Scitex FB550 and FB750 Printers. Site Preparation Checklist



Similar documents
HP Designjet L65500 printer series Site preparation checklist (second edition)

QuickSpecs. HP Fixed Cord PDUs & Extension Bars (Zero-U/1U Modular PDUs) Overview

Lava. Precision Solutions. Site Planning and Installation Guide

QuickSpecs. HP Modular Power Distribution Units (Zero-U/1U Modular PDUs) Overview

QuickSpecs. HP 480/277 Volt Solutions. Overview

Bluetooth Pairing. User Guide

Customizing Asset Manager for Managed Services Providers (MSP) Software Asset Management

QuickSpecs. Overview. HP Power Distribution Rack. HP Power Distribution Rack. DA North America Version 5 August 22, 2008 Page 1

QuickSpecs. Models HP T1500 UPS JPN/TWN. HP UPS T1000 G2, T1500 G2 Models Overview

HP PDU Management Module Overview

HP UPS R1500 Generation 3

QuickSpecs. HP IP Console Switch with Virtual Media Overview

Sharing Pictures, Music, and Videos on Windows Media Center Extender

QuickSpecs. HP Managed Power Distribution Units (mapdu) Overview

Storage System. Planning Checklist. EC E1, First Edition

QuickSpecs. HP Managed and Unmanaged Notebook Charging Carts. Models HP 30-Notebook Charging Cart

HP Managed and Unmanaged Notebook Charging Carts Overview. Models HP 30-Notebook Charging Cart. HP 30-Notebook Managed Charging Cart

HP ThinPro. Table of contents. Connection Configuration for RDP Farm Deployments. Technical white paper

HP Advanced Wireless Docking Station. User Guide

HP Windows 7 Onsite Upgrade Service

QuickSpecs. Models. HP Cable Lock Solutions for Business Notebook PCs Overview. HP Cable Lock. HP Docking Station Cable Lock

Installing Microsoft Windows

HP UPS Management Module Overview

Modem and Local Area Network

How To Power A Power Supply Shelf With A Power Unit (Hp 2920)

Designjet T2500 emultifunction Series

HP Data Center Services

Modem and Local Area Networks. Document Part Number:

QuickSpecs. Models. HP UPS Management Module. HP UPS Management Module. Overview

HP Server Console Switch with Virtual Media Overview

HP Velocity Live QoS Support

QuickSpecs. What's New Dual Port SFF 10K and 15K SAS drives Dual Port 3.5" 15K SAS drives. HP SAS Drives (Servers) Overview

HP Hardware Technical Support

HP Storage Virtual Volume Design and Implementation Service

Server Virtualization with Windows Server Hyper-V and System Center (20409) H8B93S

HP Roar Plus Speaker. Other Features

HP Cash Drawers for Point of Sale Systems

Mounting HP Desktop Mini Rack Mount Tray Kit HP Desktop Mini Security/Dual VESA Sleeve

HP Software as a Service

HP Storage Data Migration Service

HP Hardware Support Onsite 6-Hour Call-to-Repair Service HP Customer Support Contractual Service Package

HP Security Assessment Services

How to configure 802.1X authentication with a Windows XP or Vista supplicant

Cases / Screen Protectors HP Pro Tablet 408 Bluetooth Keyboard Case HP Pro Tablet 408 Smart Cover HP Pro Tablet 408 Rugged Case

QuickSpecs. Models HP Server Console Switches

HP Insight Capacity Advisor Virtualization Services

HP ProDisplay P19A LED Backlit Monitor. User Guide

HP Multimode OM3 LC/LC Optical Cables Overview. Models HP 50 m Multimode OM3 LC/LC Optical Cable

HP Thin Client Imaging Tool

Software Manual. HP SimpleSave. Backup Software User Manual. SimpleSave

QuickSpecs. HP Remote Monitored Power Distribution Units (mpdu) Overview

QuickSpecs. What's New HP 750GB 1.5G SATA 7.2K 3.5" Hard Disk Drive. HP Serial-ATA (SATA) Hard Drive Option Kits. Overview

HP Point of Sale (POS) Peripherals Configuration Guide ap5000 VFD Windows (non-opos)

Service Description: Dell On Call HelpDesk Service

HP rack and power infrastructure products are designed and developed to be used specifically with HP servers and storage.

