LNG A Different Approach The Teesside GasPort Project

Similar documents
Teesside GasPort. World s first dockside high pressure gas offloading facility for Energy Bridge Regasification Vessels (EBRV)

Latest trends -FSRU and FSU

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

Marine Transportation of Compressed Natural Gas

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG. Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU

Pandora FLNG Wison Offshore & Marine

Leasing scheme information

Design and Construction of LNG Regasification Vessel

Single Point Mooring System (SPM) for an Offshore LNG Terminal

LNG terminal project in Lithuania November, 2012

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

London Array Off-Shore Wind Farm

LNG Terminal in Lithuania Security of Gas Supply

Carbon Capture & Storage Reliable cost effective CO 2 shipping through statistical modelling

Class Environmental Assessment Process Guide

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

The Pipelines Regulations, 2000

TECHNICAL INFORMATION

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

SC KLAIPĖDOS NAFTA 9 MONTHS 2014 RESULTS. 9 months 2014 results 1

Loading Master Training 2015

The Ship/Shore Safety Check-List

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

Frequently Asked Questions About. Japan s Feed-in- Tariff System

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

Watco Companies, L.L.C. NUTC Oil Panel Discussion Terminal Perspective Evanston, IL June 11, 2014 Stefan Loeb SVP Marketing & Strategic Development

Comanche Trail Pipeline Project. September 2015

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

BONATTI: COMPANY OVERVIEW

Gas Marketplace Work? July 9-13, 2007

Ultrasonic Gas Leak Detection

Electric heat tracing

Propane-Fueled Microturbine: Case Study

TransGas General Overview

MLD: Domestic Maritime Transport Project

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

Integrated Risk Management Solutions

Marsh is a leading broker and risk adviser for FSRU projects. Marsh Insights:

DONG Energy offshore wind experience

New England Pipeline Safety Seminar October 22, 2014

Norsk Olje og gass Selbusjøen

Committees: Dates: Item no. Community and Children's Services Committee Projects Sub 10/07/ /07/2015. Gateway 3/4 Options Appraisal.

Bondholders Report. Six months ended 30 September 2010

Operational Review and Outlook

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

lng FSRUs A guide to risk and insurance

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

LOGISTICS SOLUTION FOR NUSTAR ENERGY

OFFSHORE WIND PROCUREMENT

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017

Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data

Mercator Limited. Driven by growth Sustained by values

References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES

OUR CONVERSATION TODAY

CMPDI. An ISO 9001Company. R.K.Chopra Director (Tech/RD&T), CMPDI, Ranchi, INDIA

OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS

Natural Gas Storage in Alaska

Natural Gas Utilization in Ghana. West African Gas Pipeline Project History and Technical Description

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT ANNEX 15: TRAFFIC MANAGEMENT PLAN

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

Synfuels GASRICH Transport Light Gas Technology

Boskalis: at home in the Middle East

Suzanne Minter. Manager, Oil and Gas Consulting BENTEK Energy. Natural Gas Outlook

TECHNIP AT A GLANCE 2014

Completion of Acquisition: New England - New York Cross Sound Cable

Petrol Storage Information Note

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway

Liberty Utilitiec. Samson. Local Plant, Domestic Supply. 4~NORTHSTAR ~i~~~industriesllc ENERGY. ~LH~PJi~C~ La~ Exhibit F~LE

FREMANTLE PORTS. A Guide to Our Business

CRITICAL SUCCESS FACTORS FOR ELECTRICITY GENERATION PROJECTS

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

LIQUEFIED NATURAL GAS (LNG) Terminal BUSINESS PLAN February

Undergrounding high voltage electricity transmission. The technical issues

Facts about gas physical properties

Case Study: Sand Removal from 3 Phase Production Separators and Vessels

NOVEMBER 2015 UPDATE

Development of a Scottish Government Policy Approach to Repowering. Debbie Harper Arup Glasgow

