APPROVAL AMENDMENT HISTORY



Similar documents
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Scheduling Maintenance for Infiltration Basins and Trenches

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

A Developer s Guide: Watershed-Wise Development

Permeable Paving System with StormAbsorb Technology

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

How To Amend A Stormwater Ordinance

Low Impact Development Checklist

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Sustainable Drainage Systems (SUDS) A guide for developers

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Low Impact Development

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Stormwater Ponds. c ıty of a bı le ne st or m wat e r utı lıty dıv ısı on

Guidelines for. Permeable Pavement

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Planning, Health and Environment Division

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Permeable Interlocking Concrete Pavements

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Storm Drain Inlet Protection

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

How To Plan A Buffer Zone

Storm Drain Inlet Protection

Stormwater Credit Open House Q&A

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Stormwater Management Functional Servicing Report

Waste Handling & Disposal

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

1.7.0 Floodplain Modification Criteria

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

4.3 Cisterns and Rain Barrels

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

4. Environmental Impacts Assessment and Remediation Targets

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

DRAINAGE DISCHARGE AGREEMENTS A WAY OF MANAGING RISK Mr. Sam Green Goulburn-Murray Water

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

AUSTRALIAN PAVING CENTRE

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Permeable Pavement Operation & Maintanence Guide

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Porous Pavement Alternatives Cost Analysis

Forward. Introduction. Objective of the manual. Development of the manual. Key revisions

Curt Kerns, M.S., R.P.Bio., C.F.S. WetlandsPacific Corp

Development at 2 St Albans Road, Kingston, London, KT25HQ

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

CASFM Stormwater Quality Field Trip June 23rd, 2011

Computing Stormwater Runoff Rates and Volumes

Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit Annual Report to the Land Use Parks & Environment Committee

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

understanding Sustainable Landscaping & Tree Preservation Standards

Temporary Batch Plants

at a disposal site for which a permit has been issued; or

Property Care White Papers. Site Drainage: Monitor and Maintain

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Environmental Guidelines for Preparation of an Environmental Management Plan

Outlet stabilization structure

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

Concrete Waste Management

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual

Gettysburg Adams Chamber of Commerce Storm Water Management

Spill Prevention, Control & Cleanup SC-11

Stormwater Design Guidelines Frequently Asked Questions:

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Permeable Pavement Construction Guide

Transcription:

Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E: Francois.dutoit@aurecongroup.com Prepared for: Submitted to: City of Cape Town Catchment, Stormwater and River Management Contact Person: Mr Abdulla Parker Head : Catchment Planning (North) T: +27 21 400 1385 E: Abdulla.Parker@capetown.gov.za

ii APPROVAL Signature Date Compiled by: F du Toit Approved by : N van Zyl AMENDMENT HISTORY Issue Date Amendment Section/Chapter/Page Checked By: Name and Initial A 2013/05/3 Draft 1: Issued for information F du Toit

iii TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Background to Report... 1 1.2 Location of Development... 1 1.3 Objective of Report... 1 1.4 Scope of Work... 2 2. FUTURE DEVELOPMENT SCENARIO... 3 2.1 Future Development... 3 2.2 Calculation of storm water runoff... 4 2.3 Proposed storm water control measures... 4 3. OPERATION AND MAINTENANCE... 7 3.1 Responsibilities... 7 3.2 Maintenance requirements... 7 4. CONCLUSION... 8

1 1. Introduction 1.1 Background to Report The Faircape Group is in the process of developing erf 13730, situated in Tokai within the Southern Suburbs of Cape Town. The property, formerly referred to as Erf 4116 (Portion 14 of Cape Farm 1133), formed part of a number of properties which were rezoned from Single Residential to General Residential Purposes in 1975. Erf 13730 is a recent subdivision of Cape Farm 1133 and is owned by Dreyersdal Farms (Pty) Ltd. The majority of the area to be developed is zoned for General Residential purposes. The proposed Tokai Estate development on erf 13730 will consist of two development components. There will be a residential estate consisting of approximately 45 single storey units a retirement estate consisting of approximately 150 units with a health care centre. The two components will be developed as individual developments. Aurecon was appointed to design roads and services for the proposed residential subdivision, which includes the necessary infrastructure to collect and control stormwater runoff. The development is subject to the CoCT s stormwater policy (Management of Urban Stormwater Impacts Policy C58/05/09). The strategy of managing stormwater on the site will be similar for both sites and will be reported on in the stormwater management plan. 1.2 Location of Development Erf 13730 is situated to the north of the Blue Route Mall and east of the Simon van der Stel Road (M3) in Tokai within the southern suburbs of Cape Town in the Western Cape. It falls under the jurisdiction of the City of Cape Town: South Peninsula Administration. The property is 8,4 hectares in size and falls within the existing urban edge. It borders existing residential property to the south and the west, open land to the north and the existing Keyser River to the north east. The surrounding context of mixed urban development is farm remnants and wetland areas. The site locality plan is presented in Figure 1 below. 1.3 Objective of Report The objective of this statement is to: Identify measures to comply with the CoCT s Management of Urban Stormwater Impacts Policy (C58/05/09); Propose methods (structural controls) for removing, reducing, or retarding runoff flows, and preventing targeted stormwater runoff constituents, pollutants and contaminants from reaching receiving waters.

