P ACKAGED DRINKING WATER/ MINERAL WATER
|
|
|
- Shon Pearson
- 9 years ago
- Views:
Transcription
1 17 P ACKAGED DRINKING WATER/ MINERAL WATER PRODUCT CODE : QUALITY AND STANDARDS : ISI Specification for packaged drinking water is IS14543:1998 and for packaged natural mineral water is IS13428:1998. PRODUCTION CAPACITY : The Project is for processing and bottling of plain drinking and mineral water of 5000 bottles (one litre) per shift of 8 hrs. The total quantity of water processed and packed will be Litres/day in three shifts. MONTH AND YEAR : March, 2003 OF PREPARATION PREPARED BY : Small Industries Service Institute 111 and 112, B.T. Road, Kolkata - 35 (W. B.) Phone: , 2596, 0597 and Fax: gram-smallindben INTRODUCTION It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind including animals. The water used for potable purposes should be free from undesirable impurities. The water available from untreated sources such as Well, Boreholes and Spring is generally not hygienic and safe for drinking. Thus it is desirable and necessary to purify the water and supply under hygienic conditions for human drinking purpose. As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals such as Barium, Iron, Manganese, etc. which can be absorbed by human body. It is either obtained from natural resources like spring and drilled wells or it is fortified artificially by blending and treating with mineral salts. The mineral water shall be manufactured and packed under hygienic conditions in properly washed and cleaned bottles in sterilised conditions. MARKET POTENTIAL Unfortunately sufficient safe potable water is not available everywhere in the country, either harmful chemical substances are found in the layers of earth which enter into water or it may be contaminated due to pathogenic micro-organisms. If such water is consumed, the body suffers from water born diseases. Due to this, it has become
2 100 P ACKAGED DRINKING WATER/MINERAL WATER imperative to process and bottle safe potable water for the mankind in prevailing conditions. The demand for purified water becomes more during summer season. Although few companies have already entered in the bottling of safe potable water and mineralised water, but still huge gap is there in between demand and supply at all metropolitan-cities and towns. The product is widely accepted in offices, restaurants, railway stations, airport, bus stands, hospitals and to some extent even in rich house-holds. So there is good scope for establishing the units for processing and bottling plain and mineralised drinking water in different parts of the country. BASIS AND PRESUMPTIONS This project has been drawn on the basis of following presumptions. 1 Working hours : 8 per shift 2 Number of : 3 shift/day 3 Number of : 300 Working days per annum 4 Total number of : 72 working hours 5 Working : 75% efficiency 6 Total period for : Third year achieving from maximum the date of capacity commencement utilisation of production. 7 Margin money : 25% of Capital Investment 8 Rate of Interest : 15% per annum of Capital 9 Construction Cost of Building, Cost of Land, Labour Charges and Cost of Plant, Machinery and Equipment have been considered as per prevailing rates in the market. 10 Cost of Installation and Electrification of Machinery and Equipment has been taken at the rate of 10% of the cost of Plant and Machinery. 11 Operative period of the project has been considered as 7 years. IMPLEMENTATION SCHEDULE It is expected that total time of about 9 months will be taken from the date of approval of the scheme for complete implementation. Break-up of the activities and relative time for each of them is shown below: Nature of Activity Time Period (in months) 1. Preparation of Project 0-1 month and its approval 2. SSI Provisional 1-3 months Registration 3. Sanction of Loan 2-5 months 4. Clearance from 2-5 months Pollution Control Board and taking permission from Municipal Health Authority/BIS etc. 5. Placement Order for 4-6 months machinery of equipment 6. Installation of machin- 6-8 months ery and equipment 7. Power connection 2-6 months arrangement from Electricity Board
3 P ACKAGED DRINKING WATER/MINERAL WATER Appointment of staff 5-8 months etc. 9. Trial run 8-9 months 10.Commencement of 9 months Production and perma- onwards nent registration/marketing TECHNICAL ASPECTS Processing and Bottling Raw water to be processed is collected in tanks. A known quantity is pumped into the above tank where the water is dozed with alum for coagulation with heavy metals or insoluable matters. The water after coagulation is allowed to settle for an hour. The impurities may be removed by Reverse Osmosis techniques also. The supernatant water is taken to the chlorination tank where primary disinfection is brought about by bubbling chlorine gas. The water is then passed through sand filters for trapping of undissolved impurities. The water after sand filteration is passed through Carbon filters for removal of odour, colour and also for dechlorination. It is then passed through series of micro fillers comprising 5 micron, 1 micron and 0.4 micron filter followed by ultraviolet disinfection system for terminal disinfection. Packing is done in PET bottles of 1 litre capacity through an automatic rinsing, filling, and capping machine fitted with an Ozone generator. The bottles after capping are shrink wrapped (Optional) and packed in corrugated boxes of one dozen each. Quality Control and Standards The plain drinking water has to be bottled in pet bottle as per IS Specifications (IS:14543:1998: Packaged Drinking Water and IS:13428:1998: Packaged Mineral Water). The details of the specification can be obtained from Bureau of Indian Standard, Manak Bhawan, 9, Bahadur Shah Zafar Marg, New Delhi Production