African Barrick Gold plc ( ABG ) reports half year 2014 results
|
|
|
- Nickolas Harrison
- 9 years ago
- Views:
Transcription
1 25 July 2014 Results for the 6 months ended 30 June 2014 (Unaudited) Based on IFRS and expressed in US Dollars (US$) African Barrick Gold plc ( ABG ) reports half year 2014 results We are pleased to report strong results for H1 2014, with increased production and continued cost discipline enabling the business to return to cash generation, said Brad Gordon, Chief Executive Officer of African Barrick Gold. We have now delivered our seventh successive reduction in quarterly all-in sustaining costs (AISC) as we continue to drive operational improvements through the business. During H we produced 346,581 ounces of gold, an improvement of 13% on the same period in 2013, at an AISC of US$1,118 per ounce, a reduction of 25% on the previous year. During the second quarter, we delivered the first ounces from the Bulyanhulu CIL Expansion project with development work on the Bulyanhulu Upper East zone and the Gokona underground exploration portal progressing to plan. As a result of the strong H performance and the incorporation of the expected production from Bulyanhulu Upper East, we now expect full year gold production to be in excess of 700,000 ounces whilst continuing to target an AISC at the bottom of our guidance range of US$1,100-1,175 per ounce. Operational Highlights Q2 gold production of 178,206 ounces, 8% higher than Q2 2013, with gold sales of 171,563 ounces Q2 AISC 1,2 of US$1,105 per ounce sold, 21% lower than Q2 2013, with cash costs 1,2 of US$749 per ounce H1 gold production of 346,581 ounces with gold sales of 330,947 ounces, 13% and 5% respectively, higher than H H1 AISC 1,2 of US$1,118 per ounce sold and cash costs 1,2 of US$752, respectively down 25% and 14% on H First ounces produced from the Bulyanhulu CIL Expansion project, with final commissioning due to complete in Q Bulyanhulu Upper East and North Mara Underground projects progressing well and on schedule Continued strong results from the West Kenya Exploration Project Financial Highlights Cash position increased during Q by US$16 million to stand at US$270 million as at 30 June 2014 H1 revenue of US$446 million, 9% below H1 2013, as the impact of a lower average realised gold price more than offset increased sales volumes H1 EBITDA 1,3 of US$132 million, 1% higher than H1 2013, due to lower cash costs H1 net earnings 1,3 of US$41 million (US10.0 cents per share) impacted by a higher non cash tax charge during Q H1 operational cash flow increased to US$127 million (28% higher than H1 2013) H1 capital expenditure of US$115 million, 45% lower than H due to revised mine plans and stringent capital controls Interim dividend of US1.4 cents per share declared, based on a new cash flow based metric Three months ended 30 June Six months ended 30 June (Unaudited) Gold Production (ounces) 178, , , ,198 Gold Sold (ounces) 171, , , ,369 Cash cost (US$/ounce) AISC (US$/ounce) 1 1,105 1,404 1,118 1,483 Average realised gold price (US$/ounce) 1 1,277 1,366 1,290 1,480 (in US$'000) Revenue 229, , , ,360 EBITDA 1,3 66,959 48, , ,771 Net earnings/(loss) 3 18,412 (721,946) 40,822 (701,230) Basic earnings/(loss) per share (EPS) (cents) (176.0) 10.0 (171.0) Cash generated from operating activities 76,381 41, ,107 99,017 Capital expenditure 4 58, , , ,056 1 These are non-ifrs measures. Refer to page 23 for definitions comparative amounts have been restated to exclude Tulawaka 3 EBITDA and net earnings consist of earnings from both continuing and discontinued operations 4 Excludes non-cash reclamation asset adjustments and includes finance lease purchases 1 LSE: ABG
2 Operational Review Our continued delivery on the cost saving targets set out at the start of the Operational Review is highlighted by a further reduction in Q AISC of 2% over Q and an H reduction of 25% over the previous period. Together with a strong production profile, this enabled ABG to deliver a return to net cash flow generation during Q We remain committed and on track to deliver against the US$185 million cost saving target as previously set out and reflected in our AISC guidance. Safety During the first half of the year, Bulyanhulu regrettably experienced one fatality. On 25 March 2014, Emmanuel Mrutu, one of our underground employees sadly passed away as a result of injuries sustained following a fall-of-ground incident. We have completed internal and external investigations into this tragic incident in order to mitigate any future reoccurrence. As a mark of respect operations ceased for a 24 hour period. During the second quarter Bulyanhulu experienced a non-operational fatality which led to two weeks of disrupted operations at the mine. On 20 May 2014, an underground employee went missing following a night shift. All mining operations were initially ceased and an intensive search operation was launched. On 1 June 2014, the body of the deceased was found and investigations by the Tanzanian authorities have subsequently determined that regrettably the employee took his own life. Ensuring the safety of all our employees is paramount, and we have continuously improved our safety performance at all of our operations over the past few years. In this regard, we have launched a behavioural safety programme called WeCare at each of our operations to further enhance our safety processes. Board Changes During the six months ended 30 June 2014, David Hodgson stepped down as Non-Executive Director of the Company. The ABG Board now comprises eleven Directors, including seven Independent Non-Executive Directors, one Executive Director and three nominees from Barrick Gold Corporation. Indirect Taxes Further progress has been made with respect to the build up of VAT, and the Company received net refunds of US$18 million during the second quarter, bringing total net refunds for H to approximately US$28 million. We have also continued discussions with the Tanzanian Government on the establishment of an appropriate mechanism to safeguard the recoverability of VAT payments over the long term. In this regard, we have submitted proposals for the establishment of an escrow account for VAT paid on domestic goods, similar to that currently used to provide for the refunding of VAT paid on imports and are awaiting further feedback on this proposal. As at 30 June 2014, the outstanding amount relating to the total indirect tax receivable, not covered by the 2011 Memorandum of Settlement, stood at US$66 million, roughly US$30 million lower than 31 December Bulyanhulu Upper East In April 2014 the Board approved the next step in the optimisation of Bulyanhulu through the acceleration of mining from the Upper East Zone. The Zone is expected to produce 1.7 million ounces of gold, averaging 60,000 ounces per annum over a life in excess of 25 years at an AISC of below our target run rate for Bulyanhulu for year-end 2015 of US$900 per ounce. Following the Board approval, the mine undertook waste development in the Zone at a capital cost of US$4.7 million in Q As expected, the mine will commence ore development in Q and this is expected to lead to production from the Upper East Zone of approximately 15,000 ounces of gold in H2 2014, weighted towards the fourth quarter. ABG continues to expect that the 2014 capital requirements for the project will be approximately US$15 million. All capital associated with the project to date has been categorised as capitalised development and is included in the Bulyanhulu and Group AISC figures. Bulyanhulu Deep West We have also progressed the accelerated development of the Bulyanhulu Deep West Zone through a contractor to increase access to higher grade ore from Q During Q we incurred underground development capital costs of US$4.8 million for the project and we expect to incur similar costs per quarter for the remainder of This will be categorised as capitalised development and is included in the Bulyanhulu and Group AISC figures. 2 LSE: ABG
3 Bulyanhulu CIL Expansion During the second quarter, we progressed the commissioning of the new CIL circuit at Bulyanhulu, which will add over 40,000 ounces per annum once fully operational, and are nearing completion of the commissioning stage. Towards the end of June, roughly 6,500 tonnes of rougher tailings were treated and pumped into the new CIL circuit, resulting in 273 ounces of gold being produced in circuit. We expect commissioning to be complete in early Q with the first gold pour in August and the ramp up of production to continue throughout the third quarter. We continue to expect production of 20,000 ounces in 2014 from the project, and are investigating an option for accelerating the retreatment of the historic higher grade tailings in preference to the rougher tailings. Gokona Underground The feasibility study into the potential to mine Gokona Cut 3 via an underground operation progressed well in the second quarter and is on track to be presented to the Board for approval in Q During Q2 2014, ABG made the final decision on the location of the exploration portal which will provide the opportunity to develop a better understanding of the ore body, provide initial access to ore and drilling access to the deeper extensions of the ore body. Early works towards the construction of the portal are in progress with the first blast due in August. The total expansionary capital cost of the portal is expected to be around US$10 million. Interim dividend To ensure that our dividend policy is more closely aligned with the cash generation of the business, the Board of Directors have approved an amendment to the existing dividend policy such that rather than being based on net earnings it will now be based on operational cash flow after sustaining capital and capitalised development but before expansion capital. The Board believes this metric more appropriately reflects both ABG s and the wider market s focus on cash flow generation as well as the commitment to ongoing capital returns to shareholders. The dividend payout ratio of 15%-30% and the timing of the payment, being 1/3 of the dividend as an interim dividend and the balance as a final dividend, remain unchanged. In line with the above change, the Board of Directors is pleased to announce the approval of an interim dividend for 2014 of US1.4 cents per share, an increase of 40% when compared to H The interim dividend will be payable on 22 September 2014 to holders on record at 29 August The ex-dividend date will be 27 August ABG will declare the interim dividend in US dollars. Unless a shareholder elects to receive dividends in US dollars, they will be paid in pounds sterling with the US dollar amount being converted into pounds sterling at the exchange rate prevailing at the time. The last date for receipt of currency elections will be 2 September The exchange rate for the conversion of the interim dividend will be elected on or around 4 September Outlook Over the past six months we have continued to deliver a strong performance from our operating portfolio, with sustainable cost containment across each of the mines and production growth led by North Mara. As we move into the second half of the year we expect the contribution from Bulyanhulu to increase as we begin to access higher grade areas, and both the CIL Expansion and the Upper East projects begin to contribute ounces. At North Mara, we expect the head grade to drop in the second half of the year as the high grade ore from Gokona will be increasingly blended with lower grade material from Nyabirama. At Buzwagi, we expect the grade to revert to between g/t in the second half, but anticipate that throughput levels will increase. Following the approval of the Upper East Project and the Gokona Underground portal in Q we expect capital expenditure for the year to be between US$ million. Sustaining capital (including land purchases) is expected to be US$80-90 million, with an acceleration of spending in the second half of the year versus H Capitalised development is expected to total US$ million as a result of the accelerated development of the Bulyanhulu Deep West Zone together with the categorisation of the Bulyanhulu Upper East project as capitalised development. Expansionary capital is expected to amount to US$50 million which incorporates reduced residual CIL Expansion spend and the Gokona Underground portal. As a result of the strong performance in H and the addition of the Upper East ounces into the 2014 plan, we are revising production guidance upwards for the year to in excess of 700,000 ounces. We maintain our guidance for cash costs of US$740 to US$790 per ounce and all-in sustaining costs of US$1,100 to US$1,175 per ounce sold, and are targeting the bottom of both these ranges. 3 LSE: ABG
4 Key statistics restated to reflect Tulawaka as a discontinued operation Three months ended 30 June Six months ended 30 June (Unaudited) Tonnes mined (thousands of tonnes) 10,355 15,141 19,892 29,118 Ore tonnes mined (thousands of tonnes) 2,115 1,727 3,908 3,378 Ore tonnes processed (thousands of tonnes) 1,925 2,072 3,770 3,983 Process recovery rate (percent) 89.8% 88.8% 89.5% 88.9% Head grade (grams per tonne) Gold production (ounces) 178, , , ,198 Gold sold (ounces) 171, , , ,369 Copper production (thousands of pounds) 3,454 3,122 6,430 5,584 Copper sold (thousands of pounds) 2,874 2,756 5,391 6,113 Cash cost per tonne milled (US$/t) Per ounce data Average spot gold price² 1,288 1,415 1,291 1,523 Average realised gold price 1 1,277 1,366 1,290 1,480 Total cash cost All-in sustaining cost 1 1,105 1,404 1,118 1,483 Average realised copper price (US$/lb) Financial results restated to reflect Tulawaka as a discontinued operation Three months ended 30 June Six months ended 30 June (Unaudited, in US$'000 unless otherwise stated) Continuing operations: Revenue 229, , , ,360 Cost of sales (173,333) (203,348) (332,474) (386,733) Gross profit 55,889 38, , ,627 Corporate administration (7,618) (9,169) (13,975) (17,583) Share based payments (1,593) 425 (4,917) 3,861 Exploration and evaluation costs (6,025) (4,126) (10,995) (7,715) Corporate social responsibility expenses (1,811) (3,077) (4,307) (6,228) Impairment charges - (910,989) - (910,989) Other charges (6,159) (12,659) (12,782) (15,597) Profit/(loss) before net finance expense and taxation 32,683 (901,043) 66,059 (853,624) Finance income Finance expense (2,102) (2,177) (4,504) (4,696) Profit/(loss) before taxation 30,861 (902,813) 62,185 (857,325) Tax (expense)/credit (12,047) 198,907 (22,716) 184,648 Net profit/(loss) from continuing operations 18,814 (703,906) 39,469 (672,677) Discontinued operations: Net (loss)/profit from discontinued operations (402) (25,722) 886 (40,741) Net profit/(loss) for the period 18,412 (729,628) 40,355 (713,418) Attributed to: Owners of the parent (net earnings) 18,412 (721,946) 40,822 (701,230) - Continuing operations 18,814 (703,906) 39,469 (672,677) - Discontinued operations (402) (18,040) 1,353 (28,553) Non-controlling interests - (7,682) (467) (12,188) - Discontinued operations - (7,682) (467) (12,188) 1 These are non-ifrs financial performance measures with no standard meaning under IFRS. Refer to Non IFRS measures on page 23 for definitions. 2 Reflect the London PM fix price. 3 Restated for the reclassification of Tulawaka as a discontinued operation. 4 LSE: ABG
5 For further information, please visit our website: or contact: African Barrick Gold plc +44 (0) Brad Gordon, Chief Executive Officer Andrew Wray, Chief Financial Officer Giles Blackham, Investor Relations Manager Bell Pottinger +44 (0) Daniel Thöle About ABG ABG is Tanzania s largest gold producer and one of the largest gold producers in Africa. We have three producing mines, all located in Northwest Tanzania, and several exploration projects at various stages of development in Tanzania and Kenya. We have a high-quality asset base, solid growth opportunities and a clear strategy of optimising, expanding and growing our business. Maintaining our licence to operate through acting responsibly in relation to our people, the environment and the communities in which we operate is central to achieving our objectives. ABG is a UK public company with its headquarters in London. We are listed on the Main Market of the London Stock Exchange under the symbol ABG and have a secondary listing on the Dar es Salaam Stock Exchange. Barrick Gold Corporation is our majority shareholder. ABG reports in US dollars in accordance with IFRS as adopted by the European Union, unless otherwise stated in this report. Conference call A conference call will be held for analysts and investors on 25 July 2014 at 11:30am London time. The access details for the conference call are as follows: Participant dial in: +44 (0) / Password: ABG A recording of the conference call will be made available at after the call. FORWARD- LOOKING STATEMENTS This report includes forward-looking statements that express or imply expectations of future events or results. Forward-looking statements are statements that are not historical facts. These statements include, without limitation, financial projections and estimates and their underlying assumptions, statements regarding plans, objectives and expectations with respect to future production, operations, costs, projects, and statements regarding future performance. Forward-looking statements are generally identified by the words plans, expects, anticipates, believes, intends, estimates and other similar expressions. All forward-looking statements involve a number of risks, uncertainties and other factors, many of which are beyond the control of ABG, which could cause actual results and developments to differ materially from those expressed in, or implied by, the forward-looking statements contained in this report. Factors that could cause or contribute to differences between the actual results, performance and achievements of ABG include, but are not limited to, changes or developments in political, economic or business conditions or national or local legislation or regulation in countries in which ABG conducts - or may in the future conduct - business, industry trends, competition, fluctuations in the spot and forward price of gold or certain other commodity prices (such as copper and diesel), currency fluctuations (including the US dollar, South African rand, Kenyan shilling and Tanzanian shilling exchange rates), ABG s ability to successfully integrate acquisitions, ABG s ability to recover its reserves or develop new reserves, including its ability to convert its resources into reserves and its mineral potential into resources or reserves, and to process its mineral reserves successfully and in a timely manner, ABG s ability to complete land acquisitions required to support its mining activities, operational or technical difficulties which may occur in the context of mining activities, delays and technical challenges associated with the completion of projects, risk of trespass, theft and vandalism, changes in ABG s business strategy including, the ongoing implementation of operational reviews, as well as risks and hazards associated with the business of mineral exploration, development, mining and production and risks and factors affecting the gold mining industry in general. Although ABG s management believes that the expectations reflected in such forward-looking statements are reasonable, ABG cannot give assurances that such statements will prove to be correct. Accordingly, investors should not place reliance on forward-looking statements contained in this report. Any forwardlooking statements in this report only reflect information available at the time of preparation. Subject to the requirements of the Disclosure and Transparency Rules and the Listing Rules or applicable law, ABG explicitly disclaims any obligation or undertaking publicly to update or revise any forward-looking statements in this report, whether as a result of new information, future events or otherwise. Nothing in this report should be construed as a profit forecast or estimate and no statement made should be interpreted to mean that ABG s profits or earnings per share for any future period will necessarily match or exceed the historical published profits or earnings per share of ABG. 5 LSE: ABG
