MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project



Similar documents
MOTION NO. M WSDOT Task Order for Final Design Services PROPOSED ACTION

MOTION NO. M Contract for Transit Scheduling Software PROPOSED ACTION

MOTION NO. M Non-revenue fleet fuel and maintenance card program PROPOSED ACTION

MOTION NO. M Contract for ecitations Hardware, Software and Services for Sound Transit Fare Enforcement

Meeting Cancelled. Final Action

Recommend to Board. Final Action

Wilmington to Newark Commuter Rail Improvement Project

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT:

DRAFT Freight Performance Measures

Background and Goals for the Project

ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Environmental Impact Statement for the Washington Union Station Expansion Project

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016

Section ALTERNATIVES. 3. Alternatives

The Gateway Program and Hudson Tunnel Project

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

How To Complete A Power Line Project

Advanced Construction Techniques

SUBDIVISION APPLICATION GUIDE

IDOT Chicago - St. Louis High-Speed Rail Program Management

Management Incentive Plan Statement

Alternatives Presentation Meeting Middlebury WCRS(23)

Marion County Public Works

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01

Virginia s Approach to Intercity Passenger Rail Development

THE SAN JOAQUIN REGIONAL RAIL COMMISSION (SJRRC)

Dulles Corridor Metrorail Project

Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012

INDOT Long Range Plan

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

Metro Rail Gating Study

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Performance Goals and Objectives:

How To Write A City Of Lakewood

Planning Railway Safety in Canada

IV. INDUSTRIAL TRACK DESIGN

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

Opportunities. Railway Transportation (Engineering and Operations) Areas of Study. University of Kentucky

BART Project Status Report State of Good Repair, OAC & WSX. BART Project Status Report Agenda. 1) BART Risk-Based Asset Management Planning

4 SPADINA SUBWAY EXTENSION UPDATE

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Watershed Rehabilitation Program in Texas

TAPPAN ZEE HUDSON RIVER CROSSING PROJECT

Design-Build Process for Project Managers

2.1 Prior Richmond to South Hampton Roads Rail Service

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/

CONSTRUCTION COST ESTIMATES

VRE SYSTEM PLAN SUMMARY

How To Build A City Of Virginia Beach Arena

Cost Reduction Opportunities

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

Dallas-Fort Worth Area Major Transportation Projects

Task Order Manager. Project Planning, Engineering, Architecture service contract with experience in passenger rail or other modes, and

Comprehensive Railroad Liability Coverage

Stouffville Corridor Rail Service Expansion

Risk Management in the Development of a Penta-P Project

Transcription:

MOTION NO. M2016-76 Contingency Increase for Flatiron West, Inc. Construction Contract for Tacoma Trestle Track & Signal Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board 7/14/2016 7/28/2016 Recommend to Board Final Action Ahmad Fazel, DECM Executive Director Mark Johnson, Project Director Tom Dean, Construction Manager PROPOSED ACTION Authorizes the chief executive officer to increase the contingency for the construction services contract with Flatiron West, Inc. for the Tacoma Trestle Track & Signal Project in the amount of $22,855,250, for a total authorized contract amount not to exceed $86,118,208. KEY FEATURES SUMMARY The contingency funds requested address construction change orders to add Washington State Department of Transportation (WSDOT) funded scope as a part of the ARRA-funded Northwest High Speed Intercity Passenger Rail Program. Sound Transit and WSDOT executed an amended and restated Construction and Maintenance Agreement to add these scope components to the Tacoma Trestle construction contract: 1. Additional track work from East D Street to East C Street. 2. Construction of a second, south platform between East G Street and East D Street. 3. Relocation of the East 26th Street sanitary sewer. 4. Addition of the Control Point Tacoma Dome signal bungalow. Adding this work to the Tacoma Trestle Track & Signal project will facilitate construction coordination and minimize contractor conflicts within a constrained construction site. BACKGROUND The Tacoma Trestle Track & Signal Project will replace a 100-year old single-track wooden trestle with a modern double-track bridge structure along a 0.65-mile section of the Sounder South Line from the Tacoma Dome Station to East M Street in Tacoma. The project will be constructed mostly along Sound Transit s railroad right-of-way and over City of Tacoma public rights-of-way at G Street, J Street, and L Street. Replacement of the trestle includes demolition and track removal of the existing bridge and trestle, upgrades to the embankment along the existing trestle, construction of new tracks and crossover, construction of a new concrete structure, signal upgrades, utility relocation, and erosion control. Service in the corridor will remain active throughout construction. The Tacoma Trestle Track & Signal Project is included in the ST2 plan and is scheduled for completion in 2018. Sound Transit received a TIGER Grant in the amount of $10 million to advance the final design and construction phases of the project and to increase track capacity to accommodate the additional passenger and freight train operations. Environmental review for the Tacoma Trestle project was completed with the State Environmental Policy Act (SEPA) Checklist and Determination of Non-Significance (DNS) issued July 16, 2014, and the Federal Transit Administration approval of the National Environmental Policy Act (NEPA) Documented Categorical Exclusion (DCE) on April 14, 2014. Environmental review for the WSDOT platform extension was completed with the February 2013 Point Defiance Bypass Environmental Assessment, March 1, 2013. A Finding of No Significant Impact (FONSI) was issued by the

Federal Railroad Administration (FRA), and the March 13, 2013, WSDOT Point Defiance Bypass DNS. PROJECT STATUS Project Identification Alternatives Identification Conceptual Engineering Preliminary Engineering Final Design Construction Projected Completion Date for Construction: 2Q 2018 Project scope, schedule and budget summary located on page 125 of the March 2016 Agency Progress Report. FISCAL INFORMATION The project budget in the 2016 Transportation Improvement Plan (TIP) for the Tacoma Trestle Track & Signal project is $161,065,000. Within that amount $114,287,500 has been set aside in the Construction phase. The proposed action would commit $22,855,250 to this line item, leaving a remaining budget of $26,846,291 in the construction phase. This action is within the adopted budget and sufficient monies remain after approval of the action to fund the remaining work in the Construction phase as contained in the current cost estimates. Tacoma Trestle Track & Signal 2016 TIP Board Approvals This Action Board Approved Plus Action Uncommitted / (Shortfall) Agency Administration 8,094 2,240 2,240 5,854 Preliminary Engineering 4,062 4,062 4,062 Final Design 15,198 12,887 12,887 2,311 Third Party Agreements 1,781 871 871 910 Right of Way 10,061 6,418 6,418 3,643 Construction 114,288 64,587 22,855 87,442 26,845 Construction Services 7,581 5,352 5,352 2,229 Vehicles Total Current Budget 161,065 96,416 22,855 119,271 41,794 Phase Detail Construction Civil Construction 104,362 64,423 22,855 87,279 17,083 Other Civil Construction 9,926 164 164 9,762 Total Phase 114,288 64,587 22,855 87,442 26,845 Contract Detail Flatiron West, Inc. Current Approved Contract Status Proposed Total for Board Approval Board Approvals to Date Proposed Action Contract Amount 57,512 57,512 57,512 Contingency Amount 5,751 5,751 22,855 28,606 Total Contract 63,263 63,263 22,855 86,118 Percent Contingency 10% 10% 100% 50% Notes: Amounts are expressed in Year of Expenditure $000s. Board Approvals = Committed To-Date + Contingency, and includes pending Board actions. Project budget page is located on page 36 of 140 of the Adopted 2016 Transit Improvement Plan (TIP). SMALL BUSINESS/DBE PARTICIPATION AND APPRENTICESHIP UTILIZATION Participation by Small Businesses and Disadvantaged Business Enterprises (DBEs) Sound Transit promotes and encourages small business participation, which also includes Disadvantaged Business Enterprises (DBEs). Consistent with Sound Transit Policies and Federal Regulations, Sound Transit has established Small Business/DBE goals for this contract. These Motion No. M2016-76 Page 2 of 3 Staff Report

goals are based upon an examination of subcontracting opportunities contained in the work of this contract and the number of Small Businesses/DBEs available to perform such subcontracting work. For this specific contract, the following goals were set and the successful Bidder/Proposer has committed to the following Small Business/DBE Participation: Small Business and Disadvantaged Business Enterprise Goals Sound Transit Goal: Small Business: 6% DBE: 0% Commitment: Small Business: 7.91% DBE: 4.30% Subconsultant/Subcontractor Business Type % of Work Amount 1 Alliance Geomatics DBE 0.56% $324,000 Rebar International Inc. DBE 3.74% $2,152,630 Liberty Electric, LLC Small Business 3.61% $2,075,400 Total 7.91% $4,552,030 Apprentice Utilization Goal: 20% Commitment: 20% PUBLIC INVOLVEMENT Sound Transit has conducted a number of public outreach activities including stakeholders meetings and the environmental outreach process. Sound Transit will continue to conduct public outreach throughout the construction phase of the project. TIME CONSTRAINTS A one-month delay would create a significant impact to the project schedule putting the FRAadministered federal funding at risk. PRIOR BOARD/COMMITTEE ACTIONS Motion No. M2016-50: Authorized the chief executive officer to execute an amended and restated Construction and Maintenance Agreement with the Washington State Department of Transportation to implement a portion of the Cascade High Speed Rail Program on Sound Transitowned rail corridor in the additional amount of $22,344,392, for a new total authorized agreement amount not to exceed $151,725,572. Motion No. M2016-19: Authorized the chief executive officer to execute a contract with Flatiron West, Inc. to provide construction services for the Tacoma Trestle Track & Signal Project in the amount of $57,511,780, with a 10% contingency of $5,751,178, for a total authorized contract amount not to exceed $63,262,958. ENVIRONMENTAL REVIEW JI 6/23/2016 LEGAL REVIEW JW 7/6/2016 Motion No. M2016-76 Page 3 of 3 Staff Report