AON SPRINKLER CERTIFICATION



Similar documents
NFPA FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13?

Automatic Fire Sprinkler Submittal Requirements

SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST

Stored Palletized, Solid Piled, Bin Boxes, or Shelf Storage (12.2)

Denver Fire Department Idle Pallet Storage Guidelines Per NFPA 13_Chpt 12

SPRINKLER RULES & STANDARDS IN EUROPE CEA 4001 & EN 12845

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

F.Y.I. Specifying Fire Protection Systems Using Division 13

esfr pendent sprinkler vk510 (k25.2)

Warehouse Checklist. Warehouse Construction

Fire Safety In High Rise Building

Fire Pump Plan Review March 2010

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

FireLock LP-46 Storage Sprinkler V4601 Pendent FM Approved, culus Listed See Submittal Publication 40.95

EFSN Training i Module Minutes

FIRE SPRINKLER SYSTEM DESIGN, ENGINEERING EXEMPTION POLICY FOR (Effective April 1, 2006)

Clark County Fire Prevention

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Risk Guidance Note 03. Management of In-Rack Automatic Sprinklers (IRAS)

Fire Safety Requirements for Child Care Centre

Automatic Fire Sprinkler System Checklist

Fighting Fire in Sprinklered Buildings. Student Guide

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

Insight. Storage Fires. Balanced Risk Engineering Solutions. Understanding the Risk. Commodity Classification. Storage Configuration

OREGON FIRE CODE Interpretations and Technical Advisories

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

FLAMMABLE AND COMBUSTIBLE LIQUIDS

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

ESFR DRY PENDENT SPRINKLER VK502 (K14.0) TECHNICAL DATA

Maintaining Fire Protection Systems

General Fire Code Requirements Within Commercial Tenant Spaces

Waste Oil Collection / Storage

Proposed changes to the Acceptable Solution for Building Code clause F7 (Warning Systems) Proposed amended Acceptable Solution for Warning Systems

Manual. October 2014 FIRE SAFETY. for existing RMG buildings

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

FIRE-FIGHTING DESIGN BRIEF REPORT

Civil Engineering Sector Labour-Management Health and Safety Committee

Chapter 19 - FIRE SPRINKLER SYSTEM INSPECTIONS

Protection of unoccupied or void properties

Overview of Hotel Fire Safety Requirements

Compliance Document for New Zealand Building Code Clause F7 Warning Systems Fourth Edition

Decree of the Ministry of the Environment. on fire safety of garages

Model SW-20 and SW K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response) General Description

Safety and Health Office WORKPLACE SAFETY CHECKLIST

FPS4 APPENDIX A (INTERIM) SPECIFICATION FOR THE INSPECTION AND TESTING OF AUTOMATIC FIRE SPRINKLER SYSTEMS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

Winnipeg Fire Department Fire Prevention Branch

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

High Pressure Water Mist Systems: Alternative Solution For Critical Civil Applications

CHAPTER 11 STORM DRAINAGE

1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:

Chemical Feed System Operation and Design Considerations

UNIVERSITY OF TOLEDO

Arapahoe County Residential Water Heater Installation and Inspection Guide

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

FIRE Insurance PROPOSAL / INSPECTION FORM

Formal Interpretation NFPA 30. Flammable and Combustible Liquids Code Edition

Information Bulletin. Sprinkler System Component Fault Monitoring. Version 1.1 Approved for release September 2013

Definitions; contractors licensed by Board; examination; posting license, etc.

FIVE YEAR CERTIFICATION REPORT

Element D Services Plumbing

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Extended Coverage Sprinklers

MOTOR FUEL DISPENSING SAFETY

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

HOT WORK PERMIT PROGRAM TRAINING. John Braun

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

Current as of 11/10/08 1 of 1

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

Transformer Deluge Systems

C I T Y O F S E L M A F I R E D E P A R T M E N T

FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire Safety Risk Assessment Checklist for Residential Care Premises

Commercial Fire Inspections

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

RECON WATER HEATER INSTALLATION FORM

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Name Of Occupancy Date. Yes No Describe

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Transcription:

Form 1 Application for Approval of Basic Design Parameters for Automatic Sprinkler System Installations 1. Name of Protected Premises Site Name Address 2. Work to be Carried Out New System Extension or Alteration to Existing System Change of Use / Occupancy New Water Supply Alteration to Existing Water Supply Installation of In-Rack Sprinklers Note: For extensions, alterations and changes to existing systems, please provide a copy of current re-inspection report Approximate Completion Date Nominated Inspection Company 3. Approval Standards NZS4541:2003 NZS4541:2007 NZS4541:2003 As Modified by NZBC C/AS1 Appendix D NZS4541:2007 As Modified by NZBC C/AS1 Appendix D Other Note: 1. Please provide a copy of the Fire Report and Specification prepared for Building Consent for all applications Version 10, August 2011 Page 1 of 7

4. Building Details Principle Use(s) of Building Number of Floors Building Height (m) Construction (Include details of FRR where appropriate) Exterior Walls Floors Ceiling Roof Are there any materials such as EPS requiring consideration? NZS4541:2007 clause 212 refers Y N Are There Any Concealed Spaces in the Building? Y (Indicate below) N Location Is the Concealed Space Greater Than 800mm Deep Ground to Floor Y N Ceiling to Floor Y N Ceiling to Roof Y N Underfloor Y N Describe How The Space will be Protected 5. Separation Hazard Description How will Separation be Achieved Unsprinklered Fire Cells within the Building Construction Distance Internal Drenchers Demand: l/min kpa Other (Describe) External Fire Loads Within 10m) Construction Distance External Sprinklers Demand: l/min kpa Other (Describe) Version 10, August 2011 Page 2 of 7

