OVERVIEW. Exploration review
|
|
|
- Teresa Barrett
- 10 years ago
- Views:
Transcription
1 Exploration review Given the Group s present constrained economic situation, exploration focus is being limited to current operations and one continuing offshore project where positive results warranted follow-up. Bushveld Complex in South Africa Exploration on and around the Impala mining area focused on infill drilling at 20 Shaft and at least one borehole was drilled on each of the RBR JV prospecting areas, comprising portions of the farms Doornspruit and Roodekraalspruit, and the farms Diepkuil and Klipgatkop. Drilling in support of ongoing mining operations was conducted at 11C Shaft, 14 Decline Shaft and 16 Shaft. Elsewhere limited drilling was conducted at Afplats on the Kareepoort/Wolvekraal extension area. At the Tamboti Project two boreholes were drilled on Portions 4 and 5 of Kalkfontein and two boreholes on Tweefontein in conjunction with Two Rivers and in fulfilment of prospecting right obligations. Great Dyke in Zimbabwe At Zimplats exploration drilling at the proposed Portal 5 boxcut and decline position was completed during the 2015 financial year and the focus on the interpretation of geotechnical and geological data around Portal 5, Bimha and Mupfuti Mine footprint continued throughout the year. The extent and influence of the Mutambara shear and Manzamnyama fault were the prime objective of the 3D structural mapping and logging exercises that were undertaken following the failure of mine pillars at Bimha Mine. Regional structures were mapped in greater detail using various methods, including interpretation of existing aeromagnetic surveys and additional wireline downhole geophysical applications were employed. Improved understanding of the ground has been achieved to date and it is anticipated that further studies will be conducted in the coming year in order to improve the prediction of reef and ground conditions ahead of mining. The assay results for surface holes drilled during the Portal 7 10 drilling campaign of 2012 were received and incorporated into new block models and this resulted in the upgrading of some portions of the mineral resource from an inferred category to the indicated category. At Mimosa exploration work involved the geological studies based on the drilling that was carried out during the previous year on the western limb of the South Hill ore body to investigate perceived low grades in the area as well as drilling for fault investigation on the northern section of the mine close to the ore body limit. Similarly the results of the earlier exploration drilling at the Far South Hill ore body were used to re-assess the mineral resource estimates. Offshore projects Implats main geographic focus offshore was Canada where it is exploring PGM mineralisation in the Sunday Lake intrusion 25 kilometres north of Thunder Bay, Ontario. The programme, a joint venture owned 75% by Implats and 25% by Transition Metals Corp., was initiated last year and discovered PGM mineralisation with high Pt:Pd ratios, typically >1:1. The Sunday Lake PGM-Cu-Ni property covers a 3.5km diameter circular reversely-polarised magnetic anomaly associated with a large buried Proterozoic-aged mafic-ultramafic intrusion related to the Midcontinental Rift of North America, a feature known to host several significant nickel-copper-pgm deposits. Exploration commencing last year culminated in exploration drilling that intersected significant PGM mineralisation in the northern margin of the intrusion and in dykes extending to the north. Results reported last year included 20.2 metres grading 3.22 g/t combined PGMs, a 15 metre interval containing 2.84g/t PGMs and a 5.0 metre interval averaging 5.0g/t PGMs. A small additional drill programme in the latest year confirmed the presence of an extensive PGM mineralised horizon within the northern part of the intrusion. Two holes encountered 10.9m of 2.3g/t PGMs including 3.29g/t PGMs over 4.9m and 17.8m of 1.95g/t PGMs including 3.30g/t PGMs over 7.0m. The third hole failed to intersect the target horizon before it exited the intrusion. To date, only the northern portion of the intrusive complex has been tested by drilling. A more extensive drill programme to explore the untested southern part of the intrusion is envisaged for the 2016 financial year. Elsewhere Implats continues to monitor exploration developments worldwide and review numerous exploration and potential mining opportunities. PAGE 18 Implats mineral resource and mineral reserve statement 2015
2 Auditing and risk Implats is committed to independent third-party reviews of mineral resource and mineral reserve estimates. Such reviews not only provide assurance but also assist with the principle of continuous improvement and are undertaken on a two-year cycle. The next Group-wide review is due in The following work was undertaken during the 2015 financial year: An independent mineral resource management process audit was undertaken at Impala, Afplats and Marula by The Mineral Corporation. In addition a detailed technical review was completed for Marula during 2015 by The Mineral Corporation. The outcome of the audits showed compliance to the Implats code of practice (COP). Minor inconsistencies were noted but these were not material. The independent review by The Mineral Corporation at Marula concluded that they did not identify any fatal flaws in geological data collection and processing as well as mineral resources estimation. Likewise, no fatal flaws have been identified in the approaches and processes adopted for the conversion of mineral resources to mineral reserves and in the modifying factors utilised for the conversion. A material change in the ore reserves at Bimha occurred as a result of the low angle shearing reported in the previous period. A completely new pillar design resulted in a lower extraction rate. The updated mineral resource and ore reserve estimates were compiled and signed-off by the Competent Persons from Zimplats and independently reviewed by The Mineral Corporation. They completed an independent audit of the mineral resource and ore reserve estimates in December 2014 and concluded that there were no material issues identified with respect to the mineral resources or ore reserve estimates and assisted with the compilation of a JORC compliant Table 1 report. At Mimosa SRK conducted an independent audit of the mineral resource estimates. They concluded that the estimates derived by Mimosa are representative of the orebody. SRK did not identify any material issues. The Group s reported mineral reserves represent its estimate of quantities of PGMs that have the ability, and its reported mineral resources represent its estimate of quantities of PGMs that have the potential, to be economically mined and refined under anticipated geological and economic conditions. There are numerous uncertainties inherent in estimating quantities of mineral resources and mineral reserves and in projecting potential future rates of mineral production, including many factors beyond the Group s control. The accuracy of any mineral resources and mineral reserves estimate is a function of a number of factors, including the quality of the methodologies employed, the quality and quantity of available data and geological interpretation and judgement, and is also dependent on economic conditions and market prices being generally in line with estimates. Furthermore, estimates of different