SECTION 16402 UNDERGROUND ELECTRIC SERVICE



Similar documents
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

SECTION STORM DRAINAGE SYSTEM

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Section SEWER PIPE INSTALLATION AND TESTING

SECTION STORM DRAIN SYSTEM

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Specification Standards Communications Underground Ducts, Raceways and Structures

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Section 2100-Trenching and Tunneling

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PRECAST CONCRETE STRUCTURES

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SECTION SIGNAL WIRE AND CABLE

INDEX. Sec. No. Items Page Nos.

COMMERCIAL CONDUIT RULES AND REGULATION

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

DIVISION 4300 STORM DRAINAGE

Merrimac Municipal Light Department. Residential Developments Policy

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Underground Service Requirements and Instructions

SECTION PIPE HANGERS AND SUPPORTS

FY08 SEWER POINT REPAIRS BID TABULATION

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

SECTION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

CW GRAVITY SEWERS TABLE OF CONTENTS

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION GRAVITY SANITARY SEWERS

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

Wastewater Capital Projects Management Standard Construction Specification

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Mobile Home Pre-Inspection Checklist

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Section 402. STORM SEWERS

SECTION 7- STORM SEWER

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

C. Section TESTING LABORATORY SERVICE.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Specification Underground Services - Subdivisions. Issue 12

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

Beacon Hill Sewer District Standard Specifications

SECTION GUARDRAILS

SECTION 724 PIPE CULVERTS

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

CHAPTER 6 - SANITARY SEWER

STANDARD SPECIFICATIONS SECTION METAL FABRICATIONS

SECTION SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

SANITARY SEWER SPECIFICATIONS

HIGHLAND VALLEY SUPPLY, INC STANDARD TERMS AND CONDITONS OF SALE

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION POLYVINYL CHLORIDE (PVC) PIPE

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

1 Town of Lyons Electrical Distribution System Design Standards

LS 2540 SEWER LATERALS AND INSPECTION TEES

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

SECTION SANITARY SEWER PIPE

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

Fabricated Drainage Products

The minimum reinforcement for the stem wall is the placement of:

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

Town House Center Highway North Huntingdon, PA 15642

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Superform Products Ltd.

CABLE TRENCH INSTALLATION GUIDE

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

Transcription:

SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and furnish and install all equipment and material, including underground duct banks, direct burial conduit, manholes, lighting standard foundations, and concrete work for electrical work, as indicated or specified. B. Related Work Specified Under Other Sections 1. Excavating, trenching, backfilling, and grading for Electrical Work - SECTION 02300. 1.2 SUBMITTALS A. Furnish submittals for items that are identified in this SECTION by a different typeface and a bracketed code (e.g., Item [L]). Refer to SECTION 01340 for definition of codes for types of submittals and the administrative requirements governing submittal procedure. Additional submittal requirements pertaining to this SECTION are specified herein under this Article. B. Include complete data on each item. Coordinate the items, as they relate to the work, prior to submittal. PART 2 PRODUCTS 2.1 MATERIALS A. Underground Duct - Concrete Encased 1. Plastic Conduit: Rigid PVC conduit per NEMA Standard TC-2 Designation EPC-40-PVC standard lengths with tapered ends and matching solvent-weld type couplings. a. Carlon b. Certain Teed Corp. c. Condux International, Inc. d. The George-Ingraham Corp. e. Scepter Corp. 2. Rigid Steel Conduit: SECTION 16050. Giffels Professional Engineering Project No. SF070001.0002 16402-1

B. Direct Burial Conduit 1. Plastic Conduit: Rigid PVC conduit per NEMA Standard TC-2, Designation EPC-40-PVC, standard lengths with tapered ends and matching solvent-weld type couplings. a. Carlon b. Condux International, Inc. c. The George-Ingraham Corp. d. Olin e. Triangle 2. Rigid Steel Conduit: SECTION 16050. C. Conduit And Fittings For Pole Risers 1. Conduit: Rigid steel, SECTION 16050. 2. Cable Support Fittings: Ventilating sealing bushing type for use with one or more single conductor insulated cables, cadmium or zinc-plated, malleable iron, with properly sized neoprene sealing gaskets for sealing around each insulated conductor. a. O-Z Electrical Mfg. Co.,Inc., Type CMT D. Precast Manholes 1. Precast Type [U]: Interlocking reinforced concrete sections having interior clear dimensions not less than indicated, designed to meet or exceed AASHTO interim specification 1972, load factor design and ACI Code 318-71 (USD) where applicable, and complete with double seals at intersections, duct openings approximately as indicated, pulling irons opposite duct faces and in center of floor, opening for ground rod, equipment mounting means, and means for securing concrete throat and manhole cover frame to the reinforcing steel in the roof of the manhole or handhole. a. Hartford Concrete Products, Inc., Hartford City, Indiana b. Penn-Cast Product, Inc. 2. Concrete. High-early type having a minimum compressive strength of 4500 PSI. 3. Reinforcing. Grade 60 per Bell Laboratory Specification, bonded together, and provided with strapping exposed in the manhole or handhole for connection to the grounding system. 4. Field Waterproofing Resin: a. Sika Corp. Sikadur 31 5. Field Waterproofing Fabric: a. Sika Corp. Colma Fiberglas Mesh Fabric E. Frames And Covers For Electric Manholes 1. Manhole Frame and Cover [U]: Gray cast iron, with machine finished contact surfaces, 30 inch diameter opening, round solid cover with the word Electric (field verify with Brookhaven) cast in the center of the cover in large letters. a. Neenah R-1640-C Giffels Professional Engineering Project No. SF070001.0002 16402-2