6. Occupancies and Design Criteria Is there a signed declaration (AON Form 3 or 4 attached? Y N Note: If a signed storage declaration is not available, please attach a draft declaration If no, please advise expected date of submission Area as Shown on Block Plan 1 2 3 4 5 6 Usage Occupancy (ELH, OH1, OH2, OH3, OH3S, EHH Process) Height of Highest Sprinkler in Occupancy Non-Storage Areas Type of Sprinkler (SSU, SSP, Residential, ECOH ) Design Criteria (No. of Heads, Density x Area ) Design Flow (l/min) Design Pressure (kpa) Area as Shown on Block Plan 1 2 3 4 5 6 Highest Commodity Classification Design Table Reference NZS4541 Storage Configuration (BB,SP,P,ShS,W SS,PSS,SS,SRR, DRR,MRR) Storage Areas Height of Ceiling/Roof in Occupancy Storage Height Roof Level Design Criteria In rack Design Criteria Applicable Modifiers (Note 2) Notes Note: 1. BB Box Bin, SP Solid Pile, P Palletised, ShS Shelf, WSS Without Solid Shelves, PS Partial Solid Shelves (1.9m 2 to 5.9m 2 ), SS Solid Shelves (>5.9m 2 ), SRR Single Row Rack, DRR Double Row Rack, MRR Multi Row Rack. 2. List any factors such as use of dry systems, plastic pallets, encapsulation, excessive clearance, roof slope that modify the design criteria (note that this list is not exclusive please refer to the standard). 3. It is recommended that rack layout drawings be submitted in conjunction with any proposed in rack sprinkler installations Version 10, August 2011 Page 3 of 7

Special Risks Please provide details of any special risks below (e.g. Idle pallets, flammable an combustible liquids, aerosols, rolled paper storage, rubber tyre storage, hanging garment storage ) Details of any commodities not specifically addressed in NZS4541 should be detailed here. 7. Water Supplies What is the Water Supply Class (tick) NZS4541:2003 A B1 B2 C NZBC Single Supply NZS4541:2007 A B2 C1 C2 NZBC Single Supply Describe Each Water Supply (Source, Storage Capacity, Pump Description Provide pump and driver details with application). Primary Secondary Underground Pipe Work. Please describe the type of pipe work being used underground. If plastic pipe work (such as HDPE or MDPE) is being used down stream of the alarm valve, please provide data to allow hydraulic calculations to be verified. (Class of pipe, outside diameter, inside diameter, PBN rating. Version 10, August 2011 Page 4 of 7

8. Valvesets Valveset No. Type (X, Y, Enhanced Safety, Pre-action, Deluge, Dry ) Make, Model & Size Extension Area (m 2 ) Total Area (m 2 ) Extension Concealed Space Area (m 2 ) Total Concealed Space Area (m 2 ) No. of Floor Isolate Valves No. of Flow Switches Note: Include details of any tail end systems etc in the table above. 9. Sprinkler Hardware Please provide details of all sprinklers to be used in the installation. Area Used (from Section 6) Type Make & Model SIN No. Thread Size K-factor (l/min.kpa 1/2 ) Approx Qty. Flexible Droppers Please outline areas where flexible droppers are proposed to be used in the installation. Enclose a copy of the data sheet for the dropper. Area Used Make and Model Length Equivalent Hydraulic Length Version 10, August 2011 Page 5 of 7

10. FBA Connection Provide details of Fire Brigade Alarm type and monitoring connection. 11. Hand Operated Fire Fighting Equipment (HOFFE) Provide details of HOFFE Extinguisher Type Size Rating Quantity Fire Hose Reel Type Hose Dia (mm) Hose Length Quantity Confirm that HOFFE complies with NZS4503:2005 Y N N/A - NZBC Version 10, August 2011 Page 6 of 7

Issues to be Disclosed Please outline any issues that need to be brought to the attention of the SSC, where the Standard indicates that such issues need to be approved by the SSC, or any issues that the SSC should be aware of that are not explicitly evident in the submission. (May be in the form of a covering letter or attachment.) 12. Block Plan Please attach an A3 or A4 Block Plan, indicating following items: Y Scale Y N/A Location of Subsidiary Stop Valves Y North Point Y N/A Location of Drain Valves Y N/A Fire Separations Y Water Supplies Showing All Valves Between the Source and Alarm Valve Y N/A External Sprinklers Y N/A Power Supply Route for Electric Motor Driven Pumps Y Hazard Classifications, Densities and Assumed Areas of Operation Y N/A Location of Any Fire Alarm Panel Y Height of Highest Sprinkler in Each Hazard Classification Area Y Location of Any Back Flow Prevention Unit Y Area Protected by Each Installation Y N/A Location of Floor Isolate Valves, Flow Switches, etc Y Location of FSI and Valves Y N/A Location of Tail End Systems Such as Pre-Action, Deluge, Dry, Anti-Freeze, etc Y N/A Location of Water Supply Strainers Y Location of the Water Motor Alarm Gong Provide a copy of a Cross Section showing the highest head(s) the height of the alarm valves, relative to the water supply test points, and where used, pump house, tank, and suction inlet. Conditions of Contract: By signing this form, we accept Aon s Standard Conditions of Contract. A copy of these are available on request. Signed Company / Contractor Name Date Please forward in duplicate to Aon Sprinkler Certification, via email : chris.mak@aon.com or matt.mclellan@aon.com Version 10, August 2011 Page 7 of 7