PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES



Similar documents
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Sewer Rehabilitation Design Requirements

A Revolution for Telecom, Electric, Gas, & Water"

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Water Technology Fact Sheet Pipe Bursting

Pneumatic Pipe Bursting

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

FY08 SEWER POINT REPAIRS BID TABULATION

REPAIRS TO DAMAGED SEWERS

AXIS system used to install gravity flow sewer Laser-guided boring technology capable of pinpoint, on-grade accuracy

Section 402. STORM SEWERS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

Repair or Replacement - Band-Aids vs. Surgery

Pipe Bursting. Chapter 16

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

Trenchless Methods for Service and Mainline Pipe Rehab and New Install

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

SPR PE Steel Reinforced Liner

Sewer Line Rehabilitation

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

CHAPTER 11 STORM DRAINAGE

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

INFORMATION PACK. Registered Company Address. Contact Names Robert Hatton Chris Jones. Telephone

Sewer systems: Failures and rehabilitation

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Pipe Bursting

ITD Pipe Materials Selection & Specification Procedures. July 2011

REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND

SASTT contact details:

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

Installation of Large Diameter Buried Pipes

Trenchless Technology for Drainage Structures

OAR52 A-1 (September, 1981)

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

SANITARY SEWER SPECIFICATIONS

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Sewer Lateral Pipe Bursting

Emerging Technologies in Wastewater Collection Systems

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION

See Appendix A for additional information, or contact ASTM directly.

Utility Marking Trace Wire Guide

by Leonard Friesenhahn, P.E.

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Use of Corrugated HDPE Products

Section SEWER PIPE INSTALLATION AND TESTING

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

SECTION FACILITY STORM DRAINAGE PIPING

Sustainable trenchless rehabilitation of supply pipelines applying static pipe bursting or close-fit lining

City of Hilshire Village Pine Creek Ln Reconstruction

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

PRACTICES REVIEW FOR SASKATCHEWA MU ICIPALITIES

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION

SECTION 724 PIPE CULVERTS

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION STORM DRAINAGE TABLE OF CONTENTS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Reticulation sewers in basements Technical guidelines

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

Structural Pipe Lining Technology

Flowtite Jacking Pipe

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

City of Mill Valley Sewer Capital Improvement Plan

Transcription:

WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to the test BY ANDREW TOPF, EDITOR One of the most effective ways of replacing a pipe using trenchless technology is pipe bursting, which replaces a traditional construction trench with launching and receiving pits that pull the new pipe through the existing one, breaking the old pipe into fragments that stay in the ground in-situ. Sewer, water and gas pipes can all be replaced with pipe bursting, which involves a bursting head, winched cable or shuttle rods, a pulling machine, a retaining device and a hydraulic power pack. Patented by British Gas in the 1960s, pipe bursting is now a proven trenchless technology. The primary advantages of pipe bursting are the time saved by avoiding digging a trench to lay the pipe, and its minimal impact on vehicle and pedestrian traffic, compared to a major disruption involved in open-cut construction. A pipe can be burst and a new, often upsized pipe pulled through in a day or two, or even less, depending on the length of pipe and the level of difficulty. One of the nice things about pipe bursting is its versatility. The method can be utilized to replace pipes made of clay, concrete, PVC, ductile iron, corrugated steel, and even asbestos concrete (AC). And with pipe bursting, most of the time the pipe is upsized, meaning a gain in interior pipe diameter. Compare that to cured-inplace-pipe (CIPP), where a deteriorated pipe is re-lined, resulting in a loss of interior pipe diameter. Pipe bursting turned out to be the winning method of pipe rehabilitation for a 300-metre section of corrugated steel pipe (CSP) in North Vancouver that originally was laid down to function as a storm sewer in an industrial part of the municipality, but had since become so deterioriated that it was no longer useful. Below-tide invert caused corrosion The pipe runs between the Vancouver Shipyards operated by Seaspan, and a wood fibre export terminal run by Fibreco Export Inc. The 900-mm CSP was buried at an average depth of 3.5 metres at zero percent grade. Its close proximity to Burrard Inlet meant that the invert (bottom of the pipe) was below tide, causing sea water to enter the pipe twice a day. The pipe also had two or 8 CANADIAN UNDERGROUND INFRASTRUCTURE January/February 2016

