GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011



Similar documents
MSV FENNICA MSV FENNICA SHORT VESSEL DESCRIPTION VESSEL DETAILS

How To Operate A Pipelay Vessel

ARRANGEMENT. Main deck. Below main deck. Below tween deck. Slop. Mud. Fuel oil (FO) Base oil (BO) Fresh water (FW) Drill water (DW) Met BRIZ

OFFSHORE WIND Peter Robert

MERMAID ENDURER DIVING AND ROV SUPPORT VESSEL

Dry Bulk Carriers Vessel: Bulk Americas

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA

ACCOMMODATION BARGES FOR SALE OR CHARTER

Giulio Verne Cable Laying Ship Specification GIULIO VERNE CABLE LAYING SHIP SPECIFICATION

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

Multipurpose Offshore Construction Vessel

GAS FLAWLESS - FORM C

FLEET LIST OFFSHORE SUPPORT VESSELS

MV EVITA. VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OFFICE ADDRESS:

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

VESSEL S TECHNICAL SPECIFICATION


ARCTIC S SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE

Lifting Appliances

VS 485 CD. Siem Meling Offshore Da Karmsund Maritim Services AS, Karmøy, Norway Built IMO No DNV No

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Proven Capability for Offshore Installation. Heavy Lift-cum-Pipelay Vessel LTS3000

FLEET LIST OFFSHORE SUPPORT VESSELS

Topaz Commander 84 M BHP - DP II - Multi Purpose Support Vessel. Vessel Specifications

FOGA ApS. Arctic Hunter Multipurpose/support vessel

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean

STOUCO Drilling Equipment

PORT OF ODENSE & LINDØ INDUSTRIAL PARK STRONG LOGISTICS FACILITY IN NORTHERN EUROPE

MERMAID FLEET PROFILE SUBSEA SERVICES

EXPERIENCE WITH DP-SYSTEMS ON BOARD

VESSEL SPECIFICATIONS : OTS YEOMAN

2. Crane standing on firm, horizontal ground.

Azimuth thrusters. propulsors

Trends in the Development of Container Vessels

Safety of Life at Sea, 1974 (SOLAS)

Grain Capacity: No Hold name Hold C.B.M. ULUSOY-11

CH-01.qxd 4~6~04 11:22 AM Page 1. Part 1 Ship Design

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008

maersksupplyservice.com L-Type ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

Islay 75 M BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OPERATOR: Ugland Offshore AS TECHNICAL MANAGER: Ugland Marine Services AS

Normand Installer Deep Water Installation Vessel CALM. Our Activities

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

Mærsk Gallant. Harsh environment jack-up. Capabilities for subsea handling HP/HT drilling

Our Fleet. Deep Blue. One of the most advanced pipelay and construction vessels of the subsea industry and the flagship of the Technip Fleet

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

Case Study 10 R/V WESTERN FLYER Chronic Cracking in an Aluminum SWATH Research Vessel

Abstract. Introduction

MARINE SAFETY INVESTIGATION REPORT

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

Service life of synthetic fibre ropes in deepwater lifting operations. The 15 th North Sea Offshore Cranes & Lifting Conference Ashley Nuttall

Liebherr Top Technology. Cranes for Wind Power

Emission support system for calculation of energy demand and emissions of ships. Hans Otto Kristensen

1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/ /02/2008 Basic proposal PP GM SB

Nautischer Verein zu Bremerhaven Bremerhaven, Nautischer Verein

Design methodology and numerical analysis of a cable ferry

Sea Ray 340 Express Cruiser Joan of Art

Fot. Kacper Kowalski/aeromedia.pl

Stena S ,200 DWT Product/Chemical Tanker CONQUEST CONQUEROR CONCORD CONCEPT CONSUL CONTEST

About us. Remontowa reliability, quality & experience At Your Service. Worldwide

Caspian Supporter 72.5 M BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

PT02_PDP1 Acquisition and Fitting of a Dynamic Position (DP) vessel equipped with marine surveying equipment. Nuno Lourenço (nuno.lourenco@ipma.

