Operations Performance Metrics Monthly Report



Similar documents
Monthly Report. March Rick Gonzales Rana Mukerji Robert Fernandez

Market Solutions to Loop Flow

Day- Ahead Congestion and Real-Time Commodity Markets in East York

New York State of the Market System - NYISO Success Project

Preliminary Results of Analysis of the Broader Regional Markets Initiatives

New York Independent System Operator (NYISO)

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS

Accounting and Billing Manual

ICAP/UCAP Overview. Aaron Westcott If possible, Please mute your phones Please do not use the hold button.

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products

Outage Scheduling Manual

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

Resource Monitoring and Deliverability Tool Paper

Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM

PJM LMP Market Overview

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery

Price Responsive Load Programs in the New York Wholesale Electricity Market. Wholesale Market and New York Independent System Operator

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy

Updated November 20, Director, System Planning

Monthly Report. August Rob Fernandez

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.

Energy Imbalance Market

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

NYISO Demand Response Programs: Enrollment

A Locational Analysis of Generation Benefits on Long Island, New York

How To Manage The Ercot Grid

NYISO IT Strategic Initiatives. Progress Update. Business Issues Committee Meeting 24Apr2001. Progress Update

Grid Operations and Planning

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

NYISO 2004 Projects Summary

Transmission Pricing. Donald Hertzmark July 2008

2010 STATE OF THE MARKET REPORT

August 15, :00 a.m. 1:30 p.m.

Interjurisdictional Energy Trading. IESO Training

Priority Project Description Status and Milestone Deliverables

TRANSMISSION SERVICES MANUAL

Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT

Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM ; Order No.

Preliminary Project Description

Deliverability Testing

State Of California's Energy Bill

Market Operation s Report

Introduction to the Integrated Marketplace

Product Management Update

2009 Product Enhancements

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

Two Settlement - Virtual Bidding and Transactions

Concepts and Experiences with Capacity Mechanisms

Transmission Planning in the ERCOT Interconnection

NYISO Business Issues Committee Meeting Minutes DRAFT. October 6, :00 a.m. 3:00 p.m.

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Generator Interconnection and Deliverability Study Methodology Technical Paper

The remainder of this memo provides a summary of market performance and trends in 2014 through November.

Comments of Pacific Gas & Electric Company pertaining to ISO s Straw Proposal on Bid Cost Recovery Enhancements

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

Tacoma Power 2015 Integrated Resource Plan. Resource Adequacy Standard

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

Section 4: Scheduling Philosophy & Tools

Revenue Metering Requirements Manual

Aliso Canyon Gas-Electric Coordination. Straw Proposal

PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Generation and Transmission Interconnection Process

Wind Power and Electricity Markets

PJM Interconnection LLC Regional Transmission Organization (RTO)

REVIEW OF APRIL 17, 2006 EMERGENCY ELECTRIC CURTAILMENT EVENT ERCOT COMPLIANCE JULY 21, 2006

Convergence Bidding Tutorial & Panel Discussion

Northport - Norwalk Harbor Cable (NNC) Tie line

New York s Transmission Challenges and Opportunities: An Overview

BOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY

NTTG Study Plan for the Public Policy Consideration Scenario

Overview of the IESO-Administered Markets. IESO Training. Updated: January, Public

Demand Response Programs: Lessons from the Northeast

2019/2020 RPM Base Residual Auction Results

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

NV Energy ISO Energy Imbalance Market Economic Assessment

Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No.

Scope of Restoration Plan

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER

Nodal Exchange Contract Specifications

2015 Project Schedule Milestone Update

2016/2017 RPM Base Residual Auction Results

2013 Ventyx, an ABB company

AGCS Gas Clearing and Settlement AG

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations

Energy Efficiency Measurement & Verification

Closing the Gap Between Wholesale and Retail

A market design to support climate policy

Energy Efficiency and Demand Response Programs in the United States

IEA Workshop: Demand Response. 3 July, 2014

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Ancillary Services and Flexible Generation

Appendix C-2. Entergy Services, Inc. June 8, 2016

Transcription:

Operations Performance Metrics Monthly Report June 2013 Report Operations & Reliability Department New York Independent System Operator Prepared by NYISO Operations Analysis and Services, based on settlements initial invoice data collected on or before July 10, 2013.

