Unique solutions for Unique challenges



Similar documents
Fabrication, Delivery and Installation

Topsides, Floaters & Onshore Facilities

Offshore Structures. Offshore Drilling Equipment

Guidelines RULES on on Trailer. Presented by: Richard L.Krabbendam Heavy Lift Specialist

Fourth Generation Modular Construction

New contract for jacket to the Johan Sverdrup Process Platform. 8 October 2015 Sverre Myklebust, Executive Vice President, Jackets

Edvard Grieg Anders Henriksson, Lundin Petroleum Prosjektleder.

Manufacturer of aluminium constructions KAPP ALUMINIUM TRETUM OFFSHORE AS

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Hydraulic Solutions keep your operations running specialist services

5.3 Offshore Platforms Overview

PORT OF ODENSE & LINDØ INDUSTRIAL PARK STRONG LOGISTICS FACILITY IN NORTHERN EUROPE

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

[ North America. - Vehicle technology for transport specialists

Structural concepts for minimum facility platforms for Marginal field development in western offshore, India

NorSeaGroup2011web :05 Side 1. The leading provider of supply bases and integrated logistic solutions to the offshore industry

Logistic solutions for the installation of offshore wind farms

Financing and insuring tower cranes

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

OFFSHORE WIND Peter Robert

PROJECT MANAGEMENT SERVICES

ENGINEERING of DRILLING & PRODUCTION UNITS

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Heerema Fabrication Group Zwijndrecht Yard. Bart Pluijmers Asset & Facility Manager 03 oktober 2014

DRILLING PRODUCTS AND EXPERIENCE

Scope of EN Clarification Document

Rolls-Royce Marine, Dep. Automation Longva

EXPERIENCE WITH DP-SYSTEMS ON BOARD

ERIKKILA INDUSTRIAL CRANES

NFLB. Kristiansand, June 12, Site Manager, Stein Espen Bøe

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Civil Engineering and Marine Works (CEM) Offshore Branch Office

: L-3 COMMUNICATIONS VALMARINE AS

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean

Safety Flash. IMCA Safety Flash 18/13 December Fatality During Lifting Operations

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind

Technip Offshore Finland

Fot. Kacper Kowalski/aeromedia.pl

Noble Denton marine services - marine warranty survey

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

PORTS OF. sh i p to no r way

Property and Casualty Claims Overview. Presented by. Larry Townsend, ARM, CPCU. Risk Manager, Port of Houston Authority

PROJECT CARGO RISK MANAGEMENT

Saipem UK Ltd. Saipem. Eni. for graduate engineer recruitment

Coastal Highway Route E39 Project

OWPST & Titan 200 & UK Offshore

Q1 Presentation. CEO Karl Johnny Hersvik CFO Alexander Krane Oslo, 30 April 2014

Profile. Offshore Wind Projects. Sustainable EPC and Marine Contractors

SWEDBANK SUMMIT. Det norske presentation. Oslo, 20 March 2014

Send your directly to

Industry and academia in symbolic co-existence

RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE

80 Ton Low Loader 3 available

Power. Transport Components dimensions and weights are container-capable for cost-effective transport throughout the world.

Å bygge forskingsmiljø som møter regionens behov. Hans Petter Hildre Professor

Offshore Code of Practice

Technip in Norway. 1 Technip in Norway

21. oktober Arctic-Hub. Mineral terminal largest in the Barents region

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s

MOBILE OFFSHORE UNITS

Allianz Global Corporate & Specialty Project Cargo

Liebherr Top Technology. Cranes for Wind Power

new heights Welcome... IN THIS ISSUE ALE BREAKS RECORD WITH 42,780T JACK UP AND 47,830T LOAD-OUT

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:

Exceed Your Career Expectations

High Level Review of Decommissioning Yards for ex-north Sea Facilities. Martin Brown, DNV-GL

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

[ North America. Vehicle technology for transport specialists

Helping Our Customers Achieve Superior Results. Offshore Handling Equipment

Welcome at Aker Wirth

Former Station 12 and SpecTec. SFI Group System. Product Description

Det norske a new large independent. Odd Ragnar Heum, Det norske oljeselskap ASA

13. FPSO Operational Problems Don Smith, OGP

Facilities Pori construction yard

MERMAID FLEET PROFILE SUBSEA SERVICES

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège

Managing the broadest equipment rental fleet

REFERENCE LIST HYDROVAC OIL PURIFIER

ASSET INTEGRITY MANAGEMENT

DP platform installation/ decommissioning and pipelay vessel Pieter Schelte

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

POWER AND MOTION CONTROL FOR SUBSEA APPLICATIONS

AMOS SFI. Group System. Product Description

Transcription:

Unique solutions for Unique challenges

Sarens AS Established in Verdal in 1981. Core business: Heavy lifting and special transports. 100% owned by Sarens NV - Belgium OUR MISSION Our goal is to be a leader in Scandinavia for heavy lift and special transports. OUR VISION PEOPLE - Our most important assets and resources. CUSTOMERS - When our customers are satisfied, we are also satisfied CULTURE Our Company is built on an entrepreneurial spirit, something we strongly encourage. Our Company never loses sight of the importance of Quality, Safety and Environmental standards, all of which we strictly adhere to. Our Company has HSE as a Core Value Our Company has an awareness of professionalism, ethics and customer satisfaction.

