MINI TOOL ROOM PRODUCT CODE 359960313



Similar documents
PROJECT PROFILE ON ALUMINIUM FABRICATION

PROJECT PROFILE ELECTRONIC GAS LIGHTER **************************

COMPUTER HARDWARE MAINTENANCE & NETWORKING SERVICE

HDPE LAMINATED COLLAPSIBLE TUBES

PROJECT PROFILE ON MUSTARD OIL

PROJECT PROFILE DAIRY EQUIPMENTS **********************

PROJECT PROFILE ON PLASTER OF PARIS

PRODUCT : High Tensile Nuts & Bolts. PRODUCTION CAPACITY : Quantity. : 360 M.T. (Per annum) Value : Rs Lakhs

Electronic Gas Lighters

AIR CONDITION & REFRIGERATION INSTALLATION & REPAIR

PROJECT PROFILE ON SOYA MILK,PANEER & CURD

PROJECT PROFILE PACKAGED DRINKING WATER / MINERAL WATER

PROJECT PROFILE ON MOBILE PHONE REPAIRING AND SERVICING

PROJECT PROFILE ON COTTON GINNING UNIT

Prepared by : Installed Capacity per Annum :

COURSE CURRICULUM COURSE TITLE: ESTIMATING, COSTING AND ENGINEERING CONTRACTING (COURSE CODE: )

PROJECT PROFILE ON COMPUTER FURNITURE

PROJECT PROFILE ON PACKAGED DRINKING WATER UNIT

PROJECT PROFILE PRODUCT CODE ASICC(2000): PRODUCTION CAPACITY : QUANTITY 8,04,000 mtrs. Lancing (P.A) Valued Rs.

PRODUCTION CAPACITY : Qty : Nos./ Annum Value : Rs. 16,74,000/-

PROJECT PROFILE. PRODUCTION CAPACITY: Quantity: 2,40,000 pairs of Eva Sole per annum. Valued at Rs 76,80,000/-

Medical Transcription

1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of technology, Quality Standards and Compliances 3.

PROJECT PROFILE ON MINI FLOUR MILL

PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, Quality Standard : IS : 44 : 1991 IS : 05 : 1994

PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS

CHILLY AND TURMERIC POWDER

Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product Code (Based on NIC -2004) for Bricks & Tiles: 26921

221. PROFILE ON PRODUCTION OF PAPER ENVELOPE

EDIBLE GROUNDNUT FLOUR

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.

AUTOMOBILE REPAIRING & SERVICING WORKSHOP

CNC and conventional high quality, large, powerful and heavy duty horizontal lathes and grinding machines

PRODUCTION CAPACITY : Ouantity (i) Development of 24 website per annum (ii) Update of 24 website per annum Value : Rs. 4,80,000/-

Lesson-13. Elements of Cost and Cost Sheet

BASIS AND PRESUMPTIONS

Bakery PRODUCTS INTRODUCTION MARKET POTENTIAL

1.0 INTRODUCTION 2.0 PRODUCT 3.0 MARKET POTENTIAL 3.1 Demand and Supply 3.2 Marketing Strategy

VEGETABLE OIL REFINERY

Transistor Radio Receivers (AM/FM)

PINEAPPLE AND ORANGE PRODUCTS

2.2 Quality Standards and Compliances The BIS has specified quality standards vide IS 1011:1992. Compliance with PFA Act is necessary.

Knitted Socks (Cotton/Nylon)

INTRODUCTION. Dear Business Partners,

The Boxford range of 3-axis CNC Machining Centres are

POULTRY HATCHERY UNIT

Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme

AUTOMOBILE SERVICING STATION

AISARA. maximum weight of press tool built by us weighed 16 Metric tons (measured 2.75Met x 1.70Met).

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT

Papaya is grown in considerable quantity in MP. The area of MP in the year is 684 ha and production MT.

EQUIPMENT LIST. CNC MACHINING CENTERS (12 Machining Centers)

1 VEGETABLE OIL REFINERY. 1.1 Introduction

Advanced solutions for 5 pieces or 5,ooo,ooo pieces and everything in between. T E C H N O L O G I E S. High Volume Hydromat.