Capacity Quantity : 45 lakh Bottles per annum Value : Rs lakh. Motive Power 50 H.P. Pollution Control Although this unit will not affect the environment, but the enterpreneurs are advised to obtain, No Objection Certificate from competent authority of State Pollution Control Board. They should develop Kitchen Garden in the factory premises to utilise waste water from the plant. Energy Conservation Suitable measures should be adopted to use appropriate amount of fuel and electricity. The promoters should arrange periodic auditing of electrical consumption, as the unit will be running in three shifts. Unnecessary operation of machines should be controlled to avoid excess consumption of electricity. Natural ventilation in production premises may be made available to avoid use of electrical power during day hours. FINANCIAL ASPECTS A. Fixed Capital i) Land and Building Amount (Rs. 1. Land 0.5 Acres Total covered area required for filteration, raw material storage, packaging material storage, machinery, Spare
4 102 P ACKAGED DRINKING WATER/MINERAL WATER Land and Building Amount (Rs. parts, store, Finished goods, Office, Quality Control Lab, Toilets, Electrical Switch room and miscellaneous etc Sq. Rs 400 per Sq. ft. 3. Boundary wall and Civil Works 3.00 on gate etc. Total ii) Plant and Machinery Sl. Particulars Ind./ Qty. Total No. Imp (Rs. in lakhs) i) Alum. Treatment tanks Ind ii) Reverse Osmosis -do Plant 2000 Lit/ iii) Chlorination tanks -do made of S. Steel iv) Sand filter -do v) Activated Carbon filter -do vi) Micron filters (5, 1 and 0.4 Mic) vii) Ultraviolet disinfectant system viii) Electronic doser for alum ix) Electronic doser for Chlorine x) Ozone Generator xi) Raw and Purified water collection tanks with motor and accessories xii) Automatic rinsing filling 7.50 and capping machine xiii) Shrink wrapping 0.15 machine for bottle xiv) Miscellaneous tools 1.50 equipments, pipeline etc. and Plastic crates etc. xv) Laboratory testing and 1.50 Quality Control, Micro-biological instruments etc. Electrification and Installation charges 10% of plant and Machinery Total iii) Other Fixed Assets i) Cost of furniture, furnishing 0.88 and Official accessories ii) Cost of deep bore tubewell 1.30 for water reservoir iii) Security Deposit to Electricity 1.00 Deptt. etc. iv) Preliminary and Pre-operative 1.50 Expenses including Company Formation, Project Preparation, Technical Consultancy, Travelling Expenses, Interest during construction period, Start-up Expenses etc. v) Delivery van and contingency etc. 5 Total 9.68 iv) Total Fixed Cost 1. Land and Building Plant & Machinery Other fixed assets 9.68 Total B. Working Capital (per month) i) Raw Material 1. PET/PVC bottle including cap labels etc. 1 lit (3.75 lakh bottles) 2. Chemicals and Reagents etc. (L.S.) Corrugated boxes, strip, tap etc Total ii) Salary and Wages a) Administrative and Supervisor Sl. Designation No. Salary Amount No. (In Rs.) 1. Factory Manager , Clerk-cum Typist , Store cum-purchase Officer , Accountant-cum-Cashier , Sweeper (part time) ,000 Total 5 15,000
5 P ACKAGED DRINKING WATER/MINERAL WATER 103 b) Technical Staff Sl. Designation No. Salary Amount No. (In Rs.) 1 Production Manager ,000 cum-chief Chemist 2 Lab. Assistant ,000 3 Production Supervisor ,000 4 Skilled Workers, ,000 including Electricians and Mechanic Driver 5 Un-skilled Workers ,000 6 Chowkidar ,000 Total 20 56,000 Total Salary and Wages 71,000 Rs. 56,000 + Rs. 15,000 Perks and 8.5% of salary 6,000 and wages Total 77,000 Say 0.77 lakh iii) Utilities i) Electricity ii) Fuels and other 0.04 iv) Other Contingent Expenses Total 0.45 Amount (In Rs.) 1 Postage and Stationery Telephone/Fax Charges Consumable Stores Repairing and Maintenance Transport Charges Advertisement and Publicity Insurance and Taxes Sales Expenses Licence and other Fees Miscellaneous Expenses 1000 Total 11,000 Say 0.11 lakh v) Working Capital (per month) 1 Raw Materials/Packaging Materials 2 Salary and Wages Utilities Recurring Expenses 0.11 Total Working capital for 3 months = Rs lakh C. Total Capital Investment i) Fixed Assets ii) Working Capital (for 3 months) FINANCIAL ANALYSIS Total ) Cost of Production (per annum) i) Working Capital for One year ii) Depreciation on 5% p.a iii) Depreciation on Plant and Machinery 3.50 and 10% p.a. iv) Interest on Total Capital % Total ) Turnover Amount (Rs. By sale of 45 lakh bottles (3.75 lakh crates of 12 Rs 75 per crate (Factory premises) 3) Profit (per annum) Profit = Turnover Cost of Production = = Rs lakh
6 104 P ACKAGED DRINKING WATER/MINERAL WATER 4) Net Profit Ratio = Profit 100 Sales Turn over = = 13.19% 5) Rate of Return = Profit 100 Total Investment = = 30.84% Say 31% 6) Break-even Point i) Fixed Cost (per annum) Amount(Rs. i) Total Depreciation 4.95 ii) Total Interest iii) 40% Salary and Wages 3.70 iv) 40% Utilities and other expenses 2.64 v) Tax and Insurance fees etc Total B.E.P. = Fixed Cost 100 Fixed cost + Annual Profit = = = Say 44% Addresses of Plant and Machinery Suppliers 1. M/s. Sonalifabs 71, Biren Roy Road (West) Kolkata M/s. Enviro Tech Utility, 32A, Main Patel Road, Opposite Wings Show Room, West Patel Nagar, New Delhi M/s. Watrion Water and Filter Engg. Pvt. Ltd. 1 Harsivan Apartment, Ground Floor, (Behind Canara Bank), West J.P. Road, Andheri (West), P.B. No. 7372, Mumbai M/s. Rital Agencies 55 III Main Road, Gandhi Nagar, Chennai M/s. Ion Exchange India Ltd. Ticcon House, Dr. E. Houses Road, Mahalaxmi, Mumbai M/s. Alpha Engineering 158, Pocket-E-20, Sector-II, Rohini, Delhi
PROJECT PROFILE PACKAGED DRINKING WATER / MINERAL WATER
PROJECT PROFILE ON PACKAGED DRINKING WATER / MINERAL WATER NAME OF THE PRODUCT : Packaged Drinking Water / Mineral Water. PRODUCT CODE : 224103008. QUALITY & STANDARD : PFA Regulations and ISI 4543:1998.
