ADVANTAGES OF USING THE HYBRID GEOTHERMAL OPTION



Similar documents
Heating & Cooling Efficiency

Geothermal Heat Pump Systems: From Basics to Hybrids

Geothermal Heat Pump Systems

The next generation of geothermal systems for school buildings

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses

How a Ground Source Heat Pump Works for Commercial Buildings

Closed-Loop Ground-Coupled Heat Pump Systems

GEOTHERMAL HEATING AND COOLING INTRODUCTION

How a Ground Source Heat Pump Works for a School or College

How To Use A Water Source Heat Pump

How Ground/Water Source Heat Pumps Work

Hybrid geothermal systems: less is more

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Mechanical Systems Proposal revised

Hybrid Geothermal Heat Pumps for Beachfront Hotel

Optimization of a Hybrid Ground Source Heat Pump using the Response Surface Method

Geothermal Case Studies and Considerations

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

Development of Design Guidelines for Hybrid Ground-Coupled Heat Pump Systems

Wet Bulb Temperature and Its Impact on Building Performance

GEOTHERMAL HEATING APPLICATIONS FOR RESIDENTIAL HOMES

Basic Design Considerations for Geothermal Heat Pump Systems

MEETING AGENDA. Project Administrator:

Sustainability: Geothermal Energy for Sherman Hospital

Evaporative Cooling for Residential and Light-Commercial

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

Rules of Thumb Energy Efficiency in Buildings

Design and Implementation of Geothermal Systems for Heating and Air Conditioning

Enclosed Football Stadium Design History and Lessons Learned

Geothermal Energy. How it Works

The New Data Center Cooling Paradigm The Tiered Approach

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Below are detailed instructions for using the EMS load calculator.

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

GSHP Design Recommendations- Residential & Light Commercial

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Transmission System Total Cost of Ownership

Passive & Active Design

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

GEOTHERMAL HEAT PUMP OVERVIEW Presentation to REGBEE/ACORE

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL

Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin

Thermal Coupling Of Cooling and Heating Systems

Ground Source Heat Pumps The Fundamentals. Southington, Connecticut John F. Sima III P.E.

Elements of Energy Efficiency in Data Centre Cooling Architecture

Innovent LASER Packaged Fresh Air Conditioning Units

Zhao et al. 2.2 Experimental Results in Winter Season The analysis given below was based on the data collected from Nov to Mar. 15, 2004.

Xcel Business Customers: Program and Rebate Summary

apv heat exchanger APV ParaFlow Plate Heat Exchangers

Geothermal: The Clean Energy Secret May 7, 2008

Variable Refrigerant Flow Systems vs. Geothermal Water Source Heat Pump Systems

WATER-SOURCE HEAT PUMPS*

Second Place: Industrial Facilities or Processes, New

Forty-one miles of submerged coils that heat and cool a high school of 2,400 students.

HOME HEATING USING GEOTHERMAL ENERGY. An introduction to using ground sourced central heating in New Zealand

Water cooled chiller plant (cp/vs)

MECHANICAL PROJECT PROPOSAL

Geothermal Ice Arenas

Gas Absorption Heat Pumps. Future proofing your heating and hot water

Sustainable Energy and Resource Saving Concepts for HVAC/Process/Water/Wastewater. Thomas H. (Tom) Durkin, PE Dr. Glenn Krueger, EdD Bob Jacobi

Consumers Energy Business Solutions. Commercial and Industrial Energy Efficiency Program April 18, 2013

Rittal White Paper 508: Economized Data Center Cooling Defining Methods & Implementation Practices By: Daniel Kennedy

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

ENHANCED LABORATORY HVAC SYSTEM

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Chapter 2 Practical Approach in Design of HVAC Systems Utilizing Geothermal Energy

Design guidelines for hybrid boiler systems.

Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie

ICE THERMAL STORAGE IN AIR CONDITIONING APPLICATION FUNDAMENTALS

Serenbe Green Geothermal Solutions with Bosch Thermotechnology

RENOVATION. Performance Contract to Fund Change

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

Pharmaceutical central utility plants

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Nordic Heat Pump Product Guide

Taco Hydronic System Solutions Quick Start Guide

GEOTHERMAL HEAT PUMPS - TRENDS AND COMPARISONS - John W. Lund Geo-Heat Center

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Geothermal Heat Pumps in Agricultural Applications

Sea Water Heat Pump Project

Preliminary Final Proposal

To find out more about installing a heat pump call or visit energysavingtrust.org.uk

HEATING, VENTILATION & AIR CONDITIONING

Commissioning - Construction Documents (Page 1 of 6)

Defining Quality. Building Comfort. Precision. Air Conditioning

Transcription:

ADVANTAGES OF USING THE HYBRID GEOTHERMAL OPTION J. B. Singh, PE* Gustav Foster, Jr. PE** *J and P Engineers, P.A. 14 Kory Drive Kendall Park, NJ 08824 USA phone: 732-940-7994 fax: 732-940-5528 **Conectiv Solutions LLC 1240 South Spring Road Vineland, NJ 08361USA phone: 609-696-0880 fax: 609-569-1357 ABSTRACT Most applications of geothermal technology for commercial buildings are limited to full dependence on the ground soil temperatures for 100% of the heating and cooling energy. Although the advantages of lowest energy and maintenance costs favor this approach, first costs and space limitations may prohibit a full geothermal installation. In some states, such as New Jersey, restrictive regulations mandating minimum bore size, grouting materials, wage rates and method of heat exchange greatly increase the cost of the system. Frequently the initial cost may place the project beyond budget, and in some instances the drilling conditions may preclude the use of a large conventional closed loop bore field. The paper explores first cost savings resulting from using hybrid geothermal design and two examples of actual hybrid design. One site is an office building in operation and the other is a large school project in design in the Atlantic City area.

1. OFFICE BUILDING The Paragon Center building is an office condominium located in Allentown, Pennsylvania. It is an 7,432 m 2 (80,000 ft 2 ), 4-story building. The initial budget for the system, set at $950,000, was developed in anticipation of construction of a 100% geothermal closed loop system The project was to use a closed loop geothermal system composed of 55 bore holes, 152 m (500 ft) deep to supply 703 kw (200 tons) of heating and cooling capacity. Although the initial test bore indicated no problems to a depth of 152 m (500 ft), subsequent drilling at the rear of the property resulted in collapse of the bore at approximately 48.8 m (160 ft). Two additional bores were attempted in the same area, but casing advance shoes could not hold up below 33.5 m (110 ft). The reason for the bore failures was high water flow in a limestone strata. A static water level of 11.9 m (39 ft) was observed 24 hours after drilling. To continue deeper would have required casings which would have exceeded the project budget. Because of the presence of these drilling conditions, the site did not lend itself to a deep bore field. A decision was made to abandon the idea of a 100% geothermal system and to use a closed circuit cooler, to assist in building cooling at time near summer design conditions. The installation was made with 88 bores, each 38 m (125 ft) for 281 kw (80 tons) of cooling while the closed circuit cooler was sized to provide the remaining 422 kw (120 tons) of capacity. The following table provides a comparison on cost to install various systems. Table 1 Cost of Various Options Office Building Dollars Standard CLWSHP System Full Geothermal 55 bores @ 152 m (500 ft) (not cased) Full Geothermal 240 bores @ 33.5 m (110 ft) (cased) Base Cost 620,000 620,000 620,000 620,000 Permits 3,100 3,500 4,500 3,700 Excavations 0 15,000 55,000 28,000 Misc. concrete, fence 30,000 20,000 20,000 30,000 Closed Circuit cooler 91,300 0 69,000 69,500 Extra Electric 6,000 0 0 5,400 Boreholes & Piping 0 219,500 417,900 177,200 Boiler 20,000 0 0 0 TOTAL 770,400 878,000 1,117,400 933,800 Loop cost, $/kw ($/ton) 312 (1,098) 594 (2090) Hybrid System 88 bores @ 33.5 m (110 ft) (cased) 630 (2,215)