Leiv Eriksson Rig Skidding and Jacking of top part of drilling derrick Equipment used for skidding: Equipment used for jacking: WestCon AS Ølen, Norway/Bosphorus, Turkey Jacks for lifting of rig to skidding beams (4 off) Power packs for jacking Skidding jacks incl. gripper system (2 off) Power packs for skidding jacks SARLIFT 2500 (4 off, cap. 250 T each) Lower 220T Derrick Top Description: For the Leiv Eriksson to be able to enter the Black Sea, the top half of the drilling rig had to be removed. This to be able to pass the bridges in Bosphorus (Bosphorus Bridge and Faith Sultan Mehmet Bridge). Sarens AS designed a method that excluded the need for the crane to lift of the top half. The derrick was splitted and skidded to the Sarlift system and lowered to the Sarens support system and seafastened on this system.

Offshore Installation of Blister on Songa Delta Equipment used Songa Delta Ågotnes, Norway Strandjacks 2x45T, 60T Solution, Design, Engineering and Operation of installation of Blisters on Songa Delta

Offshore Kristin Platform - Riser Structure Equipment used for lifting risers: Statoil Kristin Platform Custom made self erecting lifting rig, with sideways movability. Capacity 160 Tonnes Lifting risers for maintenance purposes. Description: Sarens AS designed and created a solution to perform the lifting of risers for necessary maintenance work, without shutting down the production. Sarens AS provided this solution within a short time frame with CE declaration of the lifting rig. All performed in accordance to all offshore safety regulations.

Gjøa project World Record Transport Site Move and Load out 12.750 Tonnes Equipment used for load out/transport: Kværner Stord AS Stord Norway, Egersud Norway 532 axles Ballast equipment 4 x 600 tonnes jacking system (for the living quarter) Support system and beams Load out of the riser module (Egersund), Load out of the process/utility module, weight 12.750 Tonnes, load out and mating of the living quarter, in Stord Description: Sarens AS provided equipment and personnel to perform this site move and load out. The operation was performed on schedule without incidents.

SPMT Site moves Equipment used for hull section movements: Kleven Verft AS Ulsteinvik, Norway Kamag trailers in various combination up the 42 axles Load in and mating of hull sections up to 1150 Tonnes section weight. Description: Sarens AS trailers contributed to a new assembly method. Prefabricated Hull sections were loaded in at the yard. The sections were fitted with various equipment and then transported to the dock for hull mating.

Jacket Load outs Equipment used for skidded load out Kværner Verdal AS Verdal, Norway 56 Ballast pumps, 16 of 200 tonnes Strand Jacks and 62 km Strands Sarens AS has for many years performed load out operations for Kværner Verdal s jacket structures. Max. load out weight 23.000 Tonnes

Lift of thrusters Equipment used for lifting: Odfjell Drilling AS Ågotnes, Bergen Island Innovator 3 x 45 Tonnes Strand Jacks, Computer controlled system Lift of thrusters for maintance and inspection

Spudcan / add-on Installation Customers: Equipment used for installation Bergen Group AS, Master Marine AS, Sea Drill, Westcon Stavanger, Eydehavn, Ølen, Norway Strand jacks 12 x 45 Tonnes Lift of spudcan/add-on for leg mating process Description: Sarens AS provided and operated computer controlled strand jacks for precise and safe installation of Spudcan/add-on s.

Swedbank Arena Lifting of roof girders Equipment used for lifting Ruukki SE Stockholm, Sweden Strand Jacks including anchors, strands Power packs and control system Lifting and skidding operations for installation of 4 roof girders at Swedbank arena in Stockholm. Description: Sarens AS designed and executed a safe method to lift up the roof girders

Nordenga Bridge Barge transport, Load in/out, Site Move and Installation Equipment used NLI Holland and Oslo, Norway Skidding system, Climbing Jacks,StrandJacks and SPMT Load out in Holland Transport from Holland, grillage and sea fastening, warranty surveyor for the barge transport. Load in and site move of Nordenga Bridge in Oslo Installation of bridge. Crane rental for installation of sections. Description: Skidding and jacking of curved Bridge structure.

Wind Equipment used GE Norway SPMT, Installation Tower for WTG Complete logistics and transports from produces to site. Installation of the WTG s at Hundammerfjellet. Description: Installation tower designed by Sarens AS.

Yard Lifting of deck for mating with hull Aker Spitsbergen/Barents Equipment used Aker Stord Stord, Norway SPMT, ballast pumps, SMLT, Strandjacks, Crane LR1800 Load-in, Site Moves, Load-out, Lifting

Civil Equipment used Reinertsen Trondheim, Norway 12 axles SPMT, LR 1350 with superlift Move of houses

Nothing too heavy, nothing too high Sarens AS Tangenveien 5, Finstadgården N-7653 Verdal Norway Phone: +47 74 04 65 80 E-mail: sarens@sarens.no Sarens AS is a ISO certified Company at the following standards: - NS-EN ISO 9001:2008 - NS-EN ISO 14001:2004 - OHSAS 18001:2007 www.sarens.no