2 Figure 1: Site Locality Plan 1.4 Scope of Work The scope of work entails the following: Calculate the expected future stormwater runoff for the catchment area of the development; Recommend treatment and control measures for the development that will enable compliance with the CoCT requirements. Recommend remedial works on the Keyser River adjacent to the development.

3 Tokai Estate: Stormwater Management Plan 2. FUTURE DEVELOPMENT SCENARIO 2.1 Future Development Erf 13730 is currently undeveloped and was previously used for agricultural activities. The surrounding area has mixed urban developments, farm remnants and wetland areas. The existing erf 13730 is approximately 8.4 hactares in size and it is the intention of the developer to subdivide the property prior to development. The proposed land-uses within the development will consist of a residential estate with approximately 50 single residential units, a retirement estate with approximately 180 to 200 units and a health care (frail care) centre which will make provision for approximately 150 beds. The following breakdown is proposed per land-use: Single residential units: Retirement Village: Health Care Centre: Public Roads: 3.3 ha 4.1 ha 0.9 ha 0.8 ha The density of the proposed development is considered to be compatible with the existing densities of the surrounding area whilst appropriately dense to address the City and Provincial drive to develop at higher densities. It is important to note that the proposed development is at a lower density than what would be possible if the site had to be developed with flats, as allowed in terms of the zoning. The development is accordingly considered to be a very appropriate compromise between exercising existing rights and considering community response to high density development. The proposed site development plan is presented in Figure 2 below. Figure 2: Site Development Plan

4 2.2 Calculation of storm water runoff The development of Erf 13730 is categorized as a Greenfields Development. Therefore, the development of the site is expected to increase the stormwater runoff due to the fact that new hard surfaces will be created. According to guidelines laid down by CoCT, and to support Water Sensitive Urban Design Principles, all runoff from new hard surfaces created shall be treated to improve the quality of runoff and the quantity and rate of runoff shall be controlled. Preliminary stormwater run-off calculations indicate that the predevelopment runoff amounts to approximately 135 l/s for the 1:2 year storm recurrence period and 355 l/s for the 1:50 year storm recurrence period. The post development runoff will amount to approximately 650 l/s for the 1:2 year storm recurrence period and 1700 l/s for the 1:50 year storm recurrence period. The City of Cape Town s Management of Urban Stormwater Impacts Policy requires that all new developments shall be planned and designed to incorporate sustainable urban drainage systems in accordance with the City s Stormwater Management Planning and Design Guidelines for New Developments as well as with local and international best practice. It is therefore required from the developer to improve the quality of the post development runoff by removing pollutants before discharging it into the existing drainage system or natural water course. This can be achieved through Best Management Practice (BMP) and includes systems like swales and permeable paving. Pollutants that need to be removed are classified as Suspended Solids (SS) and Total Phosphorous (TP). The pollutant removal target for post-development discharge from a new development can either be to reduce the SS and TP pollutant levels to the undeveloped catchment levels, or achieve an 80% SS reduction and a 45% TP reduction. 2.3 Proposed storm water control measures 2.3.1 CoCT requirements According to the CoCT s Management of Urban Stormwater Impacts Policy all stormwater management systems shall be planned and designed in accordance with best practice criteria and guidelines laid down by Council, to support Water Sensitive Urban Design principles and the following specific sustainable urban drainage system objectives: Improve quality of stormwater runoff; Control quantity and rate of stormwater runoff; Encourage natural groundwater recharge. To achieve abovementioned objectives, the CoCT recommends the following criteria for an Existing Development Site (Greenfields Development): Improve quality of runoff - Design storm event: ½ year RI, 24 hour storm Pollutant removal target: SS 80% ; TP 45% or reduced to undeveloped catchment levels. Control quantity and rate of runoff - 1 year RI, 24 hour storm 24 hour extended detention 10 year RI peak flow reduced to pre-development level 50 year RI peak flow reduced to pre-development level Encourage natural groundwater recharge Not applicable

