Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015. Table of Contents: April 26 Schedule Change - Page 2

Similar documents
New Haven Hartford Springfield Rail Corridor Glory Days: trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

MEI Structured Mathematics. Practice Comprehension Task - 2. Do trains run late?

Connecticut s Bold Vision for a Transportation Future

Review of the A and C Lines

VRE SYSTEM PLAN SUMMARY

Why build the Silvertown Tunnel?

VIII. TRANSPORTATION

Stouffville Corridor Rail Service Expansion

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

Cost Reduction Opportunities

How To Expand Commuter Rail Between Worcester And Boston

Omni New Haven Hotel 155 Temple Street, New Haven, Connecticut 06510


Get Connected with Metro-North

Connecticut s Bold Vision for a Transportation Future

Major Improvement Schemes in Basingstoke

Including Climate Change Risks in Prioritization for Asset Management. Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC

TERMINAL TRAFFIC MONITORING STUDY

SITE SPECIFIC WEATHER ANALYSIS REPORT

GTA Cordon Count Program

Connecticut Department of Public Health Public Sexually Transmitted Diseases Clinics in Connecticut

Coordinated Transit Planning in Toronto SmartTrack Eglinton West LRT Eglinton East LRT Scarborough Subway Extension Relief Line Waterfront Transit

GO News. gotransit.com GO Transit s Newsletter for Customers summer Keeping You in the Know.

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Pays directly for business travel on behalf of an employee. Provides travel facilities, such as a train ticket, for an employee.

HOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES

Applying Schedules and Profiles in HAP

2013 Customer Satisfaction Survey Long Island Rail Road

Senior Living Community

Informational Report On City Facility Damage Resulting From The Winter Storm January 2-6, 2008

RESTORATION PROCESS. Step 1 Empire s storm restoration team assesses the damage to the system. This assessment allows Empire. = Location of damage

2007 Annual Performance Review of The MTA and Its Operating Agencies

One positive experience I've had in the last 24 hours: Exercise today:

MTA Storm Performance Review. June 2011

Electric Rate Book Revision: 13 ( ) Page No. 1 Effective date: SMALL COMMERCIAL

2.1 Prior Richmond to South Hampton Roads Rail Service

U.S. System Summary: EMPIRE CORRIDOR

TESTIMONY JOSEPH H. BOARDMAN PRESIDENT AND CHIEF EXECUTIVE OFFICER AMTRAK 60 MASSACHUSETTS AVENUE, NE WASHINGTON, DC (202)

For public transport information phone Bus 378. Easy access on all buses. Wilmslow Handforth Grove Lane Bramhall Davenport Stockport

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

PURPOSE AND NEED FOR ACTION

FOR IMMEDIATE RELEASE December 6, ATK Contact: Media Relations

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

Table 10-1 Travel Times Between Stations OPERATING & MAINTENANCE PLAN

Performance Goals and Objectives:

G-00-02: The Federal Hours of Service Law and Signal Service

Your guide to fares and tickets within Zones 1-6

Regional Membership Supplement. USA Canada Caribbean Islands 417-EN (313)

The Corporation of the TOWN OF MILTON

Anytime Banking Troubleshooting

Office of Inspector General. Audit Report. Actions Taken in Advance of El Niño s Adverse Weather. Federal Railroad Administration

AN AUDIT OF THE CITY OF SAN JOSÉ S CUSTOMER SERVICE CALL CENTER

Miami-Dade Transit Service Standards

Connecticut Americans with Disabilities Act (ADA) Paratransit Application Form

First Transit Contra Flow Lane in Downtown San Francisco

2012 Saskatoon Transit Services Annual Report

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

BxM8. Between Pelham Bay, Bronx, and Midtown, Manhattan. Express Service. Bus Timetable SERVING CITY ISLAND WEEKDAYS ONLY. Effective Summer 2016

Duke Energy Carolinas, LLC Electricity No. 4 North Carolina Fourth Revised Leaf No. 78 Superseding North Carolina Third Revised Leaf No.

San Francisco Transportation Initiatives and Workforce Support

Questions and Answers about the Orange Bus/Rail Investment Plan

Federal Railroad Administration Report to Congress. Operation Deep Dive Metro-North Commuter Railroad Safety Assessment

Metropolitan Transportation Authority Metro-North Railroad

REGIONAL OCCUPATIONAL CENTER KERN HIGH SCHOOL DISTRICT

Opportunities. Railway Transportation (Engineering and Operations) Areas of Study. University of Kentucky

Construction Phase Traffic Management Plan

THE CHINESE UNIVERSITY OF HONG KONG STAFF QUARTERING UNIT USEFUL INFORMATION ON LIVING IN UNIVERSITY STAFF QUARTERS (USQ)

5.14 Floodplains and Drainage/Hydrology

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29

Connecticut 2009 Annual Air Monitoring Network Plan. Peter Babich, CTDEP SIPRAC May 14, 2009

