ANGLO PLATINUM LIMITED CONCENTRATORS. ANALYST AND FUND MANAGER VISIT 27 May 2005



Similar documents
INTERNATIONAL AUTOGENOUS GRINDING SEMIAUTOGENOUS GRINDING AND HIGH PRESSURE GRINDING ROLL TECHNOLOGY 2011

MOGALAKWENA INFORMATION CARD PLATINUM

Interim results for the six months ended 31 December 2009

Improving Energy Efficiency Across Mineral Processing and Smelting Operations A New Approach

by Tom Kendall Special Reports Supply and Demand Tables

Solutions and life cycle services for the entire Minerals Processing value chain Life cycle solutions

Overview REGULATORY RELEASE. 28 January First Quarter 2016 Production Report and Update

OVERVIEW OF PGM PROCESSING JULY NDLOVU, EXECUTIVE HEAD OF PROCESSING

Enterprise Energy Effectiveness and Sustainability Presented by Osvaldo A. Bascur, Metals Industry Principal, OSIsoft, LLC

MINING INDABA 8TH 11TH FEBRUARY 2016

ADVISORY CAPABILITY STATEMENT

AN OVERVIEW OF OUR BUSINESS

LEVERAGING OUR ASSETS THROUGH FLEXIBILITY. RBPlat Styldrift I Site Visit 17 November 2015

Improving The Efficiency Of Fine Grinding Developments In Ceramic Media Technology

THE NEW ANGLO AMERICAN. Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference: 10 May 2016

Safety achievements in the financial year include the following:

FOURTH QUARTER 2011 RESULTS

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Lecture 12: Exercise on mineral processing. Contents. Problems 1 to 7

AVINO SILVER & GOLD MINES LTD.

Ferrochrome smelting and smelting capacity investment in Zimbabwe

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

Establishing the feasibility of your proposed mining venture

Savannah North Scoping Study Looking into the future 3 February 2016

Xstrata Alloys in Profile

This is Outokumpu Tornio Site

BMO Capital Markets 2016 Global Metals and Mining Conference. Diego Hernández Chief Executive Officer

Outotec HIGmills; A Fine Grinding Technology

Professional Geology, XRF, Mining & Mineral Processing Engineering Services

AN INTRODUCTION TO THE RADOS XRF ORE SORTER. RS Fickling Metanza Mineral Processors (Pty) Ltd

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

Sylvania Platinum Limited ( Sylvania, the Company or the Group ) AIM (SLP) Interim financial results for the period ended 31 December 2015

For personal use only

LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION

Detour Gold Provides New Life of Mine Plan for Detour Lake

NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY

Choosing your strand of engineering. J Robinson A Mottura

ANGLO AMERICAN PLATINUM INTEGRATED ANNUAL REPORT 2011

Trip to Pulacayo. Pulacayo - Paca

ANNUAL INTEGRATED REPORT 2015

PROPROCESS SERVICES & CAPABILITY STATEMENT

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Disclaimer. Implats. Share price (US$ equivalent)

OVERVIEW. Exploration review

INCREASE THROUGHPUT, REDUCE ERROR AND STABILIZE CIRCUITS WITH EXPERT SYSTEMS

FLOTATION TEST PROCEDURE (developed by Mike Bryson of Mintek) AND EXPLANATION TO INCREASE RECOVERY BY TESTING THE SEPARABILITY OF VALUES AND GANGUE

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

Understanding the Mining Business Model

Anglo American plc. Interim report 2006

Commonwealth of Australia

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading

How To Know If Goldcorp Is A Successful Company

Capability Statement for Project Consulting

Operational Performance

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

Choosing Planning & Scheduling solutions for Metals

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

Corporate Presentation October 2015

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

XYZ Contract Company Industrial Hygiene Program

General Manager/Managing Director Deputy General Manager. Divisional/Business Unit Director. Finance & Administration Director

A PRECIOUS METAL FOR A PRECIOUS PLANET

The Use of Common Business Intelligence and Analytics Tools in the Operation and Optimisation of Iron Ore Process Plants.

Finland s Minerals Strategy

Calculations and OELs

Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland

Mako Project, Eastern Senegal Completion of Scoping Study

RECENT DEVELOPMENTS IN FLOTATION REAGENTS TO IMPROVE BASE METAL RECOVERY. W.A. Grobler, S Sondashi and F.J. Chidley. Betachem (Pty) Ltd

UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA

Agile Manufacturing for ALUMINIUM SMELTERS

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

African Barrick Gold plc ( ABG ) reports half year 2014 results

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

NASA SUPPLEMENTAL CLASSIFICATION SYSTEM NON-AST SCHEMATIC

Appendix A Use of Supporting Studies in Process for NI Documentation

CNSX: TV

Business Solutions that Create Value for Aluminium Producers

Rhodium Market Outlook

Driving Operational and Financial Improvements using Balanced Scorecards and Key Performance Indicators

A Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill

For Discussion Purposes Only. Direct Metals Recycling Financing Opportunity. (Note: All figures contained herein are in US dollars)

MATERIAL SPECIFICATIONS CATALOGUE

Endeavour Management Presentation

Core Fittings C-Core and CD-Core Fittings

CLH Central Laboratory

Transcription:

ANGLO PLATINUM LIMITED CONCENTRATORS ANALYST AND FUND MANAGER VISIT 27 May 2005

Location

Concentrators capacity and context Concentrator Capacity 30 day month Throughput aver pm 2004 RS Tailings retreatment 400,000 362,000 Frank Plant 155,000 145,000 Waterval Plant 360,000 351,000 Klipfontein Plant 120,000 109,000 Waterval UG2 Plant 400,000 419,000 Ivan Plant 120,000 141,000 Mortimer Merensky Plant 80,000 80,000 Mortimer UG2 Plant 250,000 233,000 Amandelbult Mer Plant 340,000 288,000 Amandelbult UG2 Plant 220,000 210,000 Amandelbult Opencast Plant 30,000 40,000 BRPM Plant 200,000 198,000 PPL Plant 385,000 373,000 LPM UG2 Plant 50,000 64,000 LPM Merensky Plant 80,000 85,000 Modikwa Plant 200,000 197,000 Total 3,390,000 3,295,000 Total number of Employees 3,233 Group Average Cash cost per ton milled R 42 Group Average Cash cost per Refined Pt ounce R 683

Safety Achievements Lebowa - 466 IFD Amandelbult - 101 IFD Mortimer - 281 IFD Ivan - 850 IFD Klipfontein - 1038 IFD Wval UG2-1353 IFD Wval Mer -360 IFD Frank - 518 IFD PPL - 231 IFD (IFD Injury Free Days) Klipfontein won the MMMA safety competition for Category A for having Zero reportable injuries for the period June 03 to July 04. All the other Rustenburg concentrators received a MMMA certificate of merit for having Zero reportable injuries for the period June 03 to July 04 ISO 14001 Accreditation OSHAS 18000 Accreditation

Concentrating Strategy

Concentrating Strategy Match capacity to growth profile. Match technology to ore type. Reduce costs. Do it safely.

SHE Strategy Total integration of Safety, Health and Environment in terms of Systems, People and Infrastructure.

Growth in capacity Group expansion profile is in place. New capacity is built as required. Introduce technology improvements Optimisation over time.

Recovery Improvement

Process Stability Process Control Drive Plant recipes Expert Control Systems Particle size measurement as primary control input Plant:Mine buffer Strategic focus on Recovery Process Optimisation Plant surveys Circuit configuration- 2 concentrate & Cr 2 O 3 Open circuit cleaning Chemical & mineralogical size by size on F, T and C routinely Modelling of circuits Ore typing at pilot plant Reagent protocols New technology Grinding testing programme DMS test programme Reagents development Launders & circuit design Close coordination of technical support function with the operating plants Technical support, DML & Consulting Metallurgist & R&D ARC- AARL developments Process Control Group Enhanced process focus Fit for Future

Recovery Imperatives Consistent Operation Focus on Basics Sound Circuit Configuration Optimise Ore Distribution/Blending Grade/Recovery matching with Smelter Enhanced Technical Focus Fit For Future

More focussed structure Concentrator Manager Plant Manager Technical Manager Resident Engineer HR Co-ordinator Accountant Shifts Day Shift Leader Tailings Dam Section Engineer Metallurgist Met. Laboratory Metal Accounting Occupational Hygiene Technologist Environmental Technician

Improve Smelter Recovery Excess Smelter capacity Increase mass pull Manage closing of window Reducing chrome to the Smelter

Mass Pull vs Recovery Profile 110.00 100.00 Recovery 90.00 80.00 70.00 KU20 LVG2 CZD512 KU20 MP-REC LVG2 TREND CZD TREND 60.00 50.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Mass Pull

Cost Reduction Increased use of Supply Chain Internal/External benchmarking initiatives. Cost Awareness Campaign culture change

Operational Performance

45,000,000 Anglo Platinum Concentrators Concentrator Tons Treated Rustenburg Section 70.0% 40,000,000 60.0% 50.0% Tons 35,000,000 30,000,000 40.0% 30.0% %UG2 20.0% 25,000,000 10.0% 20,000,000 2002 2003 2004 Underground Tons Tailings UG2% (excluding WLTR) 0.0% Concentrator profile supports mining profile

Anglo Platinum Concentrators Combined Head Grade (4E) Rustenburg Excluding Western Section Limb Tailings 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2002 2003 2004 Combined

Anglo Platinum Concentrators 6.00 Head Grade (4E) Rustenburg Section 5.00 4.00 3.00 2.00 1.00-2002 2003 2004 Platreef Merensky UG2 Tailings

88.00 Anglo Platinum Concentrators Rustenburg Recoveries Section (4E) 40.00 86.00 35.00 84.00 30.00 82.00 25.00 80.00 20.00 78.00 15.00 76.00 10.00 74.00 5.00 72.00 2002 2003 2004 - Platreef Merensky UG2 Tailings

Operating Costs

Anglo Platinum Concentrators 60.0 Concentrator Cash Cost per Ton Milled Rustenburg Section 50.0 R/t milled 40.0 30.0 20.0 10.0 0.0 2002 2003 2004 R/ton milled 38.8 40.5 42.1 Year

Concentrator Cash Cost per Equivalent Refined Pt OZ Rustenburg Section 800 700 600 Anglo Platinum Concentrators R/Pt oz 500 400 300 200 100 0 2002 2003 2004 R/Pt oz 543 607 683 Year

Key Business Issues Match capacity to growth profile. Match technology to ore type. Reduce costs. Do it safely.