geologists and mining engineers may vary, and results of the Group s mining and production subsequent to the date of an estimate may lead to revision of estimates due to, for example, fluctuations in the market price of ores and metals, reduced recovery rates or increased production costs due to inflation or other factors which may render mineral resources and mineral reserves containing lower grades of mineralisation uneconomic to exploit and may ultimately result in a restatement of mineral resources and/or mineral reserves and may adversely impact future cash flows. Further, mineral estimates are based on limited sampling and, consequently, are uncertain as the samples may not be representative of the entire ore body and mineral resource. As a better understanding of the ore body is obtained, the estimates may change significantly. In addition, the reserves the Group ultimately exploits may not conform to geological, metallurgical or other expectations and the volume and grade of ore recovered may be below the estimated levels. Mineral resources and mineral reserves data is not indicative of future production. To mitigate this risk, the Group appoints independent third parties to review the Group mineral resources and reserves at least on a two-year cycle. Similarly all mining project feasibility studies are subject to independent reviews prior to applying for capital approval by the board. Substantial capital expenditure is required to identify and delineate mineral resources and mineral reserves through geological mapping and drilling, to identify geological features that may prevent or restrict the extraction of ore, to determine the metallurgical processes to extract the metals from the ore and, in the case of new properties, to construct mining and processing facilities. There can be no assurance that the Group will be able to identify additional mineral resources and mineral reserves or continue to extend the mine life of its existing operations. Without such additional sources, any increase in the level of annual production would therefore shorten the life of the Group s existing operations. Any failure by the Group to identify, delineate and realise mineral resources and mineral reserves in the future could have a material adverse effect on the Group s business, financial condition and results of operations. The mineral resources department subscribes to a formal risk management system and endeavours to systematically reduce all risks relevant to the mineral resources and reserves. Presently no area of risk is considered significant post the current controls. It is recognised by Implats that mineral resource and mineral reserve estimations are based on projections which may vary as new information becomes available or specifically if assumptions, modifying factors and market conditions change materially. This approach is consistent with Group definitions of risk as per ISO 31000:2009, The effect of uncertainty on objectives. The assumptions, modifying factors and market conditions therefore represent areas of potential risk. In addition, security of mineral right tenure or corporate activity could have a material impact on the future mineral asset inventory. Implats mineral resource and mineral reserve statement 2015 PAGE 19
3 Relevant assessment and reporting criteria The following key assumptions and parameters, unless otherwise stated, were used in the compilation of the estimates in this declaration: Implats developed a Group-wide protocol for the estimation, classification and reporting of mineral resources and mineral reserves in 2010 to enhance standardisation and to facilitate consistency in auditing. This protocol is updated annually with the aim to improve and specifically guide the classification of mineral resources and to ensure compliance with the SAMREC Code Implats introduced a depth cut-off in 2010 whereby mineralisation below a certain depth is excluded from the mineral resource estimate. This depth cut-off is applicable to the Bushveld Complex setting and is reviewed annually considering a range of assumptions, specifically the virgin rock temperature (VRT), cooling requirements, available technology, support design and other cost, prices and mining depth limits presently in the platinum industry. It is recognised that while the actual depth cut-off could vary from area to area and over time as conditions vary. The depth cut-off of 2 350m was applied from the 2013 Implats mineral resource estimates and equated approximately to a VRT of 73 C. A depth cut-off of 2 000m below surface was introduced in 2014, additional to the depth cut-off areas various mineral resource blocks are considered on a case-by-case basis and this has resulted in areas where the eventual economic extraction is in doubt. These mineral resources will be reported as exploration results and are excluded from the summation of total mineral resources per area and the attributable mineral resources Mineral resource tonnage and grades are estimated in situ. The mineral resources for the Merensky Reef are estimated at a minimum mining width, and may therefore include mineralisation below the selected cut-off grade. Mineral resource estimates for the UG2 Reef reflect the main UG2 chromitite layer widths only and do not include any dilution. Implats prefers to estimate the UG2 chromitite layer separately from the low-grade or barren hangingwall and footwall units as this approach supports improved grade control and ore accounting practices. This practice to report the UG2 chromitite layer as the mineral resource estimate and disclosing the actual estimated layer width is most transparent and compliant with the SAMREC Code Note that the main UG2 chromitite layer widths in the case of Impala and Marula are narrower than a practical minimum mining width. For further clarity a comparative summary is listed in these sections where the standard estimates are compared with estimates that include dilution up to a minimum mining width Mineral resource estimates for the Main Sulphide Zone are based on optimal mining widths. Such mining widths are reviewed from time to time given varying economic and operational considerations Mineral resource estimates are reported inclusive of mineral reserves, unless otherwise stated Mineral resource estimates allow for estimated geological losses but not for anticipated pillar losses during eventual mining, except where these pillars will never be extracted, such as legal, boundary and shaft pillars Mineral reserve estimates include allowances for mining dilution and are reported as tonnage and grade delivered to the mill Rounding-off of figures in the accompanying summary estimates may result in minor computational discrepancies. Where this occurs it is not deemed significant It is important to note that the mineral resource statements in principle remain imprecise estimates and cannot be referred to as calculations. All inferred mineral resources should be read as approximations Exploration samples are mainly assayed for all PGEs and Au, using the nickel sulphide fire assay collection method and determining the elements with an inductively coupled plasma mass spectrometer (ICP-MS). Base metal content is determined by an atomic absorption (AA) spectrometer using partial digestion in order to state metal in sulphide that is amenable to recovery by flotation processes. All these analyses are undertaken by Intertek Genalysis in Perth Underground samples are mainly assayed for Pt, Pd, Rh and Au using the lead collection method by the in-house laboratories at the respective mines. A partial digestion at the in-house laboratories is used to determine the base metal content of samples using AA All references to tonnage are to the metric unit All references to ounces (oz) are troy with the factor used being metric grams per ounce The mineral resources and mineral reserves reported for the individual operations and projects are reflected as the total estimate (100%). The corresponding estimates relating to attributable mineral resources and mineral reserves are only given as combined summary tabulations Mineral reserves are that portion of the mineral resource which technical and economic studies have demonstrated can justify extraction at the time of disclosure. Historically, Implats has only converted mineral resources to mineral reserves on completion of a full feasibility study for a project and LoM I for an operating mine (as per SAMREC). The exception to this in the past has been at Zimplats where the basis of a pre-feasibility study was applied, as permitted by the JORC Code This practice is in line with the SAMREC 2009 clarification that only a pre-feasibility study is required for such conversions. The conversion of mineral resources to ore reserves for Zimplats has now been aligned to the Implats standard No inferred mineral resources have been converted into mineral reserves There are only limited changes in the estimation principles and reporting style as at 30 June 2015 relative to the previous report. The key change is: The mineral resources previously reported as mineral resources under review and areas excluded from mineral resources will now be reported separately from the individual operations where applicable additional details on nickel and copper are disclosed in the tables a summary section on chromium is included The term ore reserve is interchangeable with the term mineral reserve Implats uses a discounted cash flow model that embodies economic, financial and production estimates in the valuation of mineral assets. Forecasts of key inputs are: Relative rates of inflation in Capital expenditure South Africa and the Operating expenditure United States Production profile Rand/dollar exchange rate Metal recoveries Metal prices The outputs are net present value, the internal rate of return, annual free cash flow, project payback period and funding requirements. Metal price and exchange rate forecasts are regularly updated by the marketing department of Implats. PAGE 20 Implats mineral resource and mineral reserve statement 2015
4 Relevant assessment and reporting criteria 2015 As at 30 June 2015, a real long-term forecast for revenue per platinum ounce sold of R was used. Specific real long-term forecasts include: Platinum US$1 568/oz Gold US$1 237/oz Palladium US$1 066/oz Nickel US$19 851/t Rhodium US$1 540/oz Copper US$6 940/t Ruthenium US$59/oz Exchange rate R11.30/US$ Iridium US$571/oz The spot basket price calculated for Implats as at 30 June 2015 was R and the equivalent real long-term consensus basket price is R per ounce Rigorous profitability tests are conducted to test the viability of the mineral reserves, references to this are listed in the sections per operation and highlight the spot price scenarios. A summary graph showing the price sensitivity of the total Group mineral reserves is depicted below. Reserves vs real basket price PtKoz Reserves Reserves (Pt Koz) Consensus Spots BP16 long-term Group basket price (R/Pt oz) A mineral resources by definition is a concentration or occurrence of material of economic interest in or on the earth s crust in such form, quality and quantity that there are reasonable and realistic prospects for eventual economic extraction. The interpretation of such eventual economics varies significantly, however, it implies some form of high-level view in terms of either yard-stick comparisons or high-level scenario models. On this basis Implats has excluded significant mineralisation (a) initially below 2 350m below surface, (b) then 2 000m below surface, (c) selected areas based on geology and potential infrastructure (see section Areas excluded from mineral resource estimates in this document). In total some 58 Pt has been excluded from current statements on this basis. However, under a present price regime and outlook the bulk of the Implats South African mineral resources are marginal at best and require long-term metal prices higher than current estimates. Work is underway to identify opportunities on a scenario scale to optimise such areas in terms of potential output, production costs and future capital expenses. Notably the Zimbabwean mineral resources are reasonably robust in terms of eventual economic extraction and require long-term prices in the order of US$1 500 per Pt oz and the deeper Rustenburg mineral resources require prices around US$2 000 per Pt oz. Environment Our activities associated with the exploration, extraction and processing of mineral resources result in the unavoidable disturbance of land, the consumption of resources, and the generation of waste and atmospheric and water pollutants. Growing regulatory and social pressure, increasing demands for limited natural resources, and the changing costs of energy and water all highlight the business imperative of responsible environmental management, particularly as our underground operations become deeper and consume greater amounts of energy and water. This involves taking measures not only to address security of resource supply (for example through efficiency, recycling and fuel-switching), but also to actively minimise our impacts on natural resources and on the communities around our operations. Taking such measures has direct benefits in terms of reduced costs and liabilities, enhanced resource security and improved security of our licence to operate. Implats has an environmental policy that commits the company to running our exploration, mining, processing and refining operations in an environmentally responsible manner and to ensure the well-being of our stakeholders. The policy also commits to integrating environmental management into all aspects of the business with the aim of achieving world-class environmental performance in a sustainable manner. Our management of the environmental impacts of our operations and processes involves the following focus areas: Promoting responsible water stewardship by minimising water use and water pollution Minimising our negative impacts on air quality Responding to climate change risks and opportunities and promoting responsible energy management Managing our waste streams Promoting responsible land management and biodiversity practices All our operations are ISO certified. In line with our environmental management system expectations, all operations are required to identify and report on environmental incidents. Systems are in place to investigate and determine the direct and root causes of high-severity incidents, and to address and close out these incidents. To ensure continued assurance of legal compliance to all authorisation requirements and conditions, legal, geology and environmental departments are implementing the best practice land management software FlexiCadastre, for the management of mineral rights and contractual commitments. Further details regarding the materiality of environmental aspects, management processes, performance and commitments are reported in the 2015 Implats sustainability report and also summarised in the 2015 Implats integrated report (refer in particular to the notes in the annual financial statements). These reports will be published at at the end of September The financial provisions for the rehabilitation can be summarised as follows: Name Current cost estimates R million* Financial provision R million** Impala (766.5) (458.6) Springs (70.7) (35.7) Marula (100.7) (49.1) Afplats (16.4) (8.2) Zimplats (412.8) (236.4) Totals ( ) (788.0) * The current expected cost to restore the environment disturbances as estimated by third party experts excluding VAT, P s & G s and contingencies ** Future value of the current cost estimate discounted to current balance sheet date as provided in the annual financial statements of the Group Implats mineral resource and mineral reserve statement 2015 PAGE 21