QuickSpecs. HP Compaq t5525 Thin Client. Overview

HP USB Smartcard CCID Keyboard. User Guide

Presales Certifications

SMTP PROXY SERVER INSTALLATION FOR HP QUICKPAGE

QuickSpecs. HP IP Console Switches. Overview

HP Priority Services. Priority Access

QuickSpecs. HP R/T3000 G2 Uninterruptible Power System (UPS) Overview

HP ProDisplay P17A LED Backlit Monitor. User Guide

Installing and Configuring Windows Server 2012 (20410) H4D00S

Synchronizing ProCurve IDM and Windows Active Directory

ProLiant Essentials Intelligent Networking Active Path Failover in Microsoft Windows environments

HP R/T3000 G2 Uninterruptible Power System (UPS) Overview

Printing and Imaging Support on HP Compaq Thin Clients

R5000 Uninterruptible Power System (UPS) Overview

HJ594S. Configuring, Managing and Mantaining Windows Server 2008 Servers (6419)

Models HP USB Standard Keyboard. HP (BG1650) USB Standard Keyboard

HP 3PAR Software Installation and Startup Service

HP External Hard Disk Drive Backup Solution by Seagate User Guide. November 2004 (First Edition) Part Number

HP Proactive Select services

Additional License Authorizations

HP 4 Gb PCI-X 2.0 Host Bus Adapters Overview

R5000 Uninterruptible Power System (UPS) Overview

Job Aid Pre-Installation Information S8500 Media Server

Dock HP Pro Portable Tablet Dock. HP Quick Charge 18W AC Tablet Adapter. HP Duet Pen Refills. Cables HP Micro USB to USB Adapter

USB Secure Management for ProCurve Switches

Scitex FB5x0 and FB7x0 Printers

HP 3PAR StoreServ Data Migration Service

Using Integrated and Discrete Graphics Simultaneously

QuickSpecs. Models HP Server Console G2 Switch. HP Server Console Switch G2 with Virtual Media & CAC. Overview

Service Description: Solution Station HelpDesk Service

HP 2400/2500 Ultra Light Docking Station User Guide

HP Device Manager 4.7

QuickSpecs HP TFT7600 G2 KVM Console and Monitor (TFT7600 G2)

Backup and Recovery User Guide

Interface Adapters PS/2 Interface Adapter 1 pack B21 PS/2 Interface Adapter 8 pack B21 USB Interface Adapter 1 pack B21

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

HP One-Button Disaster Recovery (OBDR) Solution for ProLiant Servers

Transcription:

Scitex FB550 and FB750 Printers Site Preparation Checklist 1

2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein. Revision A 2

1 Instructions Complete the following address information, contact information, and checklist. If a checklist item cannot be completed or is unnecessary, add a short explanation under Comments. Once you have completed the checklist, sign it and send it to your reseller or HP sales representative a minimum of two weeks before the delivery date. NOTE: Some checklist items are marked (Required), which means that you cannot proceed with installation until you have checked the Yes box. When you sign this document, you are confirming that the site has been prepared according to the specifications provided in the Site Preparation Guide, that all checklist items have been completed and that the site is prepared and ready for delivery and installation. 3

2 Checklist Table 1 Address Information Company Name Street Address City Country Postal Code Telephone Fax Email Table 2 Contact Information Contact Persons Name Telephone Email Company engineer or technician System administrator Operators to be trained on printer use and maintenance Table 3 General Access and Equipment Unloading Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment? Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways, and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required? Are the specialist movers aware of the specifications provided in this document? Are there one or more suitable forklifts contracted for installation? Are there skates available to help position the crate? Is there a pallet jack available to help position the crate? Will you install the printer on a second level or higher? If so, is there a suitable crane contracted for installation? Are the appropriate crane attachments available? Will the operator be available for the installation training which lasts two full working days? 4

Table 4 Room layout and flooring Is there sufficient space around the equipment? Has all room construction and painting been completed? Does the floor load-bearing capacity meet the specifications in this guide? Does the floor surface meet the specifications in this guide? If special reinforcements are necessary, are they completed? Is there sufficient room to conveniently store the media support tables when not in use? Table 5 Safety Information Is there an emergency exit in the print production area, with easy access and free from any obstruction? Are fire extinguishers rated for electrical fires fitted in the print production and storage areas? Are first aid facilities available within a reasonable distance of the print production environment? Is an eye wash station within a reasonable distance of the print production environment? Table 6 Electrical Installation Has the 200-240 VAC, single phase, 50/60 Hz circuit, 12 amps maximum for North America and Japan or 16 amps maximum for Europe, for the printer been correctly installed? (Required) In the US and North America, is the wall receptacle a NEMA L6-20R locking type? (Required) In Europe, is the wall receptacle an IEC 60309 type? (Required) Has a 110-240 VAC, single phase, 50/60 Hz circuit for the optional ink delivery system vacuum auxiliary power adapter been correctly installed? Has a 110-240 VAC, single phase, 50/60 Hz circuit for the print server (RIP) been correctly installed? (Required) 5

Table 7 Electrical Configuration The printer should remain energized and powered on at all times to perform its automated printhead servicing. Do you need an Uninterrupted Power Supply (UPS) for the printer to prevent regular loss of power to the printer? If yes, has a UPS with a voltage rating of 200-240VAC, 50/60Hz, a maximum current rating of 12 amps, and a minimum source of 3000VA been installed? Is the printer main power receptacle or printer UPS located within 1.5 m (5 ft.) of the service end of the printer, or 3.7 m (12 ft.) from the user end of the printer? (Required) Has an uninterruptible power supply (UPS) with minimum 15 watts of backup power for the auxiliary vacuum power adapter been installed? Table 8 Networking and Computer Requirements Is the RIP computer and software ready for installation? Have network connections for printer and RIP computer been supplied? Do you have an external color sensor (calibrator) that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? If you are using the Caldera RIP and you wish to take advantage of HP s Print Care remote-support features, you will require another networked computer that runs Microsoft Windows XP or Vista for installation of the PrintCare client software. Is such a computer available for use with Caldera and HP Print Care? Has the legal agreement for HP Print Care and CallMe@hp data gathering (see the last pages of this document) been signed? (Required) Table 9 Environmental Requirements Does the designated space for the printer have a temperaturecontrolled environment that meets the specified operation requirements listed in the Site Preparation Guide? Does the designated space for the printer have an environment that meets the specified humidity requirement listed in the Site Preparation Guide? Have the temperature and humidity requirements been satisfactorily met in the materials storage area? Is the print production area free from dirt and dust? (Required) 6

Table 9 Environmental Requirements Does the print production area have sufficient lighting? Is additional ventilation for the print production area desired?if yes, has additional ventilation been installed correctly? Have you met or exceeded all the requirements specified in the Site preparation guide? (Required) Table 10 Date of Site Preparation Completion Site preparation guide edition number or copyright date Customer signature 7

3 CallMe@hp Data Exchange Agreement Clause 1 Clause 2 Clause 3 Customer shall provide connectivity to/for HP s remote applications (including but not limited to monitoring, data collection, diagnostics and/or remote control, for the purposes of preventative maintenance and monitoring; software updating; statistical data gathering; sensor activity; impression rates/dates; and software performance of the Equipment and/or peripheral equipment. Such connectivity shall be provided by Customer via a permanent high speed broadband internet connection. Customer understands and accepts that a 3rd party company may provide service and support on behalf of HP using the CallMe@HP application and may provide HP with certain data obtained via the CallMe@HP installed at the printer owned by Customer. Customer agrees to maintain the operating connections, as defined in this paragraph, on the Equipment at all times during the term of this Order in order to enable on-line connections with HP s remote applications. HP will use these connections solely for purposes of remote diagnostics and support of the Equipment, accessing the Equipment s impression counters, and as a collection source of statistical data. Customer expressly releases the data gathered by any and all such applications to HP. Any of the Customer s: (i) detachment from the HP remote diagnostic system; (ii) misuse of the HP remote diagnostic system; or (iii) tampering with the HP hardware s impression counters, will be deemed a material breach of the Order by Customer. HP agrees to comply with the applicable data protection laws when collecting, storing, transferring, sharing and/or otherwise processing any personal data in connection with these terms and conditions. Unless expressly agreed otherwise, any personal data the Customer discloses to HP may be used by HP in accordance with the then current HP Privacy Policy for administering the relationship between the Customer and HP and for providing Customer with information about HP s products, services and programs. HP may share such personal data with other Hewlett-Packard entities and business partners who are providing services on behalf of HP, whether established in Europe or elsewhere, which are bound by appropriate confidentiality obligations. Customer Print Name: Date: Customer Signature: 8