian Rehnström, 25 February 2015

ENA Kraft, Enköping Sweden

University of Iowa Power Plant

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

Efficiency on a large scale CFB Steam Boilers

State of the art of solid biomass technologies in Germany

Wood Pellets for Power and Heat. Gordon Murray, Executive Director

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

1.3 Properties of Coal

Supporting healthy and reliable energysolutionsforvietnam!

Electric Utilities. Introduction to the module

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

Sewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results

Coal ash utilisation over the world and in Europe


Environment Impact Assessment of Thermal Power Plant for Sustainable Development

CO2 enhanced coal gasification and BlueCoal new Clean Coal Technologies proposals from Poland

Heating technology mix in a future German energy system dominated by renewables

Gasification as means of Waste-to-Energy - Main Parameters and application -

A"Local"Authority"Biomass"Supply"Chain;" experiences"in"north"lanarkshire"and" Stockport" November"2013"

PRE-QUALIFICATION ANNOUNCEMENT

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Biomass Supply Chains in South Hampshire

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

ENERGY EFFICIENCY IN POWER PLANTS

Torrefaction: technology overview and development status

Country Report, SWEDEN

European standardization of Solid Recovered Fuels

KUHMO: the perfect example of local bioenergy production

Layout Planning of Waste-to-Energy Plants

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

Lessons learnt from the use of solid biom ass in Germ any -

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

Aurinkolämpömarkkinat Skandinaviassa ATY Aurinkoseminaari Jari Varjotie, CEO

Waste to Energy. Anders Damgaard. Thanks to Jiri Hyks and Thomas H Christensen DTU for some slides

Alstom Development of Oxyfuel PC and CFB Power Plants

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

UPM THE BIOFORE COMPANY

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Metsä Fibre s Bioproduct mill

Study tour in two cement plants, Enci and Lixhe and one sewage sludge treatment plant, Waterschapsbedrijf Limburg

Analysis of the EU Renewable Directive by a TIMES-Norway

Methodology CO 2 -tool for electricity, gas and heat from biomass

Financing New Coal-Fired Power Plants

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

Transcription:

Society of Thermal Engineers of Serbia POWER PLANTS 2012 International Conference Zlatibor, Serbia October 30 November 02, 2012 Biomass & Waste Co-firing Experience at Vattenfall Dr.-Eng. Daniel Seibt Head of Power Plant Engineering Ronald Rost Head of Sales Vattenfall Europe PowerConsult GmbH, Vetschau, Germany

Introduction

Vattenfall Group Organisation involved Business Units Board of Directors Chief Executive Officer Staff functions Chief Financial Officer Business Division Asset Development Business Division Production Business Division Asset Optimisation and Trading Business Division Distribution and Sales Business Division Renewables R&D Projects Lignite Asset Optimisation Continental Customer Service Onshore Wind Development Engineering Nuclear Asset Optimisation Nordic Sales B2C Offshore Wind Development Thermal Projects Hydro Trading Sales B2B Generation Wind Nuclear and Hydro Projects Thermal Operations Heat Biomass Project Governance & Improvement Distribution Energy related services Shared Services 3 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Vattenfall Engineering Key Facts Approx. 1,000 employees Turnover: 154 MEUR Technical, management and environmental engineering and consulting services for the energy sector Active all over the world with focus on Europe Providing services through: Vattenfall Europe PowerConsult GmbH, Germany Vattenfall Europe PowerConsult East d.o.o., Serbia 4 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass use at Vattenfall