ANSI APPROVED 04/11/2014 ANSI APPROVED 08/17/ Reaffirmation ANSI APPROVED 02/28/ Reaffirmation ANSI APPROVED 05/06/2013

74. PROFILE ON BAKING OVENS

Lathe Milling Attachment

MANGO PROCESSING. 2.1 Compliance with FPO and PFA Act is necessary.

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER

AMLA PRODUCTS 2.0 PRODUCTS

CANVAS SHOES ( With Rubber Sole )

HONING LATHE DUPLICATOR CUTTERS

Making Clock Wheel & Pinion Cutters

110. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS

Quality Standards : As per Customer s requirement. Servicing Capacity : Qty : - Value : Rs. 8,00,000/- annum. Year of Preparation :

Electron S.R.L. B55 CNC TRAINING MACHINES

P ACKAGED DRINKING WATER/ MINERAL WATER

1 BISCUIT PLANT. 1.1 Introduction

TISSUE PAPER MANUFACTURING

49. PROFILE ON DAIRY PROCESSING EQUIPMENT

RAPID DIAL TEST INDICATORS

1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of know and compliances

SAMPLE CASE STUDIES FINANCE. M/s Vithal Enterprises

Fixturing systems Fixturing systems for measurement technology

PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam

CENTRE FOR CONTINUING EDUCATION BBA (AVIATION OPERATION)

Flash Butt Welding Machines

Zakład Metalowy ALEM. Kołobrzeska 19, Trzebiatów, Poland

PROFILE ON THE PRODUCTION OF STEEL TUBES

Particular / Specification 01 Armed Office Chair:

YUASA MILLING MACHINE ACCESSORIES & TOOLS

UNIT 1 INTRODUCTION TO NC MACHINE TOOLS

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

L I V E T O O L F O R O K U M A

FACILITY ACCREDITATION CHECKLIST #001 APPRENTICESHIP. Rating Code: Y = Yes * N = No * R = Required * AUDIT AREA: DATE: / / HAND TOOLS Y N R

Project Profile on the Establishment of Electric Water Heater Making Plant

The Bonelle Tool and Cutter Grinder

Providing Answers For All Your Machine Tool Needs

BED TYPE MILLING CENTRE

MACHINING OPERATIONS AND MACHINE TOOLS

Electronic Burglar Alarm System for Automobiles

TECHNICAL DESCRIPTION

Cash Flow Forecasting & Break-Even Analysis

CHAPTER 12. Cost Sheet ( or) Statement of Cost ELEMENTS OF COST

HEAVY DUTY SEVERING AND BEVELLING MACHINE TNO FAB-SERIES

PROJECT REPORT FOR FLY ASH BRICKS MANUFACTURING UNIT. Qty Price for bricks/day. No s

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Transcription:

MINI TOOL ROOM PRODUCT CODE 359960313 QUALITY AND STANDARDS Tool room facility/machine shop is a servicing industry to cater the tooling needs such as jigs, fixture, press tools, die sets, forming tools and moulds etc, to other industrial units as per their products. Every tool produced in the tool room requires 100% of inspection to adhere to the drawing, design and specifications of the user industry. Wherever necessary relevant IS: Specifications are to be followed in selecting the tool material and tolerances in the production of components of the tooling to be produces. PRODUCTION CAPACITY S.No. Item Qty. Rate Value (Rs.) 1. Sheet metal dies. 600 Nos. Rs. 20,000 1,20,00,000 2. Plastic injection moulding dies. 600 Nos. Rs. 12,000 72,00,000 3. Bakelite moulding dies. 600 Nos. Rs. 8,000 48,00,000 4. Job work L.S. L.S. 5,00,000 5. Sale of Scrape L.S. L.S. 1,00,000 Total 2,46,00,000 MONTH AND YEAR May, 2014 OF PREPARATION PREPARED BY Sh. Kamal Singh Deputy Director (Mechanical) -132-