6 LSE: ABG TABLE OF CONTENTS Interim Operating Review 7 Exploration Review 12 Financial Review 14 Going Concern Statement 22 Non-IFRS measures 23 Risk Review 25 Directors Responsibility Statement 25 Auditor s Review Report 26 Condensed Interim Financial Information: - Consolidated Income Statement and Consolidated Statement of Comprehensive Income 27/28 - Consolidated Balance Sheet 29 - Consolidated Statement of Changes in Equity 30 - Consolidated Statement of Cash Flows 31 - Notes to the Consolidated Interim Financial Information 32 6 LSE: ABG
7 Interim Operating Review Half Year Review For the first half of 2014 revenue amounted to US$445.5 million, 9% lower than the same period in Production of 346,581 ounces drove a 5% increase in sales volumes (16,578 ounces) but this was more than offset by a 13% decrease in the average realised gold price of US$1,290 per ounce, down from US$1,480 in H EBITDA increased by 1% to US$131.6 million in H despite the lower revenue, mainly due to a US$30.2 million reduction in direct mining costs, reflected in the 25% reduction of AISC to US$1,118 per ounce. Operationally, North Mara continued to mine high grade material from the Gokona pit which drove H production of 138,816 ounces, up 8% on the prior year period, and AISC down by 29% to US$936 per ounce sold. Bulyanhulu saw a 9% increase in head grade and a marginal increase in throughput which drove up H production by 13% to 105,420 ounces and AISC down by 21% to US$1,249 per ounce sold. Buzwagi saw a 34% reduction in total tonnes mined over the first half of the year against H which helped to reduce AISC by 29% to US$1,169 per ounce sold. Production increased to 102,344 ounces as a result of higher grade material milled which more than offset the reduction in throughput. As a result of operational and working capital improvements, cash generated from operating activities in H increased by 28% over the prior year period to US$127.1 million, in spite of the reduction in the average realised sales price. Over the first six months of the year this was US$4.5 million lower than EBITDA, but in Q the Company generated positive net cash flows of US$15.5 million. Our cash balance as at 30 June 2014 amounted to US$269.6 million. Capital expenditure for the six months ended 30 June 2014 amounted to US$114.7 million compared to US$209.1 million in H Capital expenditure primarily comprised capitalised development expenditure (US$69.0 million), including US$4.7 million related to waste development from the Bulyanhulu Upper East project and US$4.8 million related to the Bulyanhulu Deep West project, investment in the Bulyanhulu CIL Expansion project (US$24.9 million), investments in tailings and infrastructure (US$9.6 million) and component and equipment costs (US$6.7 million). Second Quarter Review The second quarter delivered positive results, with total production of 178,206 ounces, an increase of 8% on Q Sales ounces amounted to 171,563, 4% lower than production due to the timing of concentrate production at the end of the quarter. Copper production for the quarter of 3.5 million pounds was 11% higher than in Q (3.1 million pounds), due to higher copper grades, mainly at Buzwagi. North Mara continued its strong performance during the quarter with a 10% year on year increase in production due to improved throughput rates as a result of improved mill utilisation rates. The improved throughput rate was marginally offset by a 3% decrease in head grade. At Bulyanhulu, production of 50,241 ounces was 9% down on Q due to lower throughput as a result of ore shortages given the disruption of mining operations for two weeks in May 2014 following a non-operational fatality. Lower throughput was offset by a 6% increase in head grade as a result of higher mined grade given improved availability of high grade stopes. At Buzwagi, gold production for the quarter of 57,787 ounces was 26% higher than in Q driven by a 36% increase in head grade. Throughput rates were negatively impacted by lower mill availability primarily as a result of the re-lining of both the SAG and Ball mills during the quarter, while ore mined was 67% higher in Q year due to previously communicated changes in the mine plan which reduced the amount of waste material removed when compared to Q Total tonnes mined during the quarter amounted to 10.4 million tonnes, a decrease of 32% on Q Ore tonnes mined from open pits amounted to 1.9 million tonnes compared to 1.5 million in Q2 2013, driven by the increased focus on mining ore at Buzwagi due to the change in the mine plan, partially offset by a reduction of tonnes mined at North Mara due to mine sequencing. Ore tonnes processed amounted to 1.9 million tonnes, a decrease of 7% on Q primarily driven by reduced throughput at Buzwagi and at Bulyanhulu as discussed above. Head grade for the quarter of 3.2 grams per tonne (g/t) was 19% higher than in Q (2.7 g/t). This was due to a higher mined grade at Buzwagi as mining focused on the main ore zone as per the revised mine plan, and an improvement in grade at Bulyanhulu due to improved access to higher grade stopes. Our cash costs for the quarter were 13% lower than in Q2 2013, and amounted to US$749 per ounce sold. The decrease was primarily due to: the impact of the increased production base (US$160/oz); the impact of the Operational Review (US$77/oz) on direct mining costs through: o a reduction in the international workforce (29% down compared to the same period in 2013); o lower G&A costs driven by lower freight costs and aviation charges at Bulyanhulu and North Mara; 7 LSE: ABG
8 o o increased supplier discounts; and lower consumables costs driven by lower reagents and grinding media costs at North Mara and lower tyres and grinding media costs at Buzwagi. This was partially offset by lower capitalised development costs at Buzwagi and North Mara as a result of the revised mine plan driving a lower strip ratio (US$122/oz). All-in sustaining cost of US$1,105 per ounce sold for the quarter was 21% lower than Q2 2013, predominantly due to lower cash costs as explained above, combined with lower sustaining capital expenditure and capitalised development. Capital expenditure for the quarter amounted to US$59.0 million compared to US$103.3 million in Q Capital expenditure mainly consisted of capitalised development expenditure (US$35.8 million), including US$4.7 million related to waste development from the Bulyanhulu Upper East project and US$4.8 million relating to the Bulyanhulu Deep West project, investment in the Bulyanhulu CIL Expansion project (US$10.1 million), investments in tailings and infrastructure (US$7.2 million) and component costs (US$3.8 million). 8 LSE: ABG
9 Mine Site Review Bulyanhulu Key statistics Three months ended 30 June Six months ended 30 June (Unaudited) Underground ore tonnes hoisted Kt Ore milled Kt Head grade g/t Mill recovery % 91.5% 90.7% 91.6% 91.0% Ounces produced oz 50,241* 54, ,420* 92,974 Ounces sold oz 52,044 54, ,165 87,802 Cash cost per tonne milled US$/t Cash cost per ounce sold US$/oz ,033 AISC per ounce sold US$/oz 1,348 1,375 1,249 1,581 Copper production Klbs 1,135 1,382 2,431 2,238 Copper sold Klbs 1,153 1,167 2,347 2,035 Breakdown of Capital Expenditure - Sustaining capital US$('000) 2,334 7,953 4,482 15,546 - Capitalised development US$('000) 17,158 11,822 28,414 24,102 - Expansionary capital US$('000) 10,972 29,678 25,831 52,421 Capital expenditure 30,464 49,453 58,727 92,069 - Non-cash reclamation asset adjustments US$('000) 3,056 (6,843) 8,721 (9,208) Total capital expenditure US$('000) 33,520 42,610 67,448 82,861 * Includes 273 ounces of gold in circuit at the CIL Expansion Plant Operating performance Gold production of 50,241 ounces for the quarter was 9% lower than in Q2 2013, in spite of the 6% increase in grade driven by an increase in the availability of high grade stopes. Tonnes hoisted and throughput were both impacted by the disruption of mining operations for approximately two weeks in May as a result of the search for a missing underground employee who was subsequently found deceased as a result of a non-operational incident. Gold ounces sold of 52,044 ounces were 4% below that in Q primarily due to the lower production base, but exceeded production for the quarter due to the sale of concentrate ounces on hand at the end of Q Copper production of 1.1 million pounds for the quarter was 18% lower than in Q due to lower throughput. Cash costs for the quarter of US$919 per ounce sold were 2% lower than the prior year of US$936, although they increased over Q as a result of the lower production base and an increase in operating expenses to support the ramp up of production in the second half of the year. Against the prior year period, cash costs were positively impacted by lower general and administration costs primarily driven by lower freight costs, aviation charges, corporate charges and consumable costs. AISC per ounce sold for the quarter of US$1,348 was 2% lower than in Q (US$1,375), but higher than Q as a result of lower production, higher cash costs and higher capitalised development costs as explained below. During the quarter, we progressed the commissioning of the new CIL circuit at Bulyanhulu and are nearing the completion of the commissioning stage. In late June, roughly 6,500 tonnes of rougher tails were treated and pumped into the new CIL circuit, resulting in 273 ounces of gold being produced in circuit. We expect commissioning of this project to be complete early in Q3 with the first gold pour in August. The ramp up of production will continue throughout the third quarter. We continue to expect production of 20,000 ounces in 2014 from the project, and are investigating an option for accelerating the retreatment of the historic higher grade tailings in preference to the rougher tailings. We undertook waste development in the Upper East Zone for a capital cost of US$4.7 million in Q and will commence ore development as expected in Q As a result, we expect production from the Upper East Zone of approximately 15,000 ounces of gold in H2 2014, weighted towards the fourth quarter. In addition, we have progressed the development of the Deep West Zone through a contractor to accelerate access to higher grade ore from Q4 2014, and have incurred underground development capital costs of US$4.8 million during the quarter. ABG expects that the combined capital requirements the Upper East Zone and Deep West Zone for 2014 will be approximately US$30 million. This is categorised as capitalised development and is included in the Bulyanhulu and Group AISC figures. Capital expenditure for the quarter of US$30.5 million was 38% lower than in Q of US$49.5 million. Capital expenditure consisted mainly of capitalised underground development costs (US$17.2 million, inclusive of US$4.7 million of Upper East and US$4.8 million of Deep West spend) and expansionary capital investment relating to the CIL circuit (US$10.1 million). 9 LSE: ABG
10 Buzwagi Key statistics Three months ended 30 June Six months ended 30 June (Unaudited) Tonnes mined Kt 5,803 8,475 11,346 17,305 Ore tonnes mined Kt 1, ,354 1,501 Ore milled Kt 1,010 1,197 1,980 2,290 Head grade g/t Mill recovery % 91.9% 87.3% 90.3% 88.2% Ounces produced oz 57,787 45, ,344 85,746 Ounces sold oz 49,479 44,556 92,442 96,367 Cash cost per tonne milled US$/t Cash cost per ounce sold US$/oz 837 1, AISC per ounce sold US$/oz 1,078 1,632 1,169 1,643 Copper production Klbs 2,318 1,740 3,999 3,346 Copper sold Klbs 1,721 1,589 3,044 4,078 Breakdown of Capital Expenditure - Sustaining capital US$('000) 3,915 4,512 5,776 20,657 - Capitalised development US$('000) 5,525 17,426 15,157 41,338 Capital expenditure 9,440 21,938 20,933 61,995 - Non-cash reclamation asset adjustments US$('000) 174 (5,770) 839 (6,809) Total capital expenditure US$('000) 9,614 16,168 21,772 55,186 Operating performance Gold production for the quarter of 57,787 ounces was 26% higher than in Q2 2013, driven by increased head grade as a result of the re-engineered mine plan as communicated in Gold sold for the quarter amounted to 49,479 ounces, 11% above that of Q due to the increased production base, but lagging production as a result of the availability and timing of copper concentrate shipments. We anticipate that the majority of the unsold ounces at the end of June will be shipped during Q with the remainder sold in Q Tonnes milled during the quarter were 16% lower than in Q due to lower mill availability as a result of the re-lining of both the SAG and Ball mills in May, coupled with the limiting of daily throughput to manage a defective SAG mill gearbox ahead of a change out in early Q3. The management of the SAG mill gearbox meant that the process plant ran on 100% diesel power to ensure consistent power supply from May, although this has now reverted back to the normal power mix. Total tonnes mined for the quarter of 5.8 million tonnes were 32% lower than in Q due to changes in the mine plan compared to 2013 due to the focus on the removal of less waste and mining of higher grade areas. Copper production of 2.3 million pounds for the quarter was 33% higher than in Q driven by the increased copper grades and concentrate production. Cash costs for the quarter of US$837 per ounce sold were 21% lower than in Q (US$1,054). Cash costs were positively impacted by increased production levels and resultant co-product revenue, together with savings driven by the Operational Review in contracted services (lower rates) and labour costs (58% reduction in the international workforce). This was partially offset by lower capitalised development costs, increased power costs to run the process plant on self generated power, and increased maintenance costs due to increased maintenance activity. AISC per ounce sold for the quarter of US$1,078 was 34% lower than in Q (US$1,632). This was driven by the lower cash cost base and lower sustaining capital and capitalised development expenditure. Capital expenditure for the quarter of US$9.4 million was 57% lower than in Q (US$21.9 million). The significant change to the mine plan reduced the levels of waste movement thereby reducing capitalised stripping costs. Key capital expenditure for the quarter included capitalised stripping costs (US$5.5 million), investments in tailings and infrastructure (US$2.1 million) and component change out costs (US$1.2 million). 10 LSE: ABG
11 North Mara Key statistics Three months ended 30 June Six months ended 30 June (Unaudited) Tonnes mined Kt 4,335 6,420 8,118 11,395 Ore tonnes mined Kt ,126 1,458 Ore milled Kt ,365 1,280 Head grade g/t Mill recovery % 86.9% 87.0% 87.3% 87.1% Ounces produced oz 70,177 63, , ,478 Ounces sold oz 70,040 71, , ,200 Cash cost per tonne milled US$/t Cash cost per ounce sold US$/oz AISC per ounce sold US$/oz 893 1, ,313 Breakdown of Capital Expenditure - Sustaining capital US$('000) 4,557 9,183 8,088 23,962 - Capitalised development US$('000) 13,125 22,271 25,392 28,917 - Expansionary capital US$('000) Capital expenditure 18,660 31,830 34,458 53,383 - Non-cash reclamation asset adjustments US$('000) 1,382 (4,442) 5,358 (5,950) Total capital expenditure US$('000) 20,042 27,388 39,816 47,433 Operating performance Production for the quarter of 70,177 ounces was 10% higher than in Q despite the marginally lower head grade as throughput rates exceeded the prior year period by 12%. The higher milled tonnes were due to improved mill efficiency. Gold ounces sold for the quarter of 70,040 ounces were in line with production. Cash costs for the quarter of US$561 per ounce sold were 18% lower than in Q (US$684). Cash costs were positively impacted by increased production levels, together with a 36% reduction in the international workforce and lower maintenance costs, both a result of initiatives driven by the Operational Review. This was partially offset by lower capitalised mining costs and higher contracted services costs given increased drilling rates and activity. AISC per ounce sold for the quarter of US$893 was 29% lower than in Q (US$1,266) due to the reasons outlined above, combined with lower sustaining capital and capitalised development expenditure in combination with the increased production base. During the second half of the year, North Mara is expected to mill an increased number of ore tonnes sourced from the lower grade Nyabirama pit rather than from the Gokona pit. As a result head grades for the full year are expected to revert towards the reserve grade of the mine. The feasibility study into the potential to mine Gokona Cut 3 via an underground operation continued to progress well during the quarter and is on track to be presented to the Board for approval in Q During Q2, ABG made the final decision on the location of the exploration portal which will provide the opportunity to develop a better understanding of the ore body, initial access to ore and drilling access to the deeper extensions of the ore body. Early works towards the construction of the portal are in progress with the first blast due in August. The total expansionary capital cost of the portal is expected to be around US$10 million. Capital expenditure for the quarter of US$18.7 million was 41% lower than in Q (US$31.8 million), due to lower capitalised development and lower sustaining capital expenditure, slightly offset by increased expansionary expenditure. Key capital expenditure included capitalised stripping costs (US$13.1 million), investments in tailings and infrastructure (US$1.8 million) and component costs (US$2.1 million). Expansion capital of US$1.0 million relates to exploration drilling costs relating to the Gokona Underground feasibility study. 11 LSE: ABG