Arcona 410 Juniper. Arcona Yachts UK. Hamble Point Marina, School Lane, Hamble, Southampton, Hampshire SO31 4NB United Kingdom

The Effects of Length on the Powering of Large Slender Hull Forms

MOOREX mooring system

RESEARCH SHIP ELLEN KHUZWAYO

Fassmer Offshore Solutions

New marine propulsion concept with booster motor

Questionnaire for Classification of Offshore Service Vessels (Newbuilding) according to GL Rules and Regulations

COMPUTER MODEL TIL BEREGNING AF EEDI OG RØGGASEMISSIONER FOR FORSKELLIGE SKIBSTYPER

AIS Overview. Evans Starzinger

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:

DMS M BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

Flood Rescue Emergency Services First Responders Coast Guard Police

Topaz Glory 59 M BHP - FIFI 1 - AHTSV. Vessel Specifications

FORCE 16 INTERCEPTOR. UNION FORCE MARINE GROUP Jean-Marc Gregori, President ITALY: FRANCE: JMG@UFMGroup.

Floating. Diesel power stations

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION

M/Y NAIA RV PEGASO. (ex. PEGASO) Isle of Man CLASSIFICATION: 14 knots (cruising) 3516C 2350 KW ( Total 4700 KW) GUESTS: 12 in 6 CONSTRUCTION:

Topaz Johor 59 M BHP - DP1 AHTSV. Vessel Specifications

PALFINGER marine cranes are developed to meet a wide range of specific applications...

THE FITTING OF RECOVERY STROPS TO LIFEBOATS DESIGNATED AS RESCUE BOATS SHIPS CONSTRUCTED ON OR AFTER 1 ST JULY 1986

NEW FOR Broadband 3G Radar. The evolution of the radar revolution.

Vessels reporting duties on the NSR

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

Part 0 - Classification and Surveys Classification and Surveys I

Boat Launch and Recovery A Key Enabling Technology For Flexible Warships Andy Kimber, BMT Defence Services Limited, Bath UK Info@bmtdsl.co.

Any Ocean, Anywhere, Anytime.

MARINE ACCIDENT REPORT April 2013

Topaz Legend 59 M BHP - FIFI 1 - AHTSV. Vessel Specifications

Automation and control

K Line Offshore AH 12 CD

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery

POSEIDON ISLA TRAWLERS 2600

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

Civil Engineering and Marine Works (CEM) Offshore Branch Office

GROWTH AND PROFITABILITY THROUGH SUPERIOR CUSTOMER UNDERSTANDING

FTheBetterMachine. Technical Description R 992. Hydraulic Excavator

Transcription:

Vessel Specification - December 2011 GOLIATH DPIII OFFSHORE SUPPORT VESSEL This technical specification sheet is subject to change without notice.whilst every effort has been made to ensure that accuracy of the information represented within this document, no guarantees of accuracy can be given

GOLIATH The Goliath is one of the largest offshore construction vessels in the world. This multi-functional vessel is equipped with DPIII and a 1600mt crane, primarily for offshore installation. The Goliath can be readily equipped for pipelaying as welll as saturation diving and a variety of other functions. The vessel also has substantial accomodation in the form of 300 high-quality berths. The heavy lifting test of the large crane was carried out in the open sea with a 1,760 t test weight corresponding to 110% of the nominal load capacity. The test loads consisted of two water filled pontoons which were lifted out of the water and turned around. BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2 DIMENSIONS LOA: 180m LWL: 167.8m Beam: 32m Displacement: 35500 tonnes Deadweight: 22000 tonnes Draft (design): 7.0 metres Draft (scantling): 7.5 metres Draft: 10.5 metres Forward Thrusters Extended BOLLARD PULL: 250 tonnes HELIDECK: Designed for Sikorsky S61N helicopter CARGO AND DECK SPACE: Below Deck Storage: Space 4 Cargo Holds 3 Cargo Holds Deck Cargo Space: 5000 sq metres Deck Loading: 10 tons / sq metre and 5 tons / sg metre CAPACITIES Fuel Capacity: 7500 m³ Fresh Water Capacity: 2700 m³ Ballast Water Capacity: 5000 m³ Lub Oil Capacity: 15 m³ Water Ballast: WBT 8590mt Anti-rolling: 7640mt ACCOMODATION: The vessel is rated to carry 296 personnel, although she actually has 314 bunks. Available for the client will be roughly 240 berths, once extra catering crew are in place to look after them. There are 5 offices and 2 conference rooms available to the client. The mess room will seat 150 at one time, and there is a large recreation room provided as well as a 24-seat cinema. A fully fitted gym and sauna are also fitted, as well as a swimming pool installed above the bridge. CRANEAGE Main Crane: Liebherr 1600mt (fully revolvable) with 70 metre Boom mounted SB Side Auxiliary Cranes: 2 x 100mt revolving lifting 100mt at 18m radius. Boom length of 48m with whip line of 20mt with subsea capacity of 50mt at 34m radius with 300m depth SPEED, CONSUMPTION AND ENDURANCE Max Speed: 14 knots 100% MCR General Service Speed: 12 knots 90% MCR Consumption in Transit: 39 mt / day Consumption on DP 15 mt / day Consumption alongside 5 mt / day Endurance: 100 days offshore GENERATORS Eight Caterpillar 3516C engines drive generators supplied by Leroy Summers. Each generator outputs 2,200 kilowatts, giving a total of 17,600 kilowatts available. An emergency generator with a Caterpillar 3500B engine is installed, which outputs 1424 kilowatts.

THRUSTERS Aft: Three Rolls Royce azimuth thrusters, each of 3,333 kilowatts. Fwd: Two Rolls Royce drop-down azimuth thrusters, each of 2,400 kilowatts, plus Two Rolls Royce tunnel thrusters, each of 1,355 kilowatts. All thrusters are powered by frequency-drive motors supplied by Wartsila. Total thruster power available is 17, 509 kilowatts. 2 MOONPOOLS Each 4m x 3m (hatch cover) DP SYSTEM Kongsberg K-Pos dual redundant main operating station on aft bridge. Kongsberg K-Pos simplex back-up operating station on forward bridge. Kongsberg C-Joy independant joysticks on forward and aft bridges. Kongsberg C-Wing remote joystick, with plug-in point port and starboard. 1 x HiPAP acoustic position reference system, with two 500mm transducers. 2 x Differential GPS position reference systems. 2 x Bandak Mk 15B taut wire position reference systems. Port and starboard. 2 x Fanbeam short-range laser position reference systems. Forward and aft. LIFEBOATS / HIGH SPEED CRAFT 4 x 102 person enclosed lifeboats 2 x 35knot SOLAS 144 HS crafts 8 x throw-over rafts (KHZ-50) HELICOPTER ACCESS 12.8t, 23m diameter heli-deck

CRANEAGE MTC 7800 MAIN CRANE C R A N E S The MTC 78000 achieves a maximum lifting capacity of 1,600 t at up to 35 m radius. This corresponds to a maximum dynamic moment of 78,000 mt, the crane still being able to slew over 360. At a maximum radius of 74 m for the main hoist the crane achieves a lifting capacity of almost 530 t. The boom length of the crane currently delivered is 87 m. In addi-tion to the main hoist, the MTC 78000 offers two auxiliary hoists with lifting capacities of up to 200 t and 50 t respectively. The drive concept is based on an electro-hydraulic drive with 8 x 500 kw or 4 MW power. The two main winches offer a line pull of 500 kn (50 t) with a rope diameter of 48 mm. High safety standards are among the most important criteria to be fulfilled during the development of the new offshore crane. The standard equipment of the MTC 78000 features the proven Litronic control system with integrated display of load and radius as well as automatic load moment limitation. This is completed by special overload protections which are either activated electronically (AOPS automatic overload protection system ) or manually (MOPS manual overload protection sys-tem ). The crane's auxiliary hoist is fitted with a constant ten-sion system exerting a tensile force on the hoist rope in case of significant wave height, thus ensuring that the hook follows the moving load. The vessel is further equipped with 2 x 100 t Litronic cranes.

2 x CBO 3600 100 Litronic ancillary cranes

For further information, please contact: Alex Vicefield Zafiro Marine info@zafiromarine.com +377 92 05 10 20 This technical specification sheet is subject to change without notice. Whilst every effort has been made to ensure that accuracy of the information represented within this document, no guarantees of accuracy can be given