Table of Contents Highlights Operations Performance Reliability Performance Metrics Alert State Declarations Major Emergency State Declarations IROL Exceedance Times Balancing Area Control Performance Reserve Activations Disturbance Recovery Times Load Forecasting Performance Wind Forecasting Performance Wind Curtailment Performance Lake Erie Circulation and ISO Schedules Broader Regional Market Performance Metrics Ramapo Interconnection Congestion Coordination Monthly Value Ramapo Interconnection Congestion Coordination Daily Value Regional Generation Congestion Coordination Monthly Value Regional Generation Congestion Coordination Daily Value Market Performance Metrics RTM Congestion Residuals Monthly Trend RTM Congestion Residuals Daily Costs RTM Congestion Residuals Event Summary RTM Congestion Residuals Cost Categories DAM Congestion Residuals Monthly Trend DAM Congestion Residuals Daily Costs DAM Congestion Residuals Cost Categories NYCA Unit Uplift Components Monthly Trend NYCA Unit Uplift Components Daily Costs Local Reliability Costs Monthly Trend & Commitment Hours TCC Monthly Clearing Price with DAM Congestion ICAP Spot Market Clearing Price UCAP Awards 1

June 2013 Operations Performance Highlights Peak load of 30,026 MW occurred on 6/24/2013 HB 14 All-time summer capability period peak load of 33,939 MW occurred on 8/2/2006 HB13 31 hours of Thunder Storm Alerts were declared 1 hour of NERC TLR level 3 curtailment Bidding and Settlement for Order 755, Regulation Movement implemented 6/26 HTP commercial operation as of 6/3 Replacement of the LIPA New Bridge Road transformer was completed on June 30 and Neptune rating was restored from 375 MW to 660 MW 2

Reliability Performance Metrics 3

4

5

6

7

8

Lake Erie Circulation and ISO Net Interchange Schedules Monthly Averages ISO Net Interchange Schedule MW 3000 2400 1800 1200 600 0-600 -1200-1800 -2400-3000 1000 800 600 400 200 0-200 -400-600 -800-1000 Circulation MW NY-IESO Sched MW PJM-NY Sched MW IESO-MISO Sched MW MISO-PJM Sched MW Circulation MW DAM On Peak MW DAM Off Peak MW Interchange schedules with positive values aggravate clockwise Lake Erie Circulation. Lake Erie Circulation and ISO Net Interchange Schedules Daily Averages ISO Net Interchange Schedule MW 4500 3600 2700 1800 900 0-900 -1800-2700 -3600-4500 1000 800 600 400 200 0-200 Circulation MW -400-600 -800-1000 NY-IESO Sched MW PJM-NY Sched MW IESO-MISO Sched MW MISO-PJM Sched MW Circulation MW DAM On Peak MW DAM Off Peak MW Interchange schedules with positive values aggravate clockwise Lake Erie Circulation. 9

Broader Regional Market Performance Metrics 10

Ramapo Interconnection Congestion Coordination Category NY RECO Description Represents the value NY realizes from Market-to-Market Ramapo Coordination. When experiencing congestion, this includes (1) the estimated savings to NY for additional deliveries into NY, plus (2) PJM compensation to NY for additional deliveries into PJM (as compared to the Ramapo Target level, excluding RECO). This is net of any settlements to PJM when they are congested. Represents the value of PJM s obligation to deliver 80% of service to RECO load over Ramapo 5018. This includes (1) the estimated reduction in NYCA congestion due to the PJM delivery of RECO over Ramapo 5018, plus (2) PJM compensation to NY for NYCA congestion for the under-delivery or inability to deliver service to RECO load over Ramapo 5018. 11

12

Regional Generation Congestion Coordination Category NY Description NYISO savings that result from PJM payments to NYISO when PJM s transmission use (PJM s market flow) is greater than PJM s entitlement of the NY transmission system and NYISO is incurring Western or Central NY congestion. Additionally, NYISO savings may result from the more efficient regional utilization of PJM s generation resources to directly address Western or Central NY transmission congestion. 13

Market Performance Metrics 14

Day's investigated in June:1,2,3,4,17,18,24,25,27,28,29 Event Date (yyyymmdd) Hours Description 3 6/1/2013 13,18-21 Derate Central East 3 6/1/2013 11,22 Uprate FreshKills-WillowBrook 138kV (#29211) 3 6/1/2013 1,19,21 Derate Gowanus-Greenwood 138kV (#42231,#42232) for l/o TWR:GOETHALS 3 6/1/2013 22 NYCA DNI Ramp Limit 5 6/1/2013 1,13,18-21 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Central East 1 6/2/2013 14-17,19-23 Thunder storm Alert 2 6/2/2013 14-17,19-23 Forced outage Greenwood-Gowanus 138kV (#42231) 3 6/2/2013 10,14-16,21,22 Derate Central East 3 6/2/2013 7 Uprate Central East 5 6/2/2013 10,15,16,21,22 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Central East 2 6/3/2013 0-12,14,16-23 Forced outage Greenwood-Gowanus 138kV (#42231) 3 6/3/2013 20-22 Derate Central East 3 6/3/2013 14,16 Derate Leeds-Pleasant Valley 345kv (#92) for l/o Athens- Pleasant Valley 345kv (#91) 4 6/3/2013 20-22 NE_NNC1385-NY Scheduling Limit 5 6/3/2013 14,16,17,20,23 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Central East, Leeds-Pleasant Valley 2 6/4/2013 0,1,6-23 Forced outage Greenwood-Gowanus 138kV (#42231) 4 6/4/2013 10,14-16,18-21 NE_NNC1385-NY Scheduling Limit 5 6/4/2013 0 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Central East 1 6/17/2013 16-19 Thunder storm Alert 3 6/17/2013 12-14,23 NYCA DNI Ramp Limit 3 6/17/2013 21,23 Derate Gowanus-Greenwood 138kV (#42231,#42232) for l/o TWR:GOETHALS 4 6/17/2013 12 IESO_AC-NY Scheduling Limit 4 6/17/2013 14 HQ_CHAT DNI Limit 1 6/18/2013 14-18 Thunder storm Alert 3 6/18/2013 12 Derate Dunwoodie-Shore Rd 345kV (#Y50) for l/o SCB:SPBK(RNS2):Y49 & M29 3 6/18/2013 12,14 Derate Gowanus-Greenwood 138kV (#42231,#42232) for l/o TWR:GOETHALS 3 6/18/2013 12 Derate Rainey-Vernon 138kV (#36312) 4 6/18/2013 9,14,15 HQ_CHAT DNI Limit 4 6/18/2013 15 PJM_AC DNI Ramp Limit 1 6/24/2013 14-20 Thunder storm Alert 3 6/24/2013 12,13 Derate Gowanus-Greenwood 138kV (#42231,#42232) for l/o SCB:GOWANUS 3 6/24/2013 18-21 Derate Greenwood/Staten Island 3 6/24/2013 12-14 Derate Leeds-Pleasant Valley 345kv (#92) for l/o Athens- Pleasant Valley 345kv (#91) 4 6/24/2013 15 PJM_AC DNI Ramp Limit 5 6/24/2013 12-14 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Leeds-Pleasant Valley 1 6/25/2013 17-19 Thunder storm Alert 3 6/25/2013 16,17 Derate East Garden City-Valley Stream 138kV (#262) for l/o BUS:BARRETT 292 & 459 & G2 3 6/25/2013 12-15,21 Uprate Gowanus-Greenwood 138kV (#42231,#42232) 3 6/25/2013 16,17 Derate Gowanus-Greenwood 138kV (#42231,#42232) for l/o SCB:GOWANUS 3 6/25/2013 12,13 Uprate Gowanus-Greenwood 138kV (#42231,#42232) for l/o SCB:GOWANUS 3 6/25/2013 18,19 Derate Greenwood/Staten Island 3 6/25/2013 16 Derate Huntley-Sawyer 230kV (#78) for l/o Sawyer-SUNY Buffalo 230kV (#80) 4 6/25/2013 12 PJM_AC DNI Ramp Limit 4 6/25/2013 0 NE_NNC1385-NY Scheduling Limit 4 6/25/2013 12,13 HQ-CHAT-NY Scheduling Limit 1 6/27/2013 18-23 Thunder storm Alert 3 6/27/2013 21 Derate East Garden City-Valley Stream 138kV (#262) for l/o BUS:BARRETT 292 & 459 & G2 3 6/27/2013 13 Uprate Huntley-Sawyer 230kV (#78) for l/o Sawyer-SUNY Buffalo 230kV (#80) 3 6/27/2013 13 NYCA DNI Ramp Limit 4 6/27/2013 13,17 HQ-CHAT-NY Scheduling Limit 5 6/27/2013 18 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Leeds-Pleasant Valley 1 6/28/2013 0,20-22 Thunder storm Alert 2 6/28/2013 14,16 Forced outage Freeport-Newbridge 138kV (#461) 3 6/28/2013 12,14 Derate Dunwoodie-Shore Rd 345kV (#Y50) for l/o SCB:SPBK(RNS2):Y49 & M29 3 6/28/2013 16 Derate Dunwoodie-Shore Rd 345kV (#Y50) for l/o SprainBrook-East Garden City 345kV (#Y49) 3 6/28/2013 8,11,13,15 Uprate FreshKills-WillowBrook 138kV (#29211) 3 6/28/2013 12,14,16 Derate Leeds-New Scotland 345kV (#93) for l/o Leeds-New Scotland 345kV (#94) 3 6/28/2013 11,18 Uprate Leeds-New Scotland 345kV (#93) for l/o Leeds-New Scotland 345kV (#94) 3 6/28/2013 18,19 Uprate Leeds-Pleasant Valley 345kV (#92) for l/o Athens- Pleasant Valley 345kV (#91) 5 6/28/2013 14,16,17 Lake Erie Clockwise Circulation, DAM-RTM exceeds 125MW; Leeds-Pleasant Valley, Leeds New Scotland 3 6/29/2013 17 Uprate Central East 3 6/29/2013 0,12,22,23 Uprate FreshKills-WillowBrook 138kV (#29211) 15