Biomass at Vattenfall has a long history of working with biomass in producing heat and electricity and plans to increase co-firing of biomass in coal power plants to reduce fossil emissions of CO 2. Vattenfall has currently more than 40 heat and power plants fuelled in full or in part by biomass. uses more than 3 million tonnes of biomass per year, an amount that is steadily increasing. intends to allocate significant resources and efforts to build a substantial, highly reliable and sustainable biomass supply chain. is one of the world s leading companies in the sector. 6 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass Plants of Vattenfall (existing and planned) Heinola Kärsämäki Laukaa Myllykoski (Vamy Oy) Pulkkila Puulaakso CHP Uurainen Vanaja (Hämeenlinna) Aschersleben Boxberg Jänschwalde Lippendorf Moabit MVB MVR Reuter C Rüdersdorf Schwarze Pumpe Sellessen T.A. Lauta Tiefstack VERA Märkisches Viertel Klingenberg Buggenum Hemweg Lelystad Amagerværket Fynsværket Askersund Båtsmannen Bollmora Ekobacken Fagersta Fisksätra Götene Grängesberg Gustavsberg Haparanda Hästhagen Hemse Idbäcken Nyköping Johannisberg Jordbro Kalix Klinte Knivsta Kvarnberget Ludvika Mölnvik Motala Munksund Överkalix Övertorneå Skavsta Slite Storvreta Uppsala CHP/waste plant Vänersborgs fjärrvärme Värmdö marknadsplats 7 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass Importance of Sustainability Importance of Sustainability for Biomass Market Development - Vattenfall s Strategy Investment in low-emitting energy Biomass plays an important role in Vattenfall s ambition on renewable energy, especially within the next 10 years Biomass co-firing quickly reduces fossil CO 2 emissions by substituting hard coal Biomass growth plan Need to secure long term supply of biomass in large volumes, develop a sustainable supply chain The biomass growth plan will five-fold Vattenfall s use of energy biomass by 2015 and will ten-fold by 2020 Biomass portfolio Vattenfall will build a biomass portfolio with a mix of sourcing agreements, sourcing contracts and upstream investments Vattenfall is evaluating and negotiating supply agreements and partnerships in following regions Europe, North-America, Africa, Russia Biomass is a cornerstone of Vattenfall's strategy for near term CO 2 reduction efforts 9 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass traditional product large future market Biomass seen as a Fuel Development over Time Wood chips (residues) Wood chips (logs) White pellets/ briquettes Black pellets/ Briquettes Steam explosion Torrefaction Carbonization R&D stage Fuel Development today 10 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Vattenfall Experiences in Biomass Co-Firing CHP Station Zeran, Poland 350 MW e / 1561 MW th Fuels: hard coal, wood chips, agric. residues, operated by Vattenfall Heat Poland CHP Station Amagervaerket, Denmark 438 MW e / 1203 GWh th Fuels: hard coal, biomass, operated by Vattenfall Heat Nordic CHP Station Fynsvaerket, Denmark 656 MW e / 2139 GWh th Fuels: hard coal, biomass, operated by Vattenfall Heat Nordic CHP Station Uppsala, Sweden 200 MW e / 1500 GWh th Fuels: peat, biomass, waste, oil; operated by Vattenfall Heat Nordic CHP Station Reuter, Germany 153 MW e Fuels: hard coal, wood chips; operated by Vattenfall Europe Heat 11 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass Co-firing CHP Moabit

Project Motivation Climate protection agreement between the city state of Berlin and Vattenfall, signed on 8 October 2009 Agreement about sustainable procurement of wood was signed on 15 th April 2011 Moabit s Wood Co-Firing impact on the commitment is shown in the chart below: Forecast of Vattenfall s CO2 emissions in Berlin ~ 1.2 mln t CO 2 current forecast target Moabit can deliver a CO 2 reduction up to 250.000 t/a from 2014 (Commercial Operation date) on 13 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Security of wood chips delivery for Moabit Supply of wood chips is only possibly by barges due to the permitting process 100 % of wood chips (265,000 t/a, approx. 40 % water content) can be provided by local sourcing, with possibility of the use of forest residues (tops and branches) and logs Additional international volumes could be provided For a secured supply of local wood chips, a hub (for transfer of local wood chips in barges) is necessary 14 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt *gmt green metric tons