PROJECT PROFILE ON PACKAGED DRINKING WATER UNIT
PROJECT PROFILE ON PACKAGED DRINKING WATER UNIT PROF. NO.4 1. INTRODUCTION Water is essential for sustenance and multiplication of living organisms. Whether it is an unicellular ameba or complex human
HDPE LAMINATED COLLAPSIBLE TUBES
HDPE LAMINATED COLLAPSIBLE TUBES 1. INTRODUCTION A typical Lamitube is a 5 layer structure with aluminium foil in the middle layer and polyethylene as an inner and outer layer. The Aluminium foil layer
PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, 31251. Quality Standard : IS : 44 : 1991 IS : 05 : 1994
PROJECT PROFILE Product : Red Iron Oxide Product Code : 24117, 31251 Quality Standard : IS : 44 : 1991 IS : 05 : 1994 Production Capacity ( Per Annum) : Quantity - 300M.T Value - Rs.1,50,00,000/- Month
PROJECT PROFILE ON MUSTARD OIL
PROJECT PROFILE ON MUSTARD OIL NAME OF THE PRODUCT : MUSTARD OIL. PRODUCT CODE : 211001023. QUALITY & STANDARD : PFA regulation is mandatory. Ag Mark for quality products. ISI Specification for Mustard
PROJECT PROFILE ON PLASTER OF PARIS
PROJECT PROFILE ON PLASTER OF PARIS 1. Name of the Product: - Plaster of Paris 2. NIC Code: - 26945 3. Product Code: - 21304 4. Production capacity: - Quantity: 900 MT / year Value: Rs.6.18 lakh 5. Month
1.0 INTRODUCTION 2.0 PRODUCT 3.0 MARKET POTENTIAL 3.1 Demand and Supply 3.2 Marketing Strategy
COLD STORAGE 1.0 INTRODUCTION Cold storages are meant to preserve the perishable commodities of food items for a longer period with retention of the original colour, flavour and taste. However, each commodity
CHILLY AND TURMERIC POWDER
CHILLY AND TURMERIC POWDER 1.0 INTRODUCTION Spices are an integral part of the Indian diet since centuries and they are used in vegetarian and non-vegetarian food and snack preparations. They help enhance
COMPUTER HARDWARE MAINTENANCE & NETWORKING SERVICE
COMPUTER HARDWARE MAINTENANCE & NETWORKING SERVICE SERVICE CAPACITY (Value) : Rs. 18,00,000/- MONTH AND YEAR : July, 2014 OF PREPARATION PREPARED BY : Dr. Amarnath Assistant Director (Metallurgy) 1. INTRODUCTION
PROJECT PROFILE ON MOBILE PHONE REPAIRING AND SERVICING
PROJECT PROFILE ON MOBILE PHONE REPAIRING AND SERVICING 1. Product:- Mobile Phone Repairing and Servicing 2. NIC Code (1998):- 52603 3. Product Code (ASICC-2000):- 97182 4. Production capacity:- Qty. 300
PROJECT PROFILE ON COTTON GINNING UNIT
PROF. NO.2 PROJECT PROFILE ON COTTON GINNING UNIT 1. INTRODUCTION A Cotton Gin (short for cotton engine) is a machine that quickly and easily separates the cotton fibers from the seedpods and the sometimes,
Prepared by : Installed Capacity per Annum :
Project Profile on : Mobile servicing centre Installed Capacity per Annum : Item Quantity Rate Total(Rs) in Nos i) Servicing/Minor repair of Mobile 3000 150 450000/- ii) Servicing/major repair of mobile
PRODUCTION CAPACITY : Ouantity (i) Development of 24 website per annum (ii) Update of 24 website per annum Value : Rs. 4,80,000/-
PROJECT PROFILE ON COMPUTER CENTRE FOR WEBSITE DESIGN AND DEVELOPMENT PRODUCT CODE (ASICC) : QUALITY STANDARDS : As per Customer Specifications PRODUCTION CAPACITY : Ouantity (i) Development of 24 website
PINEAPPLE AND ORANGE PRODUCTS
PINEAPPLE AND ORANGE PRODUCTS 1.0 INTRODUCTION Fruits are an important source of energy. However their availability is seasonal and they are perishable. Hence, they need to be processed and preserved which
PROJECT PROFILE ON ALUMINIUM FABRICATION