Economics and Financing of Integrated Gulf LNG Project

Rainwater Harvesting

Growing in challenging markets

Regional Gas Market Update

Why Insurance Cost are Rising for Biogas Power Generation Plants

HYDROSTATIC TEST PUMPS

FINANCIAL AND OPERATING HIGHLIGHTS

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

The role of technology and knowhow in the sector

Transcription:

LNG A Different Approach The Teesside GasPort Project Presented to Winter Outlook Seminar by John Baldwin of Gas Strategies and James Ball On behalf of Rob Bryngelson, Executive Vice President and Chief Operating Officer Excelerate Energy 27 September 2006

Presentation Overview Energy Bridge Technology Genesis of the GasPort Concept Teesside GasPort Overview Exceptional and Focused Project Team Project Design Basis and Functionality Project Status Project Development Risks Next Steps 2

Energy Bridge Regasification Vessels Natural Gas Delivery in Three Ways Energy Bridge was primarily designed to access markets unreachable by conventional means Energy Bridge Deepwater Port Excelerate GasPort Conventional Land-Based Terminal however, its economics are competitive with a conventional, land-based LNG terminal with added flexibility benefits 3

Energy Bridge Regasification Vessels Natural Gas Delivery in Three Ways Conventional LNG Manifold High Pressure Gas Manifold STL Buoy 4

Energy Bridge Technology Dockside Vaporization High Pressure Gas Manifold Energy Bridge ships are equipped with a high pressure gas manifold Allows delivery of regasified LNG directly into a gas pipeline installed on the jetty 5

Teesside GasPort Project Layout 6.5 km, 24 Delivery Pipeline Seal Sands SSSI Early Pipe Lay Tees River Horizontal Directional Drill Teesport Tie-In 8 Nitrogen Pipeline PX Gas Plant Excelerate Jetty AGI NTS 6

Primary project drivers Be in-service by end December 2006 Respond to market price signals Accommodate wide range of LNG specifications Key characteristics Teesside GasPort Project Overview Deliver 400 million cubic feet per day (mmcfd) of natural gas (11.3 million cubic meters per day) with expansion to 600 mmcfd from 2008 Provide the ability to accommodate market needs (variable output) Minimize onshore infrastructure and time to market Design as intrinsically safe with no LNG inventory onshore, and reduced planning impact Total development and construction cost of approx. 30 million 7

Project Team Selection The Right Team Makes all the Difference Excelerate Energy (EE) Project sponsor and developer of GasPort technology Gas Strategies Project development support and insight throughout the process PD Teesport Limited - Port Authority for the port at Teesside Lessor of jetty lease and easements for the project Invaluable in relation to local project support px (TGPP) Limited operator of the Teesside Gas Processing Plant Provider of O&M and transportation services to EE through existing NTS access point Experienced company with strong relationships in Teesport 8

Project Team Selection The Right Team Makes all the Difference Murphy Pipelines Provider of pipeline and infrastructure design and construction Respected contractor with extensive experience in building to National Grid specifications MouchelParkman GEL Engineering and design contractor providing support for Murphy Pipelines Key part of the team supporting EE throughout the permit application and development process BOC Limited Provider of nitrogen supply to the project from existing facilities Capable team that developed a rapid nitrogen solution to accommodate virtually any LNG source in the world 9

Teesside GasPort Design Basis Component Summary Regasification Vessel Sub-Terminal South Bank Onshore offloading arm Gas blending/heating system Pressure control and associated protection systems 24 (600 mm) Pipeline Sub-Terminal North Bank NTS Entry North Bank Gas quality monitoring and NTS entry (fiscal) metering system Sub terminal pressure/flow control Existing px train 1 and train 2 10

The Excelerate Jetty A.K.A. The Former Shell Jetty Existing jetty structurally sound requiring refurbishment to bring it up to acceptable standards Agreements finalized with PD Teesport for jetty lease, land use, dredging, works license and conservancy dues Limited maintenance dredging required to return the ship pocket to its original state (sufficient depth) 11