12 Exploration Review Exploration during H continued to focus on the Tanzanian near-mine and in-mine brownfield programmes and the West Kenya Joint Venture Greenfield programmes. Exploration expenditure for the first half of the year was approximately US$10.6 million and the full year forecast budget remains US$16.0 million. The 2014 exploration programmes have been weighted toward H1 2014, with large diamond core programmes from surface and underground platforms at Bulyanhulu, and extensive soil sampling, ground geophysics and Aircore drilling programmes across the West Kenya Joint Venture. In H2 2014, we expect to complete surface drilling on Bulyanhulu Deep West and Aircore drilling in Kenya. We will assess the results of H programmes and design follow-up programmes to test positive results. The next phase of underground drilling at Bulyanhulu, which is targeting the deep western extension of Reef 2, commenced in early July. Bulyanhulu Deep West Surface Drilling Throughout H1 2014, we have continued a programme of deep diamond drilling West of the Bulyanhulu mine, targeting extensions of the Reef 1 and Reef 2 vein series. The holes are designed to test the extensions of the Reef 1 structure from 400 metres to 1,200 metres west of the current Bulyanhulu resource where historic drilling had shown indications of further gold mineralisation. Additionally, holes will also intersect the Reef 2 vein series, and provide an indication of whether the Reef 2 system is mineralised up to 2 kilometres west of currently delineated underground resources. During H1 2014, a total of 7,503 metres of diamond core has been drilled from the surface holes. The Reef 1 and Reef 2 system has been intersected in several holes during H1 2014, with better results being returned from Reef 2 in this part of the Bulyanhulu mineralised system. Encouraging results from the programme to date include the following significant intersections: BGMDD0054: Au from 1,174m - Reef 2 series BGMDD0054: 37.9g/t Au from 1,335m - Reef 2 series BGMDD0054: 29.6g/t Au from 1,390m - Reef 2 series BGMDD0054W1: 11.7g/t Au from 1,435m - Reef 1 BGMDD0054W2: 24.2g/t Au from 1,034m Reef 2 series BGMDD0054W2: 8.05g/t Au from 1,640m, includes 23.8g/t Au - Reef 1 BGMDD0054W3: 5.35g/t Au from 1,363m Reef 2 series BGMDD0054W3: 11.5g/t Au from 1,367m - Reef 2 series BGMDD0055W1: 18.8g/t Au from 613m - Reef 2 series BGMDD0055W2: 16.2g/t Au from 944m Reef 2 series BGMDD0055W3: 7.00g/t Au from 1,059m Reef 1 BGMDD0056W1: 94.6g/t Au from 805m - Reef 2 series The results from these holes are potentially significant in demonstrating that gold mineralisation, particularly on the Reef 2 vein system continues West of the mine, which would open the potential for an expansion of the footprint of Bulyanhulu on Reef 2. The drilling programme is expected to be completed during H with a single rig drilling a further 2,500 metres of diamond core drilling. This programme will form an important part of our assessment of how to most effectively develop the Bulyanhulu mine over the long term. Bulyanhulu East Deeps Underground Drilling - Reef 2 The East Deeps drilling programme targeted down dip mineralisation of the Bulyanhulu Reef 2 system which is outside the current resource model. The programme was drilled from several underground drill platforms and was aimed at adding high grade gold resources on the East Zone. Drilling was completed during H with a total of 3,058 metres of diamond core completed from three holes, bringing the total for the programme to five holes at 5,598 metres. The results received were all from the Reef 2 series and included the following encouraging intersections: UX : 19.0g/t Au UX : 76.7g/t Au UX : 13.6g/t Au UX : 18.4g/t Au These intersections continue to prove continuity at depth of the mineralisation with high grade. This has the potential to add to the mine resource in this area, with the high grade shoot remaining open at depth. This stage of the programme has been completed and the results will be incorporated into the end of year resource calculations. Further drilling programmes are planned in this area and will be completed as part of a larger Reef 2 underground resource expansion programme being undertaken by the mine over the next few years. 12 LSE: ABG
13 West Kenya Joint Venture Projects Aircore drilling testing existing gold-in-soil anomalies along the Liranda Corridor on the south side of the Kakamega Dome continued throughout H1 2014, with a total of 830 holes completed for 32,215 metres. The Aircore programme has been very successful, with 247 holes of the 992 holes completed since the programme commenced in 2013 returning anomalous results (>0.1g/t Au), of which 87 holes intersecting zones of >0.50g/t Au including better results during H of: KDAC0312: 15.2 g/t Au from 41m and 1.71 g/t Au from 62m KDAC0361: 0.81 g/t Au from 9m, including 2.26 g/t Au KDAC0376: 2.57 g/t Au from 57m KDAC0617: 7.7 g/t Au incl g/t Au KDAC0832: 2.77 g/t Au incl g/t Au KDAC0841: 1.94 g/t Au and 4.35 g/t Au KDAC0858: 22.3 g/t Au incl. 44 g/t Au KDAC0860: 1.31 g/t Au incl. 2.16g/t Au KDAC0877: 12.6g/t Au incl g/t Au The gold mineralisation has been intersected in a variety of rock types along the Liranda Corridor, which indicates opportunities to test for different types and styles of gold deposits in this area. The majority of gold mineralisation intersected to date has been within weathered (oxidised) bedrock, often associated with quartz veining, but not always the case. The Aircore results to date are very encouraging given the current line spacing of the Aircore traverses varies between 200 metres and 800 metres and the average depth of drilling to date is relatively shallow at approximately 50 metres. Step-out and infill traverses are being undertaken as part of the current phase of the programme before targets will be ranked for testing by more advanced reverse circulation and diamond drilling. In tandem with the Aircore drilling we are undertaking gradient and pole-dipole IP and Resistivity across selected gold-in-soil anomalies throughout the Lake Zone Camp in the central and western areas of the project. A total of 147 line kilometres of surveys have now been completed. Ten targets showing distinct resistivity and/or chargeability zones coincident with the goldin-soil anomalies have been delineated and will be considered as priority targets for future drilling programmes. 13 LSE: ABG
14 Financial Review The positive impact of the Operational Review and the challenging gold price environment in 2014 is reflected in the ABG Group s financial results for the six months ended 30 June 2014 which also present Tulawaka as a discontinued operation: Revenue of US$445.5 million was US$41.9 million lower than H driven by a 13% decrease in the average realised gold price to US$1,290 per ounce sold (US$1,480 per ounce sold in the prior year period), which more than offset an increase of 16,578 ounces (5%) in sales volumes. Cash costs decreased to US$752 per ounce sold from US$876 in H1 2013, driven by higher production, lower labour costs and contracted services. All-in sustaining costs decreased to US$1,118 per ounce sold from US$1,483 in H due to lower cash costs, sustaining capital expenditures and capitalised development costs. EBITDA increased by 1% to US$131.6 million, mainly driven by lower direct mining costs achieved from the implementation of the Operational Review initiatives. Operational cash flow of US$127.1 million was 28% higher than H1 2013, mainly due to reduced operating costs and decreased working capital investment. The following review provides a detailed analysis of our consolidated results for the six months ended 30 June 2014 and the main factors affecting financial performance. It should be read in conjunction with the consolidated interim financial information and accompanying notes on pages 27 to 44, which have been prepared in accordance with International Financial Reporting Standards as adopted for use in the European Union (IFRS). Discontinued operation Tulawaka On 15 November 2013, ABG announced that an agreement was reached with STAMICO, the Tanzanian State Mining Corporation, whereby STAMICO acquired the Tulawaka Gold Mine ( Tulawaka ) and certain exploration licenses surrounding Tulawaka for a consideration of US$4.5 million and the grant of a 2% net smelter royalty on future production in excess of 500,000 ounces, capped at US$0.5 million. As part of the agreement, STAMICO took ownership and management of the rehabilitation fund established as part of the closure plan for the mine, in return for the assumption of all remaining past and future closure and rehabilitation liabilities for Tulawaka, and indemnified the other parties to the agreement in relation to these liabilities. This resulted in a cash payment by ABG to STAMICO of the balance of the rehabilitation fund, less the transaction consideration on completion. Tulawaka was 100% owned by the Tulawaka Joint Venture, in which ABG held a 70% economic interest through a wholly owned subsidiary, and MDN Inc held the remaining 30% of the Joint Venture. Production at Tulawaka ceased in Q The transaction completed on 4 February 2014, resulting in a cash payment of US$11.6 million to STAMICO. The financial results of Tulawaka have been presented as discontinued operations in the consolidated interim financial information. The comparative results in the consolidated interim income statement have been presented as if Tulawaka had been discontinued from the start of the comparative period, effectively excluding the net result relating to Tulawaka from individual income statement lines and aggregating it in one line called Net profit/(loss) from discontinued operations. Below is a reconciliation showing Group financial performance on a line by line basis. (US$ 000) (Unaudited) Six months ended 30 June 2014 Six months ended 30 June 2013 Continuing operations Discontinued operations Total Continuing operations Discontinued operations Revenue 445, , ,360 12, ,752 Cost of sales (332,474) - (332,474) (386,733) (28,151) (414,884) Gross profit 113, , ,627 (15,759) 84,868 Corporate administration (13,975) - (13,975) (17,583) (1,301) (18,884) Share based payments (4,917) - (4,917) 3, ,975 Exploration and evaluation costs (10,995) - (10,995) (7,715) 161 (7,554) Corporate social responsibility expenses (4,307) (92) (4,399) (6,228) (690) (6,918) Impairment charges (910,989) (16,701) (927,690) Other charges (12,782) 958 (11,824) (15,597) (6,496) (22,093) Profit/(loss) before net finance expense and taxation 66, ,925 (853,624) (40,672) (894,296) Finance income ,005 Finance expense (4,504) (16) (4,520) (4,696) (79) (4,775) Profit/(loss) before taxation 62, ,071 (857,325) (40,741) (898,066) Tax (expense)/credit (22,716) - (22,716) 184, ,648 Net profit/(loss) for the period 39, ,355 (672,677) (40,741) (713,418) Total 14 LSE: ABG
15 The financial performance below is stated for continuing operations. Revenue Revenue for H of US$445.5 million was 9% lower than in H (US$487.4 million). Year-on-year realised gold prices decreased by 13% to US$1,290 per ounce sold from US$1,480 in H1 2013, which more than offset the increase in sales volumes of 16,578 ounces. The increase in sales ounces was primarily due to the higher production base. Included in total revenue was co-product revenue of US$18.7 million for H1 2014, which decreased by 17% from the prior year period (US$22.7 million) due to the lower copper sales volumes and a lower realised copper price. The H average realised copper price of US$3.07 per pound compared unfavourably to that of H (US$3.23 per pound), and was driven by global market factors regarding supply and demand. Cost of sales Cost of sales was US$332.5 million for H1 2014, representing a decrease of 14% on the prior year period (US$386.7 million). The key aspects impacting the cost of sales for the reporting period were lower direct mining costs as a result of Operational Review savings across labour, consumables and freight, a change in inventory credit driven by the investment in ore inventory and build up of ounces on hand and lower depreciation and amortisation charges driven by the lower capital base employed. The table below provides a breakdown of cost of sales: (US$'000) Three months ended 30 June Six months ended 30 June (Unaudited) Cost of Sales Direct mining costs 122, , , ,238 Third party smelting and refining fees 5,783 3,611 9,916 7,997 Royalty expense 10,011 10,845 19,775 21,831 Depreciation and amortisation 34,698 47,269 64,696 88,667 Total 173, , , ,733 A detailed breakdown of direct mining expenses is shown in the table below: (US$'000) Three months ended 30 June Six months ended 30 June (Unaudited) Direct mining costs Labour 32,976 39,040 67,973 80,440 Energy and fuel 33,926 35,932 66,345 70,228 Consumables 24,850 28,148 48,723 54,796 Maintenance 24,907 23,142 47,923 47,741 Contracted services 23,549 23,583 42,300 50,030 General administration costs 19,522 24,103 39,591 45,808 Capitalised mining costs (36,889) (32,325) (74,768) (80,805) Total direct mining costs 122, , , ,238 Direct mining costs of US$238.1 million for H were 11% lower than H (US$268.2 million). Individual cost components comprised: A 15% reduction in labour costs, mainly as a result of the lower headcount at all operating sites, specifically a 29% reduction in group international employees, driven by localisation efforts and the impact of the Operational Review. A 6% reduction in energy and fuel expenses, driven primarily by lower diesel usage at North Mara as a result of reduced mining activity, and at Buzwagi as a result of reduced mining and processing activity. An 11% decrease in consumable costs, primarily due to supplier price negotiations, increased mine site efficiencies and lower mining activity. Maintenance costs of US$47.9 million were in line with prior year costs of US$47.7 million. A 15% decrease in contracted services, mainly driven by lower mining activity at Buzwagi, and the renegotiated maintenance rates associated with maintenance and repair contracts ( MARC ) contracts at Buzwagi and North Mara. 15 LSE: ABG
16 A 14% decrease in general administration costs, mainly at Bulyanhulu and North Mara driven by lower freight costs associated with inventory consumed, a decrease in the stock obsolescence provision and lower aviation charter costs driven by the Operational Review. Capitalised direct mining costs, consisting of capitalised development costs and the change in inventory charge, is comprised as follows: (US$'000) Three months ended 30 June Six months ended 30 June (Unaudited) Capitalised direct mining costs Capitalised development costs (30,649) (52,298) (64,095) (95,775) (Investment in)/ drawdown of inventory (6,240) 19,973 (10,673) 14,970 Total capitalised direct mining costs (36,889) (32,325) (74,768) (80,805) Capitalised development costs were 33% lower than H1 2013, driven by increased focus on mining ore at Buzwagi due to the revised mine plan. The investment in inventory was US$25.6 million higher than in H due to a build up of ore inventory at Buzwagi due to lower throughput rates combined with increased gold inventory on hand driven by the timing of production compared to sales. This was slightly offset by a drawdown of ore stockpiles at North Mara as a result of the improved throughput rate and plant performance. Corporate administration costs Corporate administration expenses totalled US$18.9 million for H A US$3.6 million decrease in general corporate administration costs due to the impact of the Operational Review was more than offset by an increase of US$8.8 million in share based payment expenses given the stronger share price performance. This resulted in a 38% increase on H (US$13.7 million) as shown in the table below. Three months ended 30 June Six months ended 30 June (US$'000) (Unaudited) Corporate administration 7,618 9,169 13,975 17,583 Share based payments 1,593 (425) 4,917 (3,861) Total corporate administration 9,211 8,744 18,892 13,722 Exploration and evaluation costs Exploration and evaluation costs of US$11.0 million were incurred in H1 2014, 43% higher than the US$7.7 million spent in H The key focus areas for H were drilling at Bulyanhulu deep central reefs 1 and 2 (US$5.5 million), and exploration programmes at the West Kenya Joint Venture project amounting to US$3.3 million. The Bulyanhulu underground programme has been completed in H and the second half of the year should see decreased field activity across all projects. Corporate social responsibility expenses Corporate social responsibility costs incurred amounted to US$4.3 million for the six months compared to the prior year of US$6.2 million. The main projects for H related to Village Benefit Implementation Agreements ( VBIAs ) at North Mara and contributions to general community projects funded from the ABG Maendeleo Fund. Other charges Other charges amounted to US$12.8 million, 18% lower than H (US$15.6 million). The main contributors were: (i) noncash foreign exchange losses mainly related to the indirect tax receivables due to the weakening of the Tanzanian shilling (US$7.8 million), (ii) Operational Review costs, including external services and retrenchment costs of US$5.3 million, (iii) legal costs of US$1.9 million, and (iv) ABG s entry into zero cost collar contracts as part of a programme to protect it against copper, silver, rand and fuel cost market volatility. The entry into these arrangements resulted in a combined mark-to-market revaluation gain of US$2.7 million, due to the fact that these arrangements do not qualify for hedge accounting. Refer to note 7 of the consolidated interim financial information for further details. 16 LSE: ABG