PROJECT PROFILE ON ALUMINIUM FABRICATION PRODUCT : Aluminium Fabrication QUALITY STANDARDS : IS: 1948-1961 IS: 1949-1961 PRODUCTION CAPACITY S.No. Description Qty. Value (Rs.in Lakhs) : a Stair case hand
PROJECT PROFILE ON SOYA MILK,PANEER & CURD
PROJECT PROFILE ON SOYA MILK,PANEER & CURD NAME OF THE PRODUCT : SOYA MILK, PANEER & CURD. PRODUCT CODE : New Product. QUALITY & STANDARD : PFA (Prevention of Food Adulteration Act, 1955). PRODUCTION CAPACITY
PROJECT PROFILE ELECTRONIC GAS LIGHTER **************************
MSME-DI KANPUR PROJECT PROFILE ON ELECTRONIC GAS LIGHTER ************************** PART-I NAME OF THE PRODUCT : Electronic Gas Lighter. PRODUCT CODE : NIC 36491100X. Category : Electrical. QUALITY & STANDARD
EDIBLE GROUNDNUT FLOUR
EDIBLE GROUNDNUT FLOUR 1.0 INTRODUCTION Groundnut flour is a cheap but good source of proteins compared to milk, eggs, meat etc. With more and more energy food plants coming up in many parts of the country,
MINI TOOL ROOM PRODUCT CODE 359960313
MINI TOOL ROOM PRODUCT CODE 359960313 QUALITY AND STANDARDS Tool room facility/machine shop is a servicing industry to cater the tooling needs such as jigs, fixture, press tools, die sets, forming tools
VEGETABLE OIL REFINERY
VEGETABLE OIL REFINERY 1.0 INTRODUCTION: Vegetable oil and fat resources are indispensable to mankind as a source of nutrient and industrial raw materials. Crude vegetable oil obtained from various oil
Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product Code (Based on NIC -2004) for Bricks & Tiles: 26921
Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product: Flyash Bricks & Pavement Tiles Product Code (Based on NIC -2004) for Bricks & Tiles: 26921 Product Code: (Based on ASICC -2000) for
PROJECT PROFILE DAIRY EQUIPMENTS **********************
MSME-DI KANPUR PROJECT PROFILE ON DAIRY EQUIPMENTS ********************** PART-I NAME OF THE PRODUCT : DAIRY EQUIPMENTS. PRODUCT CODE : QUALITY & STANDARD : Made of stainless steel grade with 0.7 Cr &
Electronic Gas Lighters
1 7 Electronic Gas Lighters PRODUCT CODE (ASICC) : 77134 QUALITY AND STANDARDS : The following BIS Standards may be referred: IS 11514:1985 Piezo electric ceramic cartridge for impact type gas lighters.
2.2 Quality Standards and Compliances The BIS has specified quality standards vide IS 1011:1992. Compliance with PFA Act is necessary.
BISCUIT MAKING 1.0 INTRODUCTION Biscuit making is a conventional activity in many parts of the country. Despite the advent of modern, large capacity and automatic biscuit making plants, large section of
PRODUCTION CAPACITY : Qty : 54000 Nos./ Annum Value : Rs. 16,74,000/-
PROJECT PROFILE ON ASSEMBLING/MOUNTING OF ELECTRONICS COMPONENTS ON PCB PRODUCT CODE (NIC) : --- QUALITY & STANDARDS : As per Customer s Specification PRODUCTION CAPACITY : Qty : 54000 Nos./ Annum Value
2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.
MINI OIL MILL 1.0 INTRODUCTION Consumption of edible oils is increasing year after year and India imports large quantities every year. Different types of oilseeds are grown in the country like groundnuts,
AIR CONDITION & REFRIGERATION INSTALLATION & REPAIR
AIR CONDITION & REFRIGERATION INSTALLATION & REPAIR SERVICE CAPACITY (Value) : Rs. 15,40,000/- MONTH AND YEAR : July, 2014 OF PREPARATION PREPARED BY : Sh. Sunil Arora Investigator (Mechanical) 1. INTRODUCTION
PROJECT PROFILE PRODUCT CODE ASICC(2000): 71332. PRODUCTION CAPACITY : QUANTITY 8,04,000 mtrs. Lancing (P.A) Valued Rs.