Mini Tool Room 1. INTRODUCTION Tool room facility is a necessity for production of tooling in all disciplines of engineering industry whether mechanical, electrical, and electronic or plastics, etc with the rapid industrialization in our country. It has become imperative to produce various tools on job work basis e.g. i. Jigs & fixtures ii. Press tools iii. Forming tools iv. Moulding dies v. Forging dies 2. MARKET POTENTIAL The tool room serves as a backbone to a number of SSI Units situated in any area. The demand for a tool room depends directly on the growth of other units. Wherever there is concentration of more than 100 SSI Units, a tool room of this size will be viable. The decision to set up a tool room facility can be taken, keeping in view an action plan of the area and growth of existing units. 3. BASIS AND PRESUMPTIONS i. The project profile has been prepared on the basis of single shift of 8 hours a day. 25 days in a month and at 75% efficiency. ii. It is presumed that in the first year, the capacity utilization will be 70% and followed by 85% in the next year and 100% in the subsequent years. iii. The rates quoted in respect of salary and wages for skilled workers and others are above the minimum rates in other states. iv. Interest rate for fixed and working capital has been taken at 15% on an average, whether by bankers and or financial corporation. v. Margin money required is minimum 30% of the promoters. vi. The rental value of the work has been taken at the rate of Rs. 100 per square meter approx. vii. After the initial gestation period of one a half year. It will require seven years to pay back the loans -133-

Mechanical Division 4. IMPLEMENTATION SCHEDULE i. Preparation of project report: a) Inviting quotation 1 month b) Preparation ½ month ii. Provisional registration ½ month iii. Financial arrangements 1 month iv. Purchase of machinery 2 months v. installation of machinery 2 months vi. Installation of machinery 1 month vii. Electrification 1 month viii. Recruitment of manpower 1 month Total time Taken 9 months 5. TECHNICAL ASPECTS 1. In the tool room various machine tools including EDM facilities have been provided to carry out various machining operations e.g. hacksaw wing, drilling, turning, shaping, milling, surface grinding, and cylindrical grinding to produce different parts/components of a tool. However, heat treatment facilities will be availed from outside as the same is not economical for this size of tool room. 2. The quality of the tools produces will be 100% inspected conforming to drawing and specification of the user industries, wherever possible is Specifications for tolerances and standard parts will be used to meet the requirements. 3. Production capacity in term of machine hours is available as the products tooling cannot be specified except types as mentioned above in the introduction. 4. Approximate motive power has been given against each machine to the installed. The total horsepower comes to 50 H.P. 5. Rate of interest is taken @ 15% in the report. 6. Pollution control needs: The tool room workshop is equipped with machine tools only for doing job works like machining of ferrous metals to make different types of tooling and there will also be no discharge of effluents. There will be no chance of pollution and hence no pollution control equipment is required. 7. Energy conservation: The machine tools provided in the scheme are individually motorized. The motive power of each motor is according to the requirement of each for proper performance. -134-

Mini Tool Room 6. FINANCIAL ASPECT 6.1. Fixed Capital Building: Built up workshop shed, Covered area of 500 sq. mtrs. on Rent. 6.1.1. Machinery and Equipments a) Production Unit: 1. Surfacing, sliding and screw cutting Precision lathe machine cap. 1500 mm. Bedx400 mm swing x 40 mm, Bore motorized with 3 HP Motor & Electrical complete with standard Accessories i.e. face place, steady and with one 250 mm 4 jaw chuck and One 200 mm true chuck (3 jaws) and tool Holders etc of graded quality. 2. 24 stroke shaping machine with 3 HP Electric motor & electrical 3. Power hacksaw machine cutting capacity 7 dia with 1 HP motor and starter 4. Bench type ½ capacity drill Machine with ½ HP Motor and Starter 5. MTR Vertical Milling with 2 HP Motor & Accessories 6. Surface grinding machine 16 x8 with 2 HP Motor & Starter 7. Cylindrical grinding machine Cap, 150x500mm, with internal Attachment with 2 HP main motor ¼ HP internal grinding motor and ¾ HP spindle driving motor and starter 8. Double ended bench type 10 dia wheel Grinder motorized with 1 HP motor & starter 9. EDM Spark Erosion Machine Table size 20 cmx30cm with 7.5 HP Load 1 Nos. Rs. 10,00,000 1 No. Rs. 50,000 1 No. Rs. 20,000 1 No. Rs. 7,500 1 No. Rs. 6,00,000 2 No. Rs. 3,00,000 2 No. Rs. 3,00,000 1 No. Rs. 10,000 1 No. Rs. 5,00,000 10 CNC milling Machine with all accessories 1 No. Rs. 25,00,000 Total Rs. 52,87,500 Installation & Electrification Charges @ 10 % Rs. 5,28,750 Total Rs. 58,16,250-135-