Location Historic CHP site in the city of Berlin 15 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit - Location in the Berlin district heating system CHP Moabit Buch 5 MW (100 + 51 MW el 136 + 3x35 MW th ) An der Kappe 0.1 MW Lichterfelde 450 MW Blankenburger Straße Schulstraße 0,1 MW Görschstraße 0,1 MW Prenzlauer Promenade Reuter West Scharnhorststraße 600 MW Velodrom Reuter 1 MW 165 MW Lichtenberg Mitte Charlottenburg 36 MW 440 MW 215 MW Treptow** 0,2 MW Wilmersdorf Klingenberg 280 MW Bayernring 188 MW Kodak- Hanseatica Friedrichshagen Adlershof 1 MW System West System Ost 0.2 MW Köpenick 10 MW Altglienicke Cogeneration power plant* Block cogeneration power plant* Heat only plants * Installed electrical power ** Molten-Carbonate-Fuel Cell 16 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit Main process flow of Unit A Furnace with "integrated" Environmental Protection Biomass Secondary Air Coal Bunker Foreign Ash Bunker Lime stone Silo Wood I Primary Air CFB Vortex Combustion Chamber Nozzle Grate Return Cyclones Fluid. Bed Cooler Bed Ash Cooler Flue Gas Downstream -Heating Surfaces Ash Air Electrostatic Precipitator Flue Gas Ash Steam Fresh Air Fan Induced Draft Fan Tube Air Preheater Flue Gas Chimney from CFB Turbine Highpressure to CFB Mediumpressure Heating Condenser Lowpressure part Generator Cooling Tower Cooling Water Main Condenser Berlin-Spandau Ship Canal Transformer Ash Silo Heat exchanger Power Water Flow Return to Consumer District Heating Network 17 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit Installed Electrical and Thermal Capacity Installed Electric Power Unit A (coal/lignite) Gas Turbines 5-7 (light heating oil) 151 MW 100 MW 51 MW (17 MW each) Thermal Site Output Unit A HOB 1-3 (light heating oil) 241 MW th 136 MW th 105 MW th (35 MW each) 18 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit Project Features CFB Boiler 240 MW th for bituminous coal (designed for max. 40 % lignite) Substitution of 50 % of combustion heat capacity by virgin wood (chips/pellets) already 10 % wood co-firing realised by earlier project Co-firing of ~ 40 t/h Biomass from the vicinity around Berlin and international markets Construction of a plant for unloading, transport, intermediate storage and dosing of biomass Wood delivery via ship throughout the whole year from nearby BEHALA facility Intermediate storage of 9,000 m 3 Heat exchange system to be tied-in into water steam cycle 19 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit Fuel Features Biomass types: virgin wood chips, wood pellets Water content: 10 55 % Particle size: 10 100 mm Density: 160 700 kg/m³ Ash content: 0.5 2 % Heating Value (raw): 9 18 MJ/kg 20 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit - Location Map 21 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Expectations - Reduction of Coal and CO 2 Planned CO 2 - reduction at the site: Additional Fuel Virgin Wood (woodchips or white pellets): up to 300.000 t/a (depending on wood quality) Reduction CO 2 : up to 280,000 t/a Reduction Coal: up to 120,000 t/a 23 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Procurement Packages Lot 1 Crane Lot 2 Bulk Material Handling Lot 3 Special Conveyer Lot 4 Fire protection Lot 5 Electrical Equipment Lot 6 Instrumentation & Control Lot 7 Steel and Metal Construction Lot 8 Fuel dosing Lot 9 Heat exchange system Lot 10 Civil works 27 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Project timeline 02/2011 05/2011 07/2012 10/2013 01/2014 Project Analysis Project Planning Establishment Realization Handover Conclusion 29 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

HSE HAZID Activities Overview HSE Manager established HAZID Workshop conducted with cross competency participants HSE Risks identified and integrated into Risk Register Several interviews/workshops conducted with risk responsible persons Knowledge exchange with HSE Managers of other projects performed HSE requirements to be fulfilled by suppliers have been included in the ITT First proposals have been evaluated and meet HSE requirements Several HSE documents have been developed and approved: HSE Masterplan HAZID Study HSE Design Plan HSE Construction Plan SiGePlan 31 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Technical Aspects

View of CHP Moabit Red brick historical parts 33 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit New unloading area Semiautomatic crane is used for ship unloading Separation of oversized particles by classifier to protect the SICON Belt Conveying of Biomass to the storage site by closed conveying system (SICON) 34 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

CHP Moabit New Biomass unloading and handling 35 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Transport to intermediate storage 36 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Transport to intermediate storage Biomass will be transported to the storage by the closed conveying system Beladung Entleerung Antrieb 37 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass handling and storage in a former turbine hall 38 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Temporary Storage Biomass flow will be divided into two flows in the receiving area of the former turbine hall 1) direct supply of the CFB Boiler (180 m³/h) 2) storage of the remaining biomass (320 m³/h) Full automatic crane will be used for fuel handling - Storage - Removal from storage - Relocating of biomass inside the storage Storage area is divided into Sections each Section consist of 6 Fields 39 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Temporary Storage The full automatic crane is capable to time-staple the stored biomass => possibility to demonstrate to the authority the storage period of max. 1 week Removal of biomass according to the boiler demand and the FIFO principle (storage period max. 7 days) Monitoring of the storage area by Infrared (IR ) camera and selective removal of biomass with a temperatures > 60 C 40 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Fire Protection Main focus: Construction of biomass plant in the area of the existing plant requires different adjustment in inventory (expansion of fire monitoring, fire protection roof of machine hall) Monitoring of temporary storage with IR cameras and specification of alarm temperatures Installation of spray levels divided into sections above biomass storage Automatic spraying units in the tunnel area and from conveyor bridge to feed regulating Dry extinguishing system along the pocket belt conveyor, in the building of coarse grain resistance and in machine hall Installation of combustion gas detectors and expansion of fire detection system 42 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Fire Protection IR Monitoring 1. Alarm temperature t > 60 C - relevant area of biomass storage is to be fed to co-firing immediately Exemplary visual analysis of IR measurement 2. Alarm temperature t > 75 C - relevant area is to be cooled down and subsequently fed to co-firing - targeted monitoring by operator 43 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Transport from intermediate storage (MH II) to Boiler 44 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Biomass feed-in in the boiler house 45 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Waste co-incineration