Roadway Congestion 139, , ,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)

Northern New England Intercity Rail Initiative Stakeholder Meeting October 22, 2014, 11:00 1:00 PM Pioneer Valley Planning Commission, Springfield, MA

NETWORK RAIL ROUTE UTILISATION STUDY YORKSHIRE AND HUMBER - DRAFT FOR CONSULTATION COMMENTS FROM NORTH YORKSHIRE COUNTY COUNCIL (NYCC)

NEW BLUE LINE CONNECTIONS

MTA Bus Routes and Points of Interest

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

MTA Capital Program

Transitways and the RouteAhead for Calgary Transit

Campus Specific Information JSA Summer School at Stanford University

11. Monitoring Performance monitoring in LTP2

This document is part of a series of Building a Stronger South Australia policy initiatives from the Government of South Australia.

CUSTOMER RELATIONSHIP MANAGEMENT

CULVER LINE REHABILITATION PRESENTATION TO COMMUNITY BOARD 6 TRANSPORTATION COMMITTEE NOVEMBER 15, 2007

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture

Green Line Extension Project Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility

Northeast Corridor State of Good Repair Spend Plan

Notice of Comment Period

BM4. Between Gerritsen Beach, Brooklyn, and Midtown/Downtown, Manhattan. Express Weekday & Saturday Service. Bus Timetable. Effective Fall 2015

BM1. Between Mill Basin, Brooklyn, and Midtown/Downtown, Manhattan. Express Weekday & Saturday Service. Bus Timetable. Effective Summer 2016

Brookdale Site. CB6 Update April 1, 2015

ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS

Welcome to the LRT Overview Open House

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town.

Wilmington to Newark Commuter Rail Improvement Project

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010

OPERATIONS POLICY & PROCEDURE NOTICE # 9/96

2016 Transit Service Review CCT Meeting #2. Calgary Transit April 19, 2016

Preapplication for HSIPR Program OMB No

Transcription:

Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015 Table of Contents: April 26 Schedule Change - Page 2 Master Page # 1 of 5 - Metro-North Railroad Committee Meeting 3/23/2015

Memorandum Date: To: From: Re: Metro-North Committee Joe Giulietti April 26, 2015 East of Hudson Schedule Change For your information, schedules will change on all Metro-North lines effective Sunday, April 26, 2015. This schedule change reflects the normal necessary adjustments to provide for the safe and reasonable operation of the service. These changes are necessary to: improve reliability; provide appropriate track outage windows to assure Metro-North s ability to perform needed track work and to advance capital construction projects; and address customer requests and service guideline issues. Under the new schedules, weekend travel times are temporarily lengthened to reflect the impact of several critical infrastructure projects, and a small number of service adjustments are made to address service guidelines and customer service issues. All Lines We have identified some minor adjustments to improve reliability and better reflect actual operating performance. Most adjustments are in the AM and PM Peak and involve changes of one to two minutes. As the summer construction season begins, several critical infrastructure projects will get under way. These projects require continuous track outages on weekends, and include: construction of the new interlocking near Fordham station (CP 109); Bronx drainage improvements; Replacement of switches at CP 3 (south of Harlem-125th Street Station); Replacement of third rail and components in the Park Avenue Viaduct; Culvert replacement at CP 72 (south of Poughkeepsie). These projects require continuous track outages on multiple weekends from Friday evening until early Monday morning. In combination, these outages will place a heavy constraint on capacity, which leads to the potential for significant weekend service delays. To reflect the potential for service impacts, five minutes of additional running time is added to virtually all weekend trains. Master Page # 2 of 5 - Metro-North Railroad Committee Meeting 3/23/2015