5 2.3.2 Proposed Solution The City requires that the amount of post-developed runoff which is discharged into the existing system cannot exceed the pre-developed discharge in a major storm event as to prevent flooding of the natural water courses. It is therefore required that excess discharge be managed on site by temporarily storing the runoff on site until it can discharge into the existing system once the peak storm event have passed. This can be achieved by supplying stormwater detention facilities on site. It is calculated at this stage that approximately 2650m³ of stormwater runoff water will have to be made provision for on-site. The removal of pollutants and the storage of the post development runoff can be managed through integrated systems which can enhance the appearance of the development and can be made part of the landscaping of the development. After considering the different options presented by the Structural Best Management Practices (BMP) Screening in the Municipal Stormwater Management book (Table 13-15, Source: Georgia Stormwater Manual, 2001), it was determined that for the specific site layout and topography as well as the Client s requirements, permeable paving will be introduced to all roads with a combination of swales for overland stormwater drainage would be best suited to control the quantity and quality of runoff. Permeable paving is a range of sustainable materials which consist of permeable clay brick pavers and a base and subbase that allow the movement of stormwater through the surface. In addition to reducing runoff, this effectively traps suspended solids and filters pollutants from the water. It also serves as a detention facility to reduce the post development runoff. Permeable clay brick pavements are fired clay brick units with open, permeable spaces between the units. Clay pavers provide a durable surface that allows stormwater runoff to permeate through the joints. Permeable paving surfaces keep the pollutants in place in the soil or other material underlying the roadway, and allow water seepage to groundwater recharge while preventing the stream erosion problems. They capture the heavy metals that fall on them, preventing them from washing downstream and accumulating inadvertently in the environment. In the void spaces, naturally occurring micro-organisms digest car oils, leaving little but carbon dioxide and water. Figure 3: Image of a Typical Section through Permeable Paving Layer Swales capture stormwater in a long gently sloped vegetated drainage channel, which slows the flow rate, allowing the water to infiltrate down thorough the garden bed where it is filtered and cleaned by natural environmental processes. Bio retention swales treat the stormwater through a naturally process called bio filtration. Stormwater flows through the surface vegetation which slows the flow rate and filters out the large sediments. As the stormwater flows along the swale, it slowly filters vertically through the soil or filter media.

6 As the water flows through the soil, a combination of physical and, chemical and biological processes allow the contaminants to be filtered out. The clean water then flows into the natural water ways and into the Keyser River. Figure 4: Image of a Typical Section through a Biofiltration Swale It is proposed that remedial work will be done to the Keyser River adjacent to the proposed development. These remedial measures will aim to reduce the flow rate of the river and promote the natural flow thereof as well as prevent erosion. This will be achieved by introducing gabion weir structures in the river channel which would assist in achieving the reduction of the flow rate. The gabion structures are a natural product which would also be acceptable to the natural surroundings. Figure 5: Image of a Typical Image of Gabion Weirs

7 3. OPERATION AND MAINTENANCE 3.1 Responsibilities Once the stormwater facilities have been completed, the maintenance and monitoring thereof will remain the sole responsibility of the developer until the establishment of a Home Owners Association, which will take financial responsibility for the operation and maintenance of the stormwater. Initial planting will be carried out by an experienced horticulturist or landscaper. The maintenance requirements are discussed below. 3.2 Maintenance requirements 3.2.1 Irrigation System It is estimated that it will take up to two years before the system and it s vegetation is fully established. In most part it is intended that the swales will be seasonally wet with dry intervals. Sufficient irrigation (as decided by the landscaper) must be provided in the areas that are dry during summer months. This should continue until the vegetation is suitably established to survive a dry season. The irrigation system must be checked on a monthly basis during times of operation for leaks, breaks and blocked nozzles/sprayers. 3.2.2 Litter clearing A litter clean-up is to take place once every four weeks or as required. 3.2.3 Alien and problem vegetation The swales must be inspected for invasive alien vegetation once per month by the appointed landscaper. As far as possible all alien vegetation will be manually removed (pulled out). Where manual removal is not possible, alien vegetation will be treated with an appropriate herbicide using the correct application method and to the manufacturer s directions and specifications. Herbicides shall not be applied when conditions are windy, so as to avoid spray drift. No herbicides shall be applied when rain is forecast within 2 days. Colour dyes must be used with the herbicides to clearly mark areas that have been treated, taking exceptional care when working near water. It must be recognized that under certain conditions some indigenous vegetation may become problematic and may require intervention. Typha reeds have a strong potential to smother the system. The appointed landscaper will ensure that any areas being overrun by Typha to the detriment of vegetation diversity must be cleared and controlled to allow for the intended and planted species to remain established. 3.2.4 Cleaning of siltation traps The stormwater catcpits must be inspected every six months, with one of the inspections taking place just before the first seasonal rains. These will be inspected for a build-up of silt, dirt, mud and similar material. All silt and other material will be removed and disposed of at a suitable landfill site. Care must be taken to ensure that no silt enters the stormwater system during the cleaning process. 3.2.5 Fertilizer It is the intention to create a system that will remove unwanted nutrients and inputs in the stormwater system, therefore the use of fertilizer will be in conflict with the swale s goals. No fertilizer will be used. Should a situation arise where there are persistent or recurring problems such as poor water quality, problems with vegetation and similar issues an aquatic specialist will be consulted for input and advice on the matter. If required or requested by the specialist water sampling will be undertaken.

8 4. Conclusion The proposed development of of Erf 13730 is subject to the stormwater management requirements of the City of Cape Town. On-site treatment and attenuation facilities have been proposed to comply with the Management of Urban Stormwater Impacts Policy (C58/05/09). Aurecon trusts that these proposals will enable the necessary approvals to be granted for the development.