FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation



Similar documents
Fire & Explosion Risks in Service Stations

Petroleum (Consolidation) Regulations 2014

Petrol Storage Information Note

Controlling fire and explosion risks in the workplace

FLAMMABLE LIQUIDS COMPLIANCE NOTE

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

Waste Oil Collection / Storage

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT

Fire Risk Assessment Safety Checklist

Civil Engineering Sector Labour-Management Health and Safety Committee

FIRE SAFETY GUIDANCE NOTE Regulatory Reform (Fire Safety) Order 2005

How To Manage A Fire Explosion

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Safe use of liquefied petroleum gas (LPG) at small commercial and industrial bulk installations

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Ethanol Vehicle and Infrastructure Codes and Standards Citations

OREGON FIRE CODE Interpretations and Technical Advisories

REFERENCE NUMBER : PPC/54. POLLUTION PREVENTION AND CONTROL ACT 1999 POLLUTION PREVENTION & CONTROL (ENGLAND AND WALES) REGULATIONS 2000(as amended)

Fuels Safety Program. Liquid Fuels Handling Code Adoption Document Amendment

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Wilkins Safety Group


Chemical Storage and Spill Response Guidelines

IGEM/UP/16 Communication 1756

September 2008 AFC (2) Page 1 of 5. Maximum Size and Aggregate Capacities of Aboveground Storage Tank Systems at Fuel Dispensing Stations

Guide to Certification for Retail Hardware Stores

Fire Safety Policy. Fire Safety Policy: May 2011 Page 1 of 6. Version 1. Scope:

ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

The following definitions apply with regard to requirements specified in this document:

Standards and best practice guidelines for vapour recovery at petrol service stations. Department of Environment, Climate Change and Water NSW

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

Environmental Management System Procedures

FUELING AND FUEL STORAGE

MOTOR FUEL DISPENSING SAFETY

Spill Control Prevention Plan (SCPP)

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

UNIVERSITY OF WISCONSIN MADISON

A guide for service station operators

Pollution Incident Response Plan

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

List of Frequently Utilized Storage Tank Standards and Practices

Portable petrol storage containers

ANNEX 2 Emergency / Pollution Incident Response Plan

Pressure Vessels (Air Compressors) and LPG Tanks

SAFETY SIGNAGE PROCEDURE

TANKER - SHORE SAFETY CHECK-LIST

Gas and Oil Fired Space Heating

History of the SPCC Rule

INTERNATIONAL STANDARD

An inventory of hazardous materials used in your workplace will prove useful.

Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN PREPARED FOR: ARKANSAS STATE UNIVERSITY JONESBORO, ARKANSAS ORIGINAL DATE OF PLAN: APRIL 2005

The Fuel Storage Tank Regulations 2009

Management of Environmental Risks and Emergencies. Compliance Audit Program

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL HIGHWAY 90 BEDROCK, COLORADO Prepared by:

WORKING IN CONFINED SPACES GUIDELINES

GUERNSEY OIL INSTALLATION GUIDELINES

Installation Guidance: CNG Refueling Stations

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

PPG3 April pollution prevention guidelines. 1. Introduction. Use and design of oil separators in surface water drainage systems: PPG 3

Examples of pressure systems and equipment are:

Pollution Incident Response Management Plan

Written schemes of examination

DPR DEPARTMENT OF PETROLEUM RESOURCES

Fire Pump Plan Review March 2010

APPENDIX 7-B. Hazardous Materials Management Plan

Northern Region. Underground Storage Tank

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

RESTRICTED ACCESS AND CONFINED SPACES

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Cyan 100% Magenta 76% Yellow 0 Black 27% Wetstock Reconciliation at Fuel Storage Facilities. An Operator s Guide

CONFINED SPACES MANAGEMENT PROGRAM (REGIONAL CAMPUSES AND RESEARCH STATIONS)

AON SPRINKLER CERTIFICATION

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

OHS Contractor Management Procedure

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

Underground Storage Tank Operational Compliance Field Guide

BRO Roles & Responsibilities Form Page 1 of 9

APPLICATION FOR GAS WORK AUTHORISATION (MOTOR FUEL)

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

The Pipelines Regulations, 2000

The terms hazard and risk are often used, which we define as the following:

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

PROPANE AUTOGAS REPAIR AND MAINTENANCE FACILITY REQUIREMENTS

MPM. Customer Service Representative Training. Class C Fuel Spill Handling

Fire Safety Risk Assessment Checklist for Residential Care Premises

Transcription:

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation Number: GN75 This Guidance Note provides information on the legislation relating to risk assessments for petrol filling stations. This Note is one of a series produced by the Authority to provide advice on various aspects of fire safety. If you require any further guidance on the advice given or require advice on another topic please contact your local borough Fire and Community Safety Centre or visit the London Fire Brigade web site at http://www.london-fire.gov.uk CONTENTS: 1 INTRODUCTION 2 2 RELATED LEGISLATION 2 3 WHAT THE LEGISLATION REQUIRES 2 4 BIBLIOGRAPHY 3 GN_75 Page 1 of 9 (Rev 4, 25/07/11)

1 INTRODUCTION 1.1 Since the introduction of the Dangerous Substances and Explosive Atmospheres Regulations 2002, the conditions attached to petroleum licences issued under the Petroleum (Consolidation) Act 1928 have been significantly reduced. 1.2 The onus is now on the employer/responsible person to identify and assess the risks arising from the delivery, keeping and dispensing of petroleum spirit and other motor fuels (such as liquefied petroleum gas). 2 RELATED LEGISLATION The Petroleum (Consolidation) Act 1928 The Health and Safety at Work Act etc 1974 The Management of Health and Safety at Work Regulations 1999 The Dangerous Substances and Explosive Atmospheres Regulations 2002 The Regulatory Reform (Fire Safety) Order 2005 3 WHAT THE LEGISLATION REQUIRES 3.1 The employer / responsible person must: Find out what dangerous substances are present in their workplace/premises and what the fire and explosion risks are. (Petroleum spirit and LPG are both dangerous substances for this purpose, but there may be others at the premises. If so, they need to be considered as well.); Put control measures in place to either remove those risks or, where this is not possible, to control them; Put controls in place to reduce the effects of any incidents involving dangerous substances; Prepare plans and procedures to deal with accidents, incidents and emergencies involving dangerous substances; Make sure that employees are properly informed about and trained to control or deal with the risks from the dangerous substances. (This includes providing them with details of the substances and with a copy of the significant findings of the risk assessment.); Identify and classify areas of the workplace/premises where explosive atmospheres may occur and avoid ignition sources (for example from unprotected equipment) in those areas. Recording these areas is best done by way of a plan see Appendix 3 for an example.; Carry out a risk assessment and make a record of the significant findings of that assessment, including the measures that have been or will be taken by the employer/responsible person to control the risk. Keep a record of the risk assessment and significant findings available for inspection; Review the risk assessment periodically and following any significant changes. The requirement to assess the risks from the dangerous substances should not be considered in isolation. It should be carried out as part of the overall risk assessment required by Regulation 3 of the Management of Health and Safety at Work Regulations 1999 rather than a separate exercise. GN_75 Page 2 of 9 (Rev 4, 25/07/11)

3.2 Appendix 1, attached, is a suggested format that you may wish to consider as a method of recording the required information 3.3 Appendix 2 lists some of the control measures that may be necessary for each activity. 3.4 Appendix 3 details the hazardous zones associated with a petrol filling station forecourt, along with an example of the suggested drawing. 3.5 Following this guidance is not necessarily the only way to comply with the legislation, however, the advice offered here represents best practice. 4 BIBLIOGRAPHY 4.1 Detailed guidance on the various standards listed in the guidance note may be obtained from the following bibliography. AVAILABLE FROM TITLE Energy Institute 61 New Cavendish Street London W1G 7AR Telephone: 020 7467 7100 Fax: 020 7255 1472 E-mail: info@energyinst.org.uk Web: www.energyinst.org.uk Design, Construction, Modification, Maintenance and Decommissioning of Filling Stations The Stationery Office (Mail, Telephone, Fax & Internet Orders) TSO Orders/Post Cash Dept PO Box 29 Norwich NR3 1GN Telephone: 0870 600 5522 Fax orders: 0870 600 5533 Web: www.tso.co.uk Fire safety in offices and shops ISBN-13: 978 1 85112 815 0 The Petroleum Consolidation Act 1928* The Health and Safety at Work etc. Act 1974 The Management of Health and Safety at Work Regulations 1999 The Dangerous Substances and Explosive Atmosphere Regulations 2002 The Regulatory Reform (Fire Safety) Order 2005 The Chief Fire Officers Association 9-11 Pebble Close Amington Tamworth Staffordshire B77 4RD Telephone: 01827 302399 Website: www.cfoa.org.uk Petrol Filling Stations Guidance on Managing The Risk of Fire & Explosion (The Red Guide) GN_75 Page 3 of 9 (Rev 4, 25/07/11)

UKLPG Unit 14 Bow Court Fletchworth Gate Burnstall Road Coventry CV5 6SP Telephone: 02476 711601 Fax: 02476 672108 Email: email@uklpg.org Web: www.uklpg.org Code of Practice 1 Bulk LPG Storage at Fixed Installations Part 1 Design, Installation and Operation of Vessels Located Above Ground Part 3 Examination and Inspection Code of Practice 11 Autogas Installations Code of Practice 20 Automotive LPG Refuelling Facilities Code of Practice 22 LPG Piping Systems Design & Installation The above publications are current at the time of preparation of this Guidance Note (see date at foot of last page) *except for the Petroleum (Consolidation) Act 1928 which is only available in its original format and has not been revised to take account of current Regulations and Approved Codes of Practice. The Fire Safety guide listed above may also be downloaded free of charge from the Fire Safety Law Section of the CLG website at: http://www.communities.gov.uk/fire/firesafety/firesafetylaw/. GN_75 Page 4 of 9 (Rev 4, 25/07/11)

GN_75 Page 5 of 9 (Rev 4, 25/07/11) ACTIVITY Tanker unloading Storage of fuel on site Dispensing of fuel by members of public Carrying out repair, maintenance or modification Regulatory Reform (Fire Safety) Order 2005: Consideration of staff and public within associated premises (or who may be affected as a result of a fire at the premises) RISK/HAZARD ASSOCIATED WITH ACTIVITY Overfill/crossover Impact Actions by unauthorised personnel Spillage Uncontrolled vapour release Leak Ignition sources Leak Uncontrolled vapour release Leak Spillage Vehicular impact Vapour release Equipment failure Ignition sources Members of public Ignition sources Leaks Spillage Unauthorised personnel Vapour release Impacts Fire caused by ignition of combustible materials. EXISTING CONTROL MEASURES ENGINEERED 3A 3B 3C 3D 3E MANAGED 4A 4B 4C 4D 4E SIGNIFICANT FINDINGS (i.e. is a risk not adequately controlled?) YES NO ANY ACTION REQUIRED (BY WHOM) (TIME SCALE) Appendix 1

Appendix 2 LIST OF POSSIBLE CONTROL MEASURES FOR INCLUSION WITHIN CELLS ON RISK ASSESSMENT FORM CELL 3A 1 Overfill prevention/high level alarm 2 Correct labelling of fill points/signage 3. Stage 1b vapour recovery 4. Vent pipe location 5. Location/protection of fill pipes (tanker stand) 6. Impervious surface to tanker stand 7. Drainage of tanker stand/tank fill point area to a retention system. 8. Driver controlled delivery equipment 9. Adequate lighting 10. Hazardous area classification / suitability of equipment 11. Provision of fire fighting equipment & absorbent material CELL 4A 1. Inspection / maintenance regime 2. Staff training 3. Delivery documentation 4. Provision of personal protective equipment 5. Implemented emergency procedure CELL 3B 1. Secondary containment 2. Leak detection system 3. Observation / monitoring well(s) 4. Stage 1b vapour recovery 5. Gauge systems 6. Automated reconciliation system 7. Cathodic protection 8. Provision of fire fighting equipment and absorbent material CELL 4B 1. Staff training 2. Third party statistical inventory reconciliation 3. Wetstock reconciliation 4. Inspection / maintenance regime and records of same 5. Provision of personal protective equipment CELL 3C 1. Dispensers to approved standard 2. Dispensers operating a stage II vapour recovery system 3. Labelling / signage 4. Adequate lighting 5. Impact check valves (pressurised pumping / lpg) GN_75 Page 6 of 9 (Rev 4, 25/07/11)