Page 2 Hudson Line In response to customer requests, the Greystone stop on the 7:39 AM train from Irvington, which was eliminated in 2014, is restored. The 10:55 PM semi-express from Croton-Harmon will be combined with the 11:00 PM local from Croton-Harmon, in an effort to better align service with evolving ridership trends. In spite of a number of service improvements made in April 2013, inbound ridership in the 10 PM 2 AM time frame on the Hudson Line has declined by 22% since the fall of 2012, compared to an overall weekday off-peak ridership gain of 2.8% in the same period. This change will have an added benefit of improving diesel equipment utilization and adding to overall reliability. Construction Change: An Amtrak train whose schedule was adjusted to accommodate the weekend culvert replacement project at CP 72 conflicts with the 8:59 AM Metro-North weekday train from Poughkeepsie. To resolve the conflict, the 8:59 AM train from Poughkeepsie will now depart Poughkeepsie at 9:15 AM. In addition, this train will add stops at Ossining and Tarrytown to be consistent with other weekday off-peak upper Hudson trains. Harlem Line Weekdays: To relieve overcrowding on the 6:51 AM from Southeast, this train will instead originate at Goldens Bridge. Approximately 220 customers at the affected stations will instead take the 7:01 AM from Southeast, which makes fewer stops and arrives at Grand Central Terminal two minutes after the 6:51 AM train. To avoid the potential for overcrowding on the 7:01 AM train, it will no longer stop at White Plains. Ten to fifteen customers who normally detrain at White Plains can take other trains, and most will have their routine changed by about five minutes. Finally, to reduce the potential for congestion in this time period, the 6:00 AM from Wassaic will depart eleven minutes earlier, at 5:49 AM, and arrive Grand Central Terminal at 7:53 AM, twelve minutes earlier than it currently does. Weekends: When weekend upper Harlem half-hourly service was established in 2012, operating and crew availability constraints required that many of the new trains originate and terminate at Mount Kisco; we intended at that time to eventually extend this service to Southeast when those constraints eased. At this time, these constraints have eased, and with this schedule change the 4:02 PM, 5:02 PM, and 6:02 PM trains from Mount Kisco; and the 2:22 PM and 3:22 PM from Grand Central Terminal to Mount Kisco, are extended to/from Southeast. In addition to fulfilling the original intent to provide half-hourly service to the most of the upper Harlem Line stations, extending these trains relieves a significant burden, during winter storms in particular. As these are the only trains that originate or terminate at an intermediate interlocking location, their operation necessitates the diversion of track and signal resources from critical terminal and junction locations to address switch cleaning and other weather-related issues. Also, to better utilize crews and equipment, an existing deadhead equipment train that operates from Grand Central Terminal to Southeast on weekday afternoons will be converted into a Master Page # 3 of 5 - Metro-North Railroad Committee Meeting 3/23/2015

Page 3 revenue train, at no incremental cost. This new revenue train will depart Grand Central Terminal at 1:22 PM, making select stops between Scarsdale and Southeast, and extending by one hour the period during which half-hourly service is provided on weekday afternoons. New Haven Line In May 2014 we instituted a new weekday through train from Grand Central Terminal to Danbury at 4:29 PM, taking the place of an existing shuttle train that ran from Stamford to Danbury. An analysis of the ridership impacts of this change has revealed that few, if any, customers are taking advantage of this change. Of the 220 customers boarding the train at Grand Central Terminal, approximately 200 detrain at Stamford; only 20 customers on average travel east of Stamford. To better align service improvements with customer travel patterns, we will return this train to its previous schedule, as a shuttle train from Stamford to Danbury. Customers traveling from Grand Central Terminal to Stamford will instead travel four minutes later on the 4:33 PM New Haven train, as they did before we instituted the new through Danbury train. There will be no reduction in the number of through trains serving Danbury, however. We will be adding a new through train to Danbury, departing Grand Central Terminal at 8:01 PM, making stops at Greenwich, then all main line and Danbury Branch stops from Stamford to Danbury. The existing 9:18 PM shuttle from South Norwalk to Danbury is replaced by this new through train. With this change, Danbury Branch customers who work late will have the opportunity for a more convenient commute home at night, without a change of trains en route. This new train will take the place of the 8:03 train to New Haven. Customers on that train will be served by the current 8:06 PM New Haven train, which under the new schedule will depart Grand Central Terminal at 8:07 PM and make additional stops at Stamford, East Norwalk, Green s Farms, and Southport. The end result of this complex change is a better-utilized Danbury through train, which will accommodate several hundred main line customers as well as Danbury Branch customers. Construction Changes: Two major projects will impact Waterbury Branch service between April and October: From April 25 through May 3, track work will be performed on the single-track Waterbury Branch. Substitute bus service will be provided at all times during this nine day outage. Bus schedules will be communicated to customers via special flyers and other customer communications media. From May 4 through early October, a steel repair project on the Devon Movable Bridge will prevent Waterbury Branch trains from accessing the main line between the junction point and Bridgeport station, where connections are normally made between main line and Waterbury Branch trains. During this time a temporary platform will permit transfers between Waterbury Branch and main line trains at a temporary station known as Devon Master Page # 4 of 5 - Metro-North Railroad Committee Meeting 3/23/2015

Page 4 Transfer, located where the Waterbury Branch track connects with the main line west of Milford. Impact on the Operating Budget The above changes are projected to cost approximately $200,000 per year, and are included in the 2015 operating budget. CDOT Approval Connecticut Department of Transportation has approved the New Haven Line schedule changes. Next Schedule Change The next East of Hudson schedule change is planned for October 4, 2015. cc: T. Prendergast C. Rinaldi R. Agritelley K. Betries-Kendall S. Doering R. Fleischer J. Henly J. Kesich T. McCarthy K. Porcelain M. Shiffer A. Kirsch M. Mannix Master Page # 5 of 5 - Metro-North Railroad Committee Meeting 3/23/2015