Installation Instructions:



Similar documents
RZ Guardrail System Installation Manual

PUMP JACK SYSTEM AND ACCESSORIES

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

INSTALLATION INSTRUCTIONS

758 Heavy-duty Ratchet Guy Wire Cutter

Structural Holding System

Seismic Installation for Attic Storage System

Chapter 10 - Scaffolding Systems

Mounting Tripod Kit Installation Manual

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

Owner s Manual Read and keep this manual. Patents World Wide

VERSARAIL ALUMINUM STAIR RAILING INSTALLATION INSTRUCTIONS. Owner's Manual. Version. Models

EZ-48-3AB Weather Station Mounting Tripod and Mast

OWNER S MANUAL Table Tennis Table Patent Pending

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: (Espresso) (Pine) NOTE: Lot number: Date of purchase:

Rack installation instructions

»Product» Safety Warning

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

In-Ground Basketball System Owners Manual

Fall Protection Solutions

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR

How To Make A Thomas Bunk Bed

Rollator Cane and Brake Replacement SAFETY SUMMARY (CONTINUED)

S OUNTING INSTRUCTION M M o u n t i n g k i t 2 &

Assembly and Usage Instructions

PITCHED ROOF STRUCTURES

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

MODEL G300 BRAKE BLEEDER

AZEK Rail Install Guide

Step 1. Item 6. Item 1

PEDAL CAR - GO CART ASSEMBLY & OPERATING INSTRUCTIONS


Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

OPERATOR S INSTRUCTION MANUAL

How To Launch A Rocket From A Formica

Chelsea Loft Bed WARNING:

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

INSTRUCTIONS: LocknCharge Laptop Carts

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Flat Bottom Long Ram Hydraulic Jack

VT SERIES. Owners Manual VARIABLE TRAVEL MOUNTAIN BIKE

OAK WORKBENCH WITH 2 DRAWERS

RadianceRail Installation Guide

Installation and Assembly: Desktop Mount with Desk Clamp and Grommet for 19" - 30" LCD Screens

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

Thanks for choosing Toroidal. This file is developed to assist you in assembling and aligning Toroidal Dish.

TABLE OF CONTENTS. Section 1 - Assembling your new pit bike.

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

DYNA RIDER FOOTBOARD KIT

KEEP FOR FUTURE REFERENCE MRTALP VERTICAL LIFT BAR READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

XL PREMIUM OIL COOLER KIT

POLEMOUNT FIELD FIX ASSEMBLY INSTRUCTIONS

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

39HQ Airovision Air Handling Units

Read This Before Operating The BaseHit

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Cisco Aironet 2.4-GHz MIMO Wall-Mounted Omnidirectional Antenna (AIR-ANT2440NV-R)

3/4 PIPE CLAMP WITH STAND

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

I BEAM TRACK INSTALLATION

pottery barn kids MADELINE BUNK BED

uline.com SPECIFICATIONS

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Integral Kit Instructions

Best Barns USA Assembly Book

Things you need to assemble the tube actuator. Left to right. are small piece of masking tape, super glue,pen knife and small

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

Ceiling Mounted Folding Attic Ladders Installation Instructions

CHROME FRONT BRAKE MASTER CYLINDER KIT

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

RAIN COLLECTOR S HELF MANUAL

Auxiliary Rams USERS MANUAL

CENTERLINE Motor Control Centers Splicing Horizontal Ground Buses

INSTALLATION INSTRUCTIONS

UBBINK SOLAR IN-ROOF SYSTEM

SLACK PERFORMANCE KARTS

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

MODEL# SLA001-3 "SLIDE & LOCK" A-FRAME POOL LADDER

Part Name/Description Part Number Quantity. Power Cable

1.8 CRANKSHAFT OIL SEALS

AM/FM ANTENNA RELOCATION KIT

BODY-12, Door Handle - Removal, Installation, and Adjustment

HermanMiller Aeron Posturefit Installation AE905A AE905B AE905C

Standard Sleep Pod Side Entry Assembly Instructions

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

USE &CARE GUIDE. Remote Faucet Pump System. See Important Safeguards on page 2

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

AA Solar and Sun Power Plus

HYDRAULIC TABLE CART 500-LB.

Installation Guide. WSD-100 Wind Speed and Direction Sensor For XR5 Data Loggers. February, 2011

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Drive shaft, servicing

Page 2 of 6. Fittings Checklist. Care & Maintenance. Additional Tools Required. General Hints & Tips When

Information Technology Solutions

Transcription:

