Rosslare Case Study Passive House Cost Analysis. Seamus Mullins Quantity Surveyor Michael Bennett Group



Similar documents
Commercial Building Valuation Report

Extra Low Energy Housing in Ireland How far should we go to the Passive House? Jonathan Jennings Head of R&D Kingspan Century Homes

Module 3.7. Thermal bridging

main heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer

2014 British Columbia Building Code Changes

Commercial Building Valuation Report

A Guide to... Home Renovation Incentive (HRI)

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

The first apartment house renovation with Passive House components in Norway

RESNET National Rater Test Study Guide Outline

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

ECHO System for Basements

BER Assessors Dwellings Technical Bulletin

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

Energy Efficient Windows

Case Studies of Successful Code for Sustainable Homes Projects

Chapter 2: Foundations

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Improving thermal insulation of concrete sandwich panel buildings

Energy Code Compliance With SIPs. Frank Baker, PFB Corporation Don Ferrier, Ferrier Custom Homes

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Building Control Guidance Note

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

Requirements for Building Application Submission

Standards Committee T echnical Technical Conference

Energy Company Obligation (ECO): Technical Monitoring Questions

RPV - RP - RA air handling units

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: MPRN:

Enclosing Timber Frames. Panels. Frank Baker Founder, Riverbend Timber Framing and Insulspan

PROJECT COST ESTIMATES & FEASIBILITIES

Introduction to DEAP for Professionals DWELLING ENERGY ASSESSMENT PROCEDURE (DEAP)

2009 IECC Update. Scope. Content. International Energy Conservation Code

Passive homes GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF PASSIVE HOUSE DWELLINGS IN IRELAND

School in Schwanenstadt, Austria

SIP (STRUCTURAL INSULATED PANEL)

Achieving Net Zero. Bradley Berneche, President Alouette Homes. National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

TGD L Limiting Thermal Bridging and Air Infiltration. Acceptable Construction Details. Introduction

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

BUILDING SAFETY UNIT

Advice Series. the maintenance and repair of historic buildings

Casa Sani Barvitius, Vedole di Colorno (PR), Italy - progetto ID 2759

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

Sixth Issue March Kingspan. Building System. CERTIFICATE No. 02/0158. Low Energy - Low Carbon Buildings

FREQUENTLY ASKED QUESTIONS about HERS and CHEERS Provided by the California Energy Commission Consumer Energy Center

FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS

Welcome to a warmer home. You could qualify for: Your guide to a gas supply and central heating system

THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.

The Real Value of Space

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Challenging the possibilities

Thermal Performance of Steel Beam Junctions using Different Connection Methods

CI/SfB 2- Rj7 December 2010

Residential Weatherization Plus Program

INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to:

Development Services City of Lawrence, KS

Energy Performance Certificate

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

Options for Financing Retrofits in Ireland. Brendan Nevin Director of Consumer Banking Bank of Ireland

Energy Efficiency in Buildings

CONDENSATION IN REFRIDGERATED BUILDINGS

Key energy-efficient features of your new home

Practice Note

TechPractices: Home Front Homes:

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

Norwegian Tax Authority - Oslo Norway

Is Your Envelope Effective? Mark Lawton P.Eng Morrison Hershfield Limited Vancouver

innovation makes us the better building choice.

RELEASE NOTES EG USA 3.0.0

House building is changing fast NHBC unveils new Standards Chapters on curtain walling and cladding, and light steel framed walls and floors

Jesse Krivolavek Nebraska Native American Energy Auditors Veterans Dr Ste. 600, Omaha, NE 68022

SAP 2012 IN A NUTSHELL

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

PERFORMANCE OF SIDE-BY-SIDE SOUTH TEXAS HOMES Isolating the Contribution of Spray Polyurethane Foam Insulation

Climate and Energy Responsive Housing in Continental Climates. The Suitability of Passive Houses for Iran's Dry and Cold Climate. Farshad Nasrollahi

Residential Buildings Energy Code Summary

Estimated Cost of Repair

EPA WaterSense for New Homes Program DOE Zero Energy Ready Home Quality Management Guidelines

Project Build with CaRe - WP 2 Education and Training

Building Permit Application

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

South Ash Manor Ash Lane, Ash, Sevenoaks, Kent. savills.co.uk

How To Design An Hvac Design For A Stick Built Home

Conservatory warm roof conversion system

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5

Transcription:

Rosslare Case Study Passive House Cost Analysis Seamus Mullins Quantity Surveyor Michael Bennett Group

2

South Elevation North Elevation 3

West Elevation East Elevation 4

Ground Floor Plan 5

First Floor Plan 6

Building Description First dwelling of a scheme of eight houses Ireland s s first certified passive house commercial scheme Irish design, manufacture, and construction Thermal envelope of timber frame Storey and a-half a type dwelling with a cruciform foot print 7

Building Description Floor area of 167m² (1,806 sq.ft Traditional design with a modern twist Space heat demand of 10KWh/( m²a) m Window installed U-Value U of 0.85W( m²k) m Dwelling heat load of 1.5Kw Structural air tightness of less than 0.60 h ¹ 8

Cost Comparison Definition Extra over construction cost of the Rosslare house (No. 01A) built to certified passive standards compared to building of the same dwelling to current building regulations with a good mid-range A3 BER rating, and also of timber frame construction. 9

Cost Comparison Definition No building elements other than those containing a passive aspect have been examined. An overheads / profit margin has not been included in the analysis. VAT has not been added on to the final figure. 10

Exclusions Land Cost Site Preliminaries Finishes and Fitments Personal Choice Items 11

Cost Analysis 12

1. Substructure Additional insulation detailing at the junction of the external wall and the floor slab. Increased insulation thickness under the general area of the floor slab. Extra Over Cost 400 (22 - sq.ft 1,110 (61 - sq.ft 13

2. External Wall Wider and heavier wall structure. Greater insulation thickness. Wider service cavity. Increased measures to deal with interstitial condensation, air tightness, and wind tightness. Extra Over Cost 7,320 ( 4.05-sq.ft 14

3. Roof Structure Heavier roof structure. Greater insulation thickness. Increased measures to deal with interstitial condensation, air tightness, and wind tightness. Extra Over Cost 1,480 (82 - sq.ft 15

4. Windows and External Doors Supply and installation. Builder s s work in improving thermal bridging at side reveals, head, and cill level. Overcoming weatherproofing caused by the necessary repositioning of the window in the thermal envelope. Extra Over Cost 2,350 ( 1.30-sq.ft 2,400 ( 1.33-sq.ft 16

5. Space Heating System No requirement to provide a full hydraulic heating system in a passive house, due to a very low space heat requirement. Higher specification requirement of a passive certified MHRV System. Extra Over Cost - 1,000 (-55 - sq.ft 510 (28 - sq.ft 17

6. Distribution Losses Extra Over Cost Additional insulation thickness to the exhaust /fresh air ductwork between the building envelope and the MHRV unit. 100 (6 - sq.ft Lagging of hot water pipework. 420 (23 - sq.ft 18

7. Passive House Certification Extra Over Cost Irish Passive House Academy Certification Fee. Technical advice to ensure compliance with PHPP calculations and software. 1,500 (83 - sq.ft 1,000 (55 - sq.ft 19

8. Door Blower Test Passive House door blower test requires a different methodology, and the air tightness requirement is far greater than our current building standards. BER testing is also required for compliance purposes. Extra Over Cost 420 (23 - sq.ft 20

Cost Analysis Summary 21

Cost Analysis Summary 1. Substructure 2. External Wall 3. Roof Structure 4. Windows and External Doors 5. Space Heating System 6. Distribution Losses 7. Passive House Certification 8. Door Blower Test 1,510.00 7,320.00 1,480.00 4,750.00-490.00 520.00 2,500.00 420.00 18,010.00 22

Conclusions Additional costs v Benefits of passive construction Cost benefits (both private and public) Lifestyle benefits (controlled air flow, warm, draught-proof, healthier living) 23

Conclusions Selling at a lower house price v selling at a higher house price with lower running cost to the purchaser The learning curve: how steep and how can it be paid for? 24

Conclusions Extra over cost per sq. ft. = 9.97 Effects of the downturn on passive house building costs Future ideas to reduce building costs Problems for the auctioneer 25

Rosslare Case Study Passive House Cost Analysis Thanks for your attention! Seamus Mullins Quantity Surveyor Michael Bennett Group