Note that the borehole and looping costs more than double because of the need to use casings. If casing had not been necessary, the hybrid system cost would have been less than the 100% geothermal system even considering a higher drilling cost because of a smaller number of bores. At one point during the design process, it was contemplated abandoning the concept of a geothermal system entirely because of well field problems. In this example of a hybrid system, the design allowed the project to stay within the proposed construction budget despite the conditions at the site which required casing and shallow bores. The use of a closed circuit cooler increases energy costs. However, other areas of energy control more than offset the increased cost of employing the closed circuit cooler. Incorporated in the project was sensible heat recovery, adjustable speed drives on the pumps and monitoring equipment. By the middle of 1994, Dr. Steven Kavanaugh was brought onto the project as an Electric Power Research Institute (EPRI) consultant. Dr. Kavanaugh reinforced the need for reduction of pumping energy, from 22.3 kw (30 hp) to 11.2 kw (15 hp), and also the need to use variable frequency drives for the pumps. After more than two full years of operation, the project operating energy cost is less than $0.0929/m 2 ($1.00/ft 2 ) at an average electric cost of $0.08 annually, including demand charges. 2. ELEMENTARY SCHOOL BUILDING This building is planned for expansion, in the West Atlantic City, New Jersey area and is situated on a relatively small city block 64 m x 177m (210 ft x 580 ft) or 11,315 m 2 (121,800 ft 2 ). Conditioned space within the building is 2,138 m 2 (23,000 ft 2 ) for the existing structure, 5,853 m 2 (63,000 ft 2 ) for the new addition, totaling 7,897 m 2 (85,000 ft 2 ). Enrollment is between 550 and 670 students, with 9 months a year use. A requirement of 7.079 L/s (15,000 cfm) of outside air is needed to meet indoor air quality guidelines, resulting in a total cooling requirement of 967 kw (275 tons). Heat recovery equipment reduces this requirement to 879kW (250 tons) of loop cooling. The building is a combination one and two story masonry structure. In addition to classrooms, the school contains a multi-purpose room, library and a 195 m 2 (2,100 ft 2 ) swimming pool area with a 83.6 m 2 (900 ft 2 ). swimming pool. Electricity cost averages $0.997/kWh including demand charges. Typical individual classroom cooling requirement is 8.79kW (2.5 tons) utilizing separate outside air heat recovery, and 12.3 kw (3.5 Tons) if classroom cooling is performed without heat recovery equipment. The initial 100% closed loop geothermal design called for 90 bores 122 m (330 ft). After several rough layouts of the Elementary School borefield were made, it was determined that available space was not sufficient to provide a 100% closed loop geothermal system. It was decided to consider a hybrid design, employing a closed circuit cooler. The hybrid design uses 66 bores 122 m (400 ft) deep to provide all the required heating and most of the cooling. The geothermal borefield provides 468 kw (133 tons) of capacity. On hot and humid days the closed circuit

cooler assists with an additional 411 kw (117 tons) of cooling. The following table provides a comparison on cost to install various systems. Table 2 Estimated Cost of Various Options Elementary School Dollars Standard CLWSHP System Chiller, Boiler & Tower Full Geothermal 90 bores @ 122 m (400 ft) (not cased) Hybrid System 66 bores @ 122 m (400 ft) (not cased) Base Cost 1,043,300 1,211,700 894,100 846,930 Cooling Tower 50,000 50,000 0 0 Closed Circuit cooler 0 0 0 36,570 Boreholes & Piping 0 0 310,000 255,600 Boiler 25,000 25,000 0 0 TOTAL 1,118,300 1,286,700 1,204,100 1,139,100 Loop cost, $/kw ($/ton) n/a n/a 352.57 (1,240.00) 546.43 (1,921.80) Costs were calculated for construction in 1996. Annual energy savings were estimated to be $6,118 for full geothermal and $4,500 for the hybrid geothermal, compared to the standard CLWSHP system. Maintenance savings were estimated to be $8,895 and $5,000. Based on these estimates, simple payback would be 5.7 years for the full geothermal and 2.2 years for the hybrid. In this example, the idea to construct the system using hybrid came about from the tight footprint of the site. However, a clear economic advantage is shown by the use of hybrid geothermal. Significant first cost savings are traded for slightly higher operating and maintenance costs. REFERENCES 1. Kavanaugh, S.P., Analysis and Development of a Design Method for Hybrid Geothermal Heat Pumps, Draft, University of Alabama, Tuscaloosa, March 1997. 2. Kavanaugh, S.P., M. Khattar, D.R. McGraw, S.L. Rubin, T.F. Brown, Jr. and J.B. Singh, The Geothermal Hybrid System at the Paragon Center in Allentown, PA, EPRI, December 6, 1995. 3. Kavanaugh, S.P. and K. Rafferty, Ground Source Heat Pumps, Draft, University of Alabama, Tuscaloosa, 1997. 4. Singh, J.B., Information on the Hybrid System, Letter to contractor, June 1, 1996. 5. Singh, J.B., Life Cycle Cost Analysis of Various HVAC System Options for Chelsea Heights Elementary School, Letters to contractor, June 1, 1996.