17 Finance expense and income Finance expense of US$4.5 million for H was 4% lower than H (US$4.7 million). The key drivers were US$1.2 million (US$1.5 million in 2013) relating to the servicing of the US$150 million undrawn revolving credit facility, and accretion expenses relating to the discounting of the environmental reclamation liability (US$2.5 million). Other costs include bank charges and interest on finance leases. Interest costs relating to the project financing on the CIL Bulyanhulu Expansion project are capitalised to the cost of the asset due to the facility being directly attributable to the asset. For the six months ended 30 June 2014 US$2.0 million of borrowing costs have been capitalised to the project. Finance income relates predominantly to interest charged on non-current receivables and interest received on money market funds. Refer to note 8 of the consolidated interim financial information for details. Taxation matters The taxation charge was US$22.7 million for H1 2014, compared to a credit of US$184.6 million in H The tax charge was made up solely of deferred tax charges and reflects the impact of the profitability on a year-to-date basis. The effective tax rate in H amounted to 36.5% compared to 21.5% in H The increase is mainly driven by the increase in taxable income, and temporary higher tax losses for corporate and exploration entities in Q for which deferred tax assets are not recognised. This is expected to normalise in H Net earnings from continuing operations As a result of the factors discussed above, net profit from continuing operations for H was US$39.5 million, against the prior year period loss of US$672.7 million. Lower impairment charges, costs of sales, and other charges contributed to the variance. This was offset by the higher tax charge and lower revenue. Earnings per share The earnings per share for H amounted to US10.0 cents, an increase of US181.0 cents from the prior year period loss of US171.0 cents. The increase was driven by an increased net profit with no change in the underlying issued shares. Earnings per share from continuing operations amounted to US9.6 cents. 17 LSE: ABG
18 Key financial performance indicators and reconciliations Cash costs Cash cost per ounce sold in H (US$752 per ounce sold) decreased by 14% when compared to H (US$876 per ounce). Refer to the operating overview on page 7 and cost of sales explanations as part of the financial review for the details on the year on year change. The table below provides a reconciliation between cost of sales and total cash cost to calculate the cash cost per ounce sold. (US$'000) Three months ended 30 June Six months ended 30 June (Unaudited) Total cost of sales 173, , , ,733 Deduct: depreciation and amortisation (34,698) (47,269) (64,696) (88,667) Deduct: Co-product revenue (10,098) (9,544) (18,744) (22,670) Total cash cost 128, , , ,396 Total ounces sold 171, , , ,369 Cash cost per ounce Discontinued operations Attributable cash cost per ounce Refer to note 6 to the consolidated interim financial information for a reconciliation to all-in sustaining cost per ounce sold. EBITDA EBITDA for H increased by 1% to US$131.6 million when compared to H (US$130.8 million) as a result of the lower cost of sales and other charges, partly offset by lower revenue and higher corporate administration costs. A reconciliation between net profit for the period and EBITDA is presented below: (US$ 000) Three months ended 30 June Six months ended 30 June (Unaudited) Net profit/ (loss) for the period 18,412 (729,628) 40,355 (713,418) Plus income tax expense 12,047 (198,907) 22,716 (184,648) Plus depreciation and amortisation 34,698 47,865 64,696 97,377 Plus impairment charges/write-offs - 927, ,690 Plus finance expense 2,106 2,218 4,520 4,775 Less finance income (304) (410) (666) (1,005) EBITDA 66,959 48, , , LSE: ABG
19 Financial position ABG had cash and cash equivalents on hand of US$269.6 million as at 30 June 2014 (US$320.9 million as at 30 June 2013). The Group s cash and cash equivalents are with counterparties whom the Group considers to have an appropriate credit rating. Location of credit risk is determined by physical location of the bank branch or counterparty. Investments are held mainly in United States dollars and cash and cash equivalents in other foreign currencies are maintained for operational requirements. During 2013, a US$142 million facility was put in place to fund the bulk of the costs of the construction of one of our key growth projects, the Bulyanhulu CIL Expansion project ( Project ). The Facility is collateralised by the Project, and has a term of seven years with a spread over Libor of 250 basis points. The seven year Facility is repayable in equal instalments over the term of the Facility, after a two year repayment holiday period. The interest rate has been fixed at 3.6% through the use of an interest rate swap. The full facility of US$142 million was drawn in The above compliments the existing undrawn revolving credit facility of US$150 million which runs until November The net book value of property, plant and equipment increased from US$1.28 billion in December 2013 to US$1.35 billion in June The main capital expenditure drivers have been explained in the cash flow used in the investing activities section below, and have been offset by depreciation charges of US$64.7 million. Refer to notes 6 and 12 to the consolidated interim financial information for further details. Total indirect tax receivables, net of a discount provision applied to the non-current portion, decreased from US$159.8 million as at 31 December 2013 to US$126.6 million as at 30 June The decrease was mainly due to refunds of US$65.8 million received during H1 2014, which was offset by a net increase in current VAT receivables of approximately US$37 million. The net deferred tax position decreased from an asset of US$14.9 million as at 31 December 2013 to a liability of US$7.8 million. This was mainly driven by the reduction in deferred tax assets as a result of the company making taxable income. Net assets attributable to owners of the parent increased from US$1.93 billion in December 2013 to US$1.96 billion in June The increase reflects the current year profit attributable to owners of the parent of US$40.8 million and the payment of the final 2013 dividend of US$8.2 million to shareholders during H Cash flow generation and capital management Cash flow continuing and discontinued operations For the three months ended 30 June For six months ended 30 June (US$ 000) (Unaudited) Cash generated from operating activities 76,381 41, ,107 99,017 Cash used in investing activities (50,541) (102,943) (128,074) (208,822) Cash (used in)/provided by financing activities (10,249) (20,263) (11,085) 27,588 Increase/(decrease) in cash 15,591 (81,515) (12,052) (82,217) Foreign exchange difference on cash (89) 868 (761) 1,742 Opening cash balance 254, , , ,348 Closing cash balance 269, , , ,873 Cash flow from operating activities was US$127.1 million for H1 2014, an increase of US$28.1 million, when compared to H (US$99.0 million). The increase primarily relates increased EBITDA, slightly offset by an investment in working capital. The working capital investment of US$3.8 million related mainly to a decrease in trade payables of US$16.4 million due to the timing of payments combined with an investment in gold inventory of US$14.6 million. This was offset by VAT refunds of US$28.2 million received from the Tanzanian Government. Cash flow used in investing activities was US$128.1 million for H1 2014, a decrease of 39% when compared to H (US$208.8 million), driven by lower sustaining capital expenditure across all sites, lower expansion capital expenditure mainly related to the Bulyanhulu CIL Expansion project and lower capitalised development expenditure at Buzwagi and North Mara. 19 LSE: ABG
20 A breakdown of total capital and other investing capital activities for the six months ended 30 June is provided below: (US$ 000) For six months ended 30 June (Unaudited) Sustaining capital 20,724 58,987 Expansionary capital 26,809 53,866 Capitalised development 68,963 94,357 Total cash capital 116, ,210 Non-cash rehabilitation asset adjustment 14,918 (22,128) Non-cash sustaining capital 1 (1,752) 1,846 Total capital expenditure 129, ,928 Other investing capital - Non-current asset movement 2 (55) 1,612 -Cash flow related to the sale of Tulawaka 11,633-1 Total non-cash sustaining capital relates to the impact of capital accruals excluded from cash sustaining capital. 2 Non-current asset movements relates to the investment in the land acquisitions reflected as prepaid operating leases and Tanzania government receivables. Sustaining capital Sustaining capital expenditure included the investment in mine equipment of US$6.7 million, mainly relating to component change outs at North Mara and Buzwagi and investment in tailings and infrastructure at North Mara (US$3.4 million), Bulyanhulu (US$3.2 million), and Buzwagi (US$3.0 million). Expansionary capital Expansionary capital expenditure consisted mainly of the Bulyanhulu CIL Expansion project (US$24.9 million). Capitalised development Capitalised development capital includes capitalised stripping for North Mara (US$25.4 million) and Buzwagi (US$15.2 million) and Bulyanhulu capitalised underground development of US$28.4 million. Non-cash capital Non-cash capital was US$13.2 million and consisted of reclamation asset adjustments (US$14.9 million) and the six months increase in capital accruals (US$1.8 million). The reclamation adjustments were driven by lower US risk free rates driving lower discount rates. Other investing capital The sale of Tulawaka to STAMICO resulted in a cash payment of the balance of the rehabilitation fund, less the transaction consideration on completion, and amounted to US$11.6 million. During H North Mara incurred land purchases totalling US$5.3 million. Cash flow used in financing activities for the six months ended 30 June 2014 was US$11.1 million, a decrease of US$38.7 million on H (US$27.6 million inflow). The outflow primarily relates to payment of the final 2013 dividend of US$8.2 million and finance lease payments of US$2.9 million. Dividend The final dividend for 2013 of US2.0 cents per share was paid to shareholders during May The Board of Directors have approved an interim dividend for 2014 of US1.4 cents per share, payable to shareholders in September LSE: ABG
21 Significant judgements in applying accounting policies and key sources of estimation uncertainty Many of the amounts included in the consolidated interim financial statements require management to make judgements and/or estimates. These judgements and estimates are continuously evaluated and are based on management s experience and best knowledge of the relevant facts and circumstances, but actual results may differ from the amounts included in the consolidated financial information included in this release. Information about such judgements and estimation is included in the accounting policies and/or notes to the consolidated interim financial statements, and the key areas are summarised below. Areas of judgement and key sources of estimation uncertainty that have the most significant effect on the amounts recognised in the consolidated interim financial statements include: Estimates of the quantities of proven and probable gold reserves; The capitalisation of production stripping costs; The capitalisation of exploration and evaluation expenditures; Review of goodwill, tangible and intangible assets carrying value, the determination of whether these assets are impaired and the measurement of impairment charges or reversals; The estimated fair values of cash generating units for impairment tests, including estimates of future costs to produce proven and probable reserves, future commodity prices, foreign exchange rates and discount rates; The estimated useful lives of tangible and long-lived assets and the measurement of depreciation expense; Property, plant and equipment held under finance leases; Recognition of a provision for environmental rehabilitation and the estimation of the rehabilitation costs and timing of expenditure; Whether to recognise a liability for loss contingencies and the amount of any such provision; Whether to recognise a provision for accounts receivable and the impact of discounting the non-current element; Recognition of deferred income tax assets, amounts recorded for uncertain tax positions, the measurement of income tax expense and indirect taxes; Determination of the cost incurred in the productive process of ore stockpiles, gold in process, gold doré/bullion and concentrate, as well as the associated net realisable value and the split between the long term and short term portions; Determination of fair value of derivative instruments; and Determination of fair value of stock options and cash-settled share based payments. 21 LSE: ABG
22 Going concern statement The ABG Group s business activities, together with factors likely to affect its future development, performance and position are set out in the operational and financial review sections of this report. The financial position of the ABG Group, its cash flows, liquidity position and borrowing facilities are described in the preceding paragraphs of this financial review. At 30 June 2014, the Group had cash and cash equivalents of US$269.6 million with a further US$150 million available under the undrawn revolving credit facility which has been further extended until November Total borrowings at the end of the year amounted to US$142 million, of which the first repayment is only repayable from Included in other receivables are amounts due to the Group relating to indirect taxes of US$66.0 million which are expected to be received within 12 months, but these will be offset to an extent by new claims submitted for input taxes incurred during The refunds remain dependent on processing and payments of refunds by the Government of Tanzania. We expect that the above, in combination with the expected operational cash flow generated during the year, will be sufficient to cover the capital requirements and other commitments for the foreseeable future. In assessing the ABG Group s going concern status the Directors have taken into account the above factors, including the financial position of the ABG Group and in particular its significant cash position, the current gold and copper price and market expectations for the same in the medium term, and the ABG Group s capital expenditure and financing plans. After making appropriate enquiries, the Directors consider that ABG and the ABG Group as a whole has adequate resources to continue in operational existence for the foreseeable future and that it is appropriate to adopt the going concern basis in preparing the consolidated interim financial statements. 22 LSE: ABG
23 Non-IFRS Measures ABG has identified certain measures in this report that are not measures defined under IFRS. Non-IFRS financial measures disclosed by management are provided as additional information to investors in order to provide them with an alternative method for assessing ABG s financial condition and operating results. These measures are not in accordance with, or a substitute for, IFRS, and may be different from or inconsistent with non-ifrs financial measures used by other companies. These measures are explained further below. Average realised gold price per ounce sold is a non-ifrs financial measure which excludes from gold revenue: - Unrealised mark-to-market gains and losses on provisional pricing from copper and gold sales contracts; and - Export duties. Cash cost per ounce sold is a non-ifrs financial measure. Cash costs include all costs absorbed into inventory, as well as royalties, and production taxes, and exclude capitalised production stripping costs, inventory purchase accounting adjustments, unrealised gains/losses from non-hedge currency and commodity contracts, depreciation and amortisation and corporate social responsibility charges. Cash cost is calculated net of co-product revenue. Refer to page 15 for a reconciliation to cost of sales. The presentation of these statistics in this manner allows ABG to monitor and manage those factors that impact production costs on a monthly basis. Cash cost per ounce sold is calculated by dividing the aggregate of these costs by gold ounces sold. Cash costs and cash cost per ounce sold are calculated on a consistent basis for the periods presented. All-in sustaining cost (AISC) is a non-ifrs financial measure. The measure is in accordance with the World Gold Council s guidance issued in June It is calculated by taking cash cost per ounce sold and adding corporate administration costs, reclamation and remediation costs for operating mines, corporate social responsibility expenses, mine exploration and study costs, capitalised stripping and underground development costs and sustaining capital expenditure. This is then divided by the total ounces sold. A reconciliation between cash cost per ounce sold and AISC is presented below: (Unaudited) Three months ended 30 June 2014 Three months ended 30 June 2013 (US$/oz sold) Bulyanhulu North Mara Buzwagi ABG Group ongoing operations Bulyanhulu North Mara Buzwagi ABG Group ongoing operations Cash cost per ounce sold , Corporate administration Share based payments 2 - (4) 9 - (1) - (3) Rehabilitation Mine exploration CSR expenses Capitalised development Sustaining capital Total continuing operations 1, ,078 1,105 1,375 1,266 1,632 1,404 Discontinued operations 0 12 Total 1,105 1,416 (Unaudited) Six months ended 30 June 2014 Six months ended 30 June 2013 (US$/oz sold) Bulyanhulu North Mara Buzwagi ABG Group ongoing operations Bulyanhulu North Mara Buzwagi ABG Group ongoing operations Cash cost per ounce sold , Corporate administration Share based payments (1) (1) (1) (12) Rehabilitation Mine exploration CSR expenses Capitalised development Sustaining capital Total continuing operations 1, ,169 1,118 1,581 1,313 1,643 1,483 Discontinued operations 0 24 Total 1,118 1,507 AISC is intended to provide additional information on the total sustaining cost for each ounce sold, taking into account expenditure incurred in addition to direct mining costs, depreciation and selling costs. 23 LSE: ABG
24 Cash cost per tonne milled is a non-ifrs financial measure. Cash costs include all costs absorbed into inventory, as well as royalties, by-product credits, and production taxes, and exclude capitalised production stripping costs, inventory purchase accounting adjustments, unrealised gains/losses from non-hedge currency and commodity contracts, depreciation and amortisation and corporate social responsibility charges. Cash cost is calculated net of co-product revenue. Cash costs per tonne milled are calculated by dividing the aggregate of these costs by total tonnes milled. EBITDA is a non-ifrs financial measure. ABG calculates EBITDA as net profit or loss for the period excluding: - Income tax expense; - Finance expense; - Finance income; - Depreciation and amortisation; - Impairment charges of goodwill and other long-lived assets; and - Discontinued operations. EBITDA is intended to provide additional information to investors and analysts. It does not have any standardised meaning prescribed by IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA excludes the impact of cash costs of financing activities and taxes, and the effects of changes in operating working capital balances, and therefore is not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate EBITDA differently. EBIT is a non-ifrs financial measure and reflects EBITDA adjusted for depreciation and amortisation and goodwill impairment charges. Mining statistical information The following describes certain line items used in the ABG Group s discussion of key performance indicators: - Open pit material mined measures in tonnes the total amount of open pit ore and waste mined. - Underground ore tonnes hoisted measures in tonnes the total amount of underground ore mined and hoisted. - Total tonnes mined includes open pit material plus underground ore tonnes hoisted. - Strip ratio measures the ratio of waste-to-ore for open pit material mined. - Ore milled measures in tonnes the amount of ore material processed through the mill. - Head grade measures the metal content of mined ore going into a mill for processing. - Milled recovery measures the proportion of valuable metal physically recovered in the processing of ore. It is generally stated as a percentage of the metal recovered compared to the total metal originally present. 24 LSE: ABG
25 Risk Review We have made a number of further developments in the identification and management of our risk profile over the course of H and where appropriate, risk ratings have been reviewed against risk management controls and other mitigating factors. Our principal risks continue to fall within four broad categories: strategic risks, financial risks, external risks and operational risks and, while the overall makeup of our principal risks has not significantly changed from that published in the 2013 Annual Report, there have been changes in certain risk profiles as a result of developments in our operating environment, in particular enhancements made to operating and planning practices, and continuing uncertainties and trends within the wider global economy and/or the mining industry. This has resulted in the following risks being removed from those risks previously viewed as principal risks to ABG and its operations: (i) costs and capital expenditure; (ii) utilities supply; (iii) land acquisitions; and (iv) loss of critical processes. Further details of these risks are provided in the 2013 Annual Report. In conjunction with this, we believe it appropriate to add a new risk as a principal risk for the remainder of 2014, this being safety risks relating to mining operations. This is due to the fact that, despite the significant health, safety and risk management systems that ABG has in place for its underground and surface mining operations, mining and in particular underground mining is subject to a number of hazards and risks in the workplace, such as fall of ground relating to underlying geotechnical risks, potential fires and mobile equipment incidents, such that safety incidents in the workplace may unfortunately occur. As a result of the review outlined above, for the remainder of 2014 we view our principal risks as relating to the following: Single country risk Reserves and resources estimates Commodity prices Political, legal and regulatory developments Taxation reviews Community relations Environmental hazards and rehabilitation Employer, contractor and industrial relations Security, trespass and vandalism Organisational restructuring Safety risks relating to mining operations Further detail as regards the nature of the new safety risks relating to mining operations is provided above. Further detail as regards all other principal risks outlined above is provided as part of the 2013 Annual Report. Directors Responsibility Statement The Directors confirm that, to the best of their knowledge, the consolidated interim financial information has been prepared in accordance with IAS 34 as adopted by the European Union. The interim management report includes a fair review of the information required by Disclosure and Transparency Rule 4.2.7R and Disclosure and Transparency Rule 4.2.8R, namely: an indication of important events that have occurred during the first six months of the financial year and their impact on the consolidated interim financial information, and a description of the principal risks and uncertainties for the remaining six months of the financial year; and material related-party transactions in the first six months of the financial year and any material changes in the related party transactions described in the last Annual Report. The Directors of African Barrick Gold plc are listed in the African Barrick Gold plc Annual Report for 31 December A list of current Directors is maintained on the African Barrick Gold plc website: On behalf of the Board Brad Gordon, Chief Executive Officer Kelvin Dushnisky, Chairman 25 LSE: ABG
26 Auditor s Review Report Independent review report to African Barrick Gold plc Report on the condensed consolidated interim financial statements Our conclusion We have reviewed the consolidated interim financial information, defined below, in the interim financial statements of African Barrick Gold Plc for the six months ended 30 June Based on our review, nothing has come to our attention that causes us to believe that the condensed consolidated interim financial information are not prepared, in all material respects, in accordance with International Accounting Standard 34 as adopted by the European Union and the Disclosure and Transparency Rules of the United Kingdom's Financial Conduct Authority. This conclusion is to be read in the context of what we say in the remainder of this report. What we have reviewed The condensed consolidated interim financial information, which are prepared by African Barrick Gold plc, comprise: the consolidated balance sheet as at 30 June 2014; the consolidated income statement and statement of comprehensive income for the period then ended; the consolidated statement of cash flows for the period then ended; the consolidated statement of changes in equity for the period then ended; and the explanatory notes to the condensed consolidated interim financial information. As disclosed in note 2, the financial reporting framework that has been applied in the preparation of the full annual financial statements of the group is applicable law and International Financial Reporting Standards (IFRSs) as adopted by the European Union. The condensed consolidated interim financial information included in the half-yearly financial report have been prepared in accordance with International Accounting Standard 34, Interim Financial Reporting, as adopted by the European Union and the Disclosure and Transparency Rules of the United Kingdom's Financial Conduct Authority. What a review of condensed consolidated financial information involves We conducted our review in accordance with International Standard on Review Engagements (UK and Ireland) 2410, Review of Interim Financial Information Performed by the Independent Auditor of the Entity issued by the Auditing Practices Board for use in the United Kingdom. A review of interim financial information consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing (UK and Ireland) and, consequently, does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion. We have read the other information contained in the half-yearly financial report and considered whether it contains any apparent misstatements or material inconsistencies with the information in the condensed consolidated interim financial information. Responsibilities for the condensed consolidated interim financial information and the review Our responsibilities and those of the directors The half-yearly financial report, including the condensed consolidated interim financial information, is the responsibility of, and has been approved by, the directors. The directors are responsible for preparing the half-yearly financial report in accordance with the Disclosure and Transparency Rules of the United Kingdom's Financial Conduct Authority. Our responsibility is to express to the company a conclusion on the condensed consolidated interim financial information in the half-yearly financial report based on our review. This report, including the conclusion, has been prepared for and only for the company for the purpose of complying with the Disclosure and Transparency Rules of the Financial Conduct Authority and for no other purpose. We do not, in giving this conclusion, accept or assume responsibility for any other purpose or to any other person to whom this report is shown or into whose hands it may come save where expressly agreed by our prior consent in writing. PricewaterhouseCoopers LLP Chartered Accountants, London 24 July 2014 Notes: (a) (b) The maintenance and integrity of the African Barrick Gold Plc website is the responsibility of the directors; the work carried out by the auditors does not involve consideration of these matters and, accordingly, the auditors accept no responsibility for any changes that may have occurred to the financial statements since they were initially presented on the website. Legislation in the United Kingdom governing the preparation and dissemination of financial statements may differ from legislation in other jurisdictions. 26 LSE: ABG
27 INTERIM FINANCIAL STATEMENTS Consolidated Income Statement For the six months ended 30 June For the year ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Notes Restated 2013 CONTINUING OPERATIONS Revenue 445, , ,004 Cost of sales (332,474) (386,733) (713,806) Gross profit 113, , ,198 Corporate administration (18,892) (13,722) (32,157) Exploration and evaluation costs (10,995) (7,715) (16,927) Corporate social responsibility expenses (4,307) (6,228) (12,237) Impairment charges - (910,989) (1,044,310) Other charges 7 (12,782) (15,597) (30,424) Profit/(loss) before net finance expense and taxation 66,059 (853,624) (920,857) Finance income ,670 Finance expense 8 (4,504) (4,696) (9,552) Profit/(loss) before taxation 62,185 (857,325) (928,739) Tax (expense)/credit 9 (22,716) 184, ,959 Net profit/(loss) from continuing operations 39,469 (672,677) (740,780) DISCONTINUED OPERATIONS Net profit/(loss) from discontinued operations (40,741) (57,653) Net profit/(loss) for the period 40,355 (713,418) (798,433) Net Profit/(Loss) attributable to: Owners of the parent (net earnings/(loss)) 40,822 (701,230) (781,101) - Continuing operations 39,469 (672,677) (740,780) - Discontinued operations 1,353 (28,553) (40,321) Non-controlling interests - Discontinued operations (467) (12,188) (17,332) Earnings/ (loss) per share: 10.0 (171.0) (190.4) - Basic and diluted earnings/(loss) per share (cents) from continuing operations (164.0) (180.6) - Basic and diluted earnings/(loss) per share (cents) from discontinued operations (7.0) (9.8) The notes on pages form an integral part of this financial information. 27 LSE: ABG
28 Consolidated Statement of Comprehensive Income For the year ended 31 For the six months ended 30 June December (Unaudited) (Unaudited) (Audited) (US$ 000) Net profit/(loss) for the period 40,355 (713,418) (798,433) Other comprehensive income: Items that may be subsequently reclassified to profit or loss: Changes in fair value of cash flow hedges (1,037) 560 1,570 Total comprehensive income/ (loss) for the period 39,318 (712,858) (796,863) Attributed to: - Owners of the parent 39,785 (700,670) (779,531) - Non-controlling interests (467) (12,188) (17,332) The notes on pages form an integral part of this financial information. 28 LSE: ABG
29 Consolidated Balance Sheet As at 30 June As at 30 June As at 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Notes ASSETS Non-current assets Goodwill and intangible assets 211, , ,190 Property, plant and equipment 12 1,345,587 1,288,114 1,280,671 Deferred tax assets 45,046 49,510 50,787 Non-current portion of inventory 81,561 71,123 72,689 Derivative financial instruments 13 1,823 2,645 3,253 Other assets 132, , ,191 1,818,099 1,752,833 1,755,781 Current assets Inventories 253, , ,676 Trade and other receivables 24,321 37,193 24,210 Derivative financial instruments 13 1,009 4,936 1,366 Other current assets 87,270 96, ,945 Cash and cash equivalents 269, , , , , ,606 Assets of disposal group classified as held for sale Total assets 2,453,559 2,494,660 2,431,983 EQUITY AND LIABILITIES Share capital and share premium 929, , ,199 Other reserves 1,024,816 1,075, ,915 Total owners' equity 1,954,015 2,004,714 1,922,114 Non-controlling interests 4,781 10,392 5,248 Total equity 1,958,796 2,015,106 1,927,362 Non-current liabilities Borrowings ,000 80, ,000 Deferred tax liabilities 52,841 37,686 35,862 Derivative financial instruments ,566 1,207 Provisions 149, , ,237 Other non-current liabilities 13,824 17,656 10, , , ,407 Current liabilities Trade and other payables 123, , ,896 Derivative financial instruments 13 1,869 8,514 5,074 Provisions ,610 1,028 Other current liabilities 10,040 4,132 12, , , ,454 Liabilities of disposal group classified as held for sale ,760 Total liabilities 494, , ,621 Total equity and liabilities 2,453,559 2,494,660 2,431,983 The notes on pages form an integral part of this financial information. 29 LSE: ABG
30 Consolidated Statement of Changes in Equity (US$ 000) Notes Share capital Share premium Contributed surplus/other reserve Cash flow hedging reserve Stock option reserve Retained earnings/ (Accumulated losses) Total owners' equity Total noncontrolling interests Total equity Balance at 31 December 2012 (Audited) 62, ,102 1,368, , ,934 2,755,711 22,580 2,778,291 Total comprehensive income/(loss) (701,230) (700,670) (12,188) (712,858) Dividends to equity holders of the Company (50,441) (50,441) - (50,441) Stock option grants and valuation adjustments Balance at 30 June 2013 (Unaudited) 62, ,102 1,368, ,616 (297,737) 2,004,714 10,392 2,015,106 Total comprehensive income/(loss) for the period ,010 - (79,871) (78,861) (5,144) (84,005) Dividends to equity holders of the Company (4,101) (4,101) - (4,101) Stock option grants and valuation adjustments Balance at 31 December 2013 (Audited) 62, ,102 1,368,713 1,933 3,978 (381,709) 1,922,114 5,248 1,927,362 Total comprehensive (loss)/income for the period (1,037) - 40,822 39,785 (467) 39,318 Dividends to equity holders of the Company (8,202) (8,202) - (8,202) Stock option grants and valuation adjustments Balance at 30 June 2014 (Unaudited) 62, ,102 1,368, ,296 (349,089) 1,954,015 4,781 1,958,796 The notes on pages form an integral part of this financial information. 30 LSE: ABG
31 Consolidated Statement of Cash Flows For the year ended 31 For the six months ended 30 June December (Unaudited) (Unaudited) (Audited) (US$ 000) Notes Cash flows from operating activities Net profit/(loss) for the period 40,355 (713,418) (798,433) Adjustments for: Tax expense/(credit) 9 22,716 (184,648) (187,959) Depreciation and amortisation 64,746 90, ,159 Finance items 3,855 3,770 7,968 Impairment charges - 927,690 1,061,011 Profit on disposal of property, plant and equipment (4,113) (86) (175) Working capital adjustments (3,785) (25,856) (41,165) Other non-cash items 4,730 3,067 8,181 Cash generated from operations before interest and tax 128, , ,587 Finance income 666 1,005 1,700 Finance expenses (2,063) (2,608) (5,172) Income tax paid Net cash generated by operating activities 127,107 99, ,115 Cash flows from investing activities Purchase of property, plant and equipment (116,496) (207,210) (373,101) Investments in other assets (83) (2,032) (8,289) Cash flow related to the sale of Tulawaka 5 (11,633) - - Acquisition of subsidiary, net of cash acquired - - (588) Other investing activities (4,872) Net cash used in investing activities (128,074) (208,822) (386,850) Cash flows from financing activities Loans received 14-80, ,000 Dividends paid 11 (8,202) (50,441) (54,541) Finance lease instalments (2,883) (1,971) (5,137) Net cash (used in)/generated by financing activities (11,085) 27,588 82,322 Net decrease in cash and cash equivalents (12,052) (82,217) (117,413) Net foreign exchange difference (761) 1,742 (1,526) Cash and cash equivalents at 1 January 282, , ,348 Cash and cash equivalents at period end 269, , ,409 The notes on pages form an integral part of this financial information. African Barrick Gold results for the six months ended 30 June LSE: ABG
32 Notes to the Consolidated Interim Financial Information 1. GENERAL INFORMATION African Barrick Gold plc (the Company ) is a public limited company, which is listed on the London Stock Exchange and incorporated and domiciled in the UK. It is registered in England and Wales with registered number The address of its registered office is 5 th Floor, No.1 Cavendish Place, W1G 0QF, United Kingdom. Barrick Gold Corporation currently owns 63.9 percent of the shares of the Company and is the ultimate controlling party of the Group. This condensed consolidated interim financial information for the six months ended 30 June 2014 were approved for issue by the Board of Directors of the company on 24 July The condensed consolidated interim financial information does not comprise statutory accounts within the meaning of section 434 of the Companies Act Statutory accounts for the year ended 31 December 2013 were approved by the Board of Directors on 11 March 2014 and delivered to the Registrar of Companies. The report of the auditors on those accounts was unqualified, did not contain an emphasis of matter paragraph and did not contain any statement under section 498 of the Companies Act The condensed consolidated interim financial information has been reviewed, not audited. The Group s primary business is the mining, processing and sale of gold. The Group has three operating mines located in Tanzania. The Group also has a portfolio of exploration projects located across Tanzania and Kenya. 2. BASIS OF PREPARATION OF THE CONDENSED ANNUAL FINANCIAL STATEMENTS The condensed consolidated interim financial information for the six months ended 30 June 2014 has been prepared in accordance with the Disclosure and Transparency Rules of the Financial Conduct Authority and with IAS 34, Interim Financial Reporting as adopted by the European Union. The condensed consolidated interim financial information should be read in conjunction with the annual financial statements for the year ended 31 December 2013, which have been prepared in accordance with IFRS as adopted by the European Union. The condensed consolidated interim financial information has been prepared under the historical cost basis, as modified by the revaluation of financial assets and financial liabilities (including derivative instruments) at fair value through profit or loss. The financial information is presented in US dollars (US$) and all monetary results are rounded to the nearest thousand (US$ 000) except when otherwise indicated. Where a change in the presentational format between the prior period and the current period financial information has been made during the period, comparative figures have been restated accordingly. The following presentational changes were made during the current period: Presentation of the results of discontinued operations due to the sale of Tulawaka mine to STAMICO, the Tanzanian State Mining Corporation. Refer to note 5 for a discussion of the transaction. The group s activities expose it to a variety of financial risks: market risk (including currency risk, fair value interest rate risk, cash flow interest rate risk and price risk), credit risk and liquidity risk. The condensed interim financial statements do not include all financial risk management information and disclosures required in the annual financial statements; they should be read in conjunction with the group s annual financial statements as at 31 December There have been no changes in the risk management department or in any risk management policies since the year end. The impact of the seasonality on operations is not considered as significant on the condensed consolidated interim financial information. After making enquiries, the Directors have a reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. The Group therefore continues to adopt the going concern basis in preparing the consolidated interim financial information. Refer page 22 for the Going Concern statement. 3. ACCOUNTING POLICIES The accounting policies adopted are consistent with those used in the African Barrick Gold plc annual financial statements for the year ended 31 December 2013 except as described below. Taxes on income in the interim periods are accrued using the tax rate that would be applicable to expected total annual earnings. African Barrick Gold results for the six months ended 30 June LSE: ABG
33 IFRS 10, Consolidated financial statements, IFRS 11, Joint arrangements and IFRS 12 Disclosures of interests in other entities. The adoption of these standards has had no effect on the financial statements for earlier periods and on the interim financial statements for the period ended 30 June 2014 and is not expected to have a significant effect on the results for the financial year ending 31 December IFRIC 21 Levies. IFRIC 21 addresses the accounting for a liability to pay a levy if that liability is within the scope of IAS 37 Provisions. The interpretation addresses what the obligating event is that gives rise to pay a levy, and when should a liability be recognised. The group is not currently subject to significant levies. The adoption of the interpretation has had no significant effect on the financial statements for earlier periods and on the interim financial statements for the period ended 30 June The group does not expect IFRIC 21 to have a significant effect on the results for the financial year ending 31 December There are no other new standards, interpretations or amendments to standards issued and effective for the period which materially impacted on the Group. The following exchange rates to the US dollar have been applied: As at 30 June 2014 Average six months ended 30 June 2014 As at 30 June 2013 Average six months ended 30 June 2013 As at 31 December 2013 Average year ended 31 December 2013 South African Rand (US$:ZAR) Tanzanian Shilling (US$:TZS) 1,650 1,628 1,603 1,590 1,590 1,598 Australian Dollars (US$:AUD) UK Pound (US$:GBP) ESTIMATES The preparation of interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates. In preparing these condensed consolidated interim financial statements, the significant judgements made by management in applying the Group s accounting policies and the key sources of estimation uncertainty were the same as those that applied to the consolidated financial statements for the year ended 31 December 2013, with the exception of changes in estimates that are required in determining the provision for income taxes (see note 3). 5. DISCONTINUED OPERATIONS AND DISPOSAL GROUP ASSETS AND LIABILITIES HELD FOR SALE On 15 November 2013, ABG announced that an agreement was reached with STAMICO, the Tanzanian State Mining Corporation, whereby STAMICO would acquire the Tulawaka Gold Mine ( Tulawaka ) and certain exploration licences surrounding Tulawaka for consideration of US$4.5 million and the grant of a 2% net smelter royalty on future production in excess of 500,000 ounces, capped at US$0.5 million. On 4 February 2014, ABG announced the completion of the sale. STAMICO has taken ownership and management of the rehabilitation fund established as part of the closure plan for the mine, in return for the assumption of all remaining past and future closure and rehabilitation liabilities for Tulawaka, and has indemnified the other parties to the agreement in relation to these liabilities. The transfer was completed with a net cash payment of US$11.6 million by ABG to STAMICO for the balance of the rehabilitation fund, less the transaction consideration. This resulted in a net gain on sale of assets of US$4.1 million. After non operational costs incurred in the six months to 30 June 2014 and other closing adjustments, this resulted in a total cash outflow year to date of US$14.4 million. The financial results of Tulawaka have been presented as discontinued operations in the consolidated interim financial information. The comparative results in the consolidated interim income statement have been presented as if Tulawaka had been discontinued from the start of the comparative period. African Barrick Gold results for the six months ended 30 June LSE: ABG
34 Below is a summary of the results of Tulawaka for the six months ended 30 June 2014 and 30 June 2013, and year ended 31 December 2013: For the six months ended 30 June For the year ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Results of discontinued operations Revenue - 12,392 13,514 Cost of sales - (28,151) (30,368) Gross loss - (15,759) (16,854) Corporate administration - (1,187) (1,311) Exploration and evaluation costs Corporate social responsibility expenses 1 (92) (690) (3,259) Impairment charges - (16,701) (16,701) Other charges (6,496) (19,442) Profit/(loss) before net finance expense and taxation 866 (40,672) (57,567) Finance income Finance expense (16) (79) (116) Profit/(loss) before taxation 886 (40,741) (57,653) Tax expense Net profit/(loss) for the period 886 (40,741) (57,653) 1 Corporate social responsibility expenses relate to projects supported from the ABG Maendeleo Fund. 2 Other charges consist of non-operational costs incurred since the cessation of operations. 6. SEGMENT REPORTING The Group has only one primary product produced in a single geographic location, being gold produced in Tanzania. In addition the Group produces copper and silver as a co-product. Reportable operating segments are based on the internal reports provided to the Chief Operating Decision Maker ( CODM ) to evaluate segment performance, decide how to allocate resources and make other operating decisions. After applying the aggregation criteria and quantitative thresholds contained in IFRS 8, the Group s reportable operating segments were determined to be: North Mara gold mine; Tulawaka gold mine; Bulyanhulu gold mine; Buzwagi gold mine; and a separate Corporate and Exploration segment, which primarily consist of costs related to corporate administration and exploration and evaluation activities ( Other ). Segment results and assets include items directly attributable to the segment as well as those that can be allocated on a reasonable basis. Segment assets consist primarily of property, plant and equipment, inventories, other assets and receivables. Capital expenditures comprise additions to property, plant and equipment. Segment liabilities are not reported since they are not considered by the CODM as material to segment performance. The Group has also included segment cash costs. Segment information for the reportable operating segments of the Group for the six months ended 30 June 2014 and 30 June 2013, and year ended 31 December 2013 is set out below. African Barrick Gold results for the six months ended 30 June LSE: ABG
35 (Unaudited) (US$ 000) North Mara For the six months ended 30 June 2014 Bulyanhul u Buzwagi Other Continuing operations Discontinued operations 6 Gold revenue 176, , , , ,765 Co-product revenue 280 8,426 10,038-18,744-18,744 Total segment revenue 176, , , , ,509 Segment cash operating cost 1 (80,427) (96,092) (91,259) - (267,778) - (267,778) Corporate administration and exploration (5,005) (4,605) (4,008) (16,269) (29,887) - (29,887) Other charges and corporate social responsibility expenses (6,196) (4,519) (6,596) 222 (17,089) 866 (16,223) EBITDA 2 85,321 33,529 27,952 (16,047) 130, ,621 Impairment charges Depreciation and amortisation 7 (35,724) (20,063) (7,470) (1,439) (64,696) - (64,696) EBIT 2 49,597 13,466 20,482 (17,486) 66, ,925 Finance income Finance expense (1,263) (766) (1,230) (1,246) (4,504) (16) (4,520) Profit before taxation 48,471 12,772 19,447 (18,506) 62, ,071 Tax expense (14,783) (3,507) (5,835) 1,408 (22,716) - (22,716) Net profit for the period 33,689 9,265 13,612 (17,097) 39, ,355 Capital expenditure: Sustaining 8,088 4,482 5, ,972-18,972 Expansionary , ,809-26,809 Capitalised development 25,392 28,414 15,157 68,963-68,963 Reclamation asset addition 5,358 8, ,918-14,918 Total capital expenditure 39,816 67,448 21, , ,662 Segmental cash operating cost 80,427 96,092 91, , ,778 Deduct: co-product revenue (280) (8,426) (10,038) - (18,744) - (18,744) Total cash costs 80,147 87,666 81, , ,034 Sold ounces 3 137, ,165 92, , ,947 Cash cost per ounce sold Attributable to outside interests 4 - Attributable cash cost per ounce sold Cash cost per ounce sold Corporate administration charges Rehabilitation - accretion and depreciation Mine site exploration costs Corporate social responsibility expenses Capitalised stripping/ UG development Sustaining capital expenditure Attributable to outside interests 4 - All-in sustaining cost per ounce sold ,249 1,169 1,118-1,118 Segment carrying value 5 344,975 1,158, ,522 92,844 1,854,235-1,854,235 Total African Barrick Gold results for the six months ended 30 June LSE: ABG
36 (Unaudited) (US$ 000) North Mara Bulyanhulu Buzwagi Other For the six months ended 30 June 2013 (Restated) Continuing operations Discontinued operations 6 Gold revenue 194, , , ,690 12, ,055 Co-product revenue 365 7,704 14,601-22, ,697 Total segment revenue 195, , , ,360 12, ,752 Segment cash operating cost 1 (96,538) (98,425) (103,103) (298,066) (19,441) (317,507) Corporate administration and exploration (7,141) (7,439) (16,468) 9,611 (21,437) (1,026) (22,463) Other charges and corporate social responsibility expenses (6,729) (3,355) (3,814) (7,927) (21,825) (7,186) (29,011) EBITDA 2 84,949 25,729 33,670 1, ,032 (15,261) 130,771 Impairment charges (173,938) - (690,478) (46,573) (910,989) (16,701) (927,690) Depreciation and amortisation 7 (40,859) (16,645) (29,332) (1,831) (88,667) (8,710) (97,377) EBIT 2 (129,848) 9,084 (686,140) (46,720) (853,624) (40,672) (894,296) Finance income ,005 Finance expense (1,196) (783) (1,168) (1,549) (4,696) (79) (4,775) Loss before taxation (130,874) 8,882 (687,088) (48,245) (857,325) (40,741) (898,066) Tax expense 33,278 (2,892) 146,754 7, , ,648 Net loss for the period (97,595) 5,990 (540,334) (40,738) (672,677) (40,741) (713,418) Capital expenditure: Sustaining 23,962 15,546 20, , ,833 Expansionary , ,866-53,866 Capitalised development 28,917 24,102 41,338-94,357-94,357 Reclamation asset reduction (5,950) (9,208) (6,809) - (21,967) (161) (22,128) Total capital expenditure 47,433 82,861 55,186 1, , ,928 Segmental cash operating cost 96,538 98, , ,066 19, ,507 Deduct: co-product revenue (365) (7,704) (14,601) - (22,670) (27) (22,697) Total cash costs 96,173 90,721 88, ,396 19, ,810 Sold ounces 3 130,200 87,802 96, ,369 7, ,319 Cash cost per ounce sold , , Attributable to outside interests 4 (12) Attributable cash cost per ounce sold Cash cost per ounce sold , , Corporate administration charges Rehabilitation - accretion and depreciation Mine site exploration costs (20) 8 Corporate social responsibility expenses Capitalised stripping/ UG development Sustaining capital expenditure Attributable to outside interests 4 (9) All-in sustaining cost per ounce sold 2 1,313 1,581 1,643 1,483 2,808 1,507 Segment carrying value 5 456,914 1,052, ,064 79,653 1,797,815-1,797,815 Total African Barrick Gold results for the six months ended 30 June LSE: ABG
37 (Audited) (US$ 000) North Mara Bulyanhulu Buzwagi Other For the year ended 31 December 2013 Continuing operations Discontinued operations 6 Gold revenue 364, , , ,992 13, ,475 Co-product revenue ,882 25,311-43, ,043 Total segment revenue 365, , , ,004 13, ,518 Segment cash operating cost 1 (172,894) (190,647) (202,286) - (565,827) (20,527) (586,354) Corporate administration and exploration (13,026) (14,661) (20,976) (421) (49,084) (1,311) (50,395) Other charges and corporate social responsibility expenses (11,961) (5,827) (4,730) (20,143) (42,661) (22,701) (65,362) EBITDA 2 167,512 68,286 56,198 (20,564) 271,432 (31,025) 240,407 Impairment charges (307,259) - (690,478) (46,573) (1,044,310) (16,701) (1,061,011) Depreciation and amortisation 7 (68,565) (35,867) (39,906) (3,641) (147,979) (9,841) (157,820) EBIT 2 (208,312) 32,419 (674,186) (70,778) (920,857) (57,567) (978,424) Finance income , ,700 Finance expense (2,501) (1,482) (2,446) (3,123) (9,552) (116) (9,668) Loss before taxation (210,486) 31,599 (676,226) (73,626) (928,739) (57,653) (986,392) Tax credit 44,283 (13,977) 146,990 10, , ,959 Net loss for the year (166,203) 17,622 (529,236) (62,963) (740,780) (57,653) (798,433) Capital expenditure: Sustaining 38,386 25,193 31, , ,441 Expansionary ,912-1, , ,469 Capitalised development 65,594 45,428 60, , ,158 Reclamation asset reduction (11,271) (10,044) (9,230) - (30,545) (195) (30,740) Total capital expenditure 93, ,489 82,495 2, , ,328 Segmental cash operating cost 172, , , ,827 20, ,354 Deduct: co-product revenue (819) (16,882) (25,311) - (43,012) (31) (43,043) Total cash costs 172, , , ,815 20, ,311 Sold ounces 3 260, , , ,597 8, ,375 Cash cost per ounce sold , Attributable to outside interests 4 (6) Attributable cash cost per ounce sold Cash cost per ounce sold , Corporate administration charges Rehabilitation - accretion and depreciation Mine site exploration costs Corporate social responsibility expenses Capitalised stripping/ UG development Sustaining capital expenditure Attributable to outside interests 4 (6) All-in sustaining cost per ounce sold 2 1,227 1,344 1,506 1,346 3,013 1,362 Segment carrying value 5 367,326 1,116, ,344 81,005 1,817,817 10,489 1,828,306 Total 1 The CODM reviews cash operating costs for the three operating mine sites separately from corporate administration costs and exploration costs. Consequently, the Group has reported these costs in this manner. 2 These are non-ifrs financial performance measures with no standard meaning under IFRS. Refer to Non IFRS measures on page 23 for definitions. 3 Reflects 100% of ounces sold. 4 Reflects the adjustment for non-controlling interests at Tulawaka. 5 Segment carrying values are calculated as shareholders equity after adding back debt and intercompany liabilities, and subtracting cash and intercompany assets and include outside shareholder s interest. 6 Represents Tulawaka which has been discontinued. 7 Depreciation and amortisation includes the depreciation component of the cost of inventory sold. 8 Sustaining capital expenditure for the purposes of all-in sustaining cost per ounce sold includes land purchases which are classified as long term prepayments in the balance sheet. African Barrick Gold results for the six months ended 30 June LSE: ABG
38 7. OTHER CHARGES For the six months ended 30 June For the year ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated Other expenses Operational Review costs (including retrenchment cost) 5,317 1,629 13,305 Foreign exchange losses (net) 7, Non-hedge derivative losses (net) - 4,807 7,203 Government levies and charges 527-2,387 Bad debt expense - 1,159 1,369 Disallowed indirect taxes 401 3,784 1,463 Legal costs 1,931 1,018 3,138 CNG related costs (residual) - 2,374 3,246 Discounting of indirect tax receivables - 1,375 1,375 Other - - 3,617 Total 15,970 16,186 37,103 Other income Profit on disposal of property, plant and equipment (45) (86) (99) Insurance theft claim - - (2,958) Construction and consumable inventory gains - (111) - Non-hedge derivative gains (net) (2,748) - - Foreign exchange gains (net) - - (3,622) Other (395) (392) - Total (3,188) (589) (6,679) Total other charges 12,782 15,597 30,424 1 Restated due to the classification of Tulawaka as a discontinued operation. Refer to note FINANCE INCOME AND FINANCE EXPENSE Finance income For the six months ended 30 June For the year ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated Interest on time deposits Other Total ,670 African Barrick Gold results for the six months ended 30 June LSE: ABG
39 Finance expense For the six months ended 30 June For the year ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated Unwinding of discount 1 2,457 2,145 4,468 Revolving credit facility charges 2 1,194 1,510 3,050 Interest on CIL facility 1, ,413 Interest on finance lease liability Bank charges Other ,476 5,453 11,965 Capitalised during the year interest on CIL facility (1,972) (757) (2,413) Total 4,504 4,696 9,552 1 The unwinding of discount is calculated on the environmental rehabilitation provision. 2 Included in credit facility charges are the amortisation of the fees related to the revolving credit facility as well as the monthly interest and facility fees. 3 Restated due to the classification of Tulawaka as a discontinued operation. Refer to Note TAX (CREDIT)/EXPENSE For the year For the six months ended 30 June ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated Current tax: Current tax on profits for the period Adjustments in respect of prior years Total current tax Deferred tax: Origination and reversal of temporary differences 22,716 (184,676) (187,999) Total deferred tax 22,716 (184,676) (187,999) Income tax expense/(credit) 22,716 (184,648) (187,959) 1 Restated due to the classification of Tulawaka as a discontinued operation. Refer to note 5. The tax on the Group's profit before tax differs from the theoretical amount that would arise using the weighted average tax rate applicable to the profits of the consolidated entities as follow: For the year For the six months ended 30 June ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated 2013 Tax on profit/(loss) calculated at the Tanzanian tax rate of 30% 18,655 (269,420) (292,917) Tax effects of: Prior year adjustments - - 5,572 Other non-deductible expenses ,111 Effect of tax rates in foreign jurisdictions (426) (1,754) 1,371 Deferred tax assets not recognised 4,233 73,540 84,904 Income tax payable - (28) - Impairment of goodwill - 12,921 - Tax charge/(credit) 22,716 (184,648) (187,959) African Barrick Gold results for the six months ended 30 June LSE: ABG
40 The tax rate in Tanzania is 30% (2013: 30%) and in South Africa 28% (2013: 28%). Tax periods remain open to review by the Tanzania Revenue Authority ( TRA ) in respect of income taxes for 5 years following the date of the filling of the corporate tax return, during which time the authorities have the right to raise additional tax assessments including penalties and interest. Under certain circumstances the reviews may cover longer periods. Because a number of tax periods remain open to review by tax authorities, there is a risk that transactions that have not been challenged in the past by the authorities may be challenged by them in the future, and this may result in the raising of additional tax assessments plus penalties and interest. The Group has previously accounted for an adjustment to unrecognised tax benefits in respect of tax losses to reflect uncertainty regarding recoverability of certain tax losses. The Group makes no further provision in respect of such potential tax assessments. 10. EARNINGS/ (LOSS) PER SHARE Basic earnings/ (loss) per share ( EPS ) is calculated by dividing the net profit/ (loss) for the period attributable to owners of the Company by the weighted average number of Ordinary Shares in issue during the period. Diluted earnings/ (loss) per share is calculated by adjusting the weighted average number of Ordinary Shares outstanding to assume conversion of all dilutive potential Ordinary Shares. The Company has dilutive potential Ordinary Shares in the form of stock options. The weighted average number of shares is adjusted for the number of shares granted assuming the exercise of stock options. At 30 June 2014, 30 June 2013 and 31 December 2013, (loss)/earnings per share have been calculated as follows: For the year For the six months ended 30 June ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Restated 1 Restated 2013 Earnings/(loss) Net profit/(loss) from continuing operations attributable to owners of the parent 39,469 (672,677) (740,780) Net profit/(loss) from discontinued operations attributable to owners of the parent 1,353 (28,553) (40,321) Weighted average number of Ordinary Shares in issue 410,085, ,085, ,085,499 Adjusted for dilutive effect of stock options 194, Weighted average number of Ordinary Shares for diluted earnings per share 410,279, ,085, ,085,499 Earnings/(loss) per share (190.4) Basic and dilutive earnings/(loss) per share from continuing operations (cents) 9.6 (164.0) (180.6) Basic and dilutive earnings/(loss) per share from discontinued operations (cents) 0.4 (7.0) (9.8) 1 Restated due to the classification of Tulawaka as a discontinued operation. Refer to note DIVIDENDS The final dividend declared in respect of the year ended 31 December 2013 of US$8.2 million (US2.0 cents per share) was paid during African Barrick Gold results for the six months ended 30 June LSE: ABG
41 12. PROPERTY PLANT AND EQUIPMENT For the six months ended 30 June 2014 (Unaudited) (US$ 000) Plant and equipment Mineral properties and mine development costs Assets under construction¹ At 1 January 2014, net of accumulated depreciation 296, , ,206 1,280,671 Additions , ,662 Depreciation (28,941) (35,805) - (64,746) Transfers between categories 44,126 62,477 (106,603) - At 30 June , , ,265 1,345,587 At 1 January 2014 Cost 1,397,456 1,315, ,083 3,138,457 Accumulated depreciation (1,101,157) (719,752) (36,877) (1,857,786) Net carrying amount 296, , ,206 1,280,671 Total At 30 June 2014 Cost 1,441,472 1,378, ,142 3,268,009 Accumulated depreciation and impairment (1,129,988) (755,557) (36,877) (1,922,422) Net carrying amount 311, , ,265 1,345,587 For the six months ended 30 June 2013 (Unaudited) (US$ 000) Plant and equipment Mineral properties and mine development costs Assets under construction¹ Total At 1 January 2013, net of accumulated depreciation and impairment 945, , ,859 1,975,040 Additions , ,928 Impairments (510,650) (235,975) (36,876) (783,501) Depreciation (54,907) (35,446) - (90,353) Transfers between categories 74, ,360 (178,817) - At 30 June , , ,094 1,288,114 At 1 January 2013 Cost 1,475,374 1,250, ,859 2,936,321 Accumulated depreciation and impairment (530,256) (431,025) - (961,281) Net carrying amount 945, , ,859 1,975,040 At 30 June 2013 Cost 1,549,580 1,354, ,970 3,122,997 Accumulated depreciation and impairment (1,095,562) (702,445) (36,876) (1,834,883) Net carrying amount 454, , ,094 1,288,114 African Barrick Gold results for the six months ended 30 June LSE: ABG
42 (Audited) (US$ 000) Plant and equipment Mineral properties and mine development costs Assets under construction¹ For the year ended 31 December 2013 At 1 January 2013, net of accumulated depreciation and impairment 945, , ,859 1,975,040 Additions , ,328 Disposals/write-downs (477) - - (477) Impairments (582,669) (287,276) (36,877) (906,822) Depreciation (84,350) (56,809) - (141,159) Transfers between categories 18, ,427 (140,104) - Reclassification to disposal group assets held for sale - (239) - (239) At 31 December , , ,206 1,280,671 At 1 January 2013 Cost 1,475,374 1,250, ,859 2,936,321 Accumulated depreciation and impairment (530,256) (431,025) - (961,281) Net carrying amount 945, , ,859 1,975,040 At 31 December 2013 Cost 1,397,456 1,315, ,083 3,138,457 Accumulated depreciation and impairment (1,101,157) (719,752) (36,877) (1,857,786) Net carrying amount 296, , ,206 1,280,671 Total 1 Assets under construction represents (a) sustaining capital expenditures incurred constructing tangible fixed assets related to operating mines and advance deposits made towards the purchase of tangible fixed assets; and (b) expansionary expenditure allocated to a project on a business combination or asset acquisition, and the subsequent costs incurred to develop the mine. Once these assets are ready for their intended use, the balance is transferred to plant and equipment, and/ or mineral properties and mine development costs. 2 The gain on disposal of assets reflected in the income statement relates to the assets disposed of in the sale of Tulawaka which were transferred to assets held for sale in the year ended 31 December Leases Property, plant and equipment includes assets relating to the design and construction costs of power transmission lines and related infrastructure. At completion, ownership was transferred to TANESCO in exchange for amortised repayment in the form of reduced electricity supply charges. No future lease payment obligations are payable under these finance leases. Property, plant and equipment also includes emergency back-up and spinning power generators leased at Buzwagi mine under a three year lease agreement, with an option to purchase the equipment at the end of the lease term. The lease has been classified as a finance lease. Property, plant and equipment further includes drill rigs leased at Buzwagi mine under a one year rent to own lease agreement. The lease has been classified as a finance lease. The following amounts were included in property, plant and equipment where the Group is a lessee under a finance lease: For the year For the six months ended 30 June ended 31 December (Unaudited) (Unaudited) (Audited) (US$ 000) Cost - capitalised finance leases 70,764 68,846 70,764 Accumulated depreciation (16,836) (17,065) (16,430) Net carrying amount 53,928 51,781 54,334 African Barrick Gold results for the six months ended 30 June LSE: ABG
43 13. DERIVATIVE FINANCIAL INSTRUMENTS The table below analyses financial instruments carried at fair value, by valuation method. The Group has derivative financial instruments in the form of economic and cash flow hedging contracts which are all defined as level two instruments as they are valued using inputs other than quoted prices that are observable for the assets or liabilities. The following tables present the group s assets and liabilities that are measured at fair value at 30 June 2014, 30 June 2013 and 31 December Assets Liabilities (Unaudited) (US$ 000) Current Non-current Current Non-current Net fair value For the six months ended 30 June 2014 Interest contracts: Designated as cash flow hedges - 1,823 1, Currency contracts: Not designated as hedges (802) Commodity contracts: Not designated as hedges Total 1,009 1,823 1, (Unaudited) (US$ 000) Current Assets Liabilities Noncurrent Current Non-current Net fair value For the six months ended 30 June 2013 Currency contracts: Designated as cash flow hedges - - 1,652 - (1,652) Interest contracts: Designated as cash flow hedges - 2, ,742 Currency contracts: Not designated as hedges 1,148-5,848 1,542 (6,242) Commodity contracts: Not designated as hedges 3, ,653 Total 4,936 2,645 8,514 1,566 (2,499) Assets Liabilities (Audited) (US$ 000) Current Non-current Current Non-current Net fair value For the year ended 31 December 2013 Currency contracts: Designated as cash flow hedges (353) Interest contracts: Designated as cash flow hedges - 3,191 1, ,574 Currency contracts: Not designated as hedges , (3,892) Commodity contracts: Not designated as hedges 1, ,009 Total 1,366 3,253 5,074 1,207 (1,662) 14. BORROWINGS During 2013, a US$142 million facility was put in place to fund the bulk of the costs of the construction of one of our key growth projects, the Bulyanhulu CIL Expansion project ( Project ). The facility is collateralised by the Project, and has a term of seven years with a spread over Libor of 250 basis points. The seven year facility is repayable in equal instalments over the term of the facility, after a two year repayment holiday period. The interest rate has been fixed at 3.6% through the use of an interest rate swap. The full facility of US$142 million was drawn in Interest incurred on the borrowings has been capitalised to the asset (US$2.0 million). African Barrick Gold results for the six months ended 30 June LSE: ABG
44 15. COMMITMENTS AND CONTINGENCIES The Group is subject to various laws and regulations which, if not observed, could give rise to penalties. As at 30 June 2014, the Group has the following commitments and/or contingencies: a) Legal contingencies As at 30 June 2014, the Group was a defendant in approximately 316 lawsuits. The plaintiffs are claiming damages and interest thereon for the loss caused by the Group due to one or more of the following: unlawful eviction, termination of services, wrongful termination of contracts of service, non-payment for services, defamation, negligence by act or omission, unpaid overtime and public holiday compensation. The total amounts claimed from lawsuits in which specific monetary damages are sought amounted to US$163.6 million. The Group s Legal Counsel is defending the Group s current position, and the outcome of the lawsuits cannot presently be determined. However, in the opinion of the Directors and Group s Legal Counsel, no material liabilities are expected to materialise from these lawsuits. Consequently no provision has been set aside against the claims in the books of account. Included in the total amounts claimed is an appeal by the TRA intended for a tax assessment of US$21.3 million in respect of the acquisition of Tusker Gold Limited. The case was awarded in favour of ABG however, the TRA has served a notice of appeal. The calculated tax assessment is based on the sales price of the Nyanzaga property of US$71 million multiplied by the tax rate of 30%. Management is of the opinion that the assessment is invalid due to the fact that the acquisition was for Tusker Gold Limited, a company incorporated in Australia. The shareholding of the Tanzanian-related entities did not change and the Tusker Gold Limited group structure remains the same as prior to the acquisition. Also included in the total amounts claimed is TRA claims to the value of US$41.25 million for withholding tax on historic offshore dividend payments paid by ABG to its shareholders. In addition to the claim, there are six other withholding tax claims which have not been quantified. These claims are made on the basis that ABG is resident in Tanzania for tax purposes. Management are of the opinion that the claims do not have substance and that they will be successfully defended. b) Tax-related contingencies The TRA has issued a number of tax assessments to the Group relating to past taxation years from 2002 onwards. The Group believes that these assessments are incorrect and has filed objections to each of them. The Group is attempting to resolve these matters by means of discussions with the TRA or through the Tanzanian appeals process. During the year under review the Board ruled in favour of BGML in relation to seven of ten issues raised by the TRA in final assessments for the years under review. The TRA filed a notice of intention to appeal against the ruling of the Board, while ABG has filed a counter appeal in respect of Bulyanhulu to the Appeals Tribunal for all three items that were lost. The positions that were ruled against BGML were sufficiently provided for in prior year results and management is of the opinion that open issues will not result in any material liabilities to the Group. 16. RELATED PARTY BALANCES AND TRANSACTIONS The Group has related party relationships with entities owned or controlled by Barrick Gold Corporation, which is the ultimate controlling party of the Group. The Company and its subsidiaries, in the ordinary course of business, enter into various sales, purchase and service transactions and other professional services arrangements with others in the Barrick Group. These transactions are under terms that are on normal commercial terms and conditions. These transactions are not considered to be significant. At 30 June 2014 the Group had no loans of a funding nature due to or from related parties (30 June 2013: zero; 31 December 2013: zero). 17. SUBSEQUENT EVENTS The Board of the Company has approved an interim dividend of US1.4 cents per share for this financial year to be paid on 22 September 2014 to shareholders on the register on 29 August African Barrick Gold results for the six months ended 30 June LSE: ABG
45 African Barrick Gold results for the six months ended 30 June LSE: ABG
African Barrick Gold. BMO Global Metals & Mining Conference February 2013
African Barrick Gold BMO Global Metals & Mining Conference February 2013 Disclaimer Important Notice This presentation has been provided to you for information purposes only. It does not constitute an
Acacia Mining plc ( Acacia ) reports full year 2015 results
15 February 2016 Results for the 12 months ended 31 December 2015 (Unaudited) Based on IFRS and expressed in US Dollars (US$) Acacia Mining plc ( Acacia ) reports full year 2015 results 2015 was another
Production Analysis for the Six Months Ended 2011
Half Year Report for the six months ended 2011 26 July 2011 Based on International Financial Reporting Standards ( IFRS ) and expressed in US Dollars African Barrick Gold plc ( ABG ) reports half year
NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results
FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail:
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
ACADIAN TIMBER CORP. REPORTS FOURTH QUARTER AND YEAR-END RESULTS
News Release Investors, analysts and other interested parties can access Acadian Timber Corp. s 2015 Fourth Quarter Results conference call via webcast on Thursday, February 11, 2016 at 1:00 p.m. ET at
Inmet Mining announces third quarter results
Inmet Mining announces third quarter results All amounts are in Canadian dollars, unless otherwise stated. TORONTO, Oct. 24, 2002 / - Inmet Mining Corporation reported net income in the third quarter of
PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million
PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE SEMAFO Reports 2011 Cash Flow from Operations of 172 Million Fourth Quarter Total Cash Margin of 1,029 per Ounce Montreal, Quebec, March 14, 2012, 09:30 EDT SEMAFO
Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014
Management s Discussion and Analysis and Consolidated Financial Statements Second Quarter 2014 For the six months ended June 30, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...
CANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST JULY 30, 2015 TSX: FM; LSE: FQM CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Certain statements and information herein, including all statements that
AVINO SILVER & GOLD MINES LTD.
AVINO SILVER & GOLD MINES LTD. T 604.682.370 Suite 900, 570 Granville Street [email protected] F 604.682.3600 Vancouver, BC V6C 3P www.avino.com August 8, 205 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 Avino Reports
FOR IMMEDIATE RELEASE
FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS
Year ended 31 Dec 2009
PACE PLC CHANGE OF FUNCTIONAL AND PRESENTATIONAL CURRENCY AND COMPARATIVES RE-PRESENTED IN US DOLLARS Introduction Pace announced at the time of its preliminary results announcement that the Board had
NOMAD FOODS LIMITED ANNOUNCES FINANCIAL RESULTS FOR THE THREE MONTHS ENDED MARCH 31, 2016
NOMAD FOODS LIMITED ANNOUNCES FINANCIAL RESULTS FOR THE THREE MONTHS ENDED MARCH 31, 2016 FELTHAM, United Kingdom, May 25, 2016 /PRNewswire/ Nomad Foods Limited ( Nomad or the Company ) (NYSE: NOMD), today
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
The Point Rousse Project - An Economic Analysis
ANACONDA MINING SELLS 3,956 OUNCES AND GENERATES $1.5M OF EBITDA AT THE POINT ROUSSE PROJECT FOR Q1 FISCAL 2016 TORONTO October 15, 2015 Anaconda Mining Inc. ( Anaconda or the Company ) (TSX: ANX) is pleased
TORSTAR CORPORATION REPORTS SECOND QUARTER RESULTS
PRESS RELEASE TORSTAR CORPORATION REPORTS SECOND QUARTER RESULTS TORONTO, ONTARIO (Marketwired July 30, 2014) Torstar Corporation (TSX:TS.B) today reported financial results for the second quarter ended
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS
SCORPIO MINING REPORTS FIRST QUARTER 015 FINANCIAL RESULTS TORONTO, ONTARIO May 13, 015 Scorpio Mining Corporation (TSX: SPM)(OTCQX: SMNPF) ( Scorpio Mining or the Company ) today reported financial and
Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014
Management s Discussion and Analysis and Consolidated Financial Statements First Quarter 2014 For the three months ended March 31, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014
CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 The following management s discussion and analysis ( MD&A ), prepared as of December 11, 2014, should
THIRD QUARTER EARNINGS NOVEMBER 12, 2015
THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
thescore, Inc. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS For the Three and Six Months Ended February 28, 2015 The following is Management's Discussion and Analysis
2015 Third Quarter Results Webcast October 29, 2015
2015 Third Quarter Results Webcast October 29, 2015 Speaker Randall Oliphant Executive Chairman 2 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING
Monster Worldwide Reports Third Quarter 2015 Results
Monster Worldwide Reports Third Quarter 2015 Results Third Quarter Financial Highlights: o Company Exceeds Expectations on All Profitability Metrics For the 5th Consecutive Quarter Adjusted EBITDA Including
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
How To Know If Goldcorp Is A Successful Company
Second Quarter Conference Call July 30 th, 2009 Management Participants Chuck Jeannes President and Chief Executive Officer Lindsay Hall Chief Financial Officer Steve Reid Chief Operating Officer Jeff
FIRST QUARTER CONFERENCE CALL MAY 4, 2010
FIRST QUARTER CONFERENCE CALL MAY 4, 2010 1 Cautionary Statement CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This presentation contains or incorporates by reference forwardlooking statements
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES Craig Roberts National Bank Financial ABSTRACT While various methods are available to estimate a mining project
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
FORACO INTERNATIONAL REPORTS Q3 2014
NEWS RELEASE FORACO INTERNATIONAL REPORTS Q3 2014 Toronto, Ontario / Marseille, France Tuesday, November 4, 2014 Foraco International SA (TSX:FAR) (the Company or Foraco ), a leading global provider of
SAGICOR FINANCIAL CORPORATION
Interim Financial Statements Nine-months ended September 30, 2015 FINANCIAL RESULTS FOR THE CHAIRMAN S REVIEW The Sagicor Group recorded net income from continuing operations of US $60.4 million for the
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS
DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS (All monetary figures are expressed in Canadian Dollars unless otherwise stated) Toronto, Ontario, May 6, 2008 Dundee Precious Metals Inc. ( DPM
INVESTOR PRESENTATION JULY 2013
INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
Western Energy Services Corp. Condensed Consolidated Financial Statements September 30, 2015 and 2014 (Unaudited)
Condensed Consolidated Financial Statements September 30, 2015 and 2014 (Unaudited) Condensed Consolidated Balance Sheets (Unaudited) (thousands of Canadian dollars) Note September 30, 2015 December 31,
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
Volex Group plc. Transition to International Financial Reporting Standards Supporting document for 2 October 2005 Interim Statement. 1.
Volex Group plc Transition to International Financial Reporting Standards Supporting document for 2 October 2005 Interim Statement 1. Introduction The consolidated financial statements of Volex Group plc
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
NIGHTINGALE REPORTS FISCAL 2014 RESULTS
NIGHTINGALE REPORTS FISCAL 2014 RESULTS Markham, ON, July 31, 2014 Nightingale Informatix Corporation ( Nightingale or the Company ) (TSX-V: NGH), an application service provider (ASP) of electronic health
GUYANA GOLDFIELDS INC.
Condensed Consolidated Interim Financial Statements (Unaudited, Expressed in United States Dollars) Three and Nine Months Ended July 31, 2013 Guyana Goldfields Inc. Condensed Consolidated Interim Balance
News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014
Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: [email protected]
This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.
This discussion and analysis of financial condition and results of operation of Thompson Creek Metals Company Inc. ( Thompson Creek or the Corporation ) is prepared as at August 7, 2008, and should be
The final quarter of 2015 recorded 7,924 ounces of gold production, giving a year-end total of 32,629 ounces.
Fourth quarter update on gold operations at Palito and Sao Chico, declaration of commercial production at Sao Chico and extension of loan repayment terms Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian
Auriant Mining AB (publ)
Auriant Mining AB (publ) Interim report for the period from January March Highlights: Total gold production in the first quarter was 84 kg (2,699 oz) which was the same as in Q1 : 84 kg (2,690 oz). Consolidated
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
China Gold International Resources Corp. Ltd.
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness
Staples, Inc. Announces First Quarter 2016 Performance
Media Contact: Mark Cautela 508-253-3832 Investor Contact: Chris Powers/Scott Tilghman 508-253-4632/1487 Staples, Inc. Announces First Quarter 2016 Performance FRAMINGHAM, Mass., May 18, 2016 Staples,
King Reports First Quarter 2014 Results
King Reports First Quarter 2014 Results Generates record quarterly mobile gross bookings of $480 million in Q1-14 Adjusted EBITDA more than triples year over year to $249 million in Q1-14 Extends reach
Full year and fourth quarter 2014 results 1
Full year and fourth quarter results 1 Luxembourg, February 12, 2015 Highlights Health and Safety frequency rate 2 of 1.1x in compared to 1.3x in 2013. Shipments of 1,813 thousand tonnes in full year,
MIX TELEMATICS ANNOUNCES FINANCIAL RESULTS FOR THIRD QUARTER OF FISCAL YEAR 2016
MIX TELEMATICS LIMITED (Incorporated in the Republic of South Africa) (Registration number 1995/013858/06) JSE share code: MIX ISIN: ZAE000125316 NYSE share code: MIXT ( MiX Telematics ) MIX TELEMATICS
summarize of Inter- Period Stock & Stocks - Part II
This ( MD&A ) update is current as of September 7, 2010. This report should be read in conjunction with Hart Stores Inc. ( the Company ) unaudited interim consolidated financial statements for the six
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )
Waste Management Announces Second Quarter Earnings
FOR IMMEDIATE RELEASE Waste Management Announces Second Quarter Earnings Collection and Disposal Income from Operations Grows 3.4% HOUSTON July 26, 2012 Waste Management, Inc. (NYSE: WM) today announced
N E W S R E L E A S E
N E W S R E L E A S E Corporate Headquarters 96 South George Street York, Pennsylvania 17401 U.S.A. www.glatfelter.com For Immediate Release Contacts: Investors: Media: John P. Jacunski William T. Yanavitch
Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013.
Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements 2013 (Unaudited) (Expressed in Canadian dollars) Index Page Notice to reader 2 Financial statements:
2015 FOURTH QUARTER REPORT BUILDING VALUE
2015 FOURTH QUARTER REPORT BUILDING VALUE MANAGEMENT S DISCUSSION AND ANALYSIS of Consolidated Financial Condition and Results of Operations for the Year ended December 31, 2015 (All monetary figures are
DATA GROUP LTD. ANNOUNCES SECOND QUARTER FINANCIAL RESULTS FOR 2015
For Immediate Release DATA GROUP LTD. ANNOUNCES SECOND QUARTER FINANCIAL RESULTS FOR 2015 SECOND QUARTER HIGHLIGHTS Second quarter 2015 ( Q2 ) Revenues of $73.4 million, a decrease of 4.3% year over year
De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2015
NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2015 Niko Resources Ltd. ( Niko or the Company ) is pleased to report its operating and financial results for the quarter ended December 31, 2015.
2014 INTERIM REPORT GEARED FOR GROWTH BE A PART OF IT.
2014 INTERIM REPORT Q3 GEARED FOR GROWTH BE A PART OF IT. Interim Management s Discussion and Analysis as at September 30, 2014 Quarterly highlights 1 Preliminary comments to the Management s Discussion
FINANCIAL AND OPERATING HIGHLIGHTS
Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the
Condensed Interim Consolidated Financial Statements. For the Three Months Ended March 31, 2016
Condensed Interim Consolidated Financial Statements For the Three Months Ended March 31, 2016 1 of 14 Notice of no Auditor Review of Interim Financial Statements Under National Instrument 51-102, Part
ARCONTECH GROUP PLC (formerly Knowledge Technology Solutions plc) INTERIM REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2008
20 March 2009 ARCONTECH GROUP PLC (formerly Knowledge Technology Solutions plc) INTERIM REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2008 Arcontech Group PLC (AIM: ARC)( Arcontech or the Company ), providers
GrandVision reports Revenue growth of 13.8% and EPS growth of 31.7%
GrandVision reports Revenue of 13.8% and EPS of 31.7% Schiphol, the Netherlands 16 March 2015. GrandVision NV (EURONEXT: GVNV) publishes Full Year and Fourth Quarter 2015 results. 2015 Highlights Revenue
Croda International Plc. Interim Results for the Six Months to 30 June 2009 STRONG PERFORMANCE IN CORE CONSUMER CARE BUSINESS
Croda International Plc Interim Results for the Six Months to 30 June STRONG PERFORMANCE IN CORE CONSUMER CARE BUSINESS Highlights H1 H1 * Change Sales continuing operations 447.5m 464.1m -3.6% - Consumer
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
APX GROUP HOLDINGS, INC. REPORTS FIRST QUARTER 2015 RESULTS
APX GROUP HOLDINGS, INC. REPORTS FIRST QUARTER 2015 RESULTS First Quarter 2015 Financial and Portfolio Highlights APX Group Reports Total Revenue of $149.9 Million, up 14.9% Year over Year Adjusted EBITDA
Second Quarter Earnings Release Conference Call. July 23, 2009
Second Quarter Earnings Release Conference Call July 23, 2009 Cautionary Statement This presentation contains forwardlooking statements within the meaning of Section 27A of the Securities Act of 1933,
THE EMPIRE LIFE INSURANCE COMPANY
THE EMPIRE LIFE INSURANCE COMPANY Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2013 Unaudited Issue Date: November 6, 2013 These condensed interim consolidated
ACADIAN TIMBER CORP. REPORTS FIRST QUARTER RESULTS
News Release Investors, analysts and other interested parties can access Acadian Timber Corp. s 2012 First Quarter Results conference call via webcast on Wednesday, May 2, 2012 at 1:00 p.m. ET at www.acadiantimber.com
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
Altus Group Reports First Quarter Financial Results for 2015
Street Smart. World Wise. Altus Group Reports First Quarter Financial Results for 2015 Altus Group Delivers 14% Revenue Growth, Including 43% Increase in Recurring Revenues from GAIM Businesses TORONTO,
Debt investor presentation 2015 financial year
Macedon Debt investor presentation 2015 financial year Peter Beaven Chief Financial Officer 25 August 2015 Disclaimer Forward-looking statements This presentation contains forward-looking statements, including
MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE THREE AND NINE-MONTH PERIODS ENDED SEPTEMBER 30, 2010
MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE THREE AND NINE-MONTH PERIODS ENDED SEPTEMBER 30, 2010 The following management s discussion and analysis of
MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION
MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND SIX MONTHS ENDED June 30, 2014 August 11, 2014-1- MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION This Management's Discussion & Analysis ("MD&A")
International Tower Hill Mines Ltd.
International Tower Hill Mines Ltd. ITEM 7. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS. Current Business Activities General Livengood Gold Project Developments
SUB: STANDARD CHARTERED PLC (THE "COMPANY") STOCK EXCHANGE ANNOUNCEMENT
April 26, 2016 To, Ms. D'souza AVP, Listing Department National Stock Exchange of India Exchange Plaza Bandra Complex Bandra (East) 400 001 Limited SUB: STANDARD CHARTERED PLC (THE "COMPANY") STOCK EXCHANGE
Report of the Executive Board. In millions of EUR 2014 2013
Review Results from operating activities Revenue 19,257 19,203 income 93 226 Raw materials, consumables and services (12,053) (12,186) Personnel expenses (3,080) (3,108) Amortisation, depreciation and
Interim results for the six months ended 31 December 2009
Interim results for the six months ended 31 December 29 ARM s financial position continues to be robust with net debt to equity of 8.4%. We are pleased about the significant increase in headline earnings
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
Enbridge Income Fund Holdings Inc. Announces Second Quarter Results; Declares Monthly Dividend
NEWS RELEASE Enbridge Income Fund Holdings Inc. Announces Second Quarter Results; Declares Monthly Dividend HIGHLIGHTS (all financial figures are unaudited and in Canadian dollars) Earnings for the second
DATA GROUP LTD. ANNOUNCES FIRST QUARTER RESULTS FOR 2014
For Immediate Release DATA GROUP LTD. ANNOUNCES FIRST QUARTER RESULTS FOR 2014 HIGHLIGHTS Q1 2014 First quarter 2014 ( Q1 ) Revenues of 77.9 million, Q1 Gross Profit of 18.8 million and Q1 Net Income of