PROJECT PROFILE NAME OF THE PROJECT: LANCING PIPE NIC CODE (1998): NIC:27152, PRODUCT CODE ASICC(2000): 71332 PRODUCTION CAPACITY : QUANTITY 8,04,000 mtrs. Lancing (P.A) Valued Rs. 3, 05,52,000 pipes MONTH
Bakery PRODUCTS INTRODUCTION MARKET POTENTIAL
25 Bakery PRODUCTS PRODUCT CODE : 205801010 (Biscuit) QUALITY AND STANDARDS : PFA, Act 1954 (Mandatory) and BIS/ Specification (optional) Wafers: IS 2397:1988 Biscuits: IS 1011:1992 PRODUCTION CAPACITY
1 VEGETABLE OIL REFINERY. 1.1 Introduction
1 VEGETABLE OIL REFINERY 1.1 Introduction Vegetable oil and fat resources are indispensable to mankind as a source of nutrient and industrial raw materials. Crude vegetable oil obtained from various oil
Knitted Socks (Cotton/Nylon)
13 Knitted Socks (Cotton/Nylon) PRODUCT CODE : 260103/260301 QUALITY AND STANDARDS : Nylon Socks-IS 5084:1990 Socks Cotton-IS 3329:1973 PRODUCTION CAPACITY : Quantity: 1,50,000 Dozen Pairs Value : Rs.
PRODUCT : High Tensile Nuts & Bolts. PRODUCTION CAPACITY : Quantity. : 360 M.T. (Per annum) Value : Rs. 234.00 Lakhs
PRODUCT : NIC CODE : 343201011 QUALITY AND STANDARDS : IS 1363:1992 IS 1367:1994 IS 2389:1968 IS 4206:1987 PRODUCTION CAPACITY : Quantity. : 360 M.T. (Per annum) Value : Rs. 234.00 Lakhs MONTH & YEAR OF
1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of know and compliances
PICKLES & CHUTNEY 1.0 INTRODUCTION Pickles & chutney are specialities of India and assume important position in the Indian cuisine. They are eaten along with main course and provide tempting tastes. Pickles
POULTRY HATCHERY UNIT
POULTRY HATCHERY UNIT Introduction : Poultry meat is the fastest growing component of global meat production. Poultry production in the country has shown a steady increase in the last decade. As a result,
TISSUE PAPER MANUFACTURING
PROJECT PROFILE ON TISSUE PAPER MANUFACTURING Prepared by: Kerala State Industrial Development Corporation September 2012 1 TISSUE PAPER PROJECT SUMMARY 1 The Proposal : To set up a Tissue Paper Production
AMLA PRODUCTS 2.0 PRODUCTS
AMLA PRODUCTS 1.0 INTRODUCTION Amla (Indian Gooseberry) is known for its medicinal values since long and it is used in various forms. Many ayurvedic and herbal preparations use amla as one of the ingredients.
MANGO PROCESSING. 2.1 Compliance with FPO and PFA Act is necessary.
MANGO PROCESSING 1.0 INTRODUCTION Mango is a fruit which has many varieties and is grown in majority of the states of the country. Pulp or juice of ripe mangoes is consumed along with main course. Many
PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS
PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS PRODUCT : Cement Concrete Hollow Blocks NIC CODE : 26959 (based on NIC 2004) PRODUCT CODE : 94459 (based on ASICC 2000) PRODUCTION CAPACITY : Quantity :
Medical Transcription
15 109 Medical Transcription PRODUCT CODE (ASICC) : 97720 QUALITY AND STANDARDS : N.A. PRODUCTION CAPACITY : Qty. : 27,00,000 Nos. of lines (per annum) Value : Rs. 67,50,000 YEAR OF PREPARATION : 2002
Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme
Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme 1. Indian agriculture is undergoing a gradual shift from dependence on human power and animal power to mechanical power because increasing
FAMILY PROTECTION FROM WATERBORNE DISEASES
A Product by : GIVE A 100% FAMILY PROTECTION FROM WATERBORNE DISEASES CATALOGUE 100% SAFE WATER LATEST JAPAN TECHNOLOGY ABOUT US We are introducing a unique Water Purifier with the proud name of Harshali
1 BISCUIT PLANT. 1.1 Introduction
1 BISCUIT PLANT 1.1 Introduction Biscuit making is a conventional activity in many parts of the country. Despite the advent of modern, large capacity and automatic biscuit making plants, large section
PROJECT PROFILE ON MINI FLOUR MILL
PROJECT PROFILE ON MINI FLOUR MILL PRODUCT : WHEAT FLOUR (Atta), SOOJI/RAWA WHEAT FLOUR (Maida), BRAN PRODUCT CODE : 204109000 (Wheat Flour) 204111003 (Sooji /Rawa) 204108004 (Maida) QUALITY STANDARD.
Quality Standards : As per Customer s requirement. Servicing Capacity : Qty : - Value : Rs. 8,00,000/- annum. Year of Preparation : 2006-07.
PROJECT PROFILE ON MOBILE PHONE REPAIRING & SERVICING *** Production Code : - Quality Standards : As per Customer s requirement Servicing Capacity : Qty : - Value : Rs. 8,00,000/- annum Year of Preparation
Papaya is grown in considerable quantity in MP. The area of MP in the year 2004-05 is 684 ha and production 18500 MT.