2. Square Sump Frame and Grate [U]: Gray cast iron, with machine finished contact surfaces, 12 inch square opening, square slotted cover. a. Neenah R-1646 3. Round Sump Cover [U]: Designed to fit in bell end of standard sewer pipe of size indicated, gray cast iron, heavy duty with square openings or light duty with slotted openings. a. Neenah R-4030 Series or R-4040 Series, respectively 4. Sump [U]: Vitrified clay pipe, Type VCP-ES, extra strength, bell and spigot, of size indicated, per ASTM C 700. F. Frames And Covers For Communication Manholes 1. Manhole Frame and Cover [U]: Gray cast iron, with machine finished contact surfaces, 30 inch diameter opening, round solid cover with the word COMMUNICATION (field verify with Brookhaven) cast in the center of the cover in large letters. a. Neenah R-1640-C 2. Square Sump Frame and Grate [U]: Gray cast iron, with machine finished contact surfaces, 12 inch square opening, square slotted cover. a. Neenah R-1646 3. Round Sump Cover [U]: Designed to fit in bell end of standard sewer pipe of size indicated, gray cast iron, heavy duty with square openings or light duty with slotted openings. a. Neenah R-4030 Series or R-4040 Series, respectively 4. Sump: Vitrified clay pipe, Type VCP-ES, extra strength, bell and spigot, of size indicated, per ASTM C 700. G. Cable Racks For Electric Manholes 1. Cable Racks: Hot-dip galvanized, standard, heavy duty underground type. a. Line Material DU1B4 b. Underground Devices, Inc. CR31 c. A. B. Chance Company, 1200 Series 2. Hooks: Hot-dip galvanized, standard, heavy duty, to fit racks furnished. a. Line Material DU1S1 through DU1S4 b. Underground Devices, Inc. RA10 c. A. B. Chance Company, 1200 Series 3. Insulators: High glaze, wet process white porcelain, to fit hooks furnished. a. Condux International 83811-00 b. Line Material DE3U1 and DE6U1 c. A. B. Chance Company, 1200 Series H. Cable Racks For Communication Manholes 1. Cable Racks: Hot-dip galvanized, standard underground communication type. a. Condux International 83800 Series b. The George-Ingraham Corp. 8737 or 8747 Giffels Professional Engineering Project No. SF070001.0002 16402-3

c. Cooper Power Systems DU17B4 2. Hooks: Hot-dip galvanized standard, to fit racks furnished. a. Condux International 83800 Series b. The George-Ingraham Corp. 8710 Series c. Line Material DU5S1 3. Insulators: High glaze, wet process white porcelain, to fit hooks furnished. a. Condux International 83811-00 b. Line Material DE11U1 c. A. B. Chance Company, 1100 Series I. Miscellaneous Hardware 1. Pulling-In Irons: 7/8 inch formed steel, hot-dip galvanized. a. Condux International 83813-02 b. The George-Ingraham Corp. 8220 c. Line Material DU2T3 2. Concrete Inserts: Continuous type, cold roll formed from No. 12 gage strip steel, galvanized, length as indicated, with cardboard or styrofoam filler. a. Unistrut P3000 Series b. B-Line Systems, Inc., B32 and B52 Series c. Kindorf D900 Series PART 3 EXECUTION 3.1 INSTALLATION A. Underground Duct Banks - Concrete Encased 1. Form single conduit as specified into duct banks as shown and encase in concrete. Use molded plastic spacers. Lay conduit to grades indicated. Stagger joints 6 inches vertically and horizontally in horizontal duct runs and make joints watertight. Where it is necessary to cut a tapered end on duct, make cut with a tool or lathe designed to cut a taper to match the taper of the particular duct used. Provide end bells where ducts enter manholes. 2. Use rigid steel conduit in lieu of conduit specified for duct banks at risers, within 5 feet of building walls, under roads and railroads, at points of strain, and at other locations as indicated. Provide conduit adapters for connection of conduit of different materials. Extend rigid steel conduit a minimum of 5 feet beyond each edge of roads and railroads. For risers, use bends having a minimum radius of 36 inches for three inch and larger conduit, and 24 inches for conduit smaller than three inch. 3. Plug duct ends during and after construction to prevent water, mud and debris from entering duct. 4. After a duct line has been completed, pull a standard flexible mandrel not less than 12 inches long and having a diameter approximately 1/4 inch less than the inside diameter of the conduit through each conduit, and then pull a brush with stiff bristles through each conduit to make certain that no particles of earth, sand or gravel have been left in the conduit. Giffels Professional Engineering Project No. SF070001.0002 16402-4

B. Direct Burial Conduit 1. Clear and final grade bottom of trench not less than 3 inches below the level at which conduit is to be installed. Provide a 3 inch minimum sand bed in bottom of trench preparatory to installing conduit. Install conduit as specified, with spacing as indicated, on the sand bed, and cover with a minimum of 3 inches of sand. Make conduit joints watertight. Use Type NS sand per SECTION 01640. Refer to SECTION 01640 for compaction methods and requirements. 2. Where it is necessary to cut a tapered end of duct, make cut with a tool or lathe designed to cut a taper to match the taper of the particular duct used. Provide end bells where ducts enter manholes. 3. Use rigid steel conduit in lieu of conduit specified for direct burial, at risers, within 5 feet of building walls, under roads and railroads, at points of strain, and at other locations as indicated. Extend rigid steel conduit a minimum of 5 feet beyond each edge of roads and railroads. Provide conduit adapters for connection of conduit of different materials. For risers, use bends having a minimum radius of 36 inches for three inch and larger conduit, and 24 inches for conduit smaller than 3 inch. 4. Plug ends of conduit during and after construction to prevent water, mud and debris from entering conduit. After a run has been completed, pull a brush with stiff bristles through each conduit to make certain that no particles of earth, sand or gravel have been left in the conduit. 5. Provide a concrete cover not less than 2 inches thick and of a width equal to the overall dimension of the installed conduit on top of the sand cover. 6. Provide underground hazard tape 12 inches below grade and above concrete per SECTION 16050. 7. Fill the remainder of the trench, and carefully tamp, with materials and compaction methods to suit project conditions per SECTION 01640. C. Manholes 1. Construct manholes of cast-in-place reinforced concrete and as indicated, or provide precast manholes as indicated on the Drawings specified. Install pulling irons in cast-in-place manholes at locations indicated. In unpaved areas, install manhole frame and cover such that top of cover (rim) is 2 inches above finish grade. In paved areas, install manhole frame and cover such that top of cover (rim) is flush with finish grade. Provide waterproofing of manholes as indicated on the Drawings. Seal opening around ground rod watertight in precast manholes. 2. Rim elevations where indicated on DRAWINGS, are nominal. Contractor shall coordinate final tops of cover (rim) elevations of manholes with final grade. Manholes installed in unpaved areas shall have top of cover (rim) elevations placed at 2 inches above final grade. 3. In Electric manholes, install concrete inserts as required and not less than 2 cable racks on each wall with additional racks as indicated and required for proper support of cables. Equip racks with hooks and insulators as required for cable support. Install one spare hook of the maximum size used on each rack. Do not provide insulators on spare hooks. Provide grounding as indicated, and ground all steel and equipment. 4. In Communication manholes, install concrete inserts as required and 2 cable racks on each wall. Equip racks with 2 hooks and one insulator on each hook. Provide grounding as indicated and ground all steel and equipment. Giffels Professional Engineering Project No. SF070001.0002 16402-5

D. Lighting Standard Foundations 1. Construct foundations of reinforced concrete and as indicated, complete with anchors, conduit and grounding. Anchors are specified in SECTION 16500. E. Concrete Work For Electrical Work 1. Provide concrete work including concrete, forming, pouring and reinforcing for underground duct banks, protection of direct burial conduit, equipment foundations at grade, risers, and lighting standard foundations. Provide concrete, forming, pouring and reinforcing in conformance with requirements of SECTION 03300, except as otherwise specified. Use concrete having a minimum compressive strength of 3000 psi in 28 days, unless otherwise indicated. Use air-entrained concrete for applications exposed to the weather. F. Waterproofing Of Manholes And Handholes 1. Precast Manholes. Waterproof section joints, duct entrances, and joints at top and bottom of poured concrete throats as indicated on Drawing E-503. Revision History Date Rev. No. A 0 B 0 D 0 E 0 F 0 02-19-09 0 END OF SECTION EY/ca C:\d\timsdatasf\BROOKHAVEN_NATIONAL_LABORATORY\SF070003\200-PROJEXEC\280-SPEC\16402.doc Giffels Professional Engineering Project No. SF070001.0002 16402-6