Real-Time Balancing Market Congestion Residual (Uplift Cost) Categories Category Cost Assignment Events Types Event Examples Storm Watch Zone J Thunderstorm Alert (TSA) TSA Activations Unscheduled Transmission Outage Market-wide Reduction in DAM to RTM transfers related to unscheduled transmission outage Forced Line Outage, Unit AVR Outages Interface Derate - NYISO Security Market-wide Reduction in DAM to RTM transfers not related to transmission outage Interface Derates due to RTM voltages Interface Derate - External Security Market-wide Reduction in DAM to RTM transfers related to External Control Area Security Events TLR Events, External Transaction Curtailments Unscheduled Loop Flows Market-wide Changes in DAM to RTM unscheduled loop flows impacting NYISO Interface transmission constraints DAM to RTM Clockwise Lake Erie Loop Flows greater than 125 MW M2M Settlement Market-wide Settlment result inclusive of coordianted redispatch and Ramapo flowgates Monthly Balancing Market Congestion Report Assumptions/Notes 1) Storm Watch Costs are identified as daily total uplift costs 2) Days with a value of BMCR less M2M Settlement of $100K/HR, shortfall of $200K/Day or more, or surplus of $100K/Day or more are investigated. 3) Uplift costs associated with multiple event types are apportioned equally by hour 16

17

Day-Ahead Market Congestion Residual Categories Category Cost Assignment Events Types Event Examples NYTO Outage Allocation Responsible TO Direct allocation to NYTO's re sponsible for tra nsm ission equipment status change. DAM scheduled outage for equipment modeled inservice for the TCC Auction. Unscheduled Loop Flows All TO by Monthly Allocation Factor Residual impact of Lake Erie circulation, MW difference between the DAM and TCC Auction. Lake Erie Loop Flow Assumptions External Outage Allocation All TO by Monthly Allocation Factor Direct allocation to transmission equipment status change caused by change in status of external equipment. Tie line required out-ofservice by TO of neighboring control area. Central East Commitment Derate All TO by Monthly Allocation Factor Reductions in the DAM Central East_VC limit as compared to the TCC Auction limit, which are not associated with transmission line outages. 18

19

20

21

22

23

24