1 TUTTY-FRUITY 1.1 Introduction Tutty-fruity is made from unripe papaya fruit and contains substantial quantum of sugar. It is used as an additive in ice-cream and some sweets but its major consumption
Promotional initiatives
Promotional initiatives 8. The Ministry of Tourism may consider, on being approached, one time Central Financial Assistance not exceeding Rs. 200 lakhs to a governmental institute, such as ITI, polytechnic
AUTOMOBILE SERVICING STATION
AUTOMOBILE SERVICING STATION A. INTRODUCTION: For the past one and a half decade the passenger car population has been steadily increasing. This is mainly because the Indian economy is now considerably
110. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS
0. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS 0-2 TABLE OF CONTENTS PAGE I. SUMMARY 0-3 II. PRODUCT DESCRIPTION & APPLICATION 0-3 III. MARKET STUDY AND PLANT CAPACITY 0-4 A. MARKET STUDY 0-4 B.
44-2 TABLE OF CONTENTS I. SUMMARY 44-3 II. PRODUCT DESCRIPTION & APPLICATION 44-3 III. MARKET STUDY AND PLANT CAPACITY 44-3 A.
MINERAL WATER 44-2 TABLE OF CONTENTS PAGE I. SUMMARY 44-3 II. PRODUCT DESCRIPTION & APPLICATION 44-3 III. MARKET STUDY AND PLANT CAPACITY 44-3 A. MARKET STUDY 44-3 B. PLANT CAPACITY & PRODUCTION PROGRAMME
Complete. Water Solutions. for Rural India
Complete Water Solutions for Rural India More precious than gold. That s what safe drinking water is to India s rural population. Arsenic, iron, fluoride, nitrate, brackishness and pathogens in ground
CANVAS SHOES ( With Rubber Sole )
PROJECT PROFILE ON CANVAS SHOES ( With Rubber Sole ) NAME OF THE PRODUCT : CANVAS SHOES (With Rubber Sole) PRODUCT CODE : 30130100X. QUALITY & STANDARD : ISI:3735-1966 Canvas Shoes with Rubber Sole - Reaffirmed
1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of technology, Quality Standards and Compliances 3.
BAKERY 1.0 INTRODUCTION Bakery is a traditional activity and occupies an important place in food processing industry. Despite the advent of fully automatic and semi-automatic bread as well as biscuit making
PROJECT PROFILE. RICE MILL (Capacity 4 TPH)
PROJECT PROFILE ON RICE MILL (Capacity 4 TPH) PREPARED BY 8 th Floor, Parishrama Bhavan, Basheerbagh, Hyderabad 1. Introduction: The Rice milling is the process that helps in removal of hulls and bran
ACTIVATED CARBON PLANT IN KERALA
PROJECT PROFILE ON ACTIVATED CARBON PLANT IN KERALA Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR ACTIVATED CARBON PLANT INTRODUCTION Activated Carbon is the carbon produced
PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam
PROJECT PROFILE ON MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY Prepared by United Electrical Industries Ltd, Pallimukku, Kollam (PSU-Industries Department) Company Profile Name of Company
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
CHAPTER 12. Cost Sheet ( or) Statement of Cost ELEMENTS OF COST
CHAPTER 12 Cost Sheet ( or) Statement of Cost Introduction ELEMENTS OF COST Elements of cost are necessary to have a proper classification and analysis of total cost. Thus, elements of cost provide the
Introduction. Creating Water Quality Confidence. Sample Communication and Guidance - Natural Treatment. Terminology Guidelines
Introduction This document is intended to provide guidance for water utility managers related to creating water quality confidence, specifically related to implementing Supply Replenishment projects. The
14. PROFILE ON THE PRODUCTION OF PURIFIED WATER
14. PROFILE ON THE PRODUCTION OF PURIFIED WATER 14-2 TABLE OF CONTENTS PAGE I. SUMMARY 14-3 II. PRODUCT DESCRIPTION & APPLICATION 14-3 III. MARKET STUDY AND PLANT CAPACITY 14-4 A. MARKET STUDY 14-4 B.
Lesson Plan: How Do We Clean Polluted Water?
Lesson Plan: How Do We Clean Polluted Water? Oil Spill Cleanup / Phosphate Cleanup / Groundwater Contamination / Water Treatment Simulation Estimated Time: 2-4 days State Standards taught and addressed
Iron and manganese are two similar elements
L-5451 2-04 Drinking Water Problems: Iron and Manganese Mark L. McFarland, Associate Professor and Extension Soil Fertility Specialist Monty C. Dozier, Assistant Professor and Extension Water Resources
PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation
PROJECT PROFILE ON MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR MODERN COLD STORAGE INTRODUCTION Cold Storage is a special kind of room, the temperature
Keeping Your Swimming Pool and Spa Healthy Environmental Health Guide
Keeping Your Swimming Pool and Spa Healthy Environmental Health Guide A swimming pool or spa can be an asset to your home, and provide the opportunity to take part in healthy relaxing activities. However,
Lesson-13. Elements of Cost and Cost Sheet
Lesson-13 Elements of Cost and Cost Sheet Learning Objectives To understand the elements of cost To classify overheads on different bases To prepare a cost sheet Elements of Cost Raw materials are converted
V. INDUSTRIES AND MINERALS: (Rs.150.00 lacs)
V. INDUSTRIES AND MINERALS: (Rs.150.00 lacs) IN.1 Quality improvement of Industrial facilities: (Rs.20.00 lacs) a. Industrial Development-cum-Facility Centre: (Rs.5.00 lac) The Industrial Development-cum-Facility
MOBILE WATER TREATMENT FACILITY UMUV 01
MOBILE WATER TREATMENT FACILITY UMUV 01 January 10 Basic description of facility VODASERVIS s.r.o. UMUV 01 is a multi-purpose mobile water treatment facility which enables treatment from different sources
TRADING ACCOUNT (Horizontal Format) for the year ended. Particulars. Rs.