Sub-Terminal Onshore Equipment A secure Sub-Terminal being built on land adjacent to the Excelerate Jetty, containing: Flow metering for control and nitrogen blending purposes Pressure control / reduction / heating equipment to step down from 100 bar ship delivery to NTS pressure (50 to 75 bar) Fire and gas safety systems including water deluge Site security Sub-Terminal site Old mooring anchors removed from Jetty Teesside power in background - Largest UK CCGT 12

px Terminal Connection to the NTS Gas quality measurement and fiscal metering to be located at px facility Access to NTS through existing px Network Entry Agreement No new System Entry Point required Around 40MCMD of capacity surplus at Teesside New works at px Ltd comprise additional: Gas metering Quality monitoring (to NTS standards) National Grid very helpful re metering Tie-in point for the 24 gas pipeline adjacent to the px plant site 13

Nitrogen Availability Supply from BOC BOC s largest UK Oxygen plant (with Nitrogen as a byproduct) is located around 2km from the Excelerate Jetty BOC will supply high-pressure nitrogen to the Excelerate Jetty, allowing receipt of a broader range of LNG supplies BOC will pump liquid Nitrogen to 105+ bar and then gasify it New 8 high pressure N2 pipeline being built within Murphy Pipelines scope Tie-in point for the 8 nitrogen line at the BOC facility 14

PD Teesport have consulted with all local stakeholders in relation to LNG vessel movements on the Tees Extensive and detailed HAZID Liaison with Isle of Grain and Milford Haven parties Ship Operations HAZID for LNG vessels 15

Pipeline Routing Key Issue is Securing Route New 24 pipeline will be owned and operated by px under their existing pipeline Safety Case (as applies to their pipeline to the Teesside Power Plant) Excelerate will have rights to this pipeline Easement and crossing documents developed and discussions with landowners and operators well advanced To date, all parties behaving in a reasonable manner Most agreements in place a few follow ups remain on technical issues Pipeline and associated infrastructure being built to National Grid standards 16

Current Status Project On Schedule for Dec. 2006 Project team working to maintain the December 2006 schedule Engineer, Procure, Install, Commission contract in place with Murphy Pipeline s Ltd Design finalised, with most materials on order and approximately 18.5 million invested to date Key agreements with PD Ports and BOC for jetty use and nitrogen supply respectively have been finalized O&M and related agreements with px being finalised 17

Project Consents Process is Advancing Planning application including 281 page Environmental Impact Assessment submitted on 1 June 2006 for the 24 gas and 8 nitrogen pipelines to 2 authorities: Stockton (North side of Tees River) Redcar & Cleveland (South side of Tees River) Statutory Consultees: English Nature - complete section next to SPA by November HSE pipeline safety related issues Environment Agency (EA) Timetable All approvals received on August 31, 2006 In line with expectations project proceeding for a December completion with first cargoes in early January 18

Project Risks Key Risks Being Managed Delayed material deliveries (steel pipeline, metering, etc.) Equipment pre-ordered at risk prior to permissions provide protection Delay to completion of pipeline next to SPA (1 Nov schedule) Pre-ordered pipeline allowed installation to commence immediately following planning permission Technical difficulties with HDD under Tees HDD is ongoing and all appears well Delay to BOC works (scheduled completion 5 December) Nitrogen works are progressing on schedule, also thanks to early commitments Wet September to November period hampering construction Delay in completion and installation of gas offloading arm 19

Next Steps Ensure successful project implementation in accordance with permissions granted by local authorities Focus on material and equipment delivery schedules Finalize easement and crossing agreements Finalize contracts with px (TGPP) Ltd Manage project risks and maintain overall schedule Continue coordination with regulators, port authority and port tenants Ensure gas delivery by early January 2007 20