5 Attributable mineral resources and mineral reserves For clarity, attributable mineral resources inclusive of mineral reserves and attributable mineral resources exclusive of mineral reserves are shown separately in this section Implats reports a summary of total attributable platinum ounces as sourced from all categories of mineral resources of the Implats Group of companies and its other strategic interests on a percentage equity interest basis. The tabulation below reflects estimates for platinum, palladium, rhodium and gold (4E), based on the percentage equity interest. For clarity, both attributable mineral resources, inclusive of mineral reserves, and attributable mineral resources exclusive of mineral reserves are shown separately. Note that these are not in addition to each other. These are summary estimates and inaccuracy is derived from rounding of numbers. Where this happens it is not deemed significant. Attributable mineral resources inclusive of mineral reserves As at 30 June 2015 Mineral resources inclusive of reserves Attributable ounces Orebody Category Tonnes Mt 4E grade g/t 6E Implats grade share g/t % Pt Pd Rh Au 4E Impala Merensky Measured Indicated Inferred UG2 Measured Indicated Inferred Total Impala Impala/RBR JV Merensky Measured Indicated Inferred UG2 Measured Indicated Inferred Total Impala/RBR JV Total Impala and Impala/RBR JV PAGE 22 Implats mineral resource and mineral reserve statement 2015
6 Attributable mineral resources and mineral reserves Attributable mineral resources inclusive of mineral reserves continued As at 30 June 2015 Mineral resources inclusive of reserves Attributable ounces Orebody Category Tonnes Mt 4E grade g/t 6E Implats grade share g/t % Pt Pd Rh Au 4E Marula Merensky Measured Indicated Inferred UG2 Measured Indicated Inferred Total Afplats UG2 Measured Indicated Inferred Total Imbasa UG2 Indicated Inferred Inkosi UG2 Indicated Inferred Imbasa and Inkosi Total Two Rivers Merensky Indicated Inferred UG2 Measured Indicated Inferred Total Zimplats MSZ Measured Indicated Inferred Total Mimosa MSZ Measured Indicated Inferred Total All Total Implats mineral resource and mineral reserve statement 2015 PAGE 23
7 Attributable mineral resources and mineral reserves Attributable mineral resources () Implats attributable mineral resources ( 4E) contribution by area Pt 196 Zimplats Pd 131 Impala 93.1 Rh 23 Two Rivers 22.4 Au 17 Afplats 20.1 Marula 16.7 Imbasa and Inkosi 14.2 Attributable mineral resources ( Pt) Mimosa 7.4 Measured Indicated Inferred Merensky UG2 MSZ Pt Pd Rh Au Attributable mineral resources per reef inclusive of mineral reserves () Attributable mineral resources inclusive of mineral reserves () % Pt Pd Rh Au Attributable mineral resources of 196 Pt (%) as at 30 June Zimplats Impala 6 48 Afplats Two Rivers Imbasa and Inkosi Marula Mimosa Notes Mineral resources are quoted inclusive of mineral reserves Mineral resource estimates allow for estimated geological losses but not for anticipated pillar losses during eventual mining In addition to the depth cut-off for the reporting of mineral resources as previously reported, various mineral resource blocks are considered on a case-by-case basis and this has resulted in areas where the eventual economic extraction is in doubt. These mineral resources will be reported as exploration results and are excluded from the summation of total mineral resources per area and the attributable mineral resources. The areas involved occur at Impala, Afplats and Two Rivers Implats has chosen not to publish Merensky Reef mineral resource estimates for Afplats, Imbasa and Inkosi as the eventual economic extraction is presently in doubt and under review An agreement has been concluded whereby the Tamboti mineral resources have been transferred to Two Rivers during the past year. This has resulted among others in an increase of the Implats shareholding from 45% to 49% in Two Rivers The Zimbabwean Government has been pursuing the greater participation in the mining sector by indigenous Zimbabweans. Implats is continuing to engage with the Government of Zimbabwe with respect to agreeing plans for the indigenisation of Zimplats and Mimosa 29 PAGE 24 Implats mineral resource and mineral reserve statement 2015
8 Attributable mineral resources and mineral reserves The current position with regards to the implementation of the Government of Zimbabwe s indigenisation plans is not clear and depending on what position is ultimately taken by the Government of Zimbabwe, Implats attributable mineral resources and mineral reserves may be significantly reduced. During 2013, the Government of Zimbabwe gazetted its intention to compulsorily acquire a large tract of ground in the northern portion of the Zimplats lease containing 54.6 Pt; Zimplats subsequently submitted an objection under Zimbabwean law. These mineral resources are included in the estimates and statements shown in this report. 4E refers to the summation of platinum, palladium, rhodium and gold 6E refers to the summation of platinum, palladium, rhodium, ruthenium, iridium and gold Rounding of numbers may result in minor computational discrepancies; mineral resource estimates are inherently imprecise in nature; the results tabulated in this report must be read as estimates and not as calculations; inferred mineral resources in particular are qualified as approximations In comparison with the previous annual mineral resource statement there have been changes in the attributable mineral resources. The total declared at 30 June 2015 is 8% lower at 196 Pt compared with 212 Pt in This can mainly be ascribed to the mineral right transaction involving the transfer of the Tamboti area into Two Rivers. The grouping of the platinum ounces per reef shows that some 50% of the attributable Implats mineral resources is hosted by the Great Dyke. The Zimplats mineral resources make up the bulk of these (48% of the total Implats inventory). Various small movements in mineral resource estimates are reflected at each operation due to additional work, newly acquired data, depletion and updated estimations. Summary of attributable mineral resources Pt Impala RBR JV Marula Afplats Imbasa and Inkosi Two Rivers Tamboti Zimplats Mimosa Total Implats mineral resource and mineral reserve statement 2015 PAGE 25
9 Attributable mineral resources and mineral reserves Attributable mineral reserves As at 30 June 2015 Mineral reserves Attributable ounces Orebody Category Tonnes Mt 4E grade g/t 6E Implats grade share g/t % Pt Pd Rh Au 4E Impala Merensky Proved Probable UG2 Proved Probable Total Marula UG2 Proved Probable Total Two Rivers UG2 Proved Probable Total Zimplats MSZ Proved Probable Total Mimosa MSZ Proved Probable Total All Total Summary of attributable mineral reserves Pt Impala Marula Two Rivers Zimplats Mimosa Total PAGE 26 Implats mineral resource and mineral reserve statement 2015
10 Attributable mineral resources and mineral reserves Attributable mineral reserves () Pt Pd Rh Au Attributable mineral reserves of 26.4 Pt (%) as at 30 June Impala Zimplats 15 Marula Two Rivers Mimosa 73 Attributable mineral reserves ( Pt) Proved Probable Attributable mineral reserves () per reef Merensky UG2 MSZ Pt Pd Rh AU Attributable mineral reserves () Pt Pd Rh Au Implats attributable mineral reserves ( 4E) contribution by area Impala Zimplats Marula Mimosa Two Rivers Notes The modifying factors used to convert a mineral resource to a mineral reserve are derived from historical performance while taking future anticipated conditions into account Mineral reserves quoted reflect the grade delivered to the mill At Zimplats it was reported that a low angle shear at the Bimha Mine has a deleterious effect on pillar strength and has resulted in the failure of mine pillars and the decision to temporarily close the Bimha Mine to ensure the safety of our employees. A new mine design resulted and work is under way to re-establish the mine. The impact of the pillar design was reported as part of the December 2014 half-year report. The Zimplats ore reserves reduced materially as Portal 5 has been excluded from the reserve inventory and the increased pillars impacted the overall extraction There has been increases in the mineral reserves at Mimosa, Marula and Two Rivers as additional areas have now been converted into the mineral reserve category 4E refers to the summation of platinum, palladium, rhodium and gold 6E refers to the summation of platinum, palladium, rhodium, ruthenium, iridium and gold Rounding of numbers may result in minor computational discrepancies; the results tabulated in this report must be read as estimates and not as calculations Implats reported attributable mineral reserves of some 26.4 Pt at 30 June 2015 compared to 28.4 Pt in The decrease can mostly be ascribed to changes in the Zimplats statement and depletion, however, this is offset to some extent by increases at Mimosa, Marula and Two Rivers. The attendant graphs compare the last few reporting periods and indicate an overall decrease in attributable mineral reserves in line with depletion and the aforementioned changes. The quantum of proved Merensky Reef mineral reserves at Impala remains lower than the same for the UG2 Reef. The Government of Zimbabwe has been pursuing the greater participation in the mining sector by indigenous Zimbabweans. Implats is continuing to engage with the Government of Zimbabwe with respect to agreeing plans for the indigenisation of Zimplats and Mimosa. The current position with regards to the implementation of the Government of Zimbabwe s indigenisation plans is not clear and depending on what position is ultimately taken by the Government of Zimbabwe, Implats attributable mineral resources and mineral reserves may be significantly reduced. Implats mineral resource and mineral reserve statement 2015 PAGE 27
11 Mineral resource summary, exclusive of mineral reserves Both inclusive and exclusive methods of reporting mineral resources are permitted by various international reporting codes. Implats has adopted the inclusive reporting for consistency purposes and to be aligned with its strategic partners. A collation of the mineral resource estimates exclusive of mineral reserves is presented below as it allows for additional transparency. Note that this format is not adhered to by Implats strategic partners and the corresponding estimates have been derived from details provided to Implats. Summary of mineral resource estimate, exclusive of mineral reserves As at 30 June 2015 Total estimate Attributable estimate Orebody Remarks Category Tonnes Mt 4E grade g/t 6E grade g/t 4E Pt Implats share % Tonnes Mt 4E Pt IMPALA MARULA AFPLATS, IMBASA AND INKOSI Merensky Measured Indicated Inferred UG2 Measured Indicated Inferred Merensky Impala/ RBR JV Measured Indicated Inferred UG2 Measured Indicated Inferred Total Impala Merensky Measured Indicated Inferred UG2 Measured Indicated Inferred Total Marula UG2 Afplats Measured Indicated Inferred Total Afplats Imbasa Indicated Inferred Inkosi Indicated Inferred Total Imbasa/Inkosi PAGE 28 Implats mineral resource and mineral reserve statement 2015
12 Mineral resource summary, exclusive of mineral reserves Summary of mineral resource estimate, exclusive of mineral reserves continued As at 30 June 2015 Total estimate Attributable estimate TWO RIVERS ZIMPLATS MIMOSA Orebody Remarks Category Tonnes Mt 4E grade g/t 6E grade g/t 4E Pt Implats share % Tonnes Mt Merensky Indicated Inferred UG2 Measured Indicated Inferred Total Two Rivers MSZ Measured Indicated Inferred Total Zimplats MSZ Measured Indicated Inferred All mineral resources exclusive of mineral reserves Total Mimosa Measured Indicated Inferred Total E Pt Implats mineral resource and mineral reserve statement 2015 PAGE 29
13 Mineral resource summary, exclusive of mineral reserves Notes The figures in the accompanying table reflect those mineral resources that have not been converted to mineral reserves, ie these are the mineral resources exclusive of mineral reserves The tabulation should be read in conjunction with the mineral reserve statements in the preceding sections A direct comparison of tonnes and grade is not possible between inclusive and exclusive reporting, owing to the mixing of mineral resource figures with production estimates Mineral resource estimates allow for estimated geological losses but not for anticipated pillar losses during eventual mining Note that similar to previous reports, certain areas have been excluded from the mineral resource estimates and are now reported separately as exploration results in a standalone section at the end of this report Implats has chosen not to publish Merensky Reef mineral resource estimates for Afplats, Imbasa and Inkosi as the eventual economic extraction is presently in doubt The year-on-year decrease in exclusive mineral resources is a result of the transfer of the mineral rights at Tamboti into Two Rivers as well as the conversion of additional mineral resources at Mimosa, Marula and Two Rivers into the mineral reserve category 4E refers to the summation of platinum, palladium, rhodium and gold 6E refers to the summation of platinum, palladium, rhodium, ruthenium, iridium and gold Rounding of numbers may result in minor computational discrepancies; mineral resource estimates are inherently imprecise in nature; the results tabulated in this report must be read as estimates and not as calculations; inferred mineral resources in particular are qualified as approximations Summary of attributable mineral resources exclusive of mineral reserves Pt Impala RBR JV Marula Afplats Imbasa and Inkosi Two Rivers Tamboti Zimplats Mimosa Total Mineral resources exclusive of mineral reserves ( Pt) (attributable and total) RBR JV Mimosa Marula Imbasa and Inkosi Afplats Two Rivers Impala Zimplats Pt attributable Pt total Mineral resources exclusive of mineral reserves ( 4E) (attributable and total) RBR JV Mimosa Marula Imbasa and Inkosi Afplats Two Rivers Impala Zimplats E attributable 4E total PAGE 30 Implats mineral resource and mineral reserve statement 2015
14 Mineral resource summary, exclusive of mineral reserves Implats strategic review provides the framework for this report with five key focus areas: Positive long term PGM fundamentals Expect LOWER for LONGER prices Investment through the cycle Maintain optionality and position for the future Improve efficiencies through operational excellence Cash conservation Maintain our social licence to operate Implats mineral resource and mineral reserve statement 2015 PAGE 31
15 Reconciliation The consolidated high-level reconciliation of total mineral resources and mineral reserves for the Implats Group of companies is shown below. These high-level variances are relatively small. Particulars of these variances in addition to depletions are illustrated in more detail in the sections by operation. Rounding of numbers may result in computational discrepancies, specifically in these high-level comparisons. Total mineral resources tonnes (million), inclusive of mineral reserves Variance Attributable 2015 Impala* (2) 428 Marula Afplats Imbasa/Inkosi Two Rivers Tamboti (337) Zimplats (6) Mimosa (2) 64 Totals (86) * Includes RBR JV. Total mineral resources ( Pt), inclusive of mineral reserves Depletion Gains and other changes 2015 Attributable 2015 Impala* (0.8) Marula (0.1) Afplats Imbasa/Inkosi Two Rivers (0.2) Tamboti (23.2) Zimplats (0.3) (0.7) Mimosa (0.2) Totals (1.5) (2.6) * Includes RBR JV. Notes The Impala estimate in the above table includes the contiguous Impala/RBR JV estimate Depletion was adjusted by global concentrator and mine call factors Potential impact of pillar factors was taken into account The larger variances can be attributed to the transfer of the Tamboti mineral rights into Two Rivers The Marula estimate includes the addition of UG2 mineral rights in terms of an agreement with Modikwa Smaller variances are mostly due to depletion and updates to the estimation models Attributable mineral resources (variance Pt) Impala Marula Afplats/ Two Rivers Tamboti Zimplats Mimosa 2014 Imbasa/ Inkosi Impala Marula Afplats/ Two Rivers Tamboti Zimplats Mimosa Imbasa/ Inkosi 2015 PAGE 32 Implats mineral resource and mineral reserve statement 2015
16 Reconciliation Total mineral reserves tonnes (million) Depletion Gains and other changes 2015 Attributable 2015 Impala (9.1) Marula (1.6) Two Rivers (3.4) Zimplats (5.1) (44.0) Mimosa (2.6) Totals (21.9) (1.0) Total mineral reserves ( Pt) Depletion Gains and other changes 2015 Attributable 2015 Impala (0.69) Marula (0.08) Two Rivers (0.22) Zimplats (0.21) (2.4) Mimosa (0.15) Totals (1.36) Notes Depletion was adjusted by global concentrator factors The main change is the impact of the updated Zimplats statement that now excludes Portal 5S and allows for the increased pillar design The mineral reserves increased at Mimosa, Marula and Two Rivers due to the inclusion of additional areas into the mineral reserve inventory. For clarity note that previous statements did not include mineral reserves for Tamboti, however, part of the area transferred from Tamboti to Two Rivers has been converted to mineral reserves The attributable portion of the Impala mineral reserves is now at 96% following the recent employee share issue (ESOP) of 4% Smaller changes over the past few years are mostly related to depletion Attributable mineral reserves (variance Pt) Impala Marula Two Rivers Zimplats Mimosa 2014 Impala Marula Two Rivers Zimplats Mimosa 2015 Implats mineral resource and mineral reserve statement 2015 PAGE 33
17 Historic production Since mining commenced in 1969 at Impala, Implats has grown the mineral resource portfolio and related platinum production. The production performance for the 2015 financial year at Impala was severely impacted by the unprecedented protracted industrial action and a resultant slower start-up as well as higher than normal safety stoppages, however, the annual production met the forecast. Summary production statistics are provided below as an overall perspective of the company performance. The total production in terms of tonnage and platinum ounces is depicted in the accompanying graphs. Notably the tonnage mined at the other operations, excluding Impala, continues to grow on the back of the expansion at Zimplats and the improved performances at the other operations. The annual production at Zimplats was negatively impacted by the temporary closure of the Bimha Mine. Historic annual production at Marula, Two Rivers, Mimosa and Zimplats Tonnes (millions) Zimplats Mimosa Two Rivers Marula Financial years Historic annual production at Impala Tonnes (millions) UG2 16 Merensky Financial years Gross Implats Pt production Tonnes (millions) Financial years PAGE 34 Implats mineral resource and mineral reserve statement 2015
18 Historic production Summary production statistics Units Tonnes milled Impala Kt Marula Kt Two Rivers Kt Zimplats Kt Mimosa Kt Mill head grade Impala g/t 6E Marula g/t 6E Two Rivers g/t 6E Zimplats g/t 6E Mimosa g/t 6E Production ex Impala Mine Platinum refined Koz Palladium refined Koz Rhodium refined Koz Nickel refined t PGM refined production Koz Production ex Marula Mine* Platinum in concentrate Koz Palladium in concentrate Koz Rhodium concentrate Koz Nickel in concentrate t PGM in concentrate Koz Production ex Two Rivers Mine* Platinum in concentrate Koz Palladium in concentrate Koz Rhodium concentrate Koz Nickel in concentrate t PGM in concentrate Koz Production ex Zimplats Mine* Platinum in matte Koz Palladium in matte Koz Rhodium matte Koz Nickel in matte t PGM in matte Koz Production ex Mimosa Mine* Platinum in concentrate Koz Palladium in concentrate Koz Rhodium concentrate Koz Nickel in concentrate t PGM in concentrate Koz Gross margin Impala % (10.9) (18.4) Marula % (13.4) (0.7) (15.4) (6.7) Two Rivers % Zimplats % Mimosa % Gross Implats refined production** Platinum Koz Palladium Koz Rhodium Koz Nickel t * Numbers reflect 100% of production and not the portion attributable to Implats. ** Includes IRS production from other sources. Implats mineral resource and mineral reserve statement 2015 PAGE 35
19 Life-of-mine production The high-level LoM (30-year) plan is depicted in the detailed sections per operation describing each operation in terms of planning Levels I, II and III. These graphs reflect 100% of the annual production forecasts and not the portion attributable to Implats. These do not include all the blue sky opportunities as this is often in the scoping or pre-feasibility stage of planning; some of this potential is specifically excluded at this early stage. Caution should be taken when considering the LoM plans as these may vary if assumptions, modifying factors, exchange rates or metals prices change materially. These LoM profiles should be read in conjunction with mineral resource estimates to determine the long-term potential. The graphs below show the consolidated high-level LoM plans collated from the individual profiles per operation. The pictorial 30-year profiles are shown as a combination of Levels I, II and III and also the contribution by operation. Only LoM I is based on mineral reserves while LoM II and III have not been converted to mineral reserves. Note that Afplats is the only non-producing operation included in these combined profiles to illustrate the potential impact on the Group profile. Shaft sinking operations at Afplats have been deferred for four years in terms of the strategic review during It is clear from a combined view that a large proportion of the 30-year plan is still in Levels II and III and would require further studies, funding and approval. The profiles below illustrate the total tonnage; the volumes attributable to Implats will be lower. Implats: 30-year tonnage profile per category Level I Level II Level III Financial years Implats: 30-year tonnage profile per operation Afplats Two Rivers Zimplats Impala Marula Mimosa Financial years PAGE 36 Implats mineral resource and mineral reserve statement 2015
20 Life-of-mine production Operational excellence is key to our success: low metal prices demand focus on productivity improvements and cost management Implats mineral reserves at a glance The updated allocation of Implats mineral reserves per shaft infrastructure as at 30 June 2015 is depicted in the accompanying graphic illustration. The range below surface and quantum related to the infrastructure is shown and depicts among others the advantage at Zimplats in this regard. These graphs also give an indication of the potential impact of a possible shaft closure in future should prices demand this. Platinum mineral reserve and depth range for individual Implats shafts Reserve in Koz Pt per shaft Reserve depth interval per shaft (metres below surface) E/F A Driekop Impala Marula Two Rivers Zimplats Mimosa Clapham North decline Main decline Portal 1 Portal 2 Portal 3 Portal 4 South open pit Wedza Mtshingwe (500) (1 000) (1 500) (2 000) Implats mineral resource and mineral reserve statement 2015 PAGE 37
Disclaimer. Implats. Share price (US$ equivalent)
Implats a superior platinum investment Denver Gold Forum September 25 1 Disclaimer The content of this presentation is for information purposes only and is not intended to serve as financial, investment
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 A G U I D E T O A I M U K TA X B E N E F I T S 2 AIM Note for Mining, Oil and Gas Companies Contents Introduction 1 Companies to which this Note
MOCK UP PICTURE. Mineral resource and mineral reserve statement 2015 Supplement to the integrated annual report 30 June 2015
MOCK UP PICTURE Mineral resource and mineral reserve statement 2015 Supplement to the integrated annual report 30 June 2015 Impala Platinum Holdings Limited (Implats) is one of the world s foremost producers
MOCK UP PICTURE. Mineral resource and mineral reserve statement 2015 Supplement to the integrated annual report 30 June 2015
MOCK UP PICTURE Mineral resource and mineral reserve statement 2015 Supplement to the integrated annual report 30 June 2015 Impala Platinum Holdings Limited (Implats) is one of the world s foremost producers
For personal use only
dmin1138 27 January 2016 Key Points Corporate and Operational Update Savannah - decision made to preserve the value of the remaining Savannah orebody and to move the operation onto care and maintenance
RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003
1 RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 New drill holes in the Suurikuusikko area, Finland, have further intersected high gold grades over considerable widths, increasing the depth extent
For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva
For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves
AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE
KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: [email protected] AIM:
Sabina Gold & Silver Corp.
Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION
B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
Mako Project, Eastern Senegal Completion of Scoping Study
Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company
SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASE IN GOLD AND URANIUM MINERAL RESERVES
Sibanye Gold Limited Incorporated in the Republic of South Africa Registration number 2002/031431/06 Share code: SGL ISIN - ZAE000173951 Issuer code: SGL ("Sibanye Gold" or "the Company") SIBANYE GOLD
Cannon Big Pit Given the Green Light
ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )
Focusing on Near Term Production and Exploration in Quebec
Focusing on Near Term Production and Exploration in Quebec AGM January 2016 Forward Looking Statement Forward Looking Statement This presentation may contain forward looking statements, being statements
Interim results for the six months ended 31 December 2009
Interim results for the six months ended 31 December 29 ARM s financial position continues to be robust with net debt to equity of 8.4%. We are pleased about the significant increase in headline earnings
HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE
22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL
FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
FOR IMMEDIATE RELEASE
FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.
Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained
Acquisition of Rice Lake. December 2015
Acquisition of Rice Lake December 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce
THIRD QUARTER EARNINGS NOVEMBER 12, 2015
THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
London STOCK EXCHANGE
London STOCK EXCHANGE 16 March 2006 For the attention of the Nominated Advisers/ Finance Directors/ Company Secretaries, all AIM Companies 10 Paternoster Square London EC4M 7LS Telephone 020 7797 1000
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST JULY 30, 2015 TSX: FM; LSE: FQM CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Certain statements and information herein, including all statements that
For personal use only
Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
African Barrick Gold. BMO Global Metals & Mining Conference February 2013
African Barrick Gold BMO Global Metals & Mining Conference February 2013 Disclaimer Important Notice This presentation has been provided to you for information purposes only. It does not constitute an
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves
CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves Prepared by the CIM Standing Committee on Reserve Definitions Adopted by CIM Council on November 27, 2010 FOREWORD CIM Council, on
Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo
April 6, 2016 Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo SANTIAGO, CHILE Robert Friedland, Executive Chairman of Ivanhoe
Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
ACQUISITION OF TWO QUALITY MINES IN NEVADA
November 12 2015 ACQUISITION OF TWO QUALITY MINES IN NEVADA 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the
Exploration. Exploration methods
Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216
ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 VERY HIGH GRADE PGM-COPPER-NICKEL IN MASSIVE NICKEL COPPER SULPHIDE AT PLATINUM SPRINGS, N.S.W. 0.6 metres at 11.5 g/t platinum, 25.6 g/t palladium,
NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW
NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
Galahad Gold plc (Galahad)
23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below
ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015
ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price
NOVEMBER 2015. January 2013
NOVEMBER 2015 President & CEO: Wayne Reid [email protected] 709-699- 1733 VP Exploration: Robert Duess [email protected] 613-453-7947 January 2013 TSXV: GTA www.gtaresources.com DISCLAIMER This
For personal use only
27 January 2016 Savannah North Scoping Study Positive results demonstrate robust, long life, Ni-Cu-Co Project Highlights Mining Inventory of 6.07Mt @ 1.26%Ni, 0.64% Cu and 0.09% Co for 76,500t Ni, 38,600t
Golden Band Resources Inc.
Golden Band Resources Inc. Rodney Orr, VP Corporate Development Saskatchewan Mining Supply Chain Forum, April 4, 2012 TSX.V: GBN OTCQX: GBRIF Notices Rodney Orr, P.Geo., Golden Band s VP of Corporate Development,
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES Craig Roberts National Bank Financial ABSTRACT While various methods are available to estimate a mining project
Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014
Management s Discussion and Analysis and Consolidated Financial Statements First Quarter 2014 For the three months ended March 31, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...
Falcon Minerals Ltd ACN 009 256 535 Company Announcement
Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER
GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa
New SAMREC Representative Ken Lomberg Chairman of the SAMREC Working Group Pr.Sci.Nat. Senior Principal Consultant with Coffey 30 years experience in South Africa 1 THE SOUTH AFRICAN CODE FOR THE REPORTING
For personal use only. MRV Metals Launch February 2016
MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to
Overview REGULATORY RELEASE. 28 January 2016. First Quarter 2016 Production Report and Update
Lonmin Plc (Incorporated in England and Wales) (Registered in the Republic of South Africa under registration number 1969/000015/10) JSE code: LON Issuer Code: LOLMI & ISIN : GB0031192486 ("Lonmin") REGULATORY
Lalor Project Base Metal Zones and Gold Mineralization January 2009
Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking
How To Mine And Treat Ore From Castle Hill Stage 1
` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a
Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014
Management s Discussion and Analysis and Consolidated Financial Statements Second Quarter 2014 For the six months ended June 30, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...
Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jun 17, 2016) - Pure Gold Mining Inc. (TSX VENTURE:PGM) ("Pure Gold" or the "Company") is pleased to announce financial results and operating highlights for
De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
Establishing the feasibility of your proposed mining venture
RUPPRECHT, S. Establishing the feasibility of your proposed mining venture. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy, 2004. Establishing
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target
ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on
International Tower Hill Mines Ltd.
International Tower Hill Mines Ltd. ITEM 7. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS. Current Business Activities General Livengood Gold Project Developments
News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)
News Release July 3 rd, 2012 Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX) Initial NI 43-101 Resource Estimate for the Chaminé and Casas Novas deposits within its 100% Boa Fé Gold Project,
Quarterly Activities Report
ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern
International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies
International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies Sergei Sabanov, PhD, CEng MIMMM Date:10 December 2013 Location: Almaty, Kazakhstan SRK Consulting
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
For personal use only
Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning
Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).
ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from
Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade
PRESS RELEASE TSX NYSE MKT: RIC Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade TORONTO, Ontario, Canada, February
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary
North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada Resource Summary The Canadian Potash Project is located in the central Saskatchewan Potash district that represents nearly
The Point Rousse Project - An Economic Analysis
ANACONDA MINING SELLS 3,956 OUNCES AND GENERATES $1.5M OF EBITDA AT THE POINT ROUSSE PROJECT FOR Q1 FISCAL 2016 TORONTO October 15, 2015 Anaconda Mining Inc. ( Anaconda or the Company ) (TSX: ANX) is pleased
How To Understand The Financial Results Of Platinum Group Metal (Pgm) And Platinum Mining (Platinum) Group Company (Implats)
Summarised consolidated annual results for the year ended 30 June 2015 Implats summarised consolidated annual results for the year ended 30 June 2015 Page 1 Safety Since the 2010 financial year FIFR improved
Interim Financial Report for the half-year ended 31 December 2011
Interim Financial Report for the half-year ended 31 December 2011 Note: The information contained herein should be read in conjunction with the most recent annual report. Aura Energy Limited Level 4, 66
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
MINING INDABA 8TH 11TH FEBRUARY 2016
MINING INDABA 8TH 11TH FEBRUARY 2016 Disclaimer The information presented in this presentation is of a general nature and the forward-looking information, opinions and beliefs of the Company and its affiliates
TIGER RESOURCES LTD ACN 077 110 304
TIGER RESOURCES LTD ACN 077 110 304 1st Floor, 8 Parliament Place, West Perth WA 6005 PO Box 1618, West Perth WA 6872 Tel: (08) 9481-7833 Fax: (08) 9481-7835 Email: [email protected] Website: www.tigerez.com
NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES
Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES
This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.
This discussion and analysis of financial condition and results of operation of Thompson Creek Metals Company Inc. ( Thompson Creek or the Corporation ) is prepared as at August 7, 2008, and should be
AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, 2015. (Expressed in Canadian Dollars)
AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, 2015 1 NOTICE OF NO AUDITOR REVIEW OF CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS Under National Instrument 51-102,
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
Corporate Presentation October 2015
TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start
THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION
THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION Prepared By The South African Mineral Resource Committee (SAMREC)
ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT
ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD
Second Quarter Earnings Release Conference Call. July 23, 2009
Second Quarter Earnings Release Conference Call July 23, 2009 Cautionary Statement This presentation contains forwardlooking statements within the meaning of Section 27A of the Securities Act of 1933,
KYLYLAHTI RESOURCE INCREASED
26 March 2014 ASX: AOH, FSE: A2O KYLYLAHTI RESOURCE INCREASED Copper in Resources exceeds pre-mining estimates 2 years after first production commenced Contained copper up 17% from June 2013 after mine