Mechanical Division b) Testing Equipments: 1. Rockwell Hardness Tester 1 No. Rs. 50,000 2. Profile Projector 1 No. Rs. 3,00,000 Installation & Electrification Charges L.S. Rs. 35,000 c) Measuring Instruments: Total Rs. 3,85,000 1. Surface plate 600x600 1 No. Rs. 50, 000 2. 12 Vernier height gauge 1 No. Rs. 12,000 3. Vernier Caliper 200 mm 1 No. Rs. 3000 4. Vernier caliper 300 mm 1 No. Rs. 4000 5. Micrometer 0.25 mm 1 No. Rs. 3000 6. Micrometer 0.50 mm 1 No. Rs. 3500 7. Inside Micrometer 0.20 1 Set Rs. 25,000 8. 41 pcs slip gauges set 1 Set Rs. 50,000 9. Combination set consisting of right angle bevel protector and center head and 12 scale 1 Set Rs. 20,000 10. Dial vernier caliper 1 No. Rs. 7500 11. Misc. marking instruments and vices etc. L.S. Rs. 50,000 Total Rs. 2,28,000 Initial Purchase of non-recurring type cutting tools L.S. Rs. 3,00,000 Total cost of machinery & equipments Rs. 67,29,250 d) Office Equipments: 1. Computer with Design software 1 No. Rs. 1,50,000 2. Office table 2 Nos. Rs. 15,000 3. Chairs 5 Nos. Rs. 10,000 4. Almirah 2 Nos. Rs. 20,000 5. Working tables & stools 3 Nos. Rs. 10,000 6. Fixtures etc. L.S. Rs. 10,000 Total Rs. 2,15,000 Total cost of machinery, equipments and office equipments Rs. 69,44,250 Pre-operative expenses i.e. project cost and Non-refundable deposits etc. Rs. 1,50,000 Total Rs. 70,94,250-136-

Mini Tool Room 6.2. Working Capital (per month) 6.2.1. Building Building (on rent) Built up workshop shed, Covered area of 500 sq. mtrs. @ Rs. 100 per sq. mtr. (Rs.) 50,000 6.2.2. Personnel S. No. Designation Nos. Salary (Rs.) Total (Rs.) 1. Manager 01 20,000 20,000 2. Designer-Cum-Engineer 01 15,000 15,000 3. Accountant/Storekeeper 01 7500 7,500 4. Supervisor 02 12,000 24,000 5. Clerk-Cum-Typist 01 7,500 7,500 6. Skilled Workers 03 10,000 30,000 7. Semi-Skilled Worker 04 7,500 30,000 8. Die fitters 02 7,500 15,000 9. Helpers 03 6,000 18,000 10. Peon/Chowkidar 01 6,000 6,000 Total 1,73,000 Perquisites @ 15% of salary 26,000 Total 1,99,000 6.2.3. Raw Material Die steels assorted size 5000 kg @ Rs. 200 per kg. Rs. 10,00,000 Mild sheets assorted size: 2500 kg @ Rs. 60 per kg. Rs. 1,50,000 Total Rs. 11,50,000 6.2.4. Utilities Power 1500 KWH Units @ Rs. 5/- Rs. 7,500 Water L.S. Rs. 300 Total Rs. 7,800-137-

