SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST



Similar documents
Automatic Fire Sprinkler Submittal Requirements

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

MECHANICAL PLAN REVIEW REQUIREMENTS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Clark County Fire Prevention

Automatic Fire Sprinkler System Checklist

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

Pressure Reducing Valve Calculation Example

Automatic Sprinkler System Calculations

FIVE YEAR CERTIFICATION REPORT

One of the fundamental design elements that every

Fire Pump Plan Review March 2010

SIZING OF WATER PIPING SYSTEM

AON SPRINKLER CERTIFICATION

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Inspection and Testing of Water-Based Systems

C I T Y O F S E L M A F I R E D E P A R T M E N T

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM

Hydrant flow testing data provides important

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

Element D Services Plumbing

Firefighter Review. Instructor Guide

Chapter 19 - FIRE SPRINKLER SYSTEM INSPECTIONS

Maintaining Fire Protection Systems

Element D Services Plumbing

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description

FIRE PROTECTION SYSTEMS ACCEPTANCE INSPECTION AND TESTING PROCEDURE

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Design & Construction Standards, Revised January

EFSN Training i Module Minutes

Stored Palletized, Solid Piled, Bin Boxes, or Shelf Storage (12.2)

I. Introduction. 10 minutes

NFPA FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13?

Sprinkler and Fire Alarm Systems for the Building Official

H O M E F I R E S P R I N K L E R S S A V E L I V E S, M O N E Y A N D W A T E R A G U I D E F O R W A T E R P U R V E Y O R S

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

Roland Garcia Pearland Fire Department

Risk Control Bulletin Inspection, Testing & Maintenance (ITM) of Water-Based Fire Protection Systems

FIRE INSPECTION CHECKLIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

The Jockey Pump, an Important Part of a Fire Pump System.

Building Permit Application

RESIDENTIAL SPRINKLER INSTALLATION GUIDE

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Transformer Deluge Systems

LAWS AND REGULATIONS for AUTOMATIC EXTINGUISHING SYSTEMS

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS

Commercial Fire Inspections

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

UNIVERSITY OF CALGARY ALL RISKS COURSE OF CONSTRUCTION APPLICATION. Project Name:

TABLE OF CONTENT

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

F.Y.I. Specifying Fire Protection Systems Using Division 13

Module 9: Basics of Pumps and Hydraulics Instructor Guide

THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

Inspection and Testing Program Fire Protection Equipment

Technical Article. Sprinkler Protection for High Bay and Automated Storage in Warehouse-Type Storage Facilities

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Antifreeze Solutions in Residential Fire Sprinkler Systems

Concord Department of Fire and Life Safety FIRE MARSHAL S OFFICE

KODAK VERSAMARK, INC.

Winnipeg Fire Department Fire Prevention Branch

SANITARY SEWER SPECIFICATIONS

We look forward to working with you. Worldwide Headquarters 1400 Pennbrook Parkway Lansdale, PA

Plumbing Supply Piping Planning Tool Reducing Water Wasted Waiting for Hot

Requirements for Building Application Submission

The following definitions apply with regard to requirements specified in this document:

Fire and Emergency Medical Services (EMS) Responders

EXHIBIT A SCOPE OF WORK

BUILD FOR QUALITY BUILD FOR VALUE BUILD FOR LIFE

WATER SUPPLY AND DISTRIBUTION

Model WS Specific Application Window Sprinklers Horizontal and Pendent Vertical Sidewall 5.6 K-factor General Description

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

INTERNATIONAL RESIDENTIAL CODE PLUMBING

SECTION FIRE PROTECTION PIPING SYSTEMS STANDARD CONSTRUCTION STANDARD PART 1: GENERAL

2010 Residential Water Heater Replacement Check List

The following definitions apply with regard to requirements specified in this document:

Suffolk County Department of Health Services. Division of Environmental Quality

Pacific Pump and Power

What to Expect From the Examination. How to Study the Plumbing Codes

CHAPTER 2: The Plumbing System

TEXAS STATE BOARD OF PLUMBING EXAMINERS EXAMINATION AND REGISTRATION Endorsement Training Programs

Reference Guide for Obtaining Permits and Utility Services For New Construction

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

FireLock LP-46 Storage Sprinkler V4601 Pendent FM Approved, culus Listed See Submittal Publication 40.95

Residential Plumbing BCN 1058

PLAN CHECK CORRECTION SHEET FOR PLUMBING SYSTEMS 2014 LAPC

Building Code Clarifications - 7. Fire Resistance

Transcription:

SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST 1. Working plans shall be drawn to an indicated scale, on sheets of uniform size, with a plan of each floor, and shall show those items from the following list that pertain to the design of the system. Name of owner and occupant Location, including street address Point of compass. Full height cross section, or schematic diagram, including structural member information if required for clarity and including ceiling construction and method of protection for nonmetallic piping. Location of partitions. Location of fire walls. Occupancy class of each area or room Location and size of concealed spaces, closets, attics, and bathrooms. Any small enclosures in which no sprinklers are to be installed. Size of city main in street and whether dead end or circulating; if dead end, direction and distance to nearest circulating main; and city main test results and system elevation relative to test hydrant. Other sources of water supply, with pressure or elevation Make, type, model, and nominal K-factor of sprinklers. Temperature rating and location of high-temperature sprinklers. Total area protected by each system on each floor. Number of sprinklers on each riser per floor. Total number of sprinklers on each dry pipe system, preaction system, combined dry pipe-preaction system, or deluge system. Approximate capacity in gallons of each dry pipe system. Pipe type and schedule of wall thickness.

Nominal pipe size and cutting lengths of pipe. Where typical branch lines prevail, it shall be necessary to size only one typical line. Location and size of riser nipples. Type of fittings and joints and location of all welds, and bends. The contractor shall specify on drawing any sections to be shop welded and the type of fittings or formations to be used. Type and locations of hangers, sleeves, braces, and methods of securing sprinklers when applicable. All control valves, check valves, drain pipes, and test connections. Make, type, model, and size of alarm or dry pipe valve. Make, type, model, and size of preaction or deluge valve. Kind and location of alarm bells. Size and location of standpipe risers, hose outlets, hand hose, monitor nozzles, and related equipment. Private fire service main sizes, lengths, locations, weights, materials, point of connection to city main; the sizes, types and locations of valves, valve indicators, regulators, meters, and valve pits; and the depth that the top of the pipe is laid below grade. Piping provisions for flushing Where the equipment is to be installed as an addition to an existing system, enough of the existing system indicated on the plans to make all conditions clear. For hydraulically designed systems, the information on the hydraulic data nameplate. A graphic representation of the scale used on all plans.

Name and address of contractor. Hydraulic reference points shown on the plan that correspond with comparable reference points on the hydraulic calculation sheets. The minimum rate of water application (density), the design area of water application, inrack sprinkler demand, and the water required for hose streams both inside and outside. The total quantity of water and the pressure required noted at a common reference point for each system. Relative elevations of sprinklers, junction points, and supply or reference points. If room design method is used, all unprotected wall openings throughout the floor protected. Calculation of loads for sizing and details of sway bracing. The setting for pressure-reducing valves. Information about backflow preventers Information about antifreeze solution used. Size and location of hydrants, showing size and number of outlets and if outlets are to be equipped with independent gate valves. Whether hose houses and equipment are to be provided, and by whom, shall be indicated. Static and residual hydrants that were used in flow tests shall be shown. Size, location, and piping arrangement of fire department connections per Section 903.3.7, shall be within 200 feet of a fire hydrant.

2. Water Supply Capacity Information: The following information shall be included. Location and elevation of static and residual test gauge with relation to the riser reference point. Flow location. Static pressure, psi (bar) Residual pressure, psi Flow, gpm (L/min) Date Time Test conducted by or information supplied by Other sources of water supply, with pressure or elevation. 3. Summary Sheet. The summary sheet shall contain the following information, where applicable. Date Location Name of owner and occupant Building number or other I.D. Description of hazard Name and address of contractor or designer.

Name of approving agency System design requirements as follows: Design area of water application, ft² (m²) Minimum rate of water application (density), gpm/ft² (mm/min) Area per sprinkler, ft²(m²) Total water requirements as calculated, including allowance for inside hose, outside hydrants, and water curtain and exposure sprinklers. Allowance for in-rack sprinklers, gpm (L/min) Limitations (dimension, flow, and pressure) on extended coverage or other listed special sprinklers. 4. Detailed Work Sheets: Detailed work sheets or computer printouts shall contain the following information. Sheet number Sprinkler description and discharge constant (K) Hydraulic reference points Flow in gpm (l/min) Pipe size Pipe lengths, center-to-center of fittings Equivalent pipe lengths for fittings and devices Friction loss in psi/ft of pipe Total friction loss between reference points In-rack sprinkler demand balanced to ceiling demand Elevation head in psi between reference points Required pressure in psi at reference point Velocity pressure and normal pressure if included in calculations Notes to indicate starting points or reference to other sheets or to clarify data shown Diagram to accompany gridded system calculations to indicate flow quantities and directions for lines with sprinklers operating in the remote area. Combined K-factor calculations for sprinklers on drops, armovers, or sprigs where calculations do not begin at the sprinkler. 5. Graph Sheet: A graphic representation of the complete hydraulic calculation shall be plotted on semi-exponential graph paper and shall include the following. Water supply curve

Sprinkler system demand Hose demand (where applicable) In-rack sprinkler demand (where applicable) Applicant Signature: Date: