1 27 January 2016 Savannah North Scoping Study Positive results demonstrate robust, long life, Ni-Cu-Co Project Highlights Mining Inventory of 1.26%Ni, 0.64% Cu and 0.09% Co for 76,500t Ni, 38,600t Cu and 5,300t Co Annual production averaging 9,500t Ni, 5,300t Cu and 700t Co in concentrate Mine life of approximately eight years Pre-production capital is a modest A$42M to full production C1 cash cost (Ni in concentrate basis) of A$3.14/lb (US$2.20/lb) Significant opportunities to further enhance project economics Feasibility Study to commence immediately, with completion scheduled during the December 2016 quarter Summary Panoramic Resources Limited ( Panoramic ) is pleased to provide the results of the Savannah North Scoping Study. The Savannah North Scoping Study demonstrates that there is potential to add significant mine life at Savannah through the development of Savannah North. The key physicals from the Savannah North Scoping Study are summarised in Table 1. Table 1 Resource and Production Summary Operating Metric Mineral Resource Mining Inventory Mine Life Life-of-mine production (metal in concentrate) Annual production (metal in concentrate) Result 1.59% Ni, 0.77% Cu, 0.11% Co containing 109,600t Ni, 52,900t Cu, 7,800t Co 1.26% Ni, 0.64% Cu, 0.09% Co containing 76,500t Ni, 38,600t Cu, 5,300t Co 7.75 years 66,200t Ni, 36,700t Cu, 5,000t Co 9,500tpa Ni, 5,300tpa Cu, 700t Co at full production The Mineral Resources underpinning the above production target have been prepared by a competent person or persons in accordance with the requirements of the JORC Code: 2012 Edition refer to the Company s ASX announcement of 1 October The Scoping Study is based on mining Savannah North via conventional long-hole open stoping with paste fill, and processing the ore through the existing Savannah plant. Preliminary mineralogical studies and metallurgical test work on Savannah North mineralisation indicates that metallurgical recoveries will be similar to the excellent recoveries currently achieved with Savannah ore. The Scoping Study assumes average life-of-mine (LOM) recoveries of 86.6% for Ni, 94.9% for Cu and 94.2% for Co. 1
2 The Scoping Study demonstrates a relatively low initial capital investment of $42 million to achieve full production (on a standalone basis), due to the existing mine, processing plant and supporting infrastructure of the Savannah operation. Forecast average C1 cash costs (Ni-in-concentrate after by-product credits) are at the lower end of the industry cost curve at US$2.20/lb Ni over the life of the project. Table 2 summarises the financial outcomes of the Scoping Study at various US$ nickel prices and a flat US$:A$ 0.70 exchange rate. Table 2 - Financial summary for a range of US$ nickel prices (US$:A$ = 0.70) Financial Metric Units US$5.00/lb US$6.00/lb US$7.00/lb US$8.00/lb Revenue A$M 892 1,032 1,179 1,319 Initial Capital (Pre-production and ramp-up) A$M LOM Capital (inclusive of initial capital) A$M Operating costs plus royalties A$M Pre-tax cashflow A$M Pre-tax NPV (11% discount rate) A$M IRR % C1 cash cost (Ni in concentrate basis) Payable Ni cash costs A$/lb Ni US$/lb A$/lb Ni US$/lb Cautionary Statement The Scoping Study referred to in this announcement is based on low-level technical and economic assessments, and is insufficient to support the estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. As part of the Scoping Study, Panoramic has identified the following enhancement opportunities which could add significant additional value to the Project: Future Resource growth less than 30% of the potential 2km mineralisation footprint has been tested by drilling to date; Mining Inventory upgrade potential to convert further Resources into Mining Inventory by optimising the mine plan; Optimised mine plan opportunity to lower unit costs, increase production rates and/or improve mined grades by optimising mining methods, stope shapes and cut-off grades; Improved mine scheduling opportunities to bring forward zones of high grade mineralisation and defer some development to a just-in-time schedule; Increased production rates assess potential to increase production rates through refinement of mining methods, further additions to the Mining Inventory, and shaft versus decline haulage; Optimisation of plant throughput and recoveries a number of continuous improvement opportunities have been identified to improve metallurgical performance of Savannah ore that are expected to be directly applicable to the Savannah North mineralisation; Alternative products assess the amenability of Savannah North mineralisation to be processed into separate nickel and copper concentrates, co-processing of Panoramic s Panton PGM mineralisation to produce a PGM-rich bulk concentrate, and matte production via mini-smelting technology (e.g. top submerged lance); and Power the Scoping Study is based on utilising the existing diesel fired power station. If an alternative fuel source such as gas is available, power costs could be reduced. Panoramic is targeting the completion of a Feasibility Study during the December 2016 quarter. 2
3 Panoramic s Managing Director, Peter Harold said The release of the Scoping Study is an important milestone for the Company. The Scoping Study confirms the potential to extend the mine life of Savannah by approximately eight years, with an estimated capital investment of around $42 million, which is yet to be optimised. The estimated annual metal production rates combined with the relatively low estimated cash costs, could drive strong cashflows assuming commodity prices recover to levels consistent with long-run industry forecasts. The discovery of Savannah North has highlighted both the prospectivity of the Savannah North Intrusion and the potential to find other sources of mineralisation at Savannah. Importantly, the Upper Zone is open to the east and west and the Lower Zone is open to the northwest. With only around 30% of the potential strike length of the Savannah North system tested, we believe there are significant prospects of increasing the Resource and potential mine life. Details Geology and Mineralisation The Savannah North Scoping Study is based on the magmatic Ni-Cu-Co sulphide Resources hosted by the Savannah North Intrusion (SNI) located to the north of the Savannah Mine. The mineralised character of the SNI was identified by Panoramic in February 2014 when underground exploration drilling from the mine intersected broad zones of Ni-Cu-Co rich massive sulphide mineralisation 600m north of the mine beneath the surface expression of the SNI. Exploration diamond drilling continued throughout most of 2014, with 16 surface drill holes and 9 underground holes completed for a total of 27,700 drill metres. Resource diamond drilling at Savannah North commenced in April 2015, following completion of the 1570 Savannah North Access Drive (Figure 1), with a further 38 underground resource drill holes totalling 15,300 drill metres completed at Savannah North to September The Savannah North Resource is composed of two discrete zones of mineralisation, the Upper and Lower Zones. The Upper Zone relates to mineralisation developed on or about the basal contact of the SNI (Figure 2). The Upper Zone mineralisation plunges approximately 15 degrees to the west, in-keeping with the overall plunge of the SNI. To the east of Section 5750mE, the Upper Zone mineralisation is dominated by massive sulphide mineralisation developed at the base of the SNI in contact with the underlying Tickalara Metamorphics. The massive sulphide mineralisation is typically 5-8m thick and dips between 5 degrees and 40 degrees to the north. Post-mineralisation dykes associated with the formation of the 500 Fault frequently cut and dilate the Upper Zone mineralisation between 5800mE and 6100mE. To the west of Section 5750mE, the Upper Zone mineralisation appears to be developed within the SNI and is typically underlain by a 20-30m thick contaminated chilled contact zone of noritic composition. Here the Upper Zone mineralisation is typically 15-20m thick and is dominated by strong matrix mineralisation (20-40% sulphides). The matrix mineralisation frequently contains thin zones of higher grade semi-massive to massive sulphide mineralisation. The Upper Zone mineralisation remains open to the east and west. Further to the west and 300m beyond the area of the currently defined Resource, the Upper Zone mineralisation has been identified in surface drill hole SMD % Ni). The Upper Zone intersection in SMD164 is coincident with a very large, highly conductive down-hole electromagnetic (DHEM) response, which geophysical modelling indicates may extend at least a further 1km to the west from SMD164 to the limit of the DHEM system configuration (refer to the Company s ASX announcement of 25 August 2015). The Savannah North Lower Zone relates to a consistent zone of higher grade, off-contact massive sulphide mineralisation. The Lower Zone mineralisation is predominantly developed within the Tickalara Metamorphics underlying the SNI and is interpreted to originate from the Upper Zone mineralisation. It is up to 15m thick and dips degrees towards the northwest. In places, the Lower Zone mineralisation appears to coincide with dykes related to a possible link structure between the 500 and 900 Faults. The Lower Zone mineralisation is open to the northwest. Panoramic considers the Savannah North system to have significant upside, and notes the following: The Resource definition drilling is still at an early stage and considerably more drilling will be required to confirm the ultimate size of the Savannah North system; The potential strike length of the Savannah North mineralised footprint is currently believed to be approximately 2km and remains open up-dip to the east and along strike to the west; and At this stage, less than 30% of the potential strike length has been tested by Resource definition drilling. 3