6. Position of dispenser(s) (vision / impact) 7. Isolation / emergency switches 8. Impact protection of dispenser(s) 9. Under pump valves (suction) 10. Loud speaker system 11. Impervious forecourt surface 12. Drainage of dispensing area to a retention system 13. Electrical equipment suitable for hazardous zone 14. Provision of fire fighting equipment and absorbent material CELL 4C 1. Staff training 2. Inspection / maintenance regime 3. Provision of personal protective equipment for staff 4. Provision of first aid kit and first aid training 5. Implemented emergency procedure CELL 3D 1. Correct equipment to be used in hazardous areas 2. Provision of suitable lifting equipment available for access chamber covers 3. Provision of fire fighting equipment and absorbent material 4. Provision of cones and barriers 5. Adequate lighting of working area CELL 4D 1. Competent contractors / safety passport 2. Staff training 3. Provision personal protective equipment 4. Emergency plan 5. Contractors documentation: clearance certificates method statement risk assessment 6. Visitors book CELL 3E (Regulatory Reform (Fire Safety) Order 2005) 1. Suitable and sufficient means of escape 2. Suitable and sufficient provision of fire fighting equipment 3. Fire alarms and detection 4. Fire resisting separation CELL 4E (Regulatory Reform (Fire Safety) Order 2005) 1. Staff training 2. Maintenance of fire fighting equipment / alarms / separation 3. Emergency plan 4. Risk Assessment 5. Competent persons For further information on the Regulatory Reform (Fire Safety) Order 2005 visit the London Fire Brigade website: http://www.london-fire.gov.uk/regulatoryreformorder2005.asp GN_75 Page 7 of 9 (Rev 4, 25/07/11)

Appendix 3 HAZARDOUS ZONE DEFINITIONS:- Zone 0: That part of a hazardous area in which a flammable atmosphere is continuously present or present for long periods or for more than 1,000 hours per annum Zone 1: That part of a hazardous area in which a flammable atmosphere is likely to occur in normal operation or for between 10 and 1,000 hours per annum. Zone 2: That part of a hazardous area in which a flammable atmosphere is not likely to occur in normal operation and, if it occurs, will exist only for a short period or for between 0.1 and 10 hours per annum. NOMINAL AREAS OF HAZARDOUS ZONES TO BE INDICATED ON THE HAZARDOUS ZONE DRAWING:- Zone 0: Within any access chamber or pit in which there are tanker delivery hose connection point(s). Within an oil separator (petrol interceptor). Zone 1: 1m radius around the road tanker delivery and vapour return hose connections extending down to ground level. 1m radius along the delivery hose route from the tanker connection point(s) to the tank connection point(s). 1m radius from a tank fill point (above ground) 1m radius from the edge of the chamber if fill point is below ground. Within petrol tank access chambers which do not have tank fill points. 2m radius around tank venting point(s) which do not have a stage 1b vapour recovery system. 1m radius around a venting point of an oil separator (petrol interceptor). Within the access chamber of an oil separator (petrol interceptor). Within a 4.1m radius of a petrol delivery hose connection on a dispenser (without stage 2 vapour recovery). Zone 2: 4m radius of tanker delivery hose connection point(s). 4m radius of above ground off set fill connection(s). 1 m radius around vapour return hose connection point. 2m radius around tank venting points where the site has stage 1b vapour recovery installed. 2m radius from the edge of an oil separator (petrol interceptor) access chamber. Within a 4.1m radius of a petrol delivery hose connection on a dispenser (with stage 2 vapour recovery in operation). Note: additional hazardous zones are present and must be identified on sites where LPG or other highly flammable motor fuels are stored and dispensed. GN_75 Page 8 of 9 (Rev 4, 25/07/11)

GN_75 Page 9 of 9 (Rev 4, 25/07/11)