The expander cone in the exit pit, showing a section of the CSP where the cutting blade sliced through it as planned. Bursting corrugated steel pipe is tricky, and can easily bunch up on the expander and cause a stall in the machine. From the test pits we also knew that the pipe was in fact 90 percent full of debris, so that was something that we had to take into account. GREG DEACON, PROJECT MANAGER, PW TRENCHLESS CONSTRUCTION three services tied into the pipe, but since it had not been surveyed with a CCTV camera, the District of North Vancouver was unable to tell where the services were located. The pipe was nearly completely clogged full of debris, making a camera inspection impossible without clearing it. Realizing the ineffectiveness of the pipe, in 2012 North Vancouver put in a 350-mm bypass line at a higher elevation, and a year later, solicited a designbuild request for proposals to replace the deteriorated CSP. The district received two pipe bursting proposals and one for pipe ramming. The successful bid went to PW Trenchless Construction Ltd., which proposed to complete a CCTV inspection of the pipe, produce engineered drawings, and pipe burst the 900-mm CSP with a section of 1,050-mm HDPE (high-density polyethylene pipe). Almost immediately, Surrey-based PW Trenchless Construction ran into difficulties as they tried to get a camera into the pipe. A series of test pits showed the ground conditions in extremely poor shape, evidenced by sinkholes and contaminated soils the site sits on reclaimed land. The top of the pipe would collapse and material would come in. There were large sections of the pipe missing and groundwater started coming into the pit after around 30 seconds, said Greg Deacon, project manager for PW Trenchless Construction. The solution was to break up the pipe burst into three sections of 100-m bursts. A series of portable water treatment plants were set up to treat the groundwater, since it was not deemed to be suitable for discharging into the sanitary sewer system. January/February 2016 www.canadianundergroundinfrastructure.com 9

WATER & SEWER REHAB TECHNOLOGIES Deacon said the job was a challenge for PW Trenchless Construction due to the relatively large 42-inch pipe needed for the catchment area, and the pipe bursting equipment it required. A burst of this size is something that we hadn't done before. Earlier in 2013 we burst from an 18 to a 28-inch in Surrey, so we had an idea what size machine was going to be needed. Bursting corrugated steel pipe is also tricky, and can easily bunch up on the expander and cause a stall in the machine. From the test pits we also knew that the pipe was in fact 90 percent full of debris, so that was something that we had to take into account. PW Trenchless Construction chose the Grundoburst Static Pipe Bursting System from TT Technologies. The 2500G machine has 287 tonnes of pulling force and its rods are two-metres long, each weighing 200 kilograms. The contractor used a few tricks to burst the nearly completely-decayed pipe. PW Trenchless Construction was concerned that the 2500G could push the rods through the sides, top or bottom of the CSP. To get around the problem, they used an HDD rig to drill through the pipe from the entry pit to the exit pit, thus removing the debris that was in the pipe this risk. This allowed us to attach the bursting rod, and use the drill rig to pull it through the pipe, said Deacon. Expander cone blade cuts CSP The pipe now ready to be burst, the contractor cut the CSP using a sharp blade on the expander cone. PW Trench- 10 CANADIAN UNDERGROUND INFRASTRUCTURE January/February 2016 Relief pits were dug every 25 metres along all three 100-metre bursts, which allowed the contractor to track the progress of each burst, and also served as entry points to vacuum out the debris. less also reduced the size of the expander cone to limit any ground movement. The latter was important to ensure that a series of storage silos on the Fibreco side of the site did not become structurally compromised during the pipe burst. North Vancouver recognized that it would probably lose the silos if it elected to go with an open-cut method of pipe replacement. Because the silos were so close to the pipe alignment (between 3.5 and 5 m), the district was very concerned about any movement. We therefore had them sur-

WATER & SEWER REHAB TECHNOLOGIES veyed before construction, during each burst, and after construction, with no movement reported in any of the six silos throughout the entire job, according to Deacon. Relief pits were dug every 25 metres along all three 100-metre bursts, which served the dual purpose of allowing the contractor to track the progress of each burst, and also served as entry points to vacuum out the debris. In fact there was very little material for disposal, with most of the soil displaced into the existing ground, according to Deacon. The 1,050-mm pipe that was pulled through, 300 metres of HDP DR17 pipe, was later connected to the existing sanitary storm sewer and two three new manholes installed for access. Deacon said the success of the project has TT Technologies recommending to its customers that future corrugated steel pipe bursts employ the same procedure of using a blade on the expander cone to cut the CSP. CUI Top: The Vermeer Navigator HDD drill used to drill through the existing CSP pipe to pull through the bursting rods. Right: The McElroy 1648 fusing machine that was used to fuse the pipe together. Note the proximity of the silos to the pipe. TUNNELING AND HORIZONTAL DIRECTIONAL DRILLING MADE EASY... FORMATION STABILIZERS BENTONITE IN BULK BENTONITE IN BAG DRILLING FLUIDS POLYMERS (DRY/LIQUID) IN BULK POLYMERS (DRY/LIQUID) IN PAILS 1.877.683.7588 www.di-corp.com info@di-corp.com DELIVERY OPTIONS BOTH SMALL AND LARGE FORMAT FROM OUR LOCATIONS ACROSS CANADA 12 CANADIAN UNDERGROUND INFRASTRUCTURE January/February 2016 PROFESSIONAL SERVICES FIELD SUPPORT MUD PROGRAMS