Mechanical Division 6.2.5. Other Contingent Expenses (per month) 1. Postage & Stationery Rs. 2000 2. Telephone Rs. 1000 3. Consumable store, Waste Cotton, Lubricants, Cutting tools, grinding Wheels, etc. Rs. 20,000 4. Repairs & Maintenance Rs. 20,000 5. Transport Charges Rs. 10,000 6. Advertisement & Publicity Rs. 10,000 7. Taxes Rs. 3,000 8. Sales Expenses Rs. 5000 9. Misc. expenses including heat treatment charges to outside units Rs. 25,000 6.2.6. Total Recurring Expenditure (per month) 1. Rent Rs. 50,000 2. Personnel Rs. 1,99,000 Total Rs. 96,000 3. Raw Material Rs. 11,50,000 4. Utilities Rs. 7,800 5. Other contingent Expenses Rs. 96,000 Total Rs. 15,02,800 Total Working Capital for 3 months Rs. 45,08,400 6.3. Total Capital Investment Total Fixed Capital Rs. 70,94,250 Total Working Capital (for 3 months) Rs. 45,08,400 Total Rs. 1,16,02,650 Machinery Utilization This project profile is for tool room facility (medium size). It is expected that in 1st year 70%, 2nd year 85% and third year 100% machines will be utilized at 75% efficiency. No provision has been made in respect of heat treatment facilities, which are to be out sourced. This is necessary as the HT Equipment cannot be economically viable for this size of tool room. -138-

Mini Tool Room 7. FINANCIAL ANALYSIS 7.1. Cost of Production (per annum) 1. Total recurring cost Rs. 1,80,33,600 2. Depreciation of machinery & equipment including Testing machines @ 10% Rs. 5,28,750 3. Depreciation on measuring & marking instruments and cutting tools etc. @ 20% Rs. 1,82,600 4. Depreciation on office equipments @ 20% Rs. 43,000 5. Interest on total capital investment @ 15% Rs. 17,40,398 Total Rs. 2,05,28,348 Say Rs. 2,05,28,000 7.2. Turnover (per annum) S. No. Item. Qty. Rate Value (Rs.) 1. Sheet metal dies. 600 Nos. Rs. 20,000 1,20,00,000 2. Plastic injection moulding dies. 600 Nos. Rs. 12,000 72,00,000 3. Bakelite moulding dies. 600 Nos. Rs. 8,000 48,00,000 4. Job work L.S. L.S. 5,00,000 5. Sale of Scrape L.S. L.S. 1,00,000 Total 2,46,00,000 7.3. Net Profit (per annum) Turnover cost of production Rs. 2,46,00,000-2,05,28,000 Rs. 40,72,000 7.4. Net Profit Ratio Net profit per year Turnover per year 40,72,000 2,46,00,000 16.6 % -139-

Mechanical Division 7.5. Rate of Return Net profit per year Total Capital Investment 40,72,000 1,16,02,650 35.1 % 7.6. Break-even Point Fixed Cost (Per Annum) 1. Total depreciation Rs. 7,54,350 2. Rent Rs. 6,00,000 3. Interest Rs. 17,40,398 4. 40% of salaries Rs. 9,55,200 5. 40% of other expenses Rs. 4,60,800 Total Rs. 45,10,748 B.E.P Fixed Cost Fixed Cost + Net Profit 45,10,748 45,10,748 + 40,72,000 52.6 % -140-

Mini Tool Room Address of Suppliers of Machines: 1. M/s H.M.T. Bangalore 2. M/s Addison & Co. Madras. 3. M/s Cooper Engg. Works, Chuchawad, Poon 4. M/s Perfect Machine Tools (P) ltd. Bell Building Sir P.M. Road Bombay 5. M/s Leading Engg. Co., 31, New Rohtak road, New Delhi 6. M/s Daulat Industries Corpn. Pvt. Ltd, Civil Lines, Ludhiana. 7. M/s. R.K. Machine Toos, Indl. Area-A, Ludhiana. 8. M/s Sagar Engg. Works, Indl. Area-B, Ludhiana 9. M/s Ashoka Bros., Panchkuian Road, New Delhi. 10. M/s Internation Machine Tools Corporation, 5, Park Street, Behind State Bank of India, for, Bombay. Address of Suppliers of Raw Materials: 1. M/s Radhi & sons, 82, Nagdevi Cross Lane, Bombay. 2. M/s Durga Mill Store, Miller Gnaj, Ludhiana 3. M/s Victor Steels Pvt. Ltd., Sirkiwalan Bazar, Delhi. 4. M/s B.K. Steel, Ludhiana 5. M/s. B.K. Steel, Ludhiana 6. M/s. New India Steel Engg. Co., Bank of India Building, 185, Sheikh Memun Street, Bombay. 7. M/s Excel Steel Corporation, 162, Nagdevi Street, Bombay. -141-