Portable Guardrail System Model Numbers: 7900060, 7900061, 7900062, 7900063 Installation Instructions: Portable Guardrail System This instruction is intended to meet the Manufacturer s Instructions requirement of OSHA and should be used as part of an employee training program. WARNING: These instructions must be provided to the installer of this equipment and must be followed for proper use. Alterations or misuse of this product, or failure to follow instructions, may result in serious injury or death. IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact Capital Safety. Figure 1 - Component Identification A 7900060 Base Plate, 80 lbs (36 kg), steel, galvanized finish, 18 x 18 (46 cm x 46 cm) B 7900061 Guardrail, 6 (1.8 m), 18 lbs (8 kg), 1-5/8 (4 cm) Steel Tube, Powder Coat Finish, 42 (106.7 cm) height 7900062 Guardrail, 8 (2.4 m), 22 lbs (10 kg), 1-5/8 (4 cm) Steel Tube, Powder Coat Finish, 42 (106.7 cm) height 7900063 Guardrail, 10 (3.0 m), 28 lbs (13 kg), 1-5/8 (4 cm) Steel Tube, Powder Coat Finish, 42 (106.7 cm) height C 7900005 Splice Kit, Powder Coat Finish, Steel D 7900007 Safety Swing Gate, Powder Coat Finish, Steel A C B D Distributed by Engineered Fall Protection sales@engineeredfallprotection.com 314-492-4422 www.engineeredfallprotection.com Form: 5903031 Rev: B Copyright 2009, DB Industries, Inc.

This page intentionally left blank

Figure 2 - System Planning Only install on a flat, clean, dry (non-slippery, non-sloped) surface. Maintain a minimum distance of 10 (3.0 m) from electrical/power lines. Position Base Plates a minimum of 18 (45.7 cm) from any leading edge when a curb or parapet is not present. Where Guardrail runs align with a Leading Edge, install Outrigger Guardrails at right angles (90 ) at the beginning, end, and any interruption of the run. Where required, use 2 x 4 (38 mm x 89 mm) lumber Toe Board to prevent materials or equipment from falling to lower levels. Leading Edge 18 (45.7 cm) 18 (45.7 cm) Leading Edge 18 (45.7 cm) Outrigger 90 90 90 Outrigger Outrigger IMPORTANT: All Portable Guardrail System installations must be approved by trained safety personnel. Figure 3 - Guardrail Installation 1. Position Base Plates at the required locations on a flat, clean, dry surface (See 1. System Planning). IMPORTANT: Base Plates are equipped with a Rubber Pad on the bottom to prevent slippage. If the Rubber Pad is missing or damaged, do not use the Base Plate. Contact your distributor for a new Rubber Pad. 2. Insert the leg of the Guardrail in the desired receptacle on the Base Plate and tighten the Set Screw with a 1/4 Allen wrench. 3. Where required, secure 2 x 4 (38 mm x 89 mm) Toe Board to the Base Plate with nails through the holes provided on the Base Plate WARNING: Do not lean on Guardrails or use Guardrails for hoisting or tie off. Excess lateral force applied to the top of the guardrail may cause tipping, resulting in injury or death. Rubber Pad

Figure 4A - Swing Gate Assembly 1 4 Clamp Nuts Spacer U-Bolt 1. Attach the U-bolts (item 4) to the Guardrail section and Outside Gate section (item 1). Note: The top of the swing gate should be level with the top of the guardrail. 2. Using an 11/16 wrench, install the U-bolts and then install the plastic spacers followed by the two nuts. Do not over tighten the connections. Figure 4B - Swing Gate Assembly 6 3 5 4 7 3. Attach the Gate Latch (item 5) to the Latch Plate (item 3) using the #12 screws and nuts (item 6 and 7). 4. Attach the Latch Plate assembly to the opposite Guardrail section using a U-bolt (item 4). 5. Hand tighten the U-bolt.

Figure 4C - Swing Gate Assembly 2 9 11 10 8 6. Using a washer and nut on each side of the Gate section and with the bolt head facing the Gate Latch, install the 3/8-16 x 3 1/2 bolt (item 9) onto the inside Gate section (item 2) with a 9/16 wrench. 7. Slide the Gate section to the appropriate length and tighten the set screws (item 11) with a 1/4 Allen wrench. Figure 4D - Swing Gate Assembly 8. For the bolt to securely actuate the Gate Latch, adjust the Latch Plate U-bolt (3/8-16 x 3 1/2 ) and/or inside Gate section as necessary. 9. To prevent sliding, tighten the Striker Plate U-bolt with an 11/16 wrench.

Gate Figure 5 - Roof Hatch System Refer to the Guardrail Installation (Figure 3) in order to install the Roof Hatch System. Splice Kit Roof Hatch System Roof Hatch Roof Hatch System Figure 6 - Splice Kit Installation Note: The Splice Kits are used when you need to shorten a Rail section to fit a certain length. 1. Measure the length to be removed from the Rail section. 2. Mark the measured length on top of the mid rails. 3. Saw through the marked locations. 4. Insert both sections of Rail into both ends of the Splice Kit, so both ends are centered in the Splice. 5. With a 1/4 Allen wrench, tighten the set screws in order to clamp the spliced Rail in place.

This page intentionally left blank.

A Capital Safety Company CSG USA 3833 Sala Way Red Wing, MN 55066-5005 Distributed by Engineered Fall Protection Email: sales@engineeredfallprotection.com Web: www.engineeredfallprotection.com PH: 314-492-4422 FAX: 800-570-5584 I S O 9001 Certificate No. FM 39709