4 Figure 1 - Plan View showing the position of Savannah North and the initial Resource drilling area 4
5 Figure 2 - Savannah North Geological Cross Section 2600mN 5
6 Resource Panoramic released a maiden Mineral Resource estimate for Savannah North in August 2015 (refer to the Company s ASX announcement of 11 August 2015) and a major Resource upgrade in October 2015 (refer to the Company s ASX announcement of 1 October 2015). The October 2015 Resource estimate of 6.88 million 1.59% Ni for 109,600t Ni has been used for the Savannah North Scoping Study. The Resource is based on 38 drill holes completed between April and September 2015 from the 1570 Savannah North access drive, supplemented with 25 surface and underground holes from the 2014 exploration drilling campaign. The Resource was estimated using Surpac TM software and Ordinary Kriging estimation methodology and has been classified as shown in Table 3 and Figures 3 and 4. Table 3 - Savannah North Mineral Resource Resource Zone Upper Lower Other Total Metal Resource Date JORC Measured Indicated Inferred Total Metal Tonnes Tonnes (%) Tonnes (%) Tonnes (%) Tonnes (%) Nickel Oct ,700, , ,465, ,900 Copper ,700 Cobalt ,200 Nickel ,796, ,338, ,134, ,000 Copper ,800 Cobalt ,300 Nickel , , ,700 Copper ,400 Cobalt Nickel 109,600 Copper 52,900 Cobalt 7,800 Figure 3 - Plan view showing Savannah North Upper Zone Resource classification 6
7 Figure 4 - Plan view showing Savannah North Lower Zone Resource classification Mining Savannah North is located approximately 600m north of the existing Savannah underground mine. If mining and development of Savannah North were to proceed, the existing Savannah underground infrastructure including decline access, ventilation, power, water, pump stations, magazine and service bays would be utilised. Access would be via decline from the 1440 level with an internal ventilation shaft to the 1570 drill drive for the pre-production and ramp-up phase until a surface ventilation raise was established (Figure 5). Several alternative mining inventories and schedules have been developed by Panoramic from the 1 October 2015 Resource Block Model using Datamine TM Studio 5D Planner and EPS (Enhanced Production Scheduler) software. The preferred Mining Inventory adopted as the Base Case for the Scoping Study is based on the following parameters (Table 4). Mining Method Sub-level interval Minimum stope angle Minimum mining width Table 4 - Savannah North mining parameters Long hole open stoping (LHOS) 20m 50 degrees 2m Stope dilution 10% Stope mining recovery 95% A Mining Inventory of 1.26%Ni, 0.64% Cu and 0.09% Co for 76,500t contained nickel, 38,600t contained copper and 5,300t contained cobalt has been derived, with approximately 88% of the ore from open stoping methods and the balance from jumbo lateral development (Table 5). 7
8 Mining Method Inventory (Mt) Table 5 - Savannah North Mining Inventory Ni % Cu % Co % Contained Nickel (t) Contained Copper (t) Contained Cobalt Stoping ,900 34,000 4,600 Development ,600 4, Total ,500 38,600 5,300 (t) On a contained nickel tonnes basis, approximately 70% of the Resource is included in the Mining Inventory. The proportion of Indicated and Inferred Resources contained in the Mining Inventory are shown in Table 6. Table 6 - Savannah North Mining Inventory by Resource Classification Resource Classification Contained Nickel (t) % of total contained Ni Indicated 50,500 66% Inferred 26,000 34% Total 76, % Figure 5 - Proposed Savannah North Mine Layout Savannah Savannah North The mine schedule developed from the Mining Inventory assumes a single decline mine layout, truck haulage, and development and production rates based on over ten years of historical Savannah mining performance. The schedule shows that production rates of 0.8 to 1.0Mtpa can be achieved for up to 6.5 years. 8
9 Processing Savannah currently operates a processing plant consisting of conventional crushing, grinding, flotation and concentrate handling (Figure 6). The Savannah plant has operated continuously since August 2004, with improvements in recoveries and throughput via changes in operating practices and minor circuit modifications. The nominal throughput capacity of the Savannah plant is approximately 1.0Mtpa. Mineralogical and petrological studies have shown the Savannah North mineralisation has very similar properties to the currently processed Savannah ore. A preliminary flotation testwork program conducted by site-based metallurgists using composite samples from the Savannah North Upper and Lower Zones shows the flotation performance of the Savannah North mineralisation to be in line with that of Savannah ore. Therefore, the current Savannah grade-recovery curves have been used in the