Dr. To Opening Stock To Purchases Less: Returns outwards () To Frieght & Carriage To Customs & Insurance To Wages To Gas, Water & Fuel To Factory Expenses To Royalty on Production To Cargo Expenses To
Town of New Castle Utility Department Introduction
Town of New Castle Utility Department Introduction Town of New Castle Utility Department Mission Statement Our commitment is to ensure that our customers receive high quality water and wastewater treatment
CENTRE FOR CONTINUING EDUCATION BBA (AVIATION OPERATION)
CENTRE FOR CONTINUING EDUCATION BBA (AVIATION OPERATION) BATCH: SEMESTER: NAME: ROLL NO: ASSIGNMENT 1 & 2 FOR BUSINESS ACCOUNTING BBCF 131 UNIVERSITY OF PETROLEUM & ENERGY STUDIES Assignment-1 Note: All
PROJECT PROFILE. PRODUCTION CAPACITY: Quantity: 2,40,000 pairs of Eva Sole per annum. Valued at Rs 76,80,000/-
1 PROJECT PROFILE PRODUCT: MANUFACTURING OF EVA SOLE NIC CODE : 25191 PRODUCT CODE: ASICC: 41311 PRODUCTION CAPACITY: Quantity: 2,40,000 pairs of Eva Sole per annum Valued at Rs 76,80,000/- MONTH AND YEAR
CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS APPLICATION INSTRUCTIONS
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION STATE BOARD FOR CERTIFICATION OF WATER AND WASTEWATER SYSTEMS OPERATORS CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS
85. PROFILE ON ENVELOPS, LABELS AND BADGES OF PAPER
85. PROFILE ON ENVELOPS, LABELS AND BADGES OF PAPER 85-2 TABLE OF CONTENTS PAGE I. SUMMARY 85-3 II. PRODUCT DESCRIPTION & APPLICATION 85-3 III. MARKET STUDY AND PLANT CAPACITY 85-4 A. MARKET STUDY 85-4
Clean, Crisp Water Bottled Water Versus Tap Water
Clean, Crisp Water Bottled Water Versus Tap Water Bottled water is a popular beverage around the world, and consumption has grown steadily in recent years. However, even with its steady growth and popularity,
TOMATO SAUCE, KETCHUP AND PUREE
TOMATO SAUCE, KETCHUP AND PUREE 1.0 INTRODUCTION Tomato is a very popular vegetable throughout the country and it is grown in many states. Apart from use in vegetables, its down stream products like soup,
PROJECT PROPOSAL FOR ESTABLISHING CO-ED POLYTECHNIC COLLEGE AT ANOOPPUR, DATIA, KATNI, MANDSOUR, RAISEN, REWA, SHAJAPUR (M.P.)
PROJECT PROPOSAL FOR ESTABLISHING CO-ED POLYTECHNIC COLLEGE AT ANOOPPUR, DATIA, KATNI, MANDSOUR, RAISEN, REWA, SHAJAPUR (M.P.) WITH CENTRAL ASSISTANCE 2007-08 Proposal Submitted by Technical Education
Government of India Ministry of Tourism (H&R Division) GUIDELINES FOR APPROVAL OF GUEST HOUSES (Revised December 2009)
Government of India Ministry of Tourism (H&R Division) GUIDELINES FOR APPROVAL OF GUEST HOUSES (Revised December 2009) In order to meet the rising demand of hotel accommodation for budget tourists both
Water and Wastewater. Sample Collection and Analysis
Water and Wastewater Sample Collection and Analysis December 2011 Introduction Accurate testing of drinking water is crucial to maintaining the health and safety of Islanders who rely on this resource.
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
12 Marginal Costing. 12.1 Definitions
12 Marginal Costing Learning Objectives When you have finished studying this chapter, you should be able to Understand the difference between absorption costing and marginal costing Understand the concept
Corn, Rice, Wheat are the major raw materials required for the production of extruded breakfast cereals.
1 BREAKFAST CEREALS 1.1 Introduction Extruded breakfast cereal products such as corn flakes, rice flakes, wheat flakes and other formulated breakfast cereal product are now gaining popularity in India.
221. PROFILE ON PRODUCTION OF PAPER ENVELOPE
221. PROFILE ON PRODUCTION OF PAPER ENVELOPE 221-2 TABLE OF CONTENTS PAGE I. SUMMARY 221-3 II. PRODUCT DESCRIPTION & APPLICATION 221-3 III. MARKET STUDY AND PLANT CAPACITY 221-4 A. MARKET STUDY 221-4 B.
Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant
Sector Agro and Food Processing Sub - sector Agro Processing Industry Project No. AF-34 Project Title Molasses Based Fuel Ethanol (Bio-Fuel) Plant Project Description The proposed project envisages setting
166. PROFILE ON SMALL RUMINANT MEAT PROCESSING
166. PROFILE ON SMALL RUMINANT MEAT PROCESSING 166-2 TABLE OF CONTENTS PAGE I. SUMMARY 166-3 II. PRODUCT DESCRIPTION & APPLICATION 166-3 III. MARKET STUDY AND PLANT CAPACITY 166-3 A. MARKET STUDY 166-3
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY FACULTY OF COMMERCE GENERAL MASTERS IN BUSINESS ADMINISTRATION MANAGERIAL ACCOUNTING GMB 562 FINAL EXAMINATION 11 DECEMBER 2003 TIME ALLOWED: 3 HOURS + 30
ources of Drinking Water
The drop on water Sources of Drinking Water Did you know that 40 per cent of Nova Scotians get their water privately from a drilled well, a dug well, or a surface water source? The other 60 per cent rely
Frequently Asked Questions
Frequently Asked Questions Q 1) Can we avail input credit for all purchases like stationery, consumables, machine parts etc., made in Karnataka if our supplier issues a tax invoice, charging VAT? Q 2)
MBA (3rd Sem) 2013-14
310/MBA(I) MBA/28/FM-301/T/ODD/13-14 2013-14 MBA (3rd Sem) Paper Name : Corporate Taxation and Tax Planning Paper Code : FM-301 Full Marks : 70 Time : 3 Hours The figures in the right-hand margin indicate
BASIC CONCEPTS AND FORMULAE
12 Marginal Costing BASIC CONCEPTS AND FORMULAE Basic Concepts 1. Absorption Costing: a method of costing by which all direct cost and applicable overheads are charged to products or cost centers for finding
Project Description. Market and Growth Drivers. Agro and Food Processing Horticulture Infrastructure. Market
Sector Sub - sector Profile No. Project Title Agro and Food Processing Horticulture Infrastructure AF-14 Project Description Onion, being high in water content, is a delicate commodity to store and requires
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be
Marginal and. this chapter covers...
7 Marginal and absorption costing this chapter covers... This chapter focuses on the costing methods of marginal and absorption costing and compares the profit made by a business under each method. The
A. SCHEME FOR THE SETTING UP OF FISH HANDLING / CURING / SOLAR DRYING FACILITY (WITH LPG BACK UP)
Enclosure I A. SCHEME FOR THE SETTING UP OF FISH HANDLING / CURING / SOLAR DRYING FACILITY (WITH LPG BACK UP) 1. FISH DRYING TECHNIQUE Fish drying and processing methods vary from species to species. The
DE Tischwasserfilter Bedienungsanleitung. EN Water filter Instruction Manual. FR Carafe filtrante Mode d emploi
DE Tischwasserfilter Bedienungsanleitung Water filter Instruction Manual FR Carafe filtrante Mode d emploi IT Acqua filtrata Instruzione per l uso NL Waterfilter Gebruiksaanwijzing PL Filtr wody Podręcznik
XLPE PRODUCTION PLANT FOR THIRUVALLA UNIT OF TRACO CABLE LTD
PROJECT PROFILE ON XLPE PRODUCTION PLANT FOR THIRUVALLA UNIT OF TRACO CABLE LTD Prepared by: TRACO CABLE COMPANY LIMITED IV TH FLOOR, KSHB OFFICE COMPLEX PANAMPILLY NAGAR KOCHI-682036 September 2012 PROJECT
UNIVERSITY EXAMINATIONS COURSE TITLE: FINANCIAL ACCOUNTING DATE: 19/08/2010
KABARAK UNIVERSITY UNIVERSITY EXAMINATIONS /2010 ACADEMIC YEAR FOR THE DEGREE OF MASTER OF BUSINESS ADMINISTRATION COURSE CODE: ACCT 510 COURSE TITLE: FINANCIAL ACCOUNTING STREAM: DAY: TIME: MBA THURSDAY
Water Treatment & Purification Chemicals
Lime-Out Extra Water Treatment Cleaning Chemicals Dissolves tough lime, calcium & rust stains Non-abrasive thick jelly like liquid clings to vertical surfaces Cleans tubs, sinks, shower doors, dishwashers
(AA11) FINANCIAL ACCOUNTING BASICS
All Rights Reserved ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA AA1 EXAMINATION - JANUARY 2016 (AA11) FINANCIAL ACCOUNTING BASICS Instructions to candidates (Please Read Carefully): (1) Time allowed:
130. PROFILE ON PRODUCTION OF CORRUGATED PAPER BOX
130. PROFILE ON PRODUCTION OF CORRUGATED PAPER BOX 130-2 TABLE OF CONTENTS PAGE I. SUMMARY 130-3 II. PRODUCT DESCRIPTION & APPLICATION 130-3 III. MARKET STUDY AND PLANT CAPACITY 130-4 A. MARKET STUDY 130-4
WATER SUPPLY & SANITATION
WATER SUPPLY & SANITATION Puducherry region relies totally on ground water resources. Karaikal, Mahe and Yanam regions depends both on surface water and ground water. The system of water supply is bifurcated
None of the Directors had an interest in the shares of the company at any time during the year.
EMAMI BANGLADESH LIMITED DIRECTORS REPORT FOR THE PERIOD 01 st APRIL 2014 TO 31 st MARCH 2015 The directors present their report and the financial statements for the period 1 st April 2014 to 31 st March