Legal requirements in Germany acc. Recycling & Waste Act Thermal exploitation of waste must meet the following minimum conditions: Calorific value of waste 11 MJ/kg The heat created must be used Combustion efficiency of at least 75% The final residue produced is to be stored without further treatment Composition of waste with high calorific value Shredding light Dual System residues RDF (refuse-derived fuel) after mechanical and biological treatment RDF from mech.-bio. plants Industrial waste Domestic waste fraction Source A Source B Source A Source B Source A Source B Source A Source B Source A Source B share in normal operation [W-%] 10 25 10 20 10 20 50 5 20 30 Calorific value [MJ/kg] 19 15 12 20 15 17,5 11 24 13 8,5 Water content [W-% mass ] 15 3 20 10 20 15 24 10 65 30 Ash content [W-% mass ] 10 57 20 15 30 17 30 12 12 25 Sulphur [W-% mass ] 0,6 1,5 0,5 0,2 0,5 1 0,51 0,5 0,14 0,2 Cl + F [W-%] 0,3 1,8 0,2 3 0,2 1 0,18 0,8 0,2 0,5 47 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Vattenfall Experiences in Waste Co-incineration Power Station Schwarze Pumpe 1600 MW el, fuels: lignite (PC), residue derived fuel, fibre slurries; operated by Vattenfall Europe Generation Power Station Jaenschwalde 3000 MW el, fuels: lignite (PC), residue derived fuel; operated by Vattenfall Europe Generation Power Station Lippendorf 1800 MW el, fuels: lignite (PC), sewage sludge; operated by Vattenfall Europe Generation Power Station Boxberg 1900 MW el, fuels: lignite (PC), sewage sludge, animal meal; operated by Vattenfall Europe Generation 48 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Waste Co-incineration at Jaenschwalde 6 x 500 MW Verbrauchs- und Erzeugungsbilanz / Tageswerte bei Kraftwerksnennleistung 3000 MW Electricity / 72.000 MWh/d 6.850.000 Housholds Limestone 2.300 t/d 43 wagons/d District Heat / 8.300 MWh th. /d 60.000 Housholds Gypsum / 4.100 t/d 75 wagons for Gypsum processing Lignite 82.000 t/d 1.400 wagons/d Pit water 260.000 m 3 /d Ash / 7.800 t/d 195 wagons/d Water / 140.000 m 3 /d as CT vapour to atmosphere Residual moisture / 2.100 m 3 /d ash and gypsum Water to river Spree / 182.000 m 3 /d 49 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Waste Co-incineration at Jaenschwalde 6 x 500 MW ANNAHME, FÖRDERUNG UND DOSIERUNG VON SEKUNDÄRBRENNSTOFF 2X 340 m 3 50 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Waste Co-incineration at Jaenschwalde 6 x 500 MW ANNAHME, FÖRDERUNG UND DOSIERUNG VON SEKUNDÄRBRENNSTOFF 8000 m 3 51 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Waste Co-incineration at Jaenschwalde 6 x 500 MW Einbindung des SBS in den vorhandenen Brennstoffweg 52 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

VPC range of services for Biomass/Waste-to-Energy projects Strategic planning Technical planning Construction Operation Waste management Site planning Project management Documentation update Disposal concept Technology selection Quality assurance Maintenance planning Market analysis Feasibility study Commissioning Revision management Materials management Logistics concept Performance tests Stock organisation Viability analysis Basic design Documentation Operational management Site concept Permit application Status assessment Risk analysis Detailed design Incident analysis Environmental impact study Tender specification Organisation and procedure Authority support Public Relations concept Contractor selection Project planning 53 Biomass and Waste co-combustion at Vattenfall - Dr. D. Seibt

Many Thanks for your Attention!