Savannah North Scoping Study. Life-of-mine production is estimated to be 66,200t Ni, 36,700t Cu, and 5,000t Co in concentrate with average estimated LOM recoveries of 86.6% for Ni, 94.9% for Cu and 94.2% for Co. Average annual metal in concentrate at full production is estimated to be 9,500tpa Ni, 5,300tpa Cu and 700tpa Co. Further test work is planned to confirm the metallurgical performance of the Savannah North mineralisation. In particular, recoveries for high Ni, Cu and Co head grades are to be confirmed for the periods in which mined grades are higher than those currently being processed at Savannah. Additionally, a number of projects to improve future metallurgical performance have been identified through work with GR Engineering and the Julius Kruttschnitt Mineral Research Centre at the University of Queensland (JKMRC). Figure 6 Savannah Processing Plant Capital Costs If developed, Savannah North will utilise the existing Savannah infrastructure (underground development and services, process plant, accommodation camp, power station, fuel farm, roads, administration buildings, water storage, laboratory, workshops and mobile equipment). As such, the estimated up-front capital cost of $42 million is limited to pre-production and ramp-up activities associated with access development, ventilation upgrades, and leasing of mobile equipment. Life of mine capital is estimated to be $137 million and includes mining capital development, ventilation upgrades, expenditure on plant and equipment and a tailings dam expansion. Feasibility study costs, working capital requirements, closure costs and contingencies are not included in this estimate. A summary of the capital cost estimates is shown in Table 7. 9
10 Table 7 Capital Cost Summary Item Initial Capital (A$M) Sustaining Capital (A$M) Life of Mine Capital Total (A$M) Initial access development Ventilation upgrades Mining capital development PP&E and other Tails dam expansion Total Operating Costs Estimated mining, processing, administration and concentrate haulage costs are based on more than ten years of historical Savannah site costs. Mining costs have been derived from activity-based unit costs appropriate for the mining method, depth and haulage distances proposed and are based on actual FY2015 and/or FY2016YTD mining performance at Savannah. A summary of the estimated operating costs is shown in Table 8. Table 8 - Operating Cost Summary Item Unit Amount Mining A$/t ore Processing, Admin & Concentrate haulage A$/t ore 55 TOTAL A$/t ore C1 cash cost * A$/lb 3.14 (US$2.20) Payable Ni cash cost* A$/lb 5.26 (US$3.68) *After by-product credits Projected Revenue and Commodity Price Assumptions Any Savannah North production is assumed to be covered under Panoramic s existing concentrate offtake agreement with Sino Nickel Pty Limited, which operates until early Offtake terms after that date are assumed to be in line with the existing offtake agreement. Flat commodity prices of US$6.00/lb Ni, US$2.50/lb Cu, $10.00/lb Co and an US$:A$ exchange rate of A$1 = US$0.70 are used in the Scoping Study Base Case. It should be noted that the commodity prices used in the Scoping Study Base Case are lower than recent broker long-term forecasts. The Project is strongly leveraged to the US$ nickel price and US$:A$ exchange rate. The sensitivity of pre-tax NPV (11% discount rate) for a range of nickel prices and US$:A$ exchange rates is shown in Table 9. Table 9 - Sensitivity of pre-tax NPV to movements in Ni price and US$:A$ exchange rate Pre-Tax NPV US$:A$ FX Rate Nickel Price US$/lb
11 Approvals and Permitting The Savannah North Resource is located on the existing granted Savannah mining leases. Existing environmental and works approvals granted for the current Savannah operation are understood to be sufficient for commencement of operations at Savannah North. A tailings dam lift scheduled to be constructed in mid-2016 will be sufficient to store the expected tailings output at current production rates for a further three years. Additional tailings storage is required to support a mine life beyond this date, which will require additional approval. Value Enhancement Opportunities Panoramic has identified a number of opportunities which could provide significant value enhancement to Savannah North. The Company will investigate these opportunities as part of the Savannah North Feasibility Study. Opportunities include: Future Resource growth - less than 30% of the potential 2km mineralisation footprint has been tested by Resource drilling. Drill programs to convert Resources from Inferred to Indicated and test up and down dip extensions are planned. It should be noted that the most easterly hole of the 2015 Resource Drilling Program testing the eastern extent of the up-dip portion of the Upper Zone intersected 2.14% Ni in hole KUD1572 (refer to the Company s ASX announcement of 1 October 2015). The deepest hole testing the Lower Zone intersected 2.55% Ni in hole KUD1562 (refer to the Company s ASX announcement of 1 October 2015); Mining Inventory upgrade - conversion of further Resources into Mining Inventory by optimising mine planning; Mine planning - detailed review of alternative mining methods and/or stope shapes, cut-off grade, and the proportion of open stoping and selective mining methods to lower unit costs, increase production rates and/or improve mined grades; Mine scheduling - review opportunities to bring forward zones of high grade mineralisation (plus 2.0% Ni) and defer some development to a just-in-time schedule; Production rates - assess potential to increase production rates through refinement of mining methods, further additions to the Mining Inventory, and shaft versus decline haulage; Capital management - consider options for staged start-up approach, thereby minimising and/or deferring pre-production capital requirements; Optimisation of plant throughput and recoveries - a number of continuous improvement opportunities identified through work with GR Engineering and JKMRC to improve metallurgical performance at Savannah are expected to be directly applicable to the Savannah North mineralisation; Alternative products - assess the amenability of Savannah North mineralisation to be processed into separate nickel and copper concentrates, co-processing of Panoramic s Panton PGE material with Savannah material to produce a PGE-rich bulk concentrate, and study the potential to produce a value-added matte via mini-smelting technology (e.g. top submerged lance); and Power - the Scoping Study is based on utilising the existing diesel fired power station. If an alternative fuel source such as gas is available, power costs could be reduced. Identified Risks A number of key risks have been identified that may impact on the economics of the Savannah North Project. These risks include, but are not limited to: The amount and timing of pre-production capital expenditure; Unit costs and mining assumptions used in the model are based on Savannah mining performance, and may not be reflective of the costs of mining at Savannah North; Detailed geotechnical and ventilation modelling is yet to be undertaken, which may result in changes to mining assumptions and costs; High-grade material is from the deeper sections of the deposit where the amount of drilling to date is less, resulting in a lowerconfidence Inferred Resource classification; The current Savannah Concentrate Sales Agreement expires in early 2020, and future renewals and applicable terms will be subject to negotiation; and Commodity price and US$:A$ exchange rate risks. 11
12 Project Timeline Panoramic is targeting the completion of a Feasibility Study for development of Savannah North during the December 2016 quarter. Key requirements for the Feasibility Study are: Resource infill and extensional drilling Geotechnical and ventilation studies Metallurgical studies Mine design and schedule optimisation Tailings expansion studies Capital and operating cost revisions An indicative development timeline for the Savannah North Project is shown in Figure 6. Figure 7 Indicative Project Timeline 12
13 About the Company Panoramic Resources Limited (ASX code: PAN) is a Western Australian mining company formed in 2001 for the purpose of developing the Savannah Nickel Project in the East Kimberley. Panoramic successfully commissioned the $65 million Savannah Project in late 2004 and then in 2005 purchased and restarted the Lanfranchi Nickel Project, near Kambalda. In FY2014, the Company produced a record 22,256t contained nickel and produced 19,301t contained nickel in FY2015. Following the successful development of the nickel projects, the Company diversified its resource base to include gold and platinum group metals (PGM). The Gold Division consists of the Gidgee Project located near Wiluna. The Company announced on 31 July 2015 the sale of its interest in the Mt Henry Project to Metals X Limited. The PGM Division consists of the Panton Project, located 60km south of the Savannah Project and the Thunder Bay North Project in Northern Ontario, Canada, in which Rio Tinto is earning 70% in the project by spending up to C$20 million over five years. Panoramic has been a consistent dividend payer and has paid out a total of $114.3 million in fully franked dividends since At 31 December 2015, Panoramic had $25 million in cash and no bank debt. The Company s vision is to broaden its exploration and production base, with the aim of becoming a major, diversified mining company in the S&P/ASX 100 Index. The growth path will include developing existing resources, discovering new ore bodies, acquiring additional projects and is being led by an experienced exploration-to-production team with a proven track record. For further information contact: Peter Harold, Managing Director No New Information or Data This announcement contains references to exploration results and Mineral Resource estimates, all of which have been cross referenced to previous market announcements made by the Company. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Forward Looking Statements This announcement may contain certain forward-looking statements which may not have been based solely on historical facts, but rather may be based on the Company s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks in the Countries and States in which we operate or sell product to, and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company s Annual Reports, as well as the Company s other filings. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. 13
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
For personal use only
dmin1138 27 January 2016 Key Points Corporate and Operational Update Savannah - decision made to preserve the value of the remaining Savannah orebody and to move the operation onto care and maintenance
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW
NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT
ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva
For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves
Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).
ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the
AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE
KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: [email protected] AIM:
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine
TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning
BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO
BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
For personal use only
Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional
Mako Project, Eastern Senegal Completion of Scoping Study
Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST JULY 30, 2015 TSX: FM; LSE: FQM CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Certain statements and information herein, including all statements that
Sorby Hills Silver Lead Project
ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills
(NYSE-MKT:XRA, TSX:XRC,
For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce
FIJI GOLD LION ONE METALS
FIJI GOLD LION ONE METALS Tuvatu Gold Project January 2016 Presentation Disclaimer Forward Looking Statements and Qualified Person DISCLAIMER The information provided in this presentation is not intended
CNSX: TV www.trevali.com
CNSX: TV www.trevali.com March 2010 DISCLAIMER Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations
FOR IMMEDIATE RELEASE
FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
Lalor Project Base Metal Zones and Gold Mineralization January 2009
Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
Sabina Gold & Silver Corp.
Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015
Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest
BAUXITE RESOURCES LIMITED
BAUXITE RESOURCES LIMITED POSITIVE EXPORT DSO BAUXITE SCOPING STUDY RESULTS RECEIVED FOR 100% BRL FORTUNA PROJECT Highlights Existing Mineral Resource and rail logistic chain can support a Direct Shipping
Falcon Minerals Ltd ACN 009 256 535 Company Announcement
Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April
For personal use only
Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning
AGNICO-EAGLE MINES LIMITED
AGNICO-EAGLE MINES LIMITED Corporate Update January 2008 Agnico-Eagle Mines Limited 1 Forward Looking Statements The information in this document has been prepared as at January 15, 2007. Certain statements
FORWARD-LOOKING STATEMENTS
FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to:
Corporate Presentation October 2015
TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start
Second Quarter Earnings Release Conference Call. July 23, 2009
Second Quarter Earnings Release Conference Call July 23, 2009 Cautionary Statement This presentation contains forwardlooking statements within the meaning of Section 27A of the Securities Act of 1933,
Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development. 16 June 2015
Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development 16 June 2015 Safe Harbour Statement This presentation contains forward-looking statements
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
TIGER RESOURCES LTD ACN 077 110 304
TIGER RESOURCES LTD ACN 077 110 304 1st Floor, 8 Parliament Place, West Perth WA 6005 PO Box 1618, West Perth WA 6872 Tel: (08) 9481-7833 Fax: (08) 9481-7835 Email: [email protected] Website: www.tigerez.com
QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015
29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated
BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE
TSX-V/AIM Symbol: BCN April 15, 2016 NEWS RELEASE BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE BACANORA MINERALS LTD.
For personal use only
ABN 52 077 110 304 31 July 2013 JUNE 2013 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Record production of 4,422 tonnes of copper in concentrate achieved in June 2013 Record production of 11,116 tonnes of copper
Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
Ironbark Zinc Limited
Research Note Ironbark Zinc Limited Suite 5, Level 8, 99 York Street, Sydney NSW 2000 29 th August 2013 Ironbark Zinc to up the ante at Citronen Zinc Project with higher zinc prices Recommendation: Speculative
WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.
WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
Cummins Range Rare Earths Project
Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general
Candelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits
Debt investor presentation 2015 financial year
Macedon Debt investor presentation 2015 financial year Peter Beaven Chief Financial Officer 25 August 2015 Disclaimer Forward-looking statements This presentation contains forward-looking statements, including
For personal use only
ASX Release 28 January 2016 QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2015 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND
Assets, Experience, Growth ASX ANNOUNCEMENT 7 July 2015 MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND DEEP DIAMOND DRILLING COMMENCING AT BARBARA THIS WEEK, AIRBORNE VTEM UNDERWAY AND
FOCUS MINERALS LIMITED
FOCUS MINERALS LIMITED Aggressively Expanding into a Rising Gold Price Campbell Baird, Chief Executive Officer ASX: FML www.focusminerals.com.au 2 Disclaimer and Competent Person s Statement This presentation
Galahad Gold plc (Galahad)
23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below
GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL
FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012
Acquisition of Rice Lake. December 2015
Acquisition of Rice Lake December 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
Fast Tracking to Production
Fast Tracking to Production THE ABU DABBAB TANTALUM-TIN-FELDSPAR PROJECT, EGYPT THE 400K DEVELOPMENT. Gippsland Ltd (February 2015)) 1 Important Notices Competent Persons Compliance Statement The information
Disclaimer. Implats. Share price (US$ equivalent)
Implats a superior platinum investment Denver Gold Forum September 25 1 Disclaimer The content of this presentation is for information purposes only and is not intended to serve as financial, investment
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
Bendigo Mining Limited Investor Briefing February 2010
Bendigo Mining Limited Investor Briefing Investor Briefing February 2010 Agenda Corporate info Timeline Dec qtr 09 results Operations review Finance Summary Forward-looking statements This presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
For personal use only. MRV Metals Launch February 2016
MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
Merlin Diamonds Limited
Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited
Silver Mine Project Investment Opportunity in Scandinavia
Silver Mine Project Investment Opportunity in Scandinavia KPMG Corporate Finance ( KPMG ) has been retained by Sotkamo Silver as exclusive Financial and Strategic adviser in connection with the Project
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government
CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company Secretary Joshua Ward Patrick Holywell Registered office Level
Challenges of Investing in Junior Mining Companies and. Sotkamo Silver
Challenges of Investing in Junior Mining Companies and Sotkamo Silver Life Cycle of Junior Explorer High Risk - High Potential Full value Relative Value Possible takeover Speculation Discovery Lowered
PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015
PRESS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE November 13, 2015 CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015 Successful drill program at Prairie Creek leads to new resource estimate with
HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE
22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper
THIRD QUARTER EARNINGS NOVEMBER 12, 2015
THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000
6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill
CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves
CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves Prepared by the CIM Standing Committee on Reserve Definitions Adopted by CIM Council on November 27, 2010 FOREWORD CIM Council, on
Quarterly Activities Report
ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
Interim Financial Report for the half-year ended 31 December 2011
Interim Financial Report for the half-year ended 31 December 2011 Note: The information contained herein should be read in conjunction with the most recent annual report. Aura Energy Limited Level 4, 66
Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland
Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland Krister Söderholm Kevitsa Mining/FirstQuantum MineralsLtd Ltd. Cautionary Note Concerning Forward-Looking Statements Some of